    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0041 B

    NTPC Ref no SIM/1/TS/1/41 BSheet 1 of 7

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING COAL FEEDER

    SLNO

    1.0

    2.0

    3.0

    4.0

    5.0

    6.0

    7.0

    8.0

    9.0

    LIST OF CONTENTS

    PLANT DETAILS

    OBJECTIVE

    PROPOSAL

    SERVICES REQUIRED

    SAFETY PERECAUTIONS

    EMERGENCY PROCEDURE

    STATE OF THE PLANT

    METHOD

    COMPLETION CRITERIA

  • 7/28/2019 Coal Feeder

    2/8

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0041 B

    NTPC Ref no SIM/1/TS/1/41 BSheet 2 of 7

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING COAL FEEDERSL.NO

    1.0

    1.1

    1.2

    1.3

    1.4

    1.5

    1.6

    1.7

    1.8

    PLANT DETAILS

    The Coal firing system consists of separate raw coal feederconnected to each mill. This raw coal feeder is of Gravimetric belttype feeder with electronic weighing micro processor basedcontrol system type.

    No. of Raw Coal feeders /Boiler - 9 Nos

    Type - Gravimetric belt type feederWith electronic weighingMicroprocessor basedControl system

    Size - 36 inches

    Capacity - 85 TPH (Design)

    Motor rating - 5.5 KW

    Other features - Clean out conveyorPaddle switchLoad cellsObservation port & light

    Feeder inlet shut off gates- 9 Nos

    Feeder outlet shut of gates - 9 Nos

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Coal Feeder

    3/8

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0041 B

    NTPC Ref no SIM/1/TS/1/41 BSheet 3 of 7

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING COAL FEEDER

    SL.NO

    2.0

    3.0

    4.0

    4.1

    4.2

    4.3

    4.4

    4.5

    OBJECTIVE

    To commission the Coal Feeder and make it available for coalfiring of the boiler.

    PROPOSAL

    It is proposed to commission the feeders by putting the

    equipments under 8 Hrs. trail run ( As per the normal operatingmode )

    SERVICES REQUIRED

    Availability of man power with required tools for attending anyleak and cleaning of filters.

    Availability of operating personnal to carryout/co-ordinateactivities.

    Availability of lighting arrangements and communication facilitiesin the Feeder areas.

    Availability of portable fire fighting equipment near test area.

    Availability of LT Power Supply

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Coal Feeder

    4/8

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0041 B

    NTPC Ref no SIM/1/TS/1/41 BSheet 4 of 7

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING COAL FEEDER

    SL.NO

    5.0

    5.1

    5.2

    5.3

    5.4

    5.5

    6.0

    6.1

    6.2

    7.0

    7.1

    SAFETY PRECAUTIONS

    Debris in and around feeders shall be removed.

    First Aid Kit is available near the test area

    Operation of local start/stop push button shall be ensured forperfect operation to facilitate for stopping of equipment in case of

    necessity.

    Approach / staircase / platform wherever required and madeavailable..

    Portable fire fighting system made available at test area.

    EMERGENCY PROCEDURES

    The test team should be aware of the procedure to be adopted incase of damage to machinery/injury of any personnel connectedto the activity.

    The test team should be well aware of the procedures to beadopted incase of any abnormality in the activity.

    STATE OF THE PLANT

    Feeders are erected as per recommended drawing.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Coal Feeder

    5/8

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0041 B

    NTPC Ref no SIM/1/TS/1/41 BSheet 5 of 7

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING COAL FEEDER

    SL.NO

    7.2

    7.3

    7.4

    7.5

    7.6

    7.7

    7.8

    7.9

    All local instrumentation as applicable completed with propercalibration.

    .All erection Log Sheets are followed up / signed by concernedagencies with respect to feeder alignment

    Mill Feeder gear box are filled with recommended lubricating oilto the correct level.

    The clean out couveyer gear box checked for lubrication / oil filledto correct level.

    Ffeeder drive motor & clean out couveyer motor checked for itsIR value and cleared for commissioning.

    Feeder inspected & cleared for any debris or any foreignmaterial.

    The illumination lamp inside the feeder energized for properlighting

    The feeder inlet manual gates are checked for their freeness andthe operation of full open / close limit swiches. The gates are keptin fully closed condition before taking up the commissioning of thefeeder.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Coal Feeder

    6/8

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0041 B

    NTPC Ref no SIM/1/TS/1/41 BSheet 6 of 7

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING COAL FEEDER

    SL.NO

    8.0

    8.1

    8.1.1

    8.1.2

    8.1.3

    8.1.4

    8.1.5

    8.1.6

    8.1.7

    8.1.8

    8.1.9

    METHOD

    Commissioning of Feeder

    Check the meggar value of motor and ensure that the value issatisfactory.

    Ensure that the feeder inside is clean without any foreignmaterial.

    Check that the weigh span rollers are properly aligned as per O &M manual.

    Check that the belt tension is adjusted as per the instuction givenin O & M manual.

    Start the feeder.

    Adjust the take up pulley at the rear side so that the belt runsexactly at the center and doesnt deviate slowly to any one side.When the belt slips to any one side, the corresponding sides

    tension adjustment screw to be adjusted such a way that the belttightness increases in that side marginally.

    Allow the feeder to run for 8 hr trial with belt running smoothlywithout requiring any adjustment.

    Start the clean out conveyer and run for four hour trail run.

    After completion of the trial run, calibriate the feeder forgravimetric mode operation.

    STATUS

    Signatures

    NTPC BHEL

  • 7/28/2019 Coal Feeder

    7/8

    Station: NTPC- Simhadri BHEL Ref No.PS-DC-186-500-0041 B

    NTPC Ref no SIM/1/TS/1/41 BSheet 7 of 7

    Plant area: BOILER

    PROCEDURE FOR COMMISSIONING COAL FEEDER

    SL.NO

    8.1.10

    8.1.11

    8.1.12

    9.0

    Check the indication of feeder speed / weight are same both incontrol panel and in UCB.

    Check the operation of No Coal alarm switch, Feeder chutepluggage paddle switch, Belt deviation limit switches bysimulation.

    Commission the other Feeders as per steps given above

    COMPLETION CRITERIA

    Commissioning of the coal feeder completed by carrying theproposals given in Section 3.0

    STATUS

    Signatures

    NTPC BHEL