CNBC Global Headquarters. Lighting Design by: Christine Cajilig Lighting/Electrical Advisor: Dr. Mistrick. Building Overview: CNBC Global Headquarters. State of the art all-digital broadcasting facility Studios to tape and air all business news programming - PowerPoint PPT Presentation
Citation preview
CNBC Global CNBC Global HeadquartersHeadquarters
Lighting Design by:Christine CajiligLighting/ElectricalAdvisor: Dr. Mistrick
Building Overview: CNBC Building Overview: CNBC Global HeadquartersGlobal Headquarters
• State of the art all-digital broadcasting facility
• Studios to tape and air all business news programming• Supporting office spaces, cafeteria, gym
The Spaces for Lighting The Spaces for Lighting RedesignRedesign
• Business News Open Office• 1st Floor Cafeteria Seating• East Lobby• East Plaza/Façade
Key Design Words:Key Design Words:
FirmFirmWell RootedWell Rooted
SimpleSimpleMassiveMassive
BoldBoldState of the ArtState of the Art
ModernModern
Overall Design Goals:Overall Design Goals:
• To create a simple, modernistic, lighting design to reflect CNBC’s reputation as one of the broadcasting industry’s giants.
• To lower the existing power densities while achieving aesthetic beauty.
Overview: Business News Overview: Business News Open OfficeOpen Office
• Architectural Features:-Dropped and cantered
ceiling tile panels-CNBC murals on all walls
• Function:-Support office for the 3 broadcasting studios
Space Space Layout: Layout: Business Business News News Open Open OfficeOffice
Schematic Design: Schematic Design: Business News Open Business News Open
OfficeOffice• Design Goals:
-Promote a conducive working ambiance-Showcase the murals on the walls by providing 10 fc-Create a clean, simplistic lighting design-Provide 20 fc of horizontal illuminance from ambient lighting-Provide an additional 30 fc from task lighting
Schematic Design: Schematic Design: Business News Open Business News Open
OfficeOffice
Schematic Design: Schematic Design: Business News Open Business News Open
OfficeOffice
Luminous Ceiling Panel
Work Station Task Lighting
CNBC Signage
Looking at the South end of the space
Flat panel LCD monitors
Looking at the North end of the space (toward Studios)
Studio
Schematic Design Schematic Design Summary: Business News Summary: Business News
Open OfficeOpen Office• Luminous ceilings for diffuse ambient lighting• Wash perimeter walls to highlight the colorful
murals, especially the north wall to lessen the drastic visual change from bright studio to dark walls
• Avoid light on the 2 large VDT screens • Provide task lights for added illuminance levels
on work station desks• Wash the CNBC signage for accent
Overview: 1Overview: 1stst Floor Floor CafeteCafeteriaria
• Architectural Features:-Anigure wood paneling on stair walls-Blue terrazzo accent walls-Terrazzo floor tiles- Ribbon windows on north south ends-Metal fabric ceiling on middle section of cafeteria
• Function:-Extended seating area for ground floor cafeteria
Space Space Layout: 1Layout: 1stst Floor Floor CafeteriaCafeteria
Schematic Design: 1Schematic Design: 1stst Floor CafeteriaFloor Cafeteria
• Design Goals:-Promote a relaxing dining ambiance-Make the higher ceiling areas appear more spacious-Showcase the different materials in the space: metals, wood, and terrazzo-Provide 15 fc on the dining tables and a maximum of 10 fc elsewhere on the space-Provide 10 fc of vertical illuminance for art and areas to be accented
Schematic Design: 1Schematic Design: 1stst Floor CafeteriaFloor Cafeteria
Cove Lighting Over Stairs
Wood Wall Accent Lighting Metal Column Accent
Blue Terrazzo Wall
Wood Wall
Looking at the East end of the space (North part of the cafeteria)
Recessed Wall Washer for Terrazzo Columns
Looking at the West end of the space (South and Mid part of the cafeteria)
Schematic Design Schematic Design Summary: 1Summary: 1stst Floor Floor Cafeteria SeatingCafeteria Seating
• Cove lighting to provide a spacious feel and heightens ceiling
• Accent lighting on columns, artwork, terrazzo walls, and perimeter windows creates an uneven luminance distribution and promotes relaxation
• Uplights on inner stair edges to accents Anigure wood walls
• Metals, terrazzo, and wood materials are highlighted for contrast
Overview: East LobbyOverview: East Lobby• Architectural Features: -Curved and sloped glass curtain
wall -3 story CNBC colorful panels along the west wall -3 story aluminum sloped columns
along the glass curtain wall-Metal panel ceiling tiles-Dark blue terrazzo floor-Anigure wood veneer on 3-story north and south walls
• Function:- high traffic, high profile area where most studio guests and visitors enter
Space Layout: East Space Layout: East LobbyLobby
Schematic Design: East Schematic Design: East LobbyLobby
• Design Goals:-Emphasize the 3-story colorful panels-Create a modernistic and grand first impression-Provide 30 fc for task light on the security desk-Properly direct visitors and studio guests to the broadcasting studios-Accent the wood walls to create a contrast between the wood and metals in the space
Schematic Design: East Schematic Design: East LobbyLobby
Lobby Section: Panel Lighting
Schematic Design: East Schematic Design: East LobbyLobby
Lobby Desk Plan View
Lobby Desk Section
Schematic Design: East Schematic Design: East LobbyLobby
Column Detail: Inside Lobby
Studio Doors
Backlight
Looking at West end of the space (Glass curtain walls on the opposite side)
Looking into the lobby from the exterior
Schematic Design Schematic Design Summary: East LobbySummary: East Lobby
• Accent the banners with spot lights• Wash 3-story north and south walls to
showcase the Anigure wood• Recessed floor uplights on columns• Wash back wall where the doors to studios
are located• Wash door with colored light to draw even
more attention to it• Task light for lobby security/reception desk
Overview: East Overview: East Plaza/FaçadePlaza/Façade
• Architectural Features:-preformed metal canopy over the entry doors -decorative white and black terrazzo tiles on the plaza-trapezoidal planters scattered intermittently over the plaza
• Function:
-Open area leading into the building serving the building’s main entry point
Space Space Layout: Layout: East Plaza/East Plaza/FaçadeFaçade
Schematic Design: East Schematic Design: East Plaza/FaçadePlaza/Façade
• Design Goals:-Promote a safe, secure atmosphere-Showcase the lit lobby behind the glass curtain walls-Direct visitors and guests to the entry doors-Provide 5 fc on the building entrance under the canopy-Provide 0.6 fc on the plaza ground
Schematic Design: East Schematic Design: East Plaza/FaçadePlaza/Façade
Canopy and Metal Door Frame Lighting
Plaza Grounds Lighting
Schematic Design: East Schematic Design: East Plaza/FaçadePlaza/Façade
Canopy Lighting
East Plaza and Main Entrance
Schematic Design Schematic Design Summary: East Summary: East Plaza/FaçadePlaza/Façade
• Uplight the large metal door frame for the double door entrance
• Path lights on plaza leading to the entryway
• Floor washlights to wash the black strips of terrazzo tiles
Electrical ProposalElectrical Proposal
Electrical Proposal: Existing Electrical Proposal: Existing System OverviewSystem Overview
• Radial system to distribute power from the utility
• 13.2 KV stepped down to 480/277V by (2) 2500kVA transformers by CNBC owned substation unit
• Transformers feed a 4000A switchboard in the basement of the CNBC building
• Backed by generator set of (2) 2,000 kW, 480Y/277V each
• Technical equipment backed by (2) power-tied 1000kVA static UPS with 13 minute battery back-up
Electrical Proposal:Electrical Proposal:
• Compare reliability between a static UPS and a rotary UPS
• Add another 2000kW Generator to pick up load dropped by pre-programmed ATSs
Electrical Proposal: UPS Electrical Proposal: UPS Reliability Study (Static vs. Reliability Study (Static vs.
Rotary)Rotary)• Performance analysis
• Reliability• Maintenance
• Impact on mechanical loads
• Cooling• Exhaust
• Cost Comparison
Electrical Proposal: Electrical Proposal: Generator AdditionGenerator Addition
• Original Design Intent: • (2) Paralleling 2000kW generators, where (1)
2000kW can carry full load of the building
• Actual Power Consumption: • 2,964 kW (From Energy Utility Data)• Results in almost 1000kW of load to be
dropped by ATSs
• Solution: • Add a third generator to pick up the loads
dropped
Thank You.Thank You.Questions/Comments?Questions/Comments?