CMPC Guaíba Project
CMPC GUAIBA PROJECT
POWER DISTRIBUTION SYSTEM –PDS (SDEE)
CMPC Guaíba – Rio Grande do Sul4o Align Meeting – 09-10/APR/2014
POWER DISTRIBUTION SYSTEM –PDS (SDEE)
CMPC Guaíba – Rio Grande do Sul4o Align Meeting – 09-10/APR/2014
New Bleached Pulp Mill 1,5 million/ tons/year
CMPC GUAIBA PROJECT
CMPC Guaíba Project
Extra: IMPACTO DE ESTUDOS EM EQUIPAMENTOS
PROTEÇÃO TRANSFORMADORES (Transientes)
FILTRO DE HARMONICOS DE BT
Padronização Potencias => mar/14
Fornecimento => Jun – nov/14 (100%)
CMPC GUAIBA PROJECT
CMPC Guaíba Project
Power Distribution SystemENGINEERING
Main Activities in the past 60 days
Main studies released. Still on April - Harmonic and Stability will be released;
CEEE studies also released;
Studies Feedback from ONS were straight; short circuit already approved ;
Main project (EMS /125V / GIS) were certified with high quality (Cross
reference closed);
A9 / Limiter – Technical aspects clarified and defined
Harmonic MV Filter Preliminary Layout Defined
LV Harmonic and Surge Supressor Definition concluded;
CMPC Guaíba Project
CMPC GUAIBA PROJECT
Power Distribution SystemENGINEERING - STATUS
Equipments:
• 34,5 kV GIS Panel
• MV Harmonic Filters
• DC Auxiliary System
• Current Limiter
• 13,8 kV Air Insulated Panel
• Retrofit S1 Switchgear
• Grounding Transformer
• Grounding Resistor
• Revenue Metering Panel
• Energy Management System
• Load Rejection System
• Erection Material
Services:• Engineering
• Electrical Studies
• Erection Project
• Erection Supervision
• Erection
• Commissioning
• Training
• Assisted Operation
Legenda• “ OK!”
• “ ATTENTION!”
• “ PRIORITY!”
CMPC GUAIBA PROJECT
CMPC Guaíba Project
Power Distribution System
PROCUREMENT
Main Activities in the past 60 days
A9 / Limiter (LCC) – PO Released – Delivery Sep/14
All main components ordered and PO Released:
Measuring System – May/14
Grounding / Transformer – Resistor – Jun/14
EMS /LRS Cabinets – May/14
CMPC GUAIBA PROJECT
CMPC Guaíba Project
Power Distribution System
PROCUREMENT - STATUS
Equipments:
• 34,5 kV GIS Panel
• MV Harmonic Filters
• DC Auxiliary System
• Current Limiter
• 13,8 kV Air Insulated Panel
• Retrofit S1 Switchgear
• Grounding Transformer
• Grounding Resistor
• Revenue Metering Panel
• Energy Management System
• Load Rejection System
• Erection Material
Services:• Engineering
• Electrical Studies
• Erection Project
• Erection Supervision
• Erection
• Commissioning
• Training
• Assisted Operation
Legenda• “ OK! – Acquisition done”
• “ in procurement process”
• “ Critical ”
CMPC GUAIBA PROJECT
CMPC Guaíba Project
Power Distribution System
MANUFACTURING
A1 Panel: 32 Cubicles being – OK! – Cabinet Approved.
• 04 + 01 Cubicles 2500 A
• 27 Cubicles 1250 A
A5 Panel: 07 Cubicles 1250 A – April/14
A6 Panel: 05 Cubicles 1250 A – April/14
A7 Panel: 06 Cubicles 1250 A – April/14
A2 Panel: 08 Cubicles 1250 A – April/14
A3 Panel: 08 Cubicles 1250 A – April/14
A4 Panel: 12 Cubicles 1250 A - April/14
A8 Panel: 08 Cubicles 1250 A - May/14
A1 - Released to be sent to the site
CMPC GUAIBA PROJECT
CMPC Guaíba Project
Power Distribution System
MANUFACTURING
EMS / LRS A1
CMPC GUAIBA PROJECT
CMPC Guaíba Project
Power Distribution SystemS CURVE– MAR/14
2013-04 2013-05 2013-06 2013-07 2013-08 2013-09 2013-10 2013-11 2013-12 2014-01 2014-02 2014-03 2014-04 2014-05 2014-06 2014-07 2014-08 2014-09 2014-10 2014-11 2014-12 2015-01 2015-02 2015-03 2015-04 2015-05 2015-06 2013-04 2013-05 2013-06 2013-07 2013-08 2013-09 2013-10 2013-11 2013-12 2014-01 2014-02 2014-03 2014-04 2014-05 2014-06 2014-07 2014-08 2014-09 2014-10 2014-11 2014-12 2015-01 2015-02 2015-03 2015-04 2015-05 2015-06
% Prev.
0 5.433090412220
45
0 0.354072079420
863
2.894736709494
74
5.690010749529
35
3.534649384888
65
7.443999443277
91
9.283397469280
27
8.583258693082
67
10.15934128859
47
12.60414055013
13.83163892639
98
9.589274865175
9
6.525238672843
81
3.783321763026
01
4.879538414547
19
5.242762216682
33
3.045228943464
18
1.030471637878
25
0.444555237932
733
0.129184995432
354
0.116683221680
831
0.129184995432
354
0.143402694502
086
0.151982342096
105
0.147079685899
456
% Real
0 5.433090412220
45
0 0.354072079420
863
2.622783003629
91
1.428375457639
89
2.599934346690
37
2.184908669049
27
4.731504428327
94
2.887539713131
33
NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Base-line 0
0 5.432300079746
17
5.432300079746
17
5.767446751666
12
8.662183461160
85
14.35219421069
03
17.88684359557
88
25.33084303885
68
34.61424050813
7
42.66870595937
66
50.51670074158
52
59.69378087630
48
68.49427100649
59
76.02514645004
92
80.95481118941
66
86.32056326818
59
93.32023470494
11
97.74649143591
86
98.76912878393
08
98.97921212101
48
99.10301478883
23
99.23166479072
09
99.34786479242
67
99.47651479431
54
99.61976946341
82
99.77166946564
84
99.91866946780
63
Base-line 1
0 5.433090412220
45
5.433090412220
45
5.787162491641
33
8.409945495271
23
9.838320952911
1
12.43825529960
15
14.62316396865
07
19.35466839697
87
27.93792709006
13
38.09726837865
61
50.70140892878
61
64.53304785518
57
74.12232272036
15
80.64756139320
56
84.43088315623
16
89.31042157077
88
94.55318378746
11
97.59841273092
52
98.62888436880
34
99.07343960673
62
99.20262460216
86
99.31930782384
93
99.44849281928
16
99.59189551378
37
99.74387785588
99.89095754177
94
% Tend. Ac.
NaN NaN NaN NaN NaN NaN NaN NaN NaN 22.24 38.09726837865
61
50.70140892878
61
64.53304785518
57
74.12232272036
15
80.64756139320
56
84.43088315623
16
89.31042157077
88
94.55318378746
11
97.59841273092
52
98.62888436880
34
99.07343960673
62
99.20262460216
86
99.31930782384
93
99.44849281928
16
99.59189551378
37
99.74387785588
99.89095754177
94
% Real Ac.
0 5.433090412220
45
5.433090412220
45
5.787162491641
33
8.409945495271
23
9.838320952911
1
12.43825529960
15
14.62316396865
07
19.35466839697
87
22.24220811011
NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
1
3
5
7
9
11
13
15
5
15
25
35
45
55
65
75
85
95
PROJETO GUAÍBA 2Curva de Progresso Geral - Área: Distribuição de Energia
% Prev. % Real Baseline 0 Baseline 1 % Tend. Ac. % Real Ac.
% M
ês
% A
cum
ulad
o
CMPC GUAIBA PROJECT
CMPC Guaíba Project
Time Schedule with Milestones Dates
CMPC GUAIBA PROJECT
CMPC Guaíba Project
Time Schedule with Milestones Dates
CMPC GUAIBA PROJECT
CMPC Guaíba Project
Main Milestones in the next 60-90 days
Detailed Planning and schedule for Erection;
Supply all Equipments. Except A9 and MV harmonics;
EMS / LRS / EMS Software implemented and approved;
CMPC GUAIBA PROJECT
CMPC Guaíba Project
Issues & Concerns
Concerns:
Dates accuracy for the interface points;
Internal Logistic for Cabinets (from the Truck to the room)
and other Equipments;
Transformers Infrastructure / Erection delaying PDS
demobilization