City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details (With Text) File #: Version: 1 15-0241 Name: Francis Drive Rehabilitation Design Contract Status: Type: Contract Consent Agenda File created: In control: 5/11/2015 City Council Regular On agenda: Final action: 5/28/2015 Title: Presentation, possible action and discussion regarding a professional services contract (contract number 15300244) with Kimley-Horn and Associates, Inc. in the amount of $405,900 for the professional engineering services related to the design of the first two phases of the Francis Drive Rehabilitation Project. Sponsors: Donald Harmon Indexes: Code sections: Attachments: Francis Drive Project Location.pdf Action By Date Action Result Ver. Presentation, possible action and discussion regarding a professional services contract (contract number 15300244) with Kimley-Horn and Associates, Inc. in the amount of $405,900 for the professional engineering services related to the design of the first two phases of the Francis Drive Rehabilitation Project. Relationship to Strategic Goals: · Core Services and Infrastructure Recommendation(s): Staff recommends approval of the professional services contract. Summary: The first phase of the Francis Drive Rehabilitation Project will reconstruct Francis Drive from Glenhaven to Munson, approximately 3,100 linear feet. The second phase will reconstruct Francis Drive from Munson Drive to Walton, approximately 2,000 linear feet. The improvements to both phases will include replacement of the existing pavement, sidewalk improvements, and water and wastewater line replacements. Budget & Financial Summary: Budget for the design and construction of phases I and II of the Francis Drive Rehabilitation project are budgeted in the Streets Capital Improvement Projects Fund ($1,815,000), the Water Capital Improvement Projects Fund ($850,000) and the Wastewater Capital Improvement Projects Fund ($315,000). The project is budgeted to be designed in FY15 and constructed in FY16 and FY17. Attachments: 1. Contract No. 15300244 (on file with the City Secretary) 2. Project Map College Station, TX Printed on 5/22/2015 Page 1 of 2 powered by Legistar™

College Station, TX - WTAWwtaw.com/wp-content/uploads/2015/06/CScoun052815Francis.pdf · City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: College Station, TX - WTAWwtaw.com/wp-content/uploads/2015/06/CScoun052815Francis.pdf · City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details

City Hall1101 Texas Ave

College Station, TX 77840College Station, TX

Legislation Details (With Text)

File #: Version: 115-0241 Name: Francis Drive Rehabilitation Design Contract

Status:Type: Contract Consent Agenda

File created: In control:5/11/2015 City Council Regular

On agenda: Final action:5/28/2015

Title: Presentation, possible action and discussion regarding a professional services contract (contractnumber 15300244) with Kimley-Horn and Associates, Inc. in the amount of $405,900 for theprofessional engineering services related to the design of the first two phases of the Francis DriveRehabilitation Project.

Sponsors: Donald Harmon

Indexes:

Code sections:

Attachments: Francis Drive Project Location.pdf

Action ByDate Action ResultVer.

Presentation, possible action and discussion regarding a professional services contract (contractnumber 15300244) with Kimley-Horn and Associates, Inc. in the amount of $405,900 for theprofessional engineering services related to the design of the first two phases of the Francis DriveRehabilitation Project.

Relationship to Strategic Goals:

· Core Services and Infrastructure

Recommendation(s): Staff recommends approval of the professional services contract.

Summary: The first phase of the Francis Drive Rehabilitation Project will reconstruct Francis Drivefrom Glenhaven to Munson, approximately 3,100 linear feet. The second phase will reconstructFrancis Drive from Munson Drive to Walton, approximately 2,000 linear feet. The improvements toboth phases will include replacement of the existing pavement, sidewalk improvements, and waterand wastewater line replacements.

Budget & Financial Summary: Budget for the design and construction of phases I and II of theFrancis Drive Rehabilitation project are budgeted in the Streets Capital Improvement Projects Fund($1,815,000), the Water Capital Improvement Projects Fund ($850,000) and the Wastewater CapitalImprovement Projects Fund ($315,000). The project is budgeted to be designed in FY15 andconstructed in FY16 and FY17.

Attachments:

1. Contract No. 15300244 (on file with the City Secretary)2. Project Map

College Station, TX Printed on 5/22/2015Page 1 of 2

powered by Legistar™

Page 2: College Station, TX - WTAWwtaw.com/wp-content/uploads/2015/06/CScoun052815Francis.pdf · City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details

File #: 15-0241, Version: 1

College Station, TX Printed on 5/22/2015Page 2 of 2

powered by Legistar™

Page 3: College Station, TX - WTAWwtaw.com/wp-content/uploads/2015/06/CScoun052815Francis.pdf · City Hall 1101 Texas Ave College Station, TX 77840 College Station, TX Legislation Details

Lincoln Av

Texa

s Av

Francis Dr

Dominik Dr

Walton Dr

Muns

onAv

Spring Lo

Phase 1Phase 2

.Francis Drive Rehabilitation

Phases I & IIProject Location Map