Coach No. :SR02247 Type : WGSCN Built Year : 2002 Make : ICF Form No. F/BR/ICF/002 Valid From: 02/04/2015 Coach Rehabilitation Workshop, WC Railway, Bhopal (An IMS and ISO 50001 Certified Workshop) Final Inspection Sheet - Details of Corrosion Repair Rotary Side Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per% Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100% Aux. Head stock 4 100% Sole Bar 5 28% Draft Gear Bracket 2 100% Trough floor 7 100% Centre plate 2 100% SoleBar Stiffner 4 100% Bottom Wall Part 5 28% Body panel/patch 100% Door Top/Roof Patch 100% Window Module 0% Window Sill 40 100% Window Bar 54 30% Seat piller/lav. Partition 100% UIC end construction 100% End Drooping: Rotery End - EAST : -8, WEST : -3 Other End - EAST : -5, WEST : -8 Start Date : 19-May-2017, Completion Date : 29-May-2017, Net Repair Days : 9, Total Man Hours : 2040 U S BAJPAI - SSE P N VISHWKARMA - SSE MANOJ AGARAWA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR02247 Type : WGSCN Built Year : 2002 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 5 28% Draft Gear Bracket 2 100%Trough floor 7 100% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 5 28% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 40 100% Window Bar 54 30%Seat piller/lav. Partition 100% UIC end construction 100%

End Drooping: Rotery End - EAST : -8, WEST : -3 Other End - EAST : -5, WEST : -8Start Date : 19-May-2017, Completion Date : 29-May-2017, Net Repair Days : 9, Total Man Hours : 2040

U S BAJPAI - SSE P N VISHWKARMA - SSE MANOJ AGARAWA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 2: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR02413 Type : GS Built Year : 2002 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 9 56% Draft Gear Bracket 2 100%Trough floor 0 0% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 9 56% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 14 35% Window Bar 52 28%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : 0 Other End - EAST : -3, WEST : -10Start Date : 12-May-2017, Completion Date : 22-May-2017, Net Repair Days : 9, Total Man Hours : 1692

U S BAJPAI - SSE P N VISHWKARMA - SSE MANOJ AGARAWA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 3: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR03202 Type : WGSCN Built Year : 2017 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 7 100% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 40 100% Window Bar 118 64%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 6, WEST : -2 Other End - EAST : 0, WEST : 5Start Date : 15-May-2017, Completion Date : 25-May-2017, Net Repair Days : 10, Total Man Hours : 2748

H R KANNOJE - SSE K K TRIPATHI - SSE MANOJ AGARAWA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 4: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR03240 Type : WGSCN Built Year : 2003 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 9 53% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 9 53% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 21 53% Window Bar 68 38%Seat piller/lav. Partition 0% UIC end construction 0%

End Drooping: Rotery End - EAST : -3, WEST : 5 Other End - EAST : 4, WEST : -5Start Date : 14-Jun-2017, Completion Date : 21-Jun-2017, Net Repair Days : 7, Total Man Hours : 1500

R PILLAI - SSE A K D SHARMA - SSE MANOJ AGARAWA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 5: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR03247 Type : WGSCN Built Year : 2003 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 0 0% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 28 70% Window Bar 54 29%Seat piller/lav. Partition 100% UIC end construction 100%

End Drooping: Rotery End - EAST : 5, WEST : 4 Other End - EAST : -10, WEST : -10Start Date : 31-May-2017, Completion Date : 09-Jun-2017, Net Repair Days : 9, Total Man Hours : 2000

NISHANK VERMA - JE P S RATHORE - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 6: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR03402 Type : GS Built Year : 2003 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 0 0% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 40 100% Window Bar 54 29%Seat piller/lav. Partition 0% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : -3 Other End - EAST : 8, WEST : 5Start Date : 01-Jun-2017, Completion Date : 08-Jun-2017, Net Repair Days : 7, Total Man Hours : 2084

AMIT VISHWAKARMA -SSE

MAYANK PRAJAPATI - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 7: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR03409 Type : GS Built Year : 2003 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 10 59% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 10 59% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 14 35% Window Bar 52 28%Seat piller/lav. Partition 0% UIC end construction 0%

End Drooping: Rotery End - EAST : 4, WEST : 3 Other End - EAST : 4, WEST : 5Start Date : 23-May-2017, Completion Date : 01-Jun-2017, Net Repair Days : 9, Total Man Hours : 1816

NISHANK VERMA - JE P S RATHORE - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 8: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR03423 Type : GS Built Year : 2003 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 7 44% Draft Gear Bracket 2 100%Trough floor 0 0% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 7 44% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 40 100% Window Bar 60 33%Seat piller/lav. Partition 0% UIC end construction 0%

End Drooping: Rotery End - EAST : -6, WEST : 0 Other End - EAST : 5, WEST : 6Start Date : 02-Jun-2017, Completion Date : 12-Jun-2017, Net Repair Days : 9, Total Man Hours : 1500

P N VISHWKARMA - SSE U S BAJPAI - SSE MANOJ AGARAWA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 9: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR03428 Type : GS Built Year : 2003 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 9 53% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 9 53% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 35 88% Window Bar 54 29%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 6, WEST : 4 Other End - EAST : 5, WEST : 2Start Date : 05-May-2017, Completion Date : 15-May-2017, Net Repair Days : 9, Total Man Hours : 1856

K K TRIPATHI - SSE H R KANNOJE - SSE MANOJ AGARAWA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 10: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR03436 Type : GS Built Year : 2017 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 40 100% Window Bar 54 29%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : 0 Other End - EAST : 5, WEST : 5Start Date : 03-May-2017, Completion Date : 11-May-2017, Net Repair Days : 8, Total Man Hours : 1884

P S RATHORE - JE NISHANK VERMA - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 11: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR04213 Type : WGSCN Built Year : 2004 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 8 50% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 8 50% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 40 100% Window Bar 70 39%Seat piller/lav. Partition 0% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : -6 Other End - EAST : 5, WEST : 8Start Date : 20-Jun-2017, Completion Date : 29-Jun-2017, Net Repair Days : 9, Total Man Hours : 2004

PANKAJ KU SINGH - JE S K SHARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 12: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR04237 Type : WGSCN Built Year : 2004 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 11 69% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 11 69% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 100 56%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -10, WEST : -10 Other End - EAST : 10, WEST : 10Start Date : 01-Jul-2017, Completion Date : 12-Jul-2017, Net Repair Days : 10, Total Man Hours : 2088

PANKAJ KU SINGH - JE S K SHARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 13: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR04248 Type : WGSCN Built Year : 2004 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 21 53% Window Bar 50 28%Seat piller/lav. Partition 0% UIC end construction 0%

End Drooping: Rotery End - EAST : -7, WEST : -6 Other End - EAST : -5, WEST : -3Start Date : 25-May-2017, Completion Date : 02-Jun-2017, Net Repair Days : 8, Total Man Hours : 1896

K K TRIPATHI - SSE H R KANNOJE - SSE MANOJ AGARAWA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 14: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR04272 Type : WGSCN Built Year : 2004 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 7 44% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 7 44% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 76 43%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -5, WEST : 0 Other End - EAST : 6, WEST : 4Start Date : 22-Jul-2017, Completion Date : 31-Jul-2017, Net Repair Days : 8, Total Man Hours : 1664

K K TRIPATHI - SSE H R KANNOJE - SSE MANOJ AGARAWA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 15: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR04288 Type : WGSCN Built Year : 2004 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 6 38% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 6 38% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 28 70% Window Bar 54 29%Seat piller/lav. Partition 100% UIC end construction 100%

End Drooping: Rotery End - EAST : 5, WEST : 7 Other End - EAST : 5, WEST : 4Start Date : 17-May-2017, Completion Date : 25-May-2017, Net Repair Days : 8, Total Man Hours : 1656

MAYANK PRAJAPATI - JE AMIT VISHWAKARMA -SSE

ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 16: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR04304 Type : WGSCN Built Year : 2004 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 40 100% Window Bar 50 28%Seat piller/lav. Partition 100% UIC end construction 100%

End Drooping: Rotery End - EAST : -10, WEST : -6 Other End - EAST : -10, WEST : -7Start Date : 15-May-2017, Completion Date : 23-May-2017, Net Repair Days : 8, Total Man Hours : 1856

NISHANK VERMA - JE P S RATHORE - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 17: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR04430 Type : GS Built Year : 2004 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 8 50% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 8 50% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 21 53% Window Bar 70 38%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -10, WEST : -10 Other End - EAST : 0, WEST : -5Start Date : 10-Jul-2017, Completion Date : 18-Jul-2017, Net Repair Days : 8, Total Man Hours : 1752

K K TRIPATHI - SSE H R KANNOJE - SSE MANOJ AGARAWA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 18: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR04447 Type : GS Built Year : 2004 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 13 78% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 13 78% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 40 100% Window Bar 54 29%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 10, WEST : 3 Other End - EAST : 0, WEST : 0Start Date : 08-May-2017, Completion Date : 18-May-2017, Net Repair Days : 10, Total Man Hours : 1836

S K SHARMA - SSE PANKAJ KU SINGH - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 19: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR04728 Type : GSLRD Built Year : 2004 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 0 0% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 8 42% Window Bar 20 24%Seat piller/lav. Partition 0% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : -5 Other End - EAST : 0, WEST : -6Start Date : 30-May-2017, Completion Date : 10-Jun-2017, Net Repair Days : 11, Total Man Hours : 1876

P N VISHWKARMA - SSE U S BAJPAI - SSE MANOJ AGARAWA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 20: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR05298 Type : WGSCN Built Year : 2005 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 7 44% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 7 44% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 74 42%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -4, WEST : 0 Other End - EAST : -10, WEST : -10Start Date : 22-Jul-2017, Completion Date : 28-Jul-2017, Net Repair Days : 6, Total Man Hours : 1788

AMIT VISHWAKARMA -SSE

MAYANK PRAJAPATI - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 21: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR05311 Type : WGSCN Built Year : 2005 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 4 25% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 4 25% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 28 70% Window Bar 54 30%Seat piller/lav. Partition 100% UIC end construction 100%

End Drooping: Rotery End - EAST : -10, WEST : -10 Other End - EAST : 8, WEST : 4Start Date : 23-May-2017, Completion Date : 30-May-2017, Net Repair Days : 7, Total Man Hours : 1472

AMIT VISHWAKARMA -SSE

MAYANK PRAJAPATI - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 22: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR05323 Type : WGSCN Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 8 50% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 8 50% Body panel/patch 0% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 76 41%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : -6 Other End - EAST : 0, WEST : 0Start Date : 20-Jul-2017, Completion Date : 27-Jul-2017, Net Repair Days : 7, Total Man Hours : 1688

PANKAJ KU SINGH - JE S K SHARMA - SSE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 23: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR05440 Type : GS Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 10 63% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 10 63% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 35 88% Window Bar 54 29%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 3, WEST : -3 Other End - EAST : -5, WEST : -2Start Date : 04-May-2017, Completion Date : 12-May-2017, Net Repair Days : 8, Total Man Hours : 1852

A K D SHARMA - SSE R PILLAI - SSE MANOJ AGARAWA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 24: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR05453 Type : GS Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 8 47% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 8 47% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 28 70% Window Bar 70 38%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 5, WEST : 7 Other End - EAST : -5, WEST : -3Start Date : 10-Jul-2017, Completion Date : 15-Jul-2017, Net Repair Days : 6, Total Man Hours : 1376

P S RATHORE - JE NISHANK VERMA - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 25: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR05468 Type : GS Built Year : 2005 Make : ICF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 25 78% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 6 100%Bottom Wall Part 25 78% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 40 100% Window Bar 54 29%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : -6, WEST : 0 Other End - EAST : -2, WEST : 6Start Date : 15-Apr-2017, Completion Date : 25-Apr-2017, Net Repair Days : 9, Total Man Hours : 1784

P S RATHORE - JE NISHANK VERMA - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 26: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR05745 Type : GSLRD Built Year : 2005 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 3 43% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 100%Window Module 0% Window Sill 10 53% Window Bar 38 45%Seat piller/lav. Partition 0% UIC end construction 0%

End Drooping: Rotery End - EAST : -10, WEST : 0 Other End - EAST : -10, WEST : -10Start Date : 29-May-2017, Completion Date : 05-Jun-2017, Net Repair Days : 7, Total Man Hours : 2240

MAYANK PRAJAPATI - JE AMIT VISHWAKARMA -SSE

ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 27: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR05747 Type : GSLRD Built Year : 2005 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 2 29% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 14 74% Window Bar 32 38%Seat piller/lav. Partition 100% UIC end construction 0%

End Drooping: Rotery End - EAST : 0, WEST : -8 Other End - EAST : 0, WEST : -3Start Date : 04-Jul-2017, Completion Date : 14-Jul-2017, Net Repair Days : 10, Total Man Hours : 2536

K K TRIPATHI - SSE H R KANNOJE - SSE MANOJ AGARAWA - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge

Page 28: Coach Rehabilitation Workshop, WC Railway, Bhopalwcr.indianrailways.gov.in/uploads/files/1503471977544-SR.pdfCoach Rehabilitation Workshop, WC Railway,Bhopal (An IMS and ISO 50001

Coach No. :SR05754 Type : GSLRD Built Year : 2005 Make : RCF

Form No. F/BR/ICF/002 Valid From: 02/04/2015

Coach Rehabilitation Workshop, WC Railway, Bhopal(An IMS and ISO 50001 Certified Workshop)

Final Inspection Sheet - Details of Corrosion Repair

Rotary Side

Color Particulars Qty Per% Color Particulars Qty Per% Color Particulars Qty Per%Headstock Beam 2 100% Centre Stiffner for Headstock 4 100% Floor Stiffner for Headstock 4 100%Aux. Head stock 4 100% Sole Bar 32 100% Draft Gear Bracket 2 100%Trough floor 3 43% Centre plate 2 100% SoleBar Stiffner 4 100%Bottom Wall Part 32 100% Body panel/patch 100% Door Top/Roof Patch 0%Window Module 0% Window Sill 14 74% Window Bar 32 38%Seat piller/lav. Partition 0% UIC end construction 0%

End Drooping: Rotery End - EAST : -10, WEST : -7 Other End - EAST : -10, WEST : -10Start Date : 01-Jul-2017, Completion Date : 07-Jul-2017, Net Repair Days : 6, Total Man Hours : 2352

AMIT VISHWAKARMA -SSE

MAYANK PRAJAPATI - JE ARUN SINGH - SSE A.R.R. KURUP - SSE Verified By:QU-Incharge