Upload
mackenzie-connolly
View
213
Download
0
Tags:
Embed Size (px)
Citation preview
Co-funded by the European Commission within the GMES initiative in FP-6
Integrated GMES Project on Landcover and Vegetation
geoland
Plans for Geoland “follow-on”Emphasis on global activities
Marc Leroy, Etienne Bartholomé, Jean-Christophe Calvet, and Marek Tinz
12 July 2006 HALO Workshop, Toulouse
geoland
2
Geoland structure
Globalsurface- atmosphere
surface
Regional / Europe
Land Surface Monitoring
Globalsurface- atmosphere
surface
Regional / Europe
Land Surface Monitoring
12 July 2006 HALO Workshop, Toulouse
geoland
3
GMES Urban Services
GMES SAGE
GMES Forest Monitoring / GSE FM
TerraFirma / GSE GeoHazards
CoastWatch
ES
AG
ME
S S
ervi
ce
Ele
men
ts G
SE
geoland outlook
Core Service
Interreg, LIFE, national / regional funding
Core ServicesEuropean Land Monitoring
Downstream ServiceOpportunities
?
?
2013
Land Cover & Vegetation (geoland)
EC
-FP
-6
Inte
grat
ed
Pro
ject
s2004
GSE Land Information
Services
20072006
Pilot Service“Land Monitoring”
IP Long Term Sustainability
Op
era
tion
Impl
emen
tatio
nC
onso
lidat
ion
Precursor
2005 2008
FP 7 ?
GMES Urban Services
GMFS GMFS
GlobCover
Core ServicesGlobal Land Monitoring
Pilot Service“Global Land Monitoring”
12 July 2006 HALO Workshop, Toulouse
geoland
4
geoland objectives – Global Observatories
GEOLAND• the goal was to integrate European capacities, by assembling
them in a common work & objectives• preoperational demonstration consisted in off-line production
for each segment • organize R & D efforts oriented towards service needs
GEOLAND “Follow-on”• consolidate integration of national and European capacities,
including ESA efforts• pre-operational demonstration will consist to set up and run
near real time operational processes in each segment• develop the R & D work oriented towards service needs
12 July 2006 HALO Workshop, Toulouse
geoland
5
User Segment
Service Concept
European UnionPolicy support
CoreService
Downstream Services
Biogeophysical variables
- vegetation- radiation- water
MARS Africa Observ.
Land Carbon
Seasonal Eur. Mon.
Space & In-situ data
Low – Medium resolution satellites
geostationary -heliosynchronous
High resolution satellites
Ground truth
12 July 2006 HALO Workshop, Toulouse
geoland
6
User Segment (established / foreseen in short term)
• MARS DG AGRI: though MARS-PAC (MoU) DG AIDCO: through MARS-FOOD (MoU) FAO: through JRC/MARS-FOOD (MoU) (contract FAO DG Aid Co)
• Africa Observatory DG RELEX, DEV, AIDCO through JRC (MoU) UNEP: though JRC/AfObs-Env (MoU) FAO: JRC/AfObs-Env (MoU) DG ENV: contact in place by Af.Obs, no MoU AMESD directly with project and/or AU when in place
• Land carbon ECMWF: project partner DG ENV: contacts to be consolidated EEA: contacts to be consolidated National level: no specific agreement, possible channel through
EUMETNET
• Seasonal Monitoring Europe EEA DG Env ?
12 July 2006 HALO Workshop, Toulouse
geoland
7
Core Service / Downstream services
• A Core service is a service whose users are in charge of the implementation of EU sectoral policies
• Downstream services are services for other users. They include :
GEMS Atmospheric Services at ECMWF
FAO, UNEP, AMESD, EUMETNET (customers of the Core Service through Service Level Agreements)
others, to be identified later national regional other users through GEOSS ...
12 July 2006 HALO Workshop, Toulouse
geoland
8
Space & In-situ data
Vegetation Water Radiation
Space SegmentGlobal &
Continent.Coverage
In situ & validation
data
CO2
Soil moisture
High Resolution Images :
SPOT, Landat, IKONOS,
Air photos
Carbon Storage
Avhrr
VGT
Meris
Atsr
Modis
Amsr
Smos
Ascat
MSG Goes
OthersSmmi
Sentinel 3 EPS
Leaf Area Index
RadiationCrop yield and area
Environmental Stress Indicators
12 July 2006 HALO Workshop, Toulouse
geoland
9
Management Concept (tentative, TBC)
Biogeophysical Parameters
MARS Africa Observatory Land Carbon
NRT Operations R & D
NRT Op
R & D NRT Op
R & D NRT Op R & D NRT OpR & D
Vegetation
Radiation
Water
Technical Coordination & Project Management
Seasonal Monitoring of Europe
Lead : JRC Lead : ECMWF Lead : EEA
Lead : Medias-France
12 July 2006 HALO Workshop, Toulouse
geoland
10
Users
Near Real Time Operational Data Flow
CoreService
Biogeophysical variables
MARS Africa Observ.
Land Carbon
Seasonal Eur. Mon.
Space Segment
Modis Vegetation Sentinel 3 Seviri Ascat Other Geostat. Sensors
LAI, fCover, NDVI, Burnt Areas, Active Fires, Soil Moisture, Precipitation, Water Bodies, Temperature, Albedo,, Downwelling Flux
Information Bulletins + CO2 flux + Biogeophysical variables
European Union Downstream Services
MerisAvhrr / Eps Ers / Scatt
12 July 2006 HALO Workshop, Toulouse
geoland
11
R & D Plan
IN SITU DATA• Develop and maintain network of in-situ measurements for the validation of output products ;
FLUXNET, VALERI, Soil Moisture, BSRN, Carbon storage, Crop yield & areas, Environmental stress indicators
ALGORITHMS• Develop methodologies for customizing the products to user needs (example : filling gaps in
space & time)• Prepare multi-sensor fusion methodologies• Provide a platform of intercomparison of existing algorithms (“benchmarking”); produce &
document advices for further processing• Preparing the next generation of products / algorithms (to be produced operationally in the
next 2 or 4 years)
PROCESSING LINES• Produce with updated methodologies operational and validated processing lines to be
delivered to the NRT Op component
PRODUCTS• Producing archives of time series of all output variables. Reprocess these archives with
updated generations of algorithms
12 July 2006 HALO Workshop, Toulouse
geoland
12
Implementation Plan
INTEGRATION OF CAPACITIES
• Ensure coordination between near real time operations providers in Europe in particular land SAF (MSG. METOP, MODIS/TBC), VITO (VGT,
MERIS/TBC), MEDIAS-France (off-line reprocessing), EUMETSAT (incl. hydro products),
and operators for key operational or pre-operational applications, namely JRC/MARS & Africa Obs, ECMWF, EEA
take steps towards medium resolution pre-op. operation
• Integration of results from ESA GMES programs, such as Globcover, GMFS, Kyoto ARD, Globcarbon, and relevant national projects
• Prepare Service Level Agreements between service providers, and between providers and users
• Ensure centralized/coordinated communication and distribution access
NEAR REAL TIME PRODUCTION• Implement processing lines delivered by the R&D component in each segment• Production in near real time of biogeophysical parameters, operated from the
beginning of the project, NRT production soon after for the other components
12 July 2006 HALO Workshop, Toulouse
geoland
13
Sustainability
The goal of Geoland “follow-on” is to set up near real time operational capacity and proper European & national integration.
Steps to go to truly operational capacity need to be identified – part of GMES governance
• funding source
• funding mechanism
• milestones and planning