“There is nothing more difficult to take in hand, more perilous to conduct, or more uncertain in its success, than to take the lead in the introduction of a new order of things.”
Niccolo Machiavelli
Salinas Valley Basin Groundwater Sustainability Agency
• Six Subbasins• 110 Miles Long• Joint Powers Authority• Eleven Member Board• Staffed by Contract
(Regional Government Services)• Three Part Time Staff • Admin on call
Seven Years a New Agency and-Six GSP’s
This is how we are doing it!
Built and Funded The Agency
Prop 26 Regulatory Fee-Operations And Admin Only
Completed Basin Boundary
Modification
Participated In Implementation Of First
Well Moratorium Associated With Seawater
Intrusion
Delivered An Inclusive, Transparent,
Collaborative Planning And Decision-making
Process
Used The Best Science
Available
Outcome: One Of Two
Approved GSP’s
6
7
• Critically Over Drafted• Layered Aquifers• Multiple Jurisdictions• Two Other GSA’s
Key Understanding: Achieving Sustainability Is Not Possible In This Subbasin If We
Don’t First Address Seawater Intrusion
180/400 Pressure Area
Castroville SeawaterIntrusion Project
1989 Regional Treatment Plant For Primary And Secondary Treatment Of Wastewater
1998Salinas Valley Reclamation Plant Creates Tertiary Treatment Of Wastewater For Agricultural Irrigation Use
Supplemental Wells To Meet Irrigation Demand When Plant Is Not Operating
Distribution Pipeline In Zone 2b To Deliver The Recycled Water And Well Water For Irrigation
2010Salinas River Diversion Facility For Seasonal Diversion Of River Water To Supplement Recycled Water
2019Reclamation Ditch And Blanco Drain Diversion Facilities To Augment Wastewater
11
12
CSIP Issues
• Underfunded from the Beginning• Value Engineered• Lack of Maintenance• Supplemental Well Failures• CSIP Managed by Two Different Water Agencies
• Monterey 1 Water – Production and Distribution• Monterey County Water Resources Agency –OPS, Infrastructure and Admin
• Difficult to Measure Effectiveness• Perceived to be Unfairly Funded
GSA-GSP Response
14
All Projects Work Together – No One Project Is
Enough
All People and All Projects Must Align with Defined Need
CSIP Four Individual Projects
Identified
Optimize CSIPUpgrade M1W Plant For Winter FlowsMaximize CSIP Use Of Existing SRDF DiversionExpand CSIP Area
Develop Seawater Intrusion
Working Group(SWIG)
Convene All StakeholdersStakeholder Defined ProcessSupported By Robust Technical Advisory CommitteeConsolidate All Science Create Comprehensive Understanding
Seawater Extraction Barrier
• Designed to halt and reverse seawater intrusion• Relatively high cost, but a definitive fix• State of extracted water TBD• Optional injection barrier addressed
15
Speaking of Systems
Question:
Shouldn’t those of us who struggle with Seawater Intrusion be working together for better solutions?
(Convening our Own System for Leverage)
23