    MET COALS&H Monthly Report – June 2020

    AAMC.001.031.0044CONFIDENTIAL

  • 2

    INTERNAL

    MET COAL SAFETY OVERVIEW SUMMARYThe Met Coal business recorded:• Nil HPIs during June. Grasstree continue with >17 mths and Exploration >13 mths HPI free.• 19 HPHs in June: 3xCapcoal, 7xDawson, 1xGrasstree, 2xGrosvenor, 6xMoranbah North (note 4 event dates were May however not reported due

    to June consequence dates).• 5 TRC injuries in June: 2xAquila (Conts-rolled angle, pinched finger); 1xDawson (Emp-hand laceration); 2xMoranbah North (Cont LTI-neck

    fracture, Emp-back strain).• 1 OCIL reported in June: Moranbah North (Emp).

    The Met Coal SLT VFL completion rate was slightly above target at 109% for June (YTD 101%).

    Met Coal recorded 20 critical control deficiencies in June (4xOpen Cut; 16xUnderground, 12 reported as affecting the integrity of the controls due to monitoring not completed at Grosvenor following gas and spon com events. No risk to personnel as no access to underground).

    Met Coal has 17 outstanding tasks based on ‘real due date’ for June:• 15xBrisbane Corporate Office, 2xExploration• Nil outstanding HP Tasks• 2 outstanding Audit Tasks (Exploration)• Nil outstanding Critical Control tasks.

    5 overdue investigations: • HPI: 2xMoranbah, 1xGrosvenor: HPH: 2xAquila Projects.TARP Status: • Capcoal Open Cut and Grasstree status improved moving to Normal from

    Level 1; Dawson moved from Level 2 to Level 1• Stability with Exploration (Normal); Aquila (Level 1)• Grasstree and Capcoal Open Cut moved from Normal Status to Level 1• Moranbah North moved from Normal status to Level 1• Grosvenor remained at Level 3 reflecting ongoing recovery from a major

    injury event and subsequent spon com event this month.

    2020 Met Coal Targets approved June 2020 = 10% reduction target against 2019 results. Group wide incentivised targets will be TRCFR 15% reduction based on 3 year average results = 7.77%.

    COVID-19 tracking:In last 7 days, Queensland Health has reported:• one new COVID-19 case; and • total of 36,889 COVID-19 tests undertaken.Met Coal CMW’s testing continues to increase, vulnerable persons absent remains stable, slight increase in those absent due to flu like symptoms, and slight decrease in those self-quarantining. No confirmed Covid cases in Met Coal.

    AAMC.001.031.0045CONFIDENTIAL

  • 3

    INTERNAL

    ACTUALS V TARGETS

    2020 Met Coal Targets approved June 2020 = 10% reduction target against 2019 results. Group wide incentivised targets will be TRCFR 15% reduction based on 3 year average results = 7.77%.Note: Exploration-Aus counts=incidents assigned to Met Coal Exploration-Aus entity in Enablon. Exploration incidents assigned to a site will be managed externally to reflect total exploration incidents.HPH Expectations:1. It is expected that all sites will have proactive programs at multiple levels of leadership for the identifications, reporting and correction of HPH’s;2. It is expected that SLT's will have programs to encourage workforce identification, reporting and (as appropriate) correction of HPH’s;3. It is expected that sites will analyse and report on HPH trends on a quarterly basis; and4. While no specific target for HPH's is set - it would be expected that sites would readily identify 4 HPH's per month

    2019HPI's

    This Month

    HPI'sYTD

    2019 HPH's

    This Month

    HPH'sYTD

    HPH Target

    HPI Target

    2019Actual

    This Month Target

    TRCYTD

    2019Actual

    2020Target

    TRCFRYTD

    Brisbane Misc 1 0 0 1 0 0 0 1 0 0 1.33 1.20 0.00

    Aquila 0 0 0 0 0 3 0 0 2 6 0.00 0.00 19.99

    Exploration - Aus 1 0 0 0 0 0 0 3 0 0 55.53 0.00 0.00

    Non Mining Operations 2 0 0 1 0 3 0 4 2 6 4.97 4.47 8.83

    Capcoal Open Cut 4 0 0 56 3 27 0 7 0 No 2 3.64 3.28 1.95

    Dawson 2 0 2 86 7 34 0 8 1 Individual 8 2.64 2.38 4.72

    Surface Operations 6 0 2 142 10 61 0 15 1 TRC 10 3.03 2.73 3.68

    Capcoal Grasstree 0 0 0 5 1 6 0 13 0 Targets 6 7.61 6.85 6.94

    Grosvenor 2 0 2 20 2 8 0 18 0 11 9.10 8.19 11.69

    Moranbah North 2 0 2 22 6 18 0 26 2 5 9.21 8.29 3.15

    Underground Operations 4 0 4 47 9 32 0 57 2 22 8.76 7.88 6.48

    Met Coal 12 0 6 190 19 96 0 76 5 38 6.20 5.58 5.59

    2019Actual

    This Month Target

    LTIYTD

    2019Actual

    2020Target

    LTIFR YTD 2019 YTD

    2019Actual

    2020Target

    OCILFRYTD

    2019Actual

    This Month

    OCCILYTD

    Brisbane Misc 0 0 0 0.00 0.00 0.00 0 0 1.33 1.20 0.00 1 0 0

    Aquila 0 0 3 0.00 0.00 9.99 0 510 1.33 1.20 0.00 1 0 0

    Exploration - Aus 3 0 0 55.53 0.00 0.00 5460 461 0.00 0.00 0.00 0 0 0

    Non Mining Operations 3 0 3 3.73 3.35 4.42 285 240 1.24 1.12 0.00 1 0 0

    Capcoal Open Cut 6 0 No 0 3.12 2.81 0.00 51 0 1.04 0.94 2.92 2 0 3

    Dawson 2 0 Individual 6 0.66 0.59 3.54 10 139 4.62 4.16 0.59 14 0 1

    Surface Operations 8 0 LTI 6 1.62 1.45 2.21 26 87 3.23 2.91 1.47 16 0 4

    Grasstree 11 0 Targets 2 6.44 5.80 2.31 239 131 1.17 1.05 2.31 2 0 2

    Grosvenor 12 0 9 6.07 5.46 9.56 339 918 2.02 1.82 9.56 4 0 9

    Moranbah North 19 1 2 6.73 6.06 1.26 274 95 1.06 0.95 0.63 3 1 1

    Underground Operations 42 1 13 6.45 5.81 3.83 285 332 1.38 1.24 3.54 9 1 12

    Met Coal 53 1 22 4.32 3.89 3.24 180 225 2.12 1.91 2.36 26 1 16

    Counts

    Lost Time InjuriesFrequency RatesCounts Frequency Rates Counts

    Occupational IllnessLTI Severity Rate

    Data as at 3rd July 2020

    Frequency RatesTotal Recordable InjuriesHigh Potential Incidents

    June 2020Met Coal Reporting Period:

    Counts

    See note below on HPH expectations

    High Potential Hazards

    AAMC.001.031.0046CONFIDENTIAL

  • 4

    INTERNAL

    OPERATIONAL RISK MANAGEMENT

    No. of Critical Controls

    CC Actively monitored as per requirements

    Mine Site # Controls Monitored this month

    # Deficient controls - Affected

    Controls (all in)

    # Overdue Controls

    Deficiencies without Actions

    Capcoal Open Cut 54 37 0 (2) 5 0

    Dawson 109 59 0 (2) 0 0

    Capcoal Grasstree 138 60 0 (3) 0 0

    Grosvenor 122 51 12 (13) 0 0

    Moranbah North 237 48 0 (0) 0 0

    Exploration - Aus 91 33 0 (0) 0 0

    Met Coal 751 288 12 (20) 5 0

    AAMC.001.031.0047CONFIDENTIAL

  • 5

    INTERNAL

    SAFETY INTERVENTION TARP

    Site

    Previous Month TARP

    STATUS

    Current MonthTARP

    STATUS

    Flagged Trigger Intervention Actions

    Capcoal Grasstree Level 1 Normal State

    Capcoal Open Cut Level 1 Normal State

    Dawson Level 2 Level 1 1 TRC1 HPI within 3 mths

    Aquila Project Level 1 Level 1 2 TRCs

    Moranbah Normal State Level 1 2 TRCs

    Exploration –Australia Normal State Normal State

    Grosvenor Level 3 Level 3 1 HPI within 3 mths

    LW remains under control of DNRME, mining has not resumed and investigation continues at this time.

    Extensive communications, risk assessments and planning for mine re-entry work have been implemented.

    • TARP Conditions under review to add components related to lead indicators and Critical Control factors

    AAMC.001.031.0048CONFIDENTIAL

  • 6

    INTERNAL

    LAST DATE INFORMATION

    Note: Number of Days has been calculated as at 01/07/2020

    * Exploration counts include incidents assigned to ‘Met Coal Exploration – Australia’ entity.

    Entity # of HPI’sYTD# Days since

    Last HPIDate of last

    HPI# of TRC’s

    YTD# Days since

    last TRCDate of last

    TRC# of LTI’s

    YTD# Days since

    last LTIDate of Last

    LTI

    Capcoal Open Cut 0 223 21/11/2019 2 51 11/05/2020 0 278 27/09/2019

    Dawson 2 73 19/04/2020 8 11 20/06/2020 6 36 26/05/2020

    Grasstree 0 549 30/12/2018 6 44 18/05/2020 2 146 6/02/2020

    Grosvenor 2 56 6/05/2020 11 56 6/05/2020 9 56 6/05/2020

    Moranbah North 2 93 30/03/2020 5 22 8/06/2020 2 25 6/06/2020

    Exploration Aus 0 422 6/05/2019 0 221 23/11/2019 0 221 23/11/2019

    Aquila Project 6 19 13/06/2020 3 33 29/05/2020

    Brisbane Misc-Projects 0 198 16/12/2019

    AAMC.001.031.0049CONFIDENTIAL

  • 7

    INTERNAL

    HPI/HPH DETAILS FOR MONTHEntity Event ID Event Date Consequence Date Event Summary

    HPI HPH

    Capcoal Grasstree IN.00226737 09/06/2020 12/06/2020

    E Stop engaged on #94 Shield to make slack in crossover hose easier to re-hang. Hi Set Pressure failed to dump, only system pressure dumped. HPH

    Capcoal Open Cut IN.00227285 17/06/2020 17/06/2020

    During morning inspection the mining superintendent found a slot had been cut through the windrow ,there were no controls in place stop sign or red hats circuit was not running at the time however the drill was walking down the ramp EX 359 was relocated so there

    was interaction with heavy machines service truck was active on the circuit

    HPH

    Capcoal Open Cut IN.00227461 21/06/2020 21/06/2020

    When completing weekly inspection on OD201 trades technician found air tank dump valve had been bent to allow removal of tank cap without opening dump valve to drain

    air tank .HPH

    Capcoal Open Cut IN.00228336 30/06/2020 01/07/2020

    German Creek HME Bulk Oil Tank Access System not fit for purpose and could allow CMW to fall backwards or sideways while climbing down the ladder. HPH

    Dawson IN.00226121 03/06/2020 03/06/2020 Operator of Rd127 failed to identify LV 138 at intersection. HPH

    Dawson IN.00226275 08/06/2020 08/06/2020 Non-rated attachment for the HV cable to be support and ability for personnel to walk under the cable area. HPH

    Dawson IN.00226276 04/06/2020 08/06/2020 Light vehicle 138 found in dump park up area not chocked HPH

    Dawson IN.00226277 02/06/2020 02/06/2020 Operator of LV 4-5 was returning from pit 27 dump when he crossed through an intersection onto the wrong side of the haul road and traveled towards RD3985. HPH

    Dawson IN.00227958 26/06/2020 26/06/2020 There is not hard barrier preventing access under ROM bins along the ROM transfer conveyor access walkways (ie CV111, CV121 and CV151 walkways). HPH

    Dawson IN.00228127 25/06/2020 29/06/2020After a circuit breaker failure at Dawson CHPP, the metal isolator mounting bracket and isolator actuator handle was measured at 240V. At no time should the mounting bracket

    and isolator actuator handle be live.HPH

    Dawson IN.00228150 29/06/2020 29/06/2020 Lanyard wire and runner have not been inspected periodically for structural integrity and compliance as per the Australian Standard requirements HPH

    Grosvenor IN.00227727 20/06/2020 24/06/2020Near miss of Heavy Vehicle (Truck) and Light Vehicle. Light vehicle failed to give way at intersection which was Giveway signed posted. Fully loaded heavy vehicle had to come

    to a complete stop to avoid interacting with light vehicle.HPH

    Grosvenor IN.00227739 19/05/2020 24/06/2020

    While CMW was conducting leak detection (soapy water) inspection on diesel exhaust system, the connection joint from exhaust pipe to exhaust conditioner failed the

    inspection.Further inspection found 2 x bolt sheared and 1 x bolt missing of the four M12 socket

    head cap screw bolts and evidence of impact damage to exhaust conditioner (scrubber tank)

    PJB Minecruiser tagged out of service and investigation commenced

    HPH

    AAMC.001.031.0050CONFIDENTIAL

  • 8

    INTERNAL

    HPI/HPH DETAILS FOR MONTH (CONT)Entity Event ID Event Date Consequence Date Event Summary

    HPI HPH

    Moranbah North IN.00225650 29/05/2020 01/06/2020

    During development at MG113 belt chamber, several reports of cowling, belting/guttering at roof/rib interface, shears, joints, audable roof bumping and increased tell-tale movement were made and continued after development. Additional roof support

    was installed to stop the roof deformation.

    HPH

    Moranbah North IN.00226016 02/06/2020 04/06/2020

    Cutting TG - MG in a cavity, CMW was on roof support 42, no PM32 alarm/warning, shield then started to lower. ERZC at RS 41 then hit E stop, shearer at RS 44, CMW

    manually advancing RS45.HPH

    Moranbah North IN.00226380 31/05/2020 09/06/2020 Repowered SB010 outlets to LW and Dev without notifying CRO or ERZ Controller HPH

    Moranbah North IN.00226732 31/05/2020 12/06/2020

    On packing DR23 on go line saw wash cap on gas sensor has been left on from SAT N/S HPH

    Moranbah North IN.00226762 09/06/2020 12/06/2020

    Producing on maingate to tailgate cutline run. Shearer was at PRS 61. All supports had advanced to PRS 59 as per automatics. PRS 54 lowered and set. Then PRS 53

    lowered, advanced and set.HPH

    Moranbah North IN.00228237 29/06/2020 30/06/2020 When inspecting monorail found broken monorail joining bracket HPH

    AAMC.001.031.0051CONFIDENTIAL

  • 9

    INTERNAL

    INJURY DETAILS FOR MONTH

    Entity EventIDEventDate Event Title

    Actual Consequence

    Potential Consequence

    Aquila ProjectIN.00227269 12/06/2020 Pinched Left Ring Finger Medical Treatment Case

    Medical Treatment Case

    IN.00227370 13/06/2020 Operator rolled ankle stepping out of container Medical Treatment Case Lost Time Injury

    Dawson IN.00227444 20/06/2020 CMW caught hand on a protruding screw Medical Treatment CaseMedical Treatment

    Case

    MoranbahIN.00226256 06/06/2020 DNRM SA / LTI - Fall from truck trailer resulting in injury Lost Time Injury Lost Time Injury

    IN.00226365 08/06/2020 MTC / DNRM NRI - Outbye Operator Back Pain Medical Treatment CaseMedical Treatment

    Case

    AAMC.001.031.0052CONFIDENTIAL

  • 10

    INTERNAL

    MET COAL TRC IMPACT ANALYSIS – 2020 YTD

    Analysis Calculator considers the actual or predicted outcome of Total Recordable Case (TRC) injuries based on the level of medical intervention required, time lost and/or work restrictions, impacts on the injured worker and the potential compensation costs of each case. Each TRC is allocated a numerical score for each consideration, with the total score equating to an overall impact of low, moderate or high.

    34

    32

    3

    5

    1

    2

    1 3

    5 1

    1

    5

    0

    2

    4

    6

    8

    10

    12

    14

    January February March April May June

    Low impact Moderate impact High impact

    AAMC.001.031.0053CONFIDENTIAL

  • 11

    INTERNAL

    MET COAL OVERDUE INCIDENT INVESTIGATIONS

    Entity Incident ID Incident Date Incident Summary: HPI/HPH

    Moranbah North

    IN.00196054 20/02/2019 On 20th June 2019, an Underground Grader came into contact with a personnel carrier in the man and materials drift. HPI

    IN.00222655 30/03/2020The driven pulley on PP303, Warman 10/8 filtrate pump at the CHPP failed during normal operations, resulting

    in damage to the pulley guard and projecting metal fragments around the localized area. There were no personnel in the immediate area at the time of the incident.

    HPI

    Aquila Project

    IN.00224366 30/04/2020

    While Conducting an Inspection of Critical Fibre infrastructure an IM Officer has discovered and issue with the Network after testing, he has discovered damage to a fibre line from intentional cutting. Upon further

    investigation by the Aquila tea it was discovered that several high Tension cables had been cut and removed rom site. HV switch yard chains and locks had been cut - Exposure to 66kv and 11kv infrastructure - and

    switch room parts taken from enclosures. A vehicle had been driven around the site and used to transport the goods, upon further investigation it was discovered that other store items had been tampered with and

    components removed. Video footage has been reviewed with no evidence available

    HPH

    IN.00223004 6/04/2020

    During the recent issue of COML it was identified that boreholes marked on the mine plan(Grasstree) were found to be in a different location when physically checked underground and on the mine surface by the Survey Department. As the Mine Geologist was checking plans he noticed a bore hole that appears on the Grasstree

    Mine plan 25501. This hole was not previously visible on the recent Permit To Mine NE Mains 57-62 A-C & 901 TG to 2 c/t

    HPH

    Grosvenor IN.00224943 6/05/2020

    At 2:57pm an ignition of gas occured on the longwall face of the LW104 panel. At the the time of the event the longwall (shearer) had been idle for approximately five minutes and the longwall operators were in the process

    of advancing the hydraulic roof support in an area of faulted ground.The five operators working in the area received significant burns as a result of the ignition.

    HPI

    AAMC.001.031.0054CONFIDENTIAL

  • 12

    INTERNAL

    MET COAL – OVERDUE TASKS BASED ON REAL DUE DATE

    Entity Task ID Task Name Original Due DateReal Due

    Date Task Assignee

    NIL

    HIGH PRIORITY TASKS:

    CRITICAL CONTROL TASKS:

    Entity Task ID Task Name Original Due DateReal Due

    Date Task Assignee

    Met Coal Exploration -

    Australia

    TS.01205472 Legal Compliance Audit Corrective Actions -Item 11 1/05/2020 1/05/2020 Glass Brendon -6040027_Mc

    TS.01205476 Legal Compliance Audit Corrective Actions -Item 116 30/06/2020 30/06/2020

    AUDIT TASKS:

    Entity Task ID Task Name Original Due DateReal Due

    Date Task Assignee

    NIL

    AAMC.001.031.0055CONFIDENTIAL

  • 13

    INTERNAL

    MET COAL – ALL OVERDUE TASKS (REAL DUE DATE)Entity Task ID Task Name Original Due Date

    Real Due Date Priority Task Assignee

    Brisbane Corporate

    Office

    TS.01229626 92. Redesign SGE model process 31/12/2019 31/03/2020 Medium Buddle Timothy - 6041820_Mc

    TS.00678948 Develop and Implement Management Strategy for Cultural Heritage and First Nations 31/05/2018 20/12/2019 Medium

    Fittler Jason - 5433_Mc

    TS.01024178Environmental aspects embedded in BRA and bow-ties completed for priority environmental control monitoring

    activities at all sites.30/06/2019 31/12/2019 Medium

    TS.01024180 Health of Discipline conducted and Environmental Training Needs Analysis (TNA) developed and implemented. 31/07/2019 1/11/2019 Medium

    TS.01024198 Where gaps are identified, develop strategy to bring into compliance for current and future approvals. 30/11/2019 24/01/2020 Medium

    TS.01024183 Prepare and understand requirements to obtain ISO14001:2015 certification in 2020. 31/12/2019 31/12/2019 Medium

    TS.01024177Update UG OMS to include environmental components and ensure compliance within the new OMS through assurance

    process.31/12/2019 31/12/2019 Medium

    TS.00199845Gap analysis of Aquila SHMS procedures for Low Voltage

    Electrical Testing and Extreme Weather and Lightning Protection

    30/09/2016 31/05/2020 Medium Gannon Peter - 7414_Mc

    TS.01277732 OMS Documents 30/04/2020 30/06/2020 Medium Rocchi Luca - 6170152_McTS.01257995 Dragline Improvement Programme 31/03/2020 31/05/2020 Medium KAROOZ George - 903162_Mc

    TS.01024167 Assess the adequacy and design/function of MAW structures (inc. Sediment Dams). 31/05/2019 30/06/2020 Medium

    Rootsey Gavin Peteer -6169019_McTS.01024146

    Group water standards are analysed and action plans developed at priority sites. 30/06/2019 31/05/2020 Medium

    TS.01024142 Assist in Final Design and Commissioning of RO Plant Project at CapCoal 31/12/2019 30/06/2020 Medium

    TS.01030423 Re-certification of BCO WHSO 20/12/2019 20/12/2019 Medium Smith Ian - 8945_Mc

    TS.01267898 Dawson West 14/02/2020 31/03/2020 Low Walters Jamie - 8542_Mc

    AAMC.001.031.0056CONFIDENTIAL

  • 14

    INTERNAL

    MET COAL – ALL OVERDUE TASKS (REAL DUE DATE) CONTEntity Task ID Task Name Original Due Date

    Real Due Date Priority Task Assignee

    Met Coal Exploration -

    Australia

    TS.01205472

    Item 11 – ensure “Temporary Appointments” of SSE is appointed in writing when current SSE is absent. Ensure

    “Temporary SSE Appointments” are entered into the appointments folder in the Mine Record.

    1/05/2020 1/05/2020 Low

    Glass Brendon - 6040027_Mc

    TS.01205476 Item 116 - Update Prohibited Articles Register 30/06/2020 30/06/2020 Low

    AAMC.001.031.0057CONFIDENTIAL

  • 15

    INTERNAL

    EOFV ACTION PLAN PROGRESS

    Entity Open not due (count)Open past due

    (count)Closed (count)

    Total number of tasks

    % Closed

    % Open

    not due

    % Open

    past dueCompleted Completed Overdue

    Capcoal Grasstree 0 0 7 7 100 0 100 0 7

    Grosvenor 0 0 8 8 100 0 0 8 0

    Dawson 2 0 29 31 94 6 74 6 23

    Moranbah North 3 0 8 11 73 27 0 8 0

    Entity Open not due (count)Open past due

    (count)Closed (count)

    Completed Overdue

    Total number of tasks

    % Open

    not due

    % Open

    past due

    % Closed

    % On time closure

    In progress

    Capcoal Open Cut 19 0 32 0 51 37 0 63 100 0

    Moranbah North 0 0 18 1 18 0 0 100 94 0

    Grosvenor 0 0 28 0 28 0 0 100 100 0

    Capcoal Grasstree 1 0 22 0 23 4 0 96 100 1

    EOF EPR ACTION PLAN PROGRESS

    AAMC.001.031.0058CONFIDENTIAL

  • 16

    INTERNAL

    EOF PIMC ACTION PLAN PROGRESS

    Entity Open not due (count)Open past due

    (count)Closed (count)

    Total number of tasks

    % Closed

    % Open

    not due

    % Open

    past dueScheduled

    Capcoal Grasstree 0 0 17 17 100 0 0 0

    Moranbah North 2 0 3 5 60 40 0 2

    Capcoal Open Cut 0 0 4 4 100 0 0 0

    Dawson 11 0 1 12 8 92 0 11

    AAMC.001.031.0059CONFIDENTIAL

  • 17

    INTERNAL

    Met Coal Safety and Health

    General InformationINTERNAL

    AAMC.001.031.0060CONFIDENTIAL

  • 18

    INTERNAL

    MET COAL HIGH POTENTIAL INCIDENTS

    3 3 3

    4 4

    1

    3

    4

    5

    6 6

    1234567

    Jan Feb Mar Apr May Jun

    Met Coal HPI CountYTD Comparison

    YTD 2019 YTD 2020

    1 2 1 1 1

    12

    18

    13

    1714

    19

    5

    10

    15

    20

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Met Coal - HPI / HPH Reporting

    HPI HPH

    0.00

    1.00

    2.00

    3.00

    4.00

    5.00

    Jul-19 Aug-19Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.98 0.99 0.96 0.00 0.91 3.91 0.92 1.77 0.84 0.87 0.87 0.003MMA 0.65 0.66 0.98 0.64 0.62 1.56 1.87 2.16 1.17 1.15 0.86 0.5912MMA 0.95 0.69 0.76 0.75 0.74 0.98 1.05 0.95 1.02 1.09 1.08 1.07

    Met Coal HPIFR 3MMA v 12MMA

    AAMC.001.031.0061CONFIDENTIAL

  • 19

    INTERNAL

    MET COALHIGH POTENTIAL HAZARD REPORTING

    0.00

    5.00

    10.00

    15.00

    20.00

    Jul-19 Aug-19Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 14.77 7.90 14.44 7.37 15.52 12.69 10.99 16.83 10.90 16.51 12.13 17.683MMA 16.93 16.10 12.39 9.88 12.43 11.86 13.08 13.56 12.89 14.69 13.16 15.3912MMA 16.40 16.09 15.77 15.21 15.78 15.49 15.33 14.23 13.68 13.65 13.76 13.17

    Met Coal HPHFR 3MMA v 12MMA

    12

    42

    60

    7788

    114

    12

    3144

    6377

    96

    20

    40

    60

    80

    100

    120

    Jan Feb Mar Apr May Jun

    Met Coal HPH CountYTD Comparison

    YTD 2019 YTD 2020

    15

    8

    15

    8

    1713 12

    1913

    1914

    19

    02468

    101214161820

    Met Coal HPH Levels

    # HPH Level 4 # HPH Level 5

    0

    5

    10

    15

    20

    Met Coal HPH SLT Reported

    SLT Reported Non SLT Reported

    ‘Reported by’ field removed from Enablon upgrade 11/05/2020

    AAMC.001.031.0062CONFIDENTIAL

  • 20

    INTERNAL

    MET COALTOTAL RECORDABLE CASES

    0.002.004.006.008.00

    10.0012.00

    Jul-19 Aug-19Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 6.89 2.96 5.78 3.69 4.56 3.91 4.58 5.31 3.36 5.21 10.40 4.653MMA 5.86 5.59 5.22 4.15 4.66 4.06 4.36 4.62 4.39 4.61 6.29 6.8112MMA 9.11 8.43 8.39 7.52 6.69 6.20 5.81 5.33 4.87 4.73 5.31 5.13

    Met Coal TRC 3MMA v 12MMA FR

    9.34

    10.479.80

    9.148.03 7.84

    4.58 4.95 4.39 4.60

    5.77 5.59

    2.00

    4.00

    6.00

    8.00

    10.00

    12.00

    Jan Feb Mar Apr May Jun

    Met Coal TRCFRYTD Comparison

    YTD 2019 YTD 2020

    9

    20

    29

    3640

    47

    511

    1521

    3338

    10

    20

    30

    40

    50

    Jan Feb Mar Apr May Jun

    Met Coal TRC CountYTD Comparison

    YTD 2019 YTD 2020

    6.20 4.58 4.95 4.39 4.60 5.77 5.59

    5.58

    0.001.002.003.004.005.006.007.008.009.00

    Met Coal TRCFR YTD

    YTD YTD Target

    AAMC.001.031.0063CONFIDENTIAL

  • 21

    INTERNAL

    MET COALLOST TIME INJURIES

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    Jul-19 Aug-19Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 3.94 1.97 3.85 1.84 3.65 3.91 2.75 2.66 1.68 3.48 7.80 0.933MMA 3.26 3.61 3.26 2.55 3.11 3.12 3.42 3.08 2.34 2.59 4.29 4.1412MMA 6.86 6.19 6.10 5.10 4.54 4.32 3.95 3.50 3.15 2.95 3.54 3.22

    Met Coal LTI 3MMA v 12MMA FR

    7.267.85

    7.09 6.86

    5.62 5.51

    2.75 2.70 2.34 2.633.67 3.24

    1.002.003.004.005.006.007.008.009.00

    Jan Feb Mar Apr May Jun

    Met Coal LTIFRYTD Comparison

    YTD 2019 YTD 2020

    7

    15

    21

    27 28

    33

    36

    812

    21 22

    5101520253035

    Jan Feb Mar Apr May Jun

    Met Coal LTI CountYTD Comparison

    YTD 2019 YTD 2020

    4.32 2.75 2.70 2.34 2.63 3.67 3.24

    3.89

    0.00

    1.00

    2.00

    3.00

    4.00

    5.00

    6.00

    Met Coal LTIFR YTD

    YTD YTD Target

    AAMC.001.031.0064CONFIDENTIAL

  • 22

    INTERNAL

    MET COALOCCUPATIONAL ILLNESSES

    4.153.66

    3.38

    2.79 2.612.34

    0.92

    1.80

    1.17 1.10

    2.622.36

    0.501.001.502.002.503.003.504.004.50

    Jan Feb Mar Apr May Jun

    Met Coal OCILFRYTD Comparison

    YTD 2019 YTD 2020

    4

    7

    1011

    1314

    1

    4 45

    15 16

    2468

    1012141618

    Jan Feb Mar Apr May Jun

    Met Coal OCIL CountYTD Comparison

    YTD 2019 YTD 2020

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    Jul-19 Aug-19Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 1.97 0.99 2.89 0.92 2.74 1.95 0.92 2.66 0.00 0.87 8.67 0.933MMA 1.63 1.31 1.96 1.59 2.17 1.87 1.87 1.85 1.17 1.15 3.15 3.5512MMA 2.60 2.41 2.46 2.26 1.98 2.12 1.86 1.83 1.57 1.55 2.15 2.14

    Met Coal OCIL 3MMA v 12MMA FR

    2.12 0.92 1.80 1.17 1.10 2.62 2.36

    1.91

    0.000.501.001.502.002.503.003.50

    Met Coal OCILFR YTD

    YTD YTD Target

    AAMC.001.031.0065CONFIDENTIAL

  • 23

    INTERNAL

    MET COALVFL INTERACTION ANALYSIS

    81% 91% 91% 85% 88% 94% 95% 91%0%

    20%40%60%80%

    100%

    Aquila Capcoal Grasstree Capcoal Open Cut Coal Exploration -Australia

    Dawson Grosvenor Moranbah North Met Coal

    Met Coal VFL's Safe vs Unsafe Month % Safe % Unsafe

    Met Coal VFL's Unsafe Month with Mechanism

    11% 9% 9% 10% 10% 9% 0% 0% 0% 0% 0% 0%

    89% 91% 91% 90% 90% 91%

    0% 0% 0% 0% 0% 0%0%

    20%

    40%

    60%

    80%

    100%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Met Coal Reported %SLT v Non-SLT VFL Interactions

    SLT Non-SLT

    92%106% 96% 103% 104% 109% 101%20%

    40%

    60%

    80%

    100%

    120%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020YTD

    Met Coal SLT VFL % Target

    < 75% 75% - 95% > 95%

    12%6%

    28%

    23%

    12%

    12%8% 9%

    9%

    25%

    23%

    11%

    16%

    8% 9%6%

    21%

    29%

    16%

    15%4% 11%

    7%

    23%

    17%

    14%

    18%

    10%11% 4%

    25%

    14%6%

    25%

    15% 15%4%

    30%

    16%

    21%

    10%5%

    12%9%

    19%

    12%16%

    19%

    13%

    Aquila Grasstree Capcoal OC Exploration Dawson Grosvenor Moranbah North Met Coal

    7%2%

    36%

    13%

    16%

    16%

    11%

    AAMC.001.031.0066CONFIDENTIAL

  • 24

    INTERNAL

    MET COALOVERDUE TASKS

    46

    55

    36

    14

    35

    17

    10

    20

    30

    40

    50

    60

    Jan Feb Mar Apr May Jun

    Met Coal Overdue Tasks

    8

    2

    123456789

    Jan Feb Mar Apr May Jun

    Met Coal Overdue Audit Tasks - Real Due Date1

    Jan Feb Mar Apr May Jun

    Met Coal Overdue CC Tasks - Real Due Date

    3 3

    4

    1

    2

    3

    4

    5

    Jan Feb Mar Apr May Jun

    Met Coal Overdue HP Tasks - Real Due Date

    AAMC.001.031.0067CONFIDENTIAL

  • 25

    INTERNAL

    MET COALINCIDENT INVESTIGATION / CLOSE OUT STATUS

    HPH Brisbane Misc Aquila Capcoal Grasstree Capcoal Open Cut Dawson Grosvenor Moranbah North0 0 2 0 0 0 0 00 0 0 1 2 7 1 3

    012345678

    HPH Investigation Status

    Brisbane Misc Aquila Capcoal Grasstree Capcoal Open Cut Dawson Grosvenor Moranbah North Met Coal Exploration- AustraliaOverdue 0 0 0 0 0 1 2 0Not Due 0 0 0 0 0 1 0 0

    0

    1

    2

    3

    HPI Investigation Status Not Due Overdue

    AAMC.001.031.0068CONFIDENTIAL

  • 26

    INTERNAL

    SHE WAY TASK PROGRESSSHE Way – Task Tracking over Time

    - If sites require guidance to close an action please contact Ian Hogg

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11 18

    13 12

    27

    7 11

    2822

    3

    14

    3 3 6 4 4 7 3 1 0 00 0

    00 0

    0

    00

    0

    0

    0

    0

    0 00 0 0

    10 0

    900

    5101520253035

    Real Due Date

    SHE Way - Action Plan Graph by Site

    AAMC.001.031.0069CONFIDENTIAL

  • 27

    INTERNAL

    Sign off required: Signature Date Document ControlGeneral Manager ____/____/ 2020 Forward to Head of OpsHead of Ops ____/____/ 2020 Forward to Head of S&HHead of S&H ____/____/ 2020 Forward to S&H Officer for filing

    EXPLORATION AUSTRALIA CRITICAL CONTROL DEFICIENCY SIGN OFF

    Fundamental Actions to address HPH (to be completed by site) Due Date Responsible Person

    Overview of monitoring this month – June 2020 Deficiencies Identified this month

    Total Controls No.Scheduled No.Completed No.Overdue No. Affected No. Not Affected

    91 33 33 0 0 0

    PUE Control ID Control Name Control Owner Observation Affect ControlCorrective / Immediate

    Actions

    No deficient controls were identified in June 2020

    AAMC.001.031.0070CONFIDENTIAL

  • 28

    INTERNAL

    EXPLORATION AUSTRALIAAUDIT STATUS

    Audit Audit Completed

    Audit Report Drafted for Site review

    Audit Reportreviewed by

    site and accepted

    Audit Action Plan

    developed in Enablon

    Action Plan NameAudit

    Action Status

    2017 Environment OCA Actions

    Completed Completed Completed AP.00616689 2017 Environment OCA Actions 76%

    2017 CMO Audit Completed Completed Completed AP.00624674

    2017 Coal Mine Operator Effectiveness (CMO) Audit 90%

    2020 Legal Audit Completed Completed Completed AP.00765986 Legal Compliance Audit Corrective Actions 20%

    2020 SHE Way Self

    Assessment

    Not Completed

    Not Completed

    Not Completed

    AAMC.001.031.0071CONFIDENTIAL

  • INTERNAL

    AQUILAS&H Monthly Report – June 2020

    AAMC.001.031.0072CONFIDENTIAL

  • 30

    INTERNAL

    AQUILASAFETY OVERVIEW SUMMARY

    • Aquila TARP status is Level 1 with no HPIs (YTD=0) and 2 TRCs during June (YTD TRC=6, LTI=3).

    • No HPHs were recorded in June, YTD=3.

    • No Critical Control monitoring is currently in place.

    • No overdue Tasks including High Priority, Audit or Critical Control tasks at month end.

    • 2 outstanding HPH incident investigations at month end.

    • SLT VFL June completion rate was above target at 123% (YTD 101%).

    • No OCILs reported in June (YTD=0)

    • TRCFR and LTIFR greater than underground average.

    AAMC.001.031.0073CONFIDENTIAL

  • 31

    INTERNAL

    AQUILAHIGH POTENTIAL INCIDENTS

    1

    2

    3

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Aquila HPI / HPH Reporting

    HPI HPH

    1

    Jan Feb Mar Apr May Jun

    Aquila HPI CountYTD Comparison

    YTD 2019 YTD 2020

    0.00

    0.20

    0.40

    0.60

    0.80

    1.00

    Jul-19 Aug-19Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.003MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0012MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Aquila HPIFR 3MMA v 12MMA

    AAMC.001.031.0074CONFIDENTIAL

  • 32

    INTERNAL

    AQUILAHIGH POTENTIAL HAZARDS

    1 1

    3 3 3

    1

    2

    3

    4

    Jan Feb Mar Apr May Jun

    Aquila HPH CountYTD Comparison

    YTD 2019 YTD 2020

    0.00

    10.00

    20.00

    30.00

    40.00

    50.00

    Jul-19 Aug-19Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.82 0.00 38.97 0.00 0.003MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.49 7.41 20.98 13.13 12.1012MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.49 7.41 16.11 12.53 9.99

    Aquila HPHFR 3MMA v 12MMA

    AAMC.001.031.0075CONFIDENTIAL

  • 33

    INTERNAL

    AQUILATOTAL RECORDABLE CASES

    23.16 22.99 22.24

    16.11 16.71

    19.99

    5.00

    10.00

    15.00

    20.00

    25.00

    Jan Feb Mar Apr May Jun

    Aquila TRCFRYTD Comparison

    YTD 2019 YTD 2020

    1

    2

    3 3

    4

    6

    1

    2

    3

    4

    5

    6

    7

    Jan Feb Mar Apr May Jun

    Aquila TRC CountYTD Comparison

    YTD 2019 YTD 2020

    23.16 22.99 22.24 16.11 16.71 19.99 0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    Aquila TRCFR YTD

    YTD Target

    0.005.00

    10.0015.0020.0025.0030.0035.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 0.00 0.00 0.00 0.00 0.00 23.1622.8220.89 0.00 18.8232.873MMA 0.00 0.00 0.00 0.00 0.00 0.00 23.1622.9922.2413.9813.1318.1512MMA 0.00 0.00 0.00 0.00 0.00 0.00 23.1622.9922.2416.1116.7119.99

    Aquila TRCFR 3MMA v 12MMA

    AAMC.001.031.0076CONFIDENTIAL

  • 34

    INTERNAL

    1 1

    2 2

    3 3

    1

    2

    3

    4

    Jan Feb Mar Apr May Jun

    Aquila LTI CountYTD Comparison

    YTD 2019 YTD 2020

    AQUILALOST TIME INJURIES

    23.16 11.49 14.83 10.74 12.53 9.99 0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    Aquila LTIFR YTD

    YTD Target

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 0.00 0.00 0.00 0.00 0.00 23.16 0.00 20.89 0.00 18.82 0.003MMA 0.00 0.00 0.00 0.00 0.00 0.00 23.1611.4914.83 6.99 13.13 6.0512MMA 0.00 0.00 0.00 0.00 0.00 0.00 23.1611.4914.8310.7412.53 9.99

    Aquila LTIFR 3MMA v 12MMA

    23.16

    11.49

    14.83

    10.7412.53

    9.99

    5.00

    10.00

    15.00

    20.00

    25.00

    Jan Feb Mar Apr May Jun

    Aquila LTIFRYTD Comparison

    YTD 2019 YTD 2020

    AAMC.001.031.0077CONFIDENTIAL

  • 35

    INTERNAL

    AQUILAOCCUPATIONAL ILLNESSES

    1.00

    Jan Feb Mar Apr May Jun

    Aquila OCILFRYTD Comparison

    YTD 2019 YTD 2020

    1

    Jan Feb Mar Apr May Jun

    Aquila OCIL CountYTD Comparison

    YTD 2019 YTD 2020

    0.40

    0.050.100.150.200.250.300.350.400.45

    Aquila OCILFR YTD

    YTD Target

    0.00

    0.20

    0.40

    0.60

    0.80

    1.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.003MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0012MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Aquila OCILFR 3MMA v 12MMA

    AAMC.001.031.0078CONFIDENTIAL

  • 36

    INTERNAL

    AQUILAOVERDUE TASKS

    6

    3

    10

    2

    4

    6

    8

    10

    12

    Jan Feb Mar Apr May Jun

    Aquila Overdue Tasks

    1

    Jan Feb Mar Apr May Jun

    Aquila Overdue HP Tasks - Real Due Date

    1

    Jan Feb Mar Apr May Jun

    Aquila Overdue Audit Tasks - Real Due Date

    1

    Jan Feb Mar Apr May Jun

    Aquila Overdue Tasks - Real Due Date

    AAMC.001.031.0079CONFIDENTIAL

  • 37

    INTERNAL

    AQUILAVFL INTERACTION ANALYSIS

    67% 71% 75% 82% 82% 81% 0% 0% 0% 0% 0% 0%

    33% 29% 25%18% 18% 19%

    0% 0% 0% 0% 0% 0%0%10%20%30%40%50%60%70%80%90%

    100%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Aquila % Safe v Unsafe VFL Interactions

    Safe Unsafe

    69% 79%116% 104% 110% 123% 101%20%

    40%

    60%

    80%

    100%

    120%

    140%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020YTD

    AquilaSLT VFL % Target

    < 75% 75% - 95% > 95%

    AAMC.001.031.0080CONFIDENTIAL

  • 38

    INTERNAL

    AQUILAAUDIT STATUS

    Audit Audit Completed

    Audit Report Drafted for Site review

    Audit Reportreviewed by

    site and accepted

    Audit Action Plan

    developed in Enablon

    Action Plan NameAudit

    Action Status

    2020 OCA Audit Completed Completed Completed AP.00781572 2020 Environmental OCA Aquila 11%

    2019 Legal Audit Completed Completed Completed AP.00766579

    2019 Stat Compliance Audit Aquila SHMS -Corrective Actions 100%

    2020 SHE Way Self

    Assessment

    Not Completed

    Not Completed

    Not Completed

    AAMC.001.031.0081CONFIDENTIAL

  • INTERNAL

    CAPCOAL OPEN CUTS&H Monthly Report – June 2020

    AAMC.001.031.0082CONFIDENTIAL

  • 40

    INTERNAL

    CAPCOAL OPEN CUTSAFETY OVERVIEW SUMMARY

    • Capcoal moved from Level 1 TARP status to Normal with no HPIs (YTD=0) and no TRCs during June (YTD TRC=2, LTI=0).

    • 3xHPHs were recorded in June, YTD=27.

    • 2xCritical Control deficiencies were identified in June, neither impacted the integrity of the controls, 5 were recorded as overdue.

    • Nil overdue Tasks including High Priority, Audit or Critical Control tasks at month end.

    • Nil outstanding incident investigations at month end.

    • SLT VFL June completion rate was above target at 109% (YTD 116%).

    • Nil OCILs reported in June (YTD=3).

    AAMC.001.031.0083CONFIDENTIAL

  • 41

    INTERNAL

    CAPCOAL OPEN CUTHIGH POTENTIAL INCIDENTS

    0.00

    2.00

    4.00

    6.00

    8.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 0.00 5.78 0.00 6.02 0.00 0.00 0.00 0.00 0.00 0.00 0.003MMA 0.00 0.00 2.09 2.01 3.93 2.03 2.09 0.00 0.00 0.00 0.00 0.0012MMA 2.24 1.67 2.18 2.14 2.12 2.08 2.07 1.03 1.03 1.02 1.01 1.00

    Capcoal Open Cut HPIFR 3MMA v 12MMA

    1

    7

    5 56

    3

    2

    4

    6

    8

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Capcoal Open Cut HPI / HPH Reporting

    HPI HPH

    2 2 2 2

    1

    2

    3

    Jan Feb Mar Apr May

    Capcoal Open Cut HPI CountYTD Comparison

    YTD 2019 YTD 2020

    AAMC.001.031.0084CONFIDENTIAL

  • 42

    INTERNAL

    CAPCOAL OPEN CUTHIGH POTENTIAL HAZARDS

    0.00

    20.00

    40.00

    60.00

    Jul-19 Aug-19Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 33.26 19.28 40.49 0.00 48.20 19.03 6.50 43.54 28.20 30.07 31.68 16.853MMA 31.76 31.70 31.33 20.07 29.48 22.29 25.13 23.29 26.42 33.71 30.02 26.2312MMA 30.30 30.62 31.12 27.84 29.61 29.16 27.47 27.85 29.27 27.66 28.68 26.53

    Capcoal Open Cut HPHFR 3MMA v 12MMA

    0123456789

    Capcoal Open Cut SLT Reported HPH’s

    SLT Reported Non SLT Reported

    4

    1012

    2023

    30

    1

    8

    13

    18

    2427

    5101520253035

    Jan Feb Mar Apr May Jun

    Capcoal Open Cut HPH CountYTD Comparison

    YTD 2019 YTD 2020

    ‘Reported by’ field removed from Enablon upgrade 11/05/2020

    AAMC.001.031.0085CONFIDENTIAL

  • 43

    INTERNAL

    CAPCOAL OPEN CUTTOTAL RECORDABLE CASES

    0.00

    5.00

    10.00

    15.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 6.43 11.57 0.00 6.02 0.00 6.50 0.00 0.00 0.00 5.28 0.003MMA 4.23 6.34 6.27 6.02 5.90 2.03 4.19 2.12 2.03 0.00 1.88 1.8712MMA 4.49 4.45 5.46 5.35 4.76 3.64 4.15 3.61 3.59 3.59 4.03 3.00

    Capcoal Open Cut TRCFR 3MMA v 12MMA

    0.00 3.37 2.15 1.60 1.28 3.16

    6.50

    3.18

    2.031.52

    2.361.95

    1.002.003.004.005.006.007.00

    Jan Feb Mar Apr May Jun

    Capcoal Open Cut TRCFRYTD Comparison

    YTD 2019 YTD 2020

    1 1 1 1

    3

    1 1 1 1

    2 2

    1

    2

    3

    4

    Jan Feb Mar Apr May Jun

    Capcoal Open Cut TRC CountYTD Comparison

    YTD 2019 YTD 2020

    3.64 6.50 3.18 2.03 1.52 2.36 1.95

    3.28

    0.001.002.003.004.005.006.007.00

    Capcoal Open Cut TRCFR YTD

    YTD Target

    AAMC.001.031.0086CONFIDENTIAL

  • 44

    INTERNAL

    CAPCOAL OPEN CUTLOST TIME INJURIES

    0.00

    5.00

    10.00

    15.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 6.43 11.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.003MMA 4.23 6.34 6.27 6.02 3.93 0.00 0.00 0.00 0.00 0.00 0.00 0.0012MMA 2.81 2.78 3.82 3.75 3.17 3.12 3.11 2.58 2.57 2.56 2.52 1.50

    Capcoal Open Cut LTIFR 3MMA v 12MMA

    3.37 2.15 1.60 1.28 3.16

    1.00

    2.00

    3.00

    4.00

    Jan Feb Mar Apr May Jun

    Capcoal Open Cut LTIFRYTD Comparison

    YTD 2019 YTD 2020

    1 1 1 1

    3

    1

    2

    3

    4

    Jan Feb Mar Apr May Jun

    Capcoal Open Cut LTI CountYTD Comparison

    YTD 2019 YTD 2020

    3.12

    2.81

    0.000.501.001.502.002.503.003.50

    Capcoal Open Cut LTIFR YTD

    YTD Target

    AAMC.001.031.0087CONFIDENTIAL

  • 45

    INTERNAL

    CAPCOAL OPEN CUTOCCUPATIONAL ILLNESSES

    6.88

    3.37

    2.151.60 1.28 1.05

    3.18

    2.033.04

    3.542.92

    1.002.003.004.005.006.007.008.00

    Jan Feb Mar Apr May Jun

    Capcoal Open Cut OCILFRYTD Comparison

    YTD 2019 YTD 2020

    1 1 1 1 1 11 1

    2

    3 3

    1

    2

    3

    4

    Jan Feb Mar Apr May Jun

    Capcoal Open Cut OCIL CountYTD Comparison

    YTD 2019 YTD 2020

    1.04 3.18 2.03 3.04 3.54 2.92

    0.94

    0.000.501.001.502.002.503.003.504.00

    Capcoal Open Cut OCILFR YTD

    YTD Target

    0.00

    2.00

    4.00

    6.00

    8.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 0.00 0.00 5.89 0.00 0.00 0.00 6.22 0.00 6.01 5.28 0.003MMA 0.00 0.00 0.00 2.01 1.97 2.03 0.00 2.12 2.03 3.97 3.75 3.7512MMA 0.56 0.56 0.55 1.07 1.06 1.04 0.52 1.03 1.03 1.54 2.01 2.00

    Capcoal Open Cut OCIL 3MMA v 12MMA FR

    AAMC.001.031.0088CONFIDENTIAL

  • 46

    INTERNAL

    CAPCOAL OPEN CUTOVERDUE TASKS

    2

    1

    2

    3

    Jan Feb Mar Apr May Jun

    Capcoal Open Cut Overdue Tasks

    1

    Jan Feb Mar Apr May Jun

    Capcoal OC Overdue Audit Tasks - Real Due Date

    1

    Jan Feb Mar Apr May Jun

    Capcoal Open Cut Overdue HP Tasks - Real Due Date

    1

    Jan Feb Mar Apr May Jun

    Capcoal OC Overdue CC Tasks - Real Due Date

    AAMC.001.031.0089CONFIDENTIAL

  • 47

    INTERNAL

    CAPCOAL OPEN CUTVFL INTERACTION ANALYSIS

    24% 19% 19% 18% 15% 11% 0% 0% 0% 0% 0% 0%

    76% 81% 81% 82% 85% 89%

    0% 0% 0% 0% 0% 0%0%10%20%30%40%50%60%70%80%90%

    100%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Capcoal Open Cut %SLT v Non-SLT VFL Interactions

    SLT Non-SLT

    118% 101% 109% 149% 120% 109% 116%20%40%60%80%

    100%120%140%160%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020YTD

    Capcoal Open Cut SLT VFL % Target

    < 75% 75% - 95% > 95%

    92% 92% 93% 92% 94% 91% 0% 0% 0% 0% 0% 0%0%

    10%20%30%40%50%60%70%80%90%

    100%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Capcoal Open Cut% Safe v Unsafe VFL Interactions

    Safe Unsafe

    AAMC.001.031.0090CONFIDENTIAL

  • 48

    INTERNAL

    Sign off required: Signature Date Document ControlGeneral Manager ____/____/ 2020 Forward to Head of OpsHead of Ops ____/____/ 2020 Forward to Head of S&HHead of S&H ____/____/ 2020 Forward to S&H Officer for filing

    CAPCOAL O/C CRITICAL CONTROL DEFICIENCY SIGN OFF

    Overview of monitoring this month – June 2020 Deficiencies Identified this month

    Total Controls No.Scheduled No.Completed No.Overdue No. Affected No. Not Affected

    54 37 32 5 0 2

    Fundamental Actions to address HPH (to be completed by site) Due Date Responsible Person

    PUE Control ID Control Name Control Owner Observation Affect Control*HPH

    IDCorrective / Immediate

    Action

    BW.00015802 -Trapped in Burning

    Machinery

    CT.00024931

    Fighting Equipment, Fire Detection, Fire

    Suppression and Alarm systems Jacobson Clay -

    984328_Mc

    Recent flow test for selected hydrants across site have failed. Sicada have been instructed

    to work out why.No N/A

    Arrange sicada to investigate sudden failure in fire pumps across site

    CT.00024933

    Emergency response

    capability for managing fire

    All gear is present and functional on the equipment. We do have an issue with FT805 however the German Creek fire truck is still functional. Work order to fix PTO is in SAP

    No N/AFollow up with Haynes to

    ensure PTO is fixed in timely manner

    AAMC.001.031.0091CONFIDENTIAL

  • 49

    INTERNAL

    CAPCOAL OPEN CUTAUDIT STATUS

    Audit Audit Completed

    Audit Report

    Drafted for Site review

    Audit Report

    reviewed by site and accepted

    Audit Action Plan developed in Enablon

    Action Plan NameAudit Action Status

    2018 SHE Way Gap Analysis

    Gap Analysis completed

    Not Applicable

    Not Applicable AP.00690768

    Capcoal OC SHE Way Gap Analysis Action Plan 98%

    2020 ENV OCA Completed Completed Completed AP.00781411 2020 Environmental OCA Capcoal 34%

    2019 Legal Audit Completed Completed Completed AP.00766118 2019 Legal Compliance Audit 100%

    2020 SHE Way Self

    Assessment

    Not Completed

    Not Completed

    Not Completed

    AAMC.001.031.0092CONFIDENTIAL

  • INTERNAL

    DAWSONS&H Monthly Report – June 2020

    AAMC.001.031.0093CONFIDENTIAL

  • 51

    INTERNAL

    DAWSONSAFETY OVERVIEW SUMMARY

    • Dawson TARP status moved from Level 2 to Level 1 with no HPIs (YTD=2) and 1 TRC (YTD TRC=8, LTI=6) reported in June, (1 HPI remains within 3 months).

    • 7xHPHs were reported in June (YTD=34).

    • 2xCritical Control deficiencies were identified in June, neither impacted the integrity of the controls.

    • Nil overdue tasks including High Priority, Audit or Critical Control tasks at month end.

    • Nil overdue incident investigations at month end.

    • SLT VFL June completion rate was above target at 151% (YTD 122%).

    • Nil OCILs reported in June (YTD=1).

    AAMC.001.031.0094CONFIDENTIAL

  • 52

    INTERNAL

    DAWSONHIGH POTENTIAL INCIDENTS

    6 65

    6

    4

    7

    2

    4

    6

    8

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Dawson HPI / HPH Reporting

    HPI HPH

    0.001.002.003.004.005.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 4.03 0.00 0.00 0.00 0.00 3.88 0.00 3.60 0.00 3.66 0.00 0.003MMA 1.28 1.32 1.34 0.00 0.00 1.26 1.24 2.47 1.17 2.35 1.14 1.1912MMA 1.02 0.34 0.34 0.33 0.33 0.66 0.65 0.96 0.95 1.25 1.24 1.24

    Dawson HPIFR 3MMA v 12MMA

    1 1

    2 2 2

    1

    2

    3

    Jan Feb Mar Apr May Jun

    Dawson HPI CountYTD Comparison

    YTD 2019 YTD 2020

    AAMC.001.031.0095CONFIDENTIAL

  • 53

    INTERNAL

    DAWSONHIGH POTENTIAL HAZARDS

    3

    22

    3338

    4451

    612

    1723

    2734

    10

    20

    30

    40

    50

    60

    Jan Feb Mar Apr May Jun

    Dawson HPH CountYTD Comparison

    YTD 2019 YTD 2020

    0.00

    10.00

    20.00

    30.00

    40.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 20.1420.4027.6322.7925.7019.4121.7521.6016.7021.9613.1626.473MMA 23.0622.4122.7723.6325.3522.6922.3320.9519.9319.9917.1120.2012MMA 27.5027.8427.9527.7229.2328.3728.9124.4022.1722.2021.3321.33

    Dawson HPHFR 3MMA v 12MMA

    01234567

    Dawson SLT Reported HPH's

    SLT Reported Non SLT Reported

    ‘Reported by’ field removed from Enablon upgrade 11/05/2020

    AAMC.001.031.0096CONFIDENTIAL

  • 54

    INTERNAL

    DAWSONTOTAL RECORDABLE CASES

    2.64 1.17 3.55 4.89 4.72

    2.38

    0.00

    1.00

    2.00

    3.00

    4.00

    5.00

    6.00

    Dawson TRCFR YTD

    0.00

    5.00

    10.00

    15.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 0.00 0.00 7.60 0.00 0.00 0.00 0.00 3.34 10.98 9.87 3.783MMA 5.12 3.95 0.00 2.63 2.53 2.52 0.00 0.00 1.17 4.70 7.99 8.3212MMA 5.77 4.75 4.38 4.01 2.99 2.64 2.60 2.25 2.22 3.13 3.71 3.09

    Dawson TRCFR 3MMA v 12MMA

    12 2

    3

    6

    1

    4

    78

    123456789

    Jan Feb Mar Apr May Jun

    Dawson TRC CountYTD Comparison

    YTD 2019 YTD 2020

    2.122.75

    2.082.45

    4.02

    1.17

    3.55

    4.89 4.72

    1.00

    2.00

    3.00

    4.00

    5.00

    6.00

    Jan Feb Mar Apr May Jun

    Dawson TRCFRYTD Comparison

    YTD 2019 YTD 2020

    AAMC.001.031.0097CONFIDENTIAL

  • 55

    INTERNAL

    DAWSONLOST TIME INJURIES

    0.66 1.17 3.55 4.20 3.54

    0.59

    0.000.501.001.502.002.503.003.504.004.50

    Dawson LTIFR YTD

    11

    4

    6 6

    1234567

    Jan Feb Mar Apr May Jun

    Dawson LTI CountYTD Comparison

    YTD 2019 YTD 2020

    0.671.17

    3.55

    4.20

    3.54

    1.00

    2.00

    3.00

    4.00

    5.00

    Jan Feb Mar Apr May Jun

    Dawson LTIFRYTD Comparison

    YTD 2019 YTD 2020

    0.00

    5.00

    10.00

    15.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 0.00 0.00 3.80 0.00 0.00 0.00 0.00 3.34 10.98 6.58 0.003MMA 1.28 1.32 0.00 1.31 1.27 1.26 0.00 0.00 1.17 4.70 6.84 5.9412MMA 3.40 2.72 2.36 1.67 1.00 0.66 0.65 0.64 0.95 1.88 2.47 2.16

    Dawson LTI 3MMA v 12MMA FR

    AAMC.001.031.0098CONFIDENTIAL

  • 56

    INTERNAL

    DAWSONOCCUPATIONAL ILLNESS

    4.62 1.81 1.17 0.89 0.70 0.59

    4.16

    0.00

    1.00

    2.00

    3.00

    4.00

    5.00

    6.00

    Dawson OCILFR YTD

    8.71 6.36 6.87 5.21 4.08 4.020.00

    1.811.17 0.89 0.70 0.592.00

    4.00

    6.00

    8.00

    10.00

    Jan Feb Mar Apr May Jun

    Dawson OCILFRYTD Comparison

    YTD 2019 YTD 2020

    2

    3

    5 5 5

    6

    1 1 1 1 11234567

    Jan Feb Mar Apr May Jun

    Dawson OCIL CountYTD Comparison

    YTD 2019 YTD 2020

    0.002.004.006.008.00

    10.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 8.06 4.08 3.95 0.00 7.34 7.76 0.00 3.60 0.00 0.00 0.00 0.003MMA 3.84 5.27 5.36 2.63 3.80 5.04 4.96 3.70 1.17 1.18 0.00 0.0012MMA 5.77 5.09 5.39 5.01 3.99 4.62 3.90 3.85 3.17 3.13 3.09 2.78

    Dawson OCILFR 3MMA v 12MMA

    AAMC.001.031.0099CONFIDENTIAL

  • 57

    INTERNAL

    DAWSONOVERDUE TASKS

    1

    2

    3

    Jan Feb Mar Apr May Jun

    Dawson Overdue Tasks1

    Jan Feb Mar Apr May Jun

    Dawson Overdue HP Tasks - Real Due Date

    1

    Jan Feb Mar Apr May Jun

    Dawson Overdue Audit Tasks - Real Due Date1

    Jan Feb Mar Apr May Jun

    Dawson Overdue CC Tasks - Real Due Date

    AAMC.001.031.0100CONFIDENTIAL

  • 58

    INTERNAL

    DAWSONVFL ANALYSIS

    134% 124% 96% 116% 110% 151% 122%20%40%60%80%

    100%120%140%160%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020YTD

    Dawson SLT VFL % Target

    < 75% 75% - 95% > 95%

    89% 93% 93% 93% 92% 88% 0% 0% 0% 0% 0% 0%0%

    10%20%30%40%50%60%70%80%90%

    100%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Dawson % Safe v Unsafe VFL Interactions

    Safe Unsafe

    21% 9% 15%25% 13% 15% 0%

    0% 0%0% 0% 0%

    79% 91% 85%75% 87% 85%

    0% 0% 0% 0% 0% 0%0%

    20%

    40%

    60%

    80%

    100%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Dawson %SLT v Non-SLT VFL Interactions

    SLT Non-SLT

    AAMC.001.031.0101CONFIDENTIAL

  • 59

    INTERNAL

    Sign off required: Signature Date Document ControlGeneral Manager ____/____/ 2020 Forward to Head of OpsHead of Ops ____/____/ 2020 Forward to Head of S&HHead of S&H ____/____/ 2020 Forward to S&H Officer for filing

    DAWSON CRITICAL CONTROL DEFICIENCY SIGN OFF

    Overview of monitoring this month – June 2020 Deficiencies Identified this month

    Total Controls No.Scheduled No.Completed No.Overdue No. Affected No. Not Affected

    109 59 59 0 0 2

    Fundamental Actions to address HPH’s (to be completed by site) Due Date Responsible Person

    PUE Control ID Control Name Control Owner Observation Affect Control*HPH

    IDCorrective / Immediate

    Action

    BW.00005830 -Injury from

    interaction with fixed plant, eg

    moving / rotating equipment,

    conveyors, pumps, pinch points,

    overhead cranes etc

    CT.00012616

    Prevention of people

    contacting moving parts by exclusion zones

    and guarding

    Wilkie Luke -6082047_Mc

    As per previous comment (CV303 and CV304 scraper guards U/S)

    No N/ARepair guards at head of CV303 and CV307 as per

    notificationsIdentified that the guards around the scrapers

    on CV303 and CV304 head have rusted exposing a pinch point. Notifications raised and maintenance supervisor informed. Area made safe with barricading. NOTI 11673630

    and 11673632.BW.00005800 -

    Equipment / operational (hot work related) fire resulting in injury,

    (including from tyre fire)

    CT.00012304

    Gas cylinders fit for purpose-flash back

    arrestors and deflector plates

    Clarke Adrian -17077_Mc

    Inspected ancillary. one oxy acetylene set did not have flash back arrestors on the

    handpiece. Arrestors present on both bottlesNo N/A

    Install flash back arrestors on handpiece and oxy &

    Acetylene bottles

    AAMC.001.031.0102CONFIDENTIAL

  • 60

    INTERNAL

    DAWSONAUDIT STATUS

    Audit Audit Completed

    Audit Report Drafted for Site review

    Audit Reportreviewed by

    site and accepted

    Audit Action Plan

    developed in Enablon

    Action Plan NameAudit

    Action Status

    2020 Legal Audit Completed Completed Completed AP.00776046 Dawson Mine Legal Compliance Action Plan 18%

    Legal Audits Completed Completed Completed AP.00090008 Dawson Mine Legal Compliance Action Plan 100%

    2019 Legal Audit Completed Completed Completed AP.00765572 Legal Compliance Audit 2019 Actions 100%

    2020 SHE Way Self

    Assessment

    Not Completed

    Not Completed

    Not Completed

    AAMC.001.031.0103CONFIDENTIAL

  • INTERNAL

    GRASSTREES&H Monthly Report – June 2020

    AAMC.001.031.0104CONFIDENTIAL

  • 62

    INTERNAL

    GRASSTREESAFETY OVERVIEW SUMMARY

    • Grasstree’s TARP status moved from Level 1 Status to Normal with no HPIs (YTD=0) and no TRCs reported during June (YTD TRC=6, LTI=2).

    • Grasstree remains HPI free > 17 months.

    • 3xCritical Control deficiencies which did not impact the integrity of the control were identified during June.

    • 1xHPH was reported in June (YTD=6).

    • Nil OCILs were recorded in June (YTD=2).

    • Nil overdue tasks including High Priority, Audit or Critical Control tasks at month end.

    • Nil incident investigations outstanding at month end.

    • SLT VFL June completion rate was above target at 111% (YTD 110%).

    AAMC.001.031.0105CONFIDENTIAL

  • 63

    INTERNAL

    GRASSTREEHIGH POTENTIAL INCIDENTS

    0.00

    0.20

    0.40

    0.60

    0.80

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.003MMA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0012MMA 0.60 0.60 0.59 0.58 0.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00

    Grasstree HPIFR 3MMA v 12MMA

    1

    Jan Feb Mar Apr May Jun

    Grasstree HPI CountYTD Comparison

    YTD 2019 YTD 2020

    2

    1 1 1 11

    2

    3

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Grasstree HPI v HPH Reporting

    HPI HPH

    AAMC.001.031.0106CONFIDENTIAL

  • 64

    INTERNAL

    GRASSTREEHIGH POTENTIAL HAZARDS

    0.00

    5.00

    10.00

    15.00

    20.00

    Jul-19 Aug-19Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 14.09 0.00 7.05 0.00 0.00 0.00 14.78 7.34 0.00 6.60 6.46 7.203MMA 4.61 4.73 7.02 2.30 2.30 0.00 4.99 7.60 7.16 4.59 4.41 6.7412MMA 5.99 4.17 4.12 4.08 4.08 2.93 3.54 4.15 3.54 4.10 4.69 5.27

    Grasstree HPHFR 3MMA v 12MMA

    1 1

    2 2 2 22

    3 3

    4

    5

    6

    1234567

    Jan Feb Mar Apr May Jun

    Grasstree HPH CountYTD Comparison

    YTD 2019 YTD 2020

    0

    1

    2

    3

    Grasstree SLT Reported HPH's

    SLT Reported Non SLT Reported

    ‘Reported by’ field removed from Enablon upgrade 11/05/2020

    AAMC.001.031.0107CONFIDENTIAL

  • 65

    INTERNAL

    GRASSTREETOTAL RECORDABLE CASES

    0.00

    5.00

    10.00

    15.00

    20.00

    Jul-19 Aug-19Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 7.04 0.00 7.05 13.32 7.01 8.13 7.39 14.68 13.56 0.00 6.46 0.003MMA 6.91 7.10 4.68 6.89 9.20 9.62 7.48 10.14 11.93 9.19 6.61 2.2512MMA 11.99 9.53 8.82 8.17 8.16 7.61 6.48 7.70 8.26 7.62 8.21 7.03

    Grasstree TRCFR 3MMA v 12MMA

    20.59 10.32 9.25 8.73 6.87 8.10

    7.39

    11.05 11.938.76 8.27

    6.94

    5.00

    10.00

    15.00

    20.00

    25.00

    Jan Feb Mar Apr May Jun

    Grasstree TRCFRYTD Comparison

    YTD 2019 YTD 2020

    3 34

    5 5

    7

    1

    3

    5 56 6

    12345678

    Jan Feb Mar Apr May Jun

    Grasstree TRC CountYTD Comparison

    YTD 2019 YTD 2020

    7.61 7.39 11.05 11.93 8.76 8.27 6.94

    6.85

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    12.00

    14.00Grasstree TRCFR YTD

    AAMC.001.031.0108CONFIDENTIAL

  • 66

    INTERNAL

    GRASSTREELOST TIME INJURIES

    0.00

    5.00

    10.00

    15.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 7.04 0.00 7.05 6.66 7.01 8.13 7.39 7.34 0.00 0.00 0.00 0.003MMA 6.91 7.10 4.68 4.59 6.90 7.22 7.48 7.60 4.77 2.30 0.00 0.0012MMA 10.19 7.75 7.65 6.42 6.41 6.44 5.89 6.51 5.90 5.28 5.28 4.10

    Grasstree LTIFR 3MMA v 12MMA

    13.73

    6.88 6.94 6.995.50

    6.947.39 7.36

    4.773.51 2.76 2.31

    2.004.006.008.00

    10.0012.0014.0016.00

    Jan Feb Mar Apr May Jun

    Grasstree LTIFRYTD Comparison

    YTD 2019 YTD 2020

    2 2

    3

    4 4

    6

    1

    2 2 2 2 2

    1234567

    Jan Feb Mar Apr May Jun

    Grasstree LTI CountYTD Comparison

    YTD 2019 YTD 2020

    6.44 7.39 7.36 4.77 3.51 2.76 2.31

    5.80

    0.001.002.003.004.005.006.007.008.009.00

    10.00

    Grasstree LTIFR YTD

    AAMC.001.031.0109CONFIDENTIAL

  • 67

    INTERNAL

    GRASSTREEOCCUPATIONAL ILLNESSES

    0.00

    2.00

    4.00

    6.00

    8.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 0.00 0.00 0.00 7.01 0.00 7.39 7.34 0.00 0.00 0.00 0.003MMA 0.00 0.00 0.00 0.00 2.30 2.41 4.99 5.07 4.77 2.30 0.00 0.0012MMA 1.20 1.19 1.18 1.17 1.17 1.17 1.18 1.78 1.77 1.76 1.76 1.76

    Capcoal Grasstree OCIL 3MMA v 12MMA FR

    6.86

    3.44

    2.311.75 1.37 1.16

    7.39 7.36

    4.77

    3.512.76

    2.31

    1.002.003.004.005.006.007.008.00

    Jan Feb Mar Apr May Jun

    Grasstree OCILFRYTD Comparison

    YTD 2019 YTD 2020

    1 1 1 1 1 11

    2 2 2 2 2

    1

    2

    3

    Jan Feb Mar Apr May Jun

    Grasstree OCIL CountYTD Comparison

    YTD 2019 YTD 2020

    1.17 7.39 7.36 4.77 3.51 2.76 2.31

    1.05

    0.00

    1.00

    2.00

    3.00

    4.00

    5.00

    6.00

    7.00

    8.00

    Capcoal Grasstree OCILFR YTD

    AAMC.001.031.0110CONFIDENTIAL

  • 68

    INTERNAL

    GRASSTREEOVERDUE TASKS

    5

    2

    1

    2

    3

    4

    5

    6

    Jan Feb Mar Apr May Jun

    Grasstree Overdue Tasks1

    Jan Feb Mar Apr May Jun

    Grasstree Overdue HP Tasks - Real Due Date

    1

    Jan Feb Mar Apr May Jun

    Grasstree Overdue Audit Tasks - Real Due Date1

    Jan Feb Mar Apr May Jun

    Grasstree Overdue CC Tasks - Real Due Date

    AAMC.001.031.0111CONFIDENTIAL

  • 69

    INTERNAL

    GRASSTREEVFL ANALYSIS

    104% 106% 117% 117% 103% 111% 110%20%

    40%

    60%

    80%

    100%

    120%

    140%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020YTD

    Grasstree SLT VFL % Target

    < 75% 75% - 95% > 95%

    95% 93% 95% 92% 93% 91% 0% 0% 0% 0% 0% 0%0%

    10%20%30%40%50%60%70%80%90%

    100%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Grasstree % Safe v Unsafe VFL Interactions

    Safe Unsafe

    11% 10% 11% 11% 9% 11% 0% 0%0%

    0% 0% 0%

    89% 90% 89% 89% 91% 89%

    0% 0% 0% 0% 0% 0%0%

    20%

    40%

    60%

    80%

    100%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Grasstree %SLT v Non-SLT VFL Interactions

    SLT Non-SLT

    AAMC.001.031.0112CONFIDENTIAL

  • 70

    INTERNAL

    Sign off required: Signature Date Document ControlGeneral Manager ____/____/ 2020 Forward to Head of OpsHead of Ops ____/____/ 2020 Forward to Head of S&HHead of S&H ____/____/ 2020 Forward to S&H Officer for filing

    GRASSTREE CRITICAL CONTROL DEFICIENCY SIGN OFF

    Overview of monitoring this month – June 2020 Deficiencies Identified this month

    Total Controls No.Scheduled No.Completed No.Overdue No. Affected No. Not Affected

    138 60 60 0 0 3

    PUE Control ID Control Name Control Owner Observation Affect Control*HPH ID

    Corrective / Immediate Action

    BW.00005526 -CMW are adversely

    affected by underground dust,

    coal dust, crystalline silica,

    coatings and sprays (Note: not

    referring to explosions)

    CT.00039226

    Dust suppression on the miner, belts, shearer (sprays)

    McNally Timothy - 940796_Mc

    Longwall - Longwall not operational during month due to

    relocation. Inspected spray circuits on install face and validated in accordance

    with relevant drawings. Inspected performance of new spray circuit on SWP on initial pressurization and appear to be

    effective. Performance feedback and environmental monitoring to be

    conducted once production commences as part of change management

    validation. Enablon actions TS.01229648 & TS.01229649 in

    place. LW dust mitigation WO post start-up indicates systems functioning

    correctly (attached).Conveyors - Inspected GCV910 tripper following commissioning and waiting for

    longwall production. Found dust suppression installation to be less than adequate. Issued instruction to rectify prior to LW coal and has been reported as complete. Maintenance inspection sheets for the tripper immediately after

    LW start-up (attached)indicate it has not been completed satisfactorily. Enablon

    action raised against this monitoring activity.

    No N/A

    Complete installation of GCV910 tripper air atomising

    sprays & dust containment cover and end flap

    AAMC.001.031.0113CONFIDENTIAL

  • 71

    INTERNAL

    Sign off required: Signature Date Document ControlGeneral Manager ____/____/ 2020 Forward to Head of OpsHead of Ops ____/____/ 2020 Forward to Head of S&HHead of S&H ____/____/ 2020 Forward to S&H Officer for filing

    GRASSTREE CRITICAL CONTROL DEFICIENCY SIGN OFF

    Overview of monitoring this month – June 2020 Deficiencies Identified this month

    Total Controls No.Scheduled No.Completed No.Overdue No. Affected No. Not Affected

    138 60 60 0 0 3

    PUE Control ID Control Name Control Owner Observation Affect Control*HPH

    IDCorrective / Immediate

    Action

    BW.00005600 -Inadequate

    drainage of inseam gas through SIS

    and UIS boreholes affecting longwall

    mining

    CT.00008390Borehole

    Intersection Notices

    Payne Matt -16225_Mc

    BIN tracking has been updated to now include not only the yearly running

    spreadsheet, but also a sequence plan based tracker to ensure the MSO are

    receiving BIN back based on the mining chainages.

    Tracking spreadsheet completed fortnightly due to coverage. Non-compliances have been found and incident forms raised for

    incorrect treatment and misinformation on the form by ERZC.

    No N/ARefer Observation Detail -No tasks created against

    inspection.

    Non-compliance due to 1x incident, 1x HPI in regards to BINs and treatment of boreholes

    for the month.1x incident of methane layering in 910MG

    due to boreholes not being treated as per the supplied BIN and then being signed off as

    completed correctly by the ERZ.1x HPI due to layering and high gas >2.5% in 810MG dogleg due to similar issue where the boreholes are intersected and not treated

    properly as per the supplied BIN.Document review for SWP.GTM.177 being completed to ensure it is clear enough how

    to treat boreholes (it is very clear) and crews have been counselled yet again on correctly grouting or hosing over holes. combination of

    complacency and production targets.

    AAMC.001.031.0114CONFIDENTIAL

  • 72

    INTERNAL

    Sign off required: Signature Date Document ControlGeneral Manager ____/____/ 2020 Forward to Head of OpsHead of Ops ____/____/ 2020 Forward to Head of S&HHead of S&H ____/____/ 2020 Forward to S&H Officer for filing

    GRASSTREE CRITICAL CONTROL DEFICIENCY SIGN OFF

    Overview of monitoring this month – June 2020 Deficiencies Identified this month

    Total Controls No.Scheduled No.Completed No.Overdue No. Affected No. Not Affected

    138 60 60 0 0 3

    Fundamental Actions to address HPH’s (to be completed by site) Due Date Responsible Person

    PUE Control ID Control Name Control Owner Observation Affect Control*HPH

    IDCorrective / Immediate

    Action

    BW.00005606 - A CMW is adversely

    affected due to exposure to a

    radiation source onsite (e.g. down

    hole loggers)

    CT.00009669

    Control of Energy SOP -

    Basic Isolation, Complex Personal

    Isolation & Complex Group

    Isolation process'

    Murphy Stuart -986930_Mc

    Both a basic and a Group Complex isolation were audited. There were issues identified in

    the Complex isolation which did not affect the integrity of the isolation as it was

    effective. an incident report was completed to capture the issues discovered. evidence

    attached as evidence.

    No N/A

    Complete incident report into deficiencies discovered

    during critical control monitoring activity on

    GCV910 Isolation

    AAMC.001.031.0115CONFIDENTIAL

  • 73

    INTERNAL

    GRASSTREEAUDIT STATUS

    Audit Audit Completed

    Audit Report Drafted for Site review

    Audit Reportreviewed by

    site and accepted

    Audit Action Plan

    developed in Enablon

    Action Plan NameAudit

    Action Status

    2018 ENV OCA Audit Yes Yes Yes AP.00740027 Grasstree 2018 Environment OCA 95%

    2020 ENV OCA Completed Completed Completed AP.00781546 2020 Environmental OCA Grasstree 53%

    2020 SHE Way Self

    Assessment

    Not Completed

    Not Completed

    Not Completed

    AAMC.001.031.0116CONFIDENTIAL

  • INTERNAL

    GROSVENORS&H Monthly Report – June 2020

    AAMC.001.031.0117CONFIDENTIAL

  • 75

    INTERNAL

    GROSVENORSAFETY OVERVIEW SUMMARY

    • Grosvenor’s TARP status remains at Level 3 reflecting ongoing recovery from a major injury event and subsequent sponcom event this month. No ‘Safety’ HPIs (YTD=2) or TRCs were reported during June (YTD TRC=11, LTI=9).

    • Mining has not resumed at Grosvenor following gas ignition event on 6th May (pending ongoing investigations). Mine developing re-entry and recovery plan.

    • 2xHPHs were reported during June (YTD=8). Note 1 event date was May however not reported due to June consequence dates.

    • 4 additional OCILs from May were recorded in June, no OCILs reported in June (YTD=9).

    • 13xCritical Control deficiencies were identified during June, 12 impacted the integrity of the controls resulting from monitoring not being completed due to gas ignition and spon com event underground. Mine currently evacuated with no access to underground workings. No risk to personnel as no access Underground. Monitoring activities will recommence once the mine is reopened.

    • Nil overdue tasks including High Priority, Audit or Critical Control tasks at month end.

    • 1 overdue HPI incident investigation remains at month end.

    • SLT VFL completion rate was above target at 115% (YTD 103%).

    AAMC.001.031.0118CONFIDENTIAL

  • 76

    INTERNAL

    GROSVENORHIGH POTENTIAL INCIDENTS

    1 11

    2 2

    1

    2

    1

    2

    3

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Grosvenor HPI / HPH Reporting

    HPI HPH

    0.00

    5.00

    10.00

    15.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 0.00 0.00 0.00 0.00 12.10 0.00 5.52 0.00 0.00 8.28 0.003MMA 0.00 0.00 0.00 0.00 0.00 3.93 3.88 5.72 1.87 1.87 2.11 2.4712MMA 0.00 0.00 0.00 0.00 0.00 1.01 1.00 1.47 1.46 1.46 1.99 2.05

    Grosvenor HPIFR 3MMA v 12MMA

    1 1 1

    2 2

    1

    2

    3

    Jan Feb Mar Apr May Jun

    Grosvenor HPI CountYTD Comparison

    YTD 2019 YTD 2020

    AAMC.001.031.0119CONFIDENTIAL

  • 77

    INTERNAL

    GROSVENORHIGH POTENTIAL HAZARDS

    23

    5

    89

    14

    13

    56 6

    8

    2468

    10121416

    Jan Feb Mar Apr May Jun

    Grosvenor HPH CountYTD Comparison

    YTD 2019 YTD 2020

    0.00

    5.00

    10.00

    15.00

    20.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 5.75 0.00 0.00 5.86 5.77 18.15 5.64 11.0311.28 5.71 0.00 18.333MMA 13.7411.86 1.99 2.00 3.96 9.82 9.69 11.45 9.33 9.37 6.34 7.4112MMA 11.5111.46 9.87 9.83 9.23 10.11 9.47 9.83 9.76 8.74 8.47 7.16

    Grosvenor HPHFR 3MMA v 12MMA

    0

    1

    2

    3

    Grosvenor SLT Reported HPH's

    SLT Reported Non SLT Reported

    ‘Reported by’ field removed from Enablon upgrade 11/05/2020

    AAMC.001.031.0120CONFIDENTIAL

  • 78

    INTERNAL

    GROSVENORTOTAL RECORDABLE CASES

    0.00

    20.00

    40.00

    60.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 17.2511.81 0.00 0.00 0.00 12.10 5.64 11.03 0.00 11.4249.69 0.003MMA 7.85 9.88 9.93 4.00 0.00 3.93 5.81 9.54 5.60 7.49 16.9119.7612MMA 13.6114.5914.0312.4210.26 9.10 7.98 8.35 6.35 6.31 8.97 9.21

    Grosvenor TRCFR 3MMA v 12MMA

    19.96 13.24 17.16 15.88 13.70 11.39

    5.648.36

    5.607.03

    13.2211.69

    5.00

    10.00

    15.00

    20.00

    25.00

    Jan Feb Mar Apr May Jun

    Grosvenor TRCFR

    YTD 2019 YTD 2020

    34

    8

    1011

    1

    3 3

    5

    11

    2

    4

    6

    8

    10

    12

    Jan Feb Mar Apr May

    Grosvenor TRC Count

    YTD 2019 YTD 2020

    9.10 5.64 8.36 5.60 7.03 13.22 11.69

    8.19

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    12.00

    14.00

    Grosvenor TRCFR YTD

    AAMC.001.031.0121CONFIDENTIAL

  • 79

    INTERNAL

    GROSVENORLOST TIME INJURIES

    0.00

    20.00

    40.00

    60.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 11.50 5.91 0.00 0.00 0.00 12.10 0.00 11.03 0.00 5.71 49.69 0.003MMA 3.93 5.93 5.96 2.00 0.00 3.93 3.88 7.63 3.73 5.62 14.7917.2912MMA 10.4710.9410.39 8.80 7.18 6.07 4.49 5.41 3.91 3.88 6.97 7.16

    Grosvenor LTIFR 3MMA v 12MMA

    19.96 9.93 12.87 11.11 8.72 7.25

    5.57

    3.73

    4.22

    10.829.56

    5.00

    10.00

    15.00

    20.00

    25.00

    Jan Feb Mar Apr May Jun

    Grosvenor LTIFR

    YTD 2019 YTD 2020

    3 3

    67 7 7

    2 23

    9 9

    123456789

    10

    Jan Feb Mar Apr May Jun

    Grosvenor LTI Count

    YTD 2019 YTD 2020

    6.07 5.57 3.73 4.22 10.82 9.56

    5.46

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    12.00

    Grosvenor LTIFR YTD

    AAMC.001.031.0122CONFIDENTIAL

  • 80

    INTERNAL

    GROSVENOROCCUPATIONAL ILLNESSES

    0.0010.0020.0030.0040.0050.0060.0070.0080.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 0.00 6.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 74.54 0.003MMA 0.00 0.00 1.99 2.00 1.98 0.00 0.00 0.00 0.00 0.00 19.0222.2312MMA 3.66 3.65 3.12 2.07 2.05 2.02 1.99 1.47 0.98 0.49 4.98 5.12

    Grosvenor OCILFR 3MMA v 12MMA

    2.02 10.82 9.56

    1.82

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    12.00

    Grosvenor OCILFR YTD

    12

    3 3 3

    9 9

    2

    4

    6

    8

    10

    Jan Feb Mar Apr May Jun

    Grosvenor OCIL CountYTD Comparison

    YTD 2019 YTD 2020

    3.314.29 4.76 3.74

    3.11

    10.829.56

    2.00

    4.00

    6.00

    8.00

    10.00

    12.00

    Jan Feb Mar Apr May Jun

    Grosvenor OCILFRYTD Comparison

    YTD 2019 YTD 2020

    AAMC.001.031.0123CONFIDENTIAL

  • 81

    INTERNAL

    GROSVENOROVERDUE TASKS

    1

    Jan Feb Mar Apr May Jun

    Grosvenor Overdue Tasks1

    Jan Feb Mar Apr May Jun

    Grosvenor Overdue HP Tasks - Real Due Date

    1

    Jan Feb Mar Apr May Jun

    Grosvenor Overdue Audit Tasks - Real Due Date1

    Jan Feb Mar Apr May Jun

    Grosvenor Overdue CC Tasks - Real Due Date

    AAMC.001.031.0124CONFIDENTIAL

  • 82

    INTERNAL

    GROSVENORVFL ANALYSIS

    90%120% 99% 99% 106% 115% 103%20%

    40%

    60%

    80%

    100%

    120%

    140%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2020YTD

    Grosvenor SLT VFL % Target

    < 75% 75% - 95% > 95%

    91% 93% 92% 93% 94% 94% 0% 0% 0% 0% 0% 0%0%

    10%20%30%40%50%60%70%80%90%

    100%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Grosvenor % Safe v Unsafe VFL Interactions

    Safe Unsafe

    8% 17% 7% 7% 7% 5% 0% 0% 0% 0% 0% 0%

    92% 83% 93% 93% 93% 95%

    0% 0% 0% 0% 0% 0%0%

    20%

    40%

    60%

    80%

    100%

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Grosvenor %SLT v Non-SLT VFL Interactions

    SLT Non-SLT

    AAMC.001.031.0125CONFIDENTIAL

  • 83

    INTERNAL

    Sign off required: Signature Date Document ControlGeneral Manager ____/____/ 2020 Forward to Head of OpsHead of Ops ____/____/ 2020 Forward to Head of S&HHead of S&H ____/____/ 2020 Forward to S&H Officer for filing

    GROSVENOR CRITICAL CONTROL DEFICIENCY SIGN OFF

    Overview of monitoring this month – June 2020 Deficiencies Identified this month

    Total Controls No.Scheduled No.Completed Action Required No. Affected No. Not Affected

    122 51 51 0 12 1

    PUE Control ID Control Name Control Owner ObservationAffect

    Control*

    HPH ID

    Corrective / Immediate

    ActionBW.00008816 -

    Irrespirable atmosphere/

    Explosive atmosphere/

    Engulfed personnel

    CT.00015104 Hard barrier across all Final Panel Seal sites during sealing

    Niehaus Charles -6141038_Mc

    Restricted access did

    not allow the monitoring

    activity to take place.

    Yes *

    Monitoring not completed due to gas ignition and spon com event underground. Mine currently evacuated with no access to underground workings. No

    risk to personnel as no access Underground.

    Monitoring activities will recommence

    once the mine is reopened.

    Site LFI has been conducted

    refer *IN.0022674.

    BW.00008736 - Gas \/ Hybrid Explosion

    CT.00015171 Cable management plan

    CT.00015236 Dilution through ventilation

    BW.00009537 -Failure of the gas

    monitoring system

    CT.00015739

    Priority Critical Control - ERZ-NERZ Boundary Installation Standards - Validate that the

    assurance process for gas monitoring installations is in place and effective.

    CT.00015741All tubes fitted with self-draining water traps at seal sites; All tubes fitted with end-of-line dust

    filters

    CT.00015743Priority Critical Control - ERZ-NERZ Boundary

    Installation Standards - audit of the UG workings for all new or changed installations.

    CT.00015744Priority Critical Control - ERZ-NERZ Boundary

    Installation Standards - Review the Gas Monitoring quality assurance report completed by the EEM.

    AAMC.001.031.0126CONFIDENTIAL

  • 84

    INTERNAL

    Sign off required: Signature Date Document ControlGeneral Manager ____/____/ 2020 Forward to Head of OpsHead of Ops ____/____/ 2020 Forward to Head of S&HHead of S&H ____/____/ 2020 Forward to S&H Officer for filing

    GROSVENOR CRITICAL CONTROL DEFICIENCY SIGN OFF

    Overview of monitoring this month – June 2020 Deficiencies Identified this month

    Total Controls No.Scheduled No.Completed Action Required No. Affected No. Not Affected

    122 51 51 0 12 1

    PUE Control ID Control Name Control Owner ObservationAffect

    Control*

    HPH ID

    Corrective / Immediate

    ActionBW.00009538 -

    Failure of the methane drainage system

    CT.00015880 UIS Methane Drainage Infrastructure

    Niehaus Charles -6141038_Mc

    Restricted access did not allow the monitoring activity to take

    place.

    Yes *

    Monitoring not completed due to gas ignition and spon com event underground. Mine currently evacuated with no access to underground workings. No

    risk to personnel as no access Underground.

    Monitoring activities will recommence

    once the mine is reopened.

    Site LFI has been conducted

    refer *IN.0022674.

    BW.00008205 - Spon Comb in sealed goaf CT.00017328 Stowage Management Plan

    Restricted access did not allow the monitoring activity to take

    place. Stowage inspections and permits had been completed and inspected by undermanagers and

    ERZC's prior to pit closure.

    BW.00037954 -Frictional Ignition

    CT.00066171 Minimum ventilation quantity on longwall face of 40m3/sec

    No longwall production activities & access restricted to face since

    6th May.

    CT.00066134Inspections & maintenance to ensure all picks and pick tips are in place and remain sharp

    Restricted access did not allow monitoring activity to occur - LW

    face under control of DNRME (Incident Scene)CT.00066177

    Effective water spray deluge on cutting heads, shearers, TG

    Drives, AFC Raceways, and shield canopies

    AAMC.001.031.0127CONFIDENTIAL

  • 85

    INTERNAL

    Sign off required: Signature Date Document ControlGeneral Manager ____/____/ 2020 Forward to Head of OpsHead of Ops ____/____/ 2020 Forward to Head of S&HHead of S&H ____/____/ 2020 Forward to S&H Officer for filing

    GROSVENOR CRITICAL CONTROL DEFICIENCY SIGN OFF

    Overview of monitoring this month – June 2020 Deficiencies Identified this month

    Total Controls No.Scheduled No.Completed Action Required No. Affected No. Not Affected

    122 51 51 0 12 1

    PUE Control ID Control Name Control Owner Observation Affect Control*HPH ID

    Corrective / Immediate Action

    BW.00008921 - Roof fall CT.00017136

    Geological Model maintained in compliance with OMS Standards

    Niehaus Charles -6141038_Mc

    Audit completed of MG105 hazard plan 22-41 ct. 1 non

    conformance found, action raised as appropriate to rectify. Audit

    Attached.

    No N/A Refer Audit attached INS.00386667Full audit of GRO-5313-PRO completed as per attached.

    Process is being mostly followed however some key areas

    addressing and clarification moving forward. Actions generated appropriately.

    Fundamental Actions to address HPH (to be completed by site) Due Date Responsible Person

    AAMC.001.031.0128CONFIDENTIAL

  • 86

    INTERNAL

    GROSVENORAUDIT STATUS

    Audit Audit Completed

    Audit Report Drafted for Site review

    Audit Reportreviewed by

    site and accepted

    Audit Action Plan

    developed in Enablon

    Action Plan NameAudit

    Action Status

    2019 Legal Audit Completed Completed Completed AP.00764751 2019 Grosvenor Legal Reviews 0%

    2019 Legal Audit Completed Completed Completed AP.00766350 2019 Statutory Compliance Audit 57%

    2020 SHE Way Self

    Assessment

    Not Completed

    Not Completed

    Not Completed

    AAMC.001.031.0129CONFIDENTIAL

  • INTERNAL

    MORANBAH NORTHS&H Monthly Report – June 2020

    AAMC.001.031.0130CONFIDENTIAL

  • 88

    INTERNAL

    MORANBAH NORTHSAFETY OVERVIEW SUMMARY

    • Moranbah TARP status moved from Normal State to Level 1 with no HPIs (YTD=2) and 2 TRCs/1 LTI reported during June (YTD TRC=5, LTI=2).

    • 6xHPHs were reported in June (YTD=18). Note 3 event dates were May however not reported due to June consequence dates.

    • Nil Critical Control deficiencies were identified during June.

    • 1xOCIL was recorded in June (YTD=1).

    • Nil overdue tasks including High Priority, Audit or Critical Control tasks at month end.

    • 2 overdue HPI incident investigations remain outstanding at month end.

    • SLT VFL completion rate was below target at 58% (YTD 63%).

    AAMC.001.031.0131CONFIDENTIAL

  • 89

    INTERNAL

    MORANBAH NORTHHIGH POTENTIAL INCIDENTS

    1 12 2

    1

    43

    6

    1234567

    Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

    Moranbah North HPI / HPH Reporting

    HPI HPH

    0.001.002.003.004.005.00

    Jul-19

    Aug-19

    Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 0.00 4.32 0.00 0.00 0.00 0.00 3.90 0.00 3.68 0.00 0.00 0.003MMA 0.00 1.46 1.44 1.43 0.00 0.00 1.37 1.34 2.52 1.24 1.23 0.0012MMA 0.76 0.75 0.74 0.73 0.72 0.71 1.06 0.69 1.04 1.03 1.01 1.00

    Moranbah North HPIFR 3MMA v 12MMA

    1 1 1 1 11 1

    2 2 2 2

    1

    2

    3

    Jan Feb Mar Apr May Jun

    Moranbah North HPI CountYTD Comparison

    YTD 2019 YTD 2020

    AAMC.001.031.0132CONFIDENTIAL

  • 90

    INTERNAL

    MORANBAH NORTHHIGH POTENTIAL HAZARDS

    1

    57 8

    9

    16

    24 5

    9

    12

    18

    5

    10

    15

    20

    Jan Feb Mar Apr May Jun

    Moranbah North HPH CountYTD Comparison

    YTD 2019 YTD 2020

    0.00

    5.00

    10.00

    15.00

    20.00

    25.00

    Jul-19 Aug-19Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 8.59 0.00 0.00 4.17 4.07 8.85 7.80 7.58 3.68 14.69 11.26 23.403MMA 14.58 13.12 2.88 1.43 2.80 5.62 6.87 8.04 6.31 8.66 9.87 16.3512MMA 7.99 7.49 6.99 7.26 7.53 7.80 8.15 7.29 6.93 7.87 8.45 8.02

    Moranbah North HPHFR 3MMA v 12MMA

    0

    1

    2

    3

    4

    5

    Moranbah North SLT Reported HPH's

    SLT Reported Non SLT Reported

    ‘Reported by’ field removed from Enablon upgrade 11/05/2020

    AAMC.001.031.0133CONFIDENTIAL

  • 91

    INTERNAL

    MORANBAH NORTH TOTAL RECORDABLE CASES

    0.00

    5.00

    10.00

    15.00

    Jul-19 Aug-19Sep-19

    Oct-19

    Nov-19

    Dec-19

    Jan-20

    Feb-20

    Mar-20

    Apr-20

    May-20

    Jun-20

    Monthly 8.59 0.00 8.74 0.00 8.14 4.43 3.90 3.79 0.00 3.67 0.00 7.803MMA 4.37 2.91 5.77 2.86 5.