13
CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 New Bleached Pulp Mill 1,5 million/ tons/year

CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

Embed Size (px)

Citation preview

Page 1: CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

CMPC Guaíba Project

CMPC GUAIBA PROJECT

POWER DISTRIBUTION SYSTEM –PDS (SDEE)

CMPC Guaíba – Rio Grande do Sul4o Align Meeting – 09-10/APR/2014

POWER DISTRIBUTION SYSTEM –PDS (SDEE)

CMPC Guaíba – Rio Grande do Sul4o Align Meeting – 09-10/APR/2014

New Bleached Pulp Mill 1,5 million/ tons/year

Page 2: CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

CMPC GUAIBA PROJECT

CMPC Guaíba Project

Extra: IMPACTO DE ESTUDOS EM EQUIPAMENTOS

PROTEÇÃO TRANSFORMADORES (Transientes)

FILTRO DE HARMONICOS DE BT

Padronização Potencias => mar/14

Fornecimento => Jun – nov/14 (100%)

Page 3: CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

CMPC GUAIBA PROJECT

CMPC Guaíba Project

Power Distribution SystemENGINEERING

Main Activities in the past 60 days

Main studies released. Still on April - Harmonic and Stability will be released;

CEEE studies also released;

Studies Feedback from ONS were straight; short circuit already approved ;

Main project (EMS /125V / GIS) were certified with high quality (Cross

reference closed);

A9 / Limiter – Technical aspects clarified and defined

Harmonic MV Filter Preliminary Layout Defined

LV Harmonic and Surge Supressor Definition concluded;

Page 4: CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

CMPC Guaíba Project

CMPC GUAIBA PROJECT

Power Distribution SystemENGINEERING - STATUS

Equipments:

• 34,5 kV GIS Panel

• MV Harmonic Filters

• DC Auxiliary System

• Current Limiter

• 13,8 kV Air Insulated Panel

• Retrofit S1 Switchgear

• Grounding Transformer

• Grounding Resistor

• Revenue Metering Panel

• Energy Management System

• Load Rejection System

• Erection Material

Services:• Engineering

• Electrical Studies

• Erection Project

• Erection Supervision

• Erection

• Commissioning

• Training

• Assisted Operation

Legenda• “ OK!”

• “ ATTENTION!”

• “ PRIORITY!”

Page 5: CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

CMPC GUAIBA PROJECT

CMPC Guaíba Project

Power Distribution System

PROCUREMENT

Main Activities in the past 60 days

A9 / Limiter (LCC) – PO Released – Delivery Sep/14

All main components ordered and PO Released:

Measuring System – May/14

Grounding / Transformer – Resistor – Jun/14

EMS /LRS Cabinets – May/14

Page 6: CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

CMPC GUAIBA PROJECT

CMPC Guaíba Project

Power Distribution System

PROCUREMENT - STATUS

Equipments:

• 34,5 kV GIS Panel

• MV Harmonic Filters

• DC Auxiliary System

• Current Limiter

• 13,8 kV Air Insulated Panel

• Retrofit S1 Switchgear

• Grounding Transformer

• Grounding Resistor

• Revenue Metering Panel

• Energy Management System

• Load Rejection System

• Erection Material

Services:• Engineering

• Electrical Studies

• Erection Project

• Erection Supervision

• Erection

• Commissioning

• Training

• Assisted Operation

Legenda• “ OK! – Acquisition done”

• “ in procurement process”

• “ Critical ”

Page 7: CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

CMPC GUAIBA PROJECT

CMPC Guaíba Project

Power Distribution System

MANUFACTURING

A1 Panel: 32 Cubicles being – OK! – Cabinet Approved.

• 04 + 01 Cubicles 2500 A

• 27 Cubicles 1250 A

A5 Panel: 07 Cubicles 1250 A – April/14

A6 Panel: 05 Cubicles 1250 A – April/14

A7 Panel: 06 Cubicles 1250 A – April/14

A2 Panel: 08 Cubicles 1250 A – April/14

A3 Panel: 08 Cubicles 1250 A – April/14

A4 Panel: 12 Cubicles 1250 A - April/14

A8 Panel: 08 Cubicles 1250 A - May/14

A1 - Released to be sent to the site

Page 8: CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

CMPC GUAIBA PROJECT

CMPC Guaíba Project

Power Distribution System

MANUFACTURING

EMS / LRS A1

Page 9: CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

CMPC GUAIBA PROJECT

CMPC Guaíba Project

Power Distribution SystemS CURVE– MAR/14

2013-04 2013-05 2013-06 2013-07 2013-08 2013-09 2013-10 2013-11 2013-12 2014-01 2014-02 2014-03 2014-04 2014-05 2014-06 2014-07 2014-08 2014-09 2014-10 2014-11 2014-12 2015-01 2015-02 2015-03 2015-04 2015-05 2015-06 2013-04 2013-05 2013-06 2013-07 2013-08 2013-09 2013-10 2013-11 2013-12 2014-01 2014-02 2014-03 2014-04 2014-05 2014-06 2014-07 2014-08 2014-09 2014-10 2014-11 2014-12 2015-01 2015-02 2015-03 2015-04 2015-05 2015-06

% Prev.

0 5.433090412220

45

0 0.354072079420

863

2.894736709494

74

5.690010749529

35

3.534649384888

65

7.443999443277

91

9.283397469280

27

8.583258693082

67

10.15934128859

47

12.60414055013

13.83163892639

98

9.589274865175

9

6.525238672843

81

3.783321763026

01

4.879538414547

19

5.242762216682

33

3.045228943464

18

1.030471637878

25

0.444555237932

733

0.129184995432

354

0.116683221680

831

0.129184995432

354

0.143402694502

086

0.151982342096

105

0.147079685899

456

% Real

0 5.433090412220

45

0 0.354072079420

863

2.622783003629

91

1.428375457639

89

2.599934346690

37

2.184908669049

27

4.731504428327

94

2.887539713131

33

NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN

Base-line 0

0 5.432300079746

17

5.432300079746

17

5.767446751666

12

8.662183461160

85

14.35219421069

03

17.88684359557

88

25.33084303885

68

34.61424050813

7

42.66870595937

66

50.51670074158

52

59.69378087630

48

68.49427100649

59

76.02514645004

92

80.95481118941

66

86.32056326818

59

93.32023470494

11

97.74649143591

86

98.76912878393

08

98.97921212101

48

99.10301478883

23

99.23166479072

09

99.34786479242

67

99.47651479431

54

99.61976946341

82

99.77166946564

84

99.91866946780

63

Base-line 1

0 5.433090412220

45

5.433090412220

45

5.787162491641

33

8.409945495271

23

9.838320952911

1

12.43825529960

15

14.62316396865

07

19.35466839697

87

27.93792709006

13

38.09726837865

61

50.70140892878

61

64.53304785518

57

74.12232272036

15

80.64756139320

56

84.43088315623

16

89.31042157077

88

94.55318378746

11

97.59841273092

52

98.62888436880

34

99.07343960673

62

99.20262460216

86

99.31930782384

93

99.44849281928

16

99.59189551378

37

99.74387785588

99.89095754177

94

% Tend. Ac.

NaN NaN NaN NaN NaN NaN NaN NaN NaN 22.24 38.09726837865

61

50.70140892878

61

64.53304785518

57

74.12232272036

15

80.64756139320

56

84.43088315623

16

89.31042157077

88

94.55318378746

11

97.59841273092

52

98.62888436880

34

99.07343960673

62

99.20262460216

86

99.31930782384

93

99.44849281928

16

99.59189551378

37

99.74387785588

99.89095754177

94

% Real Ac.

0 5.433090412220

45

5.433090412220

45

5.787162491641

33

8.409945495271

23

9.838320952911

1

12.43825529960

15

14.62316396865

07

19.35466839697

87

22.24220811011

NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN

1

3

5

7

9

11

13

15

5

15

25

35

45

55

65

75

85

95

PROJETO GUAÍBA 2Curva de Progresso Geral - Área: Distribuição de Energia

% Prev. % Real Baseline 0 Baseline 1 % Tend. Ac. % Real Ac.

% M

ês

% A

cum

ulad

o

Page 10: CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

CMPC GUAIBA PROJECT

CMPC Guaíba Project

Time Schedule with Milestones Dates

Page 11: CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

CMPC GUAIBA PROJECT

CMPC Guaíba Project

Time Schedule with Milestones Dates

Page 12: CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

CMPC GUAIBA PROJECT

CMPC Guaíba Project

Main Milestones in the next 60-90 days

Detailed Planning and schedule for Erection;

Supply all Equipments. Except A9 and MV harmonics;

EMS / LRS / EMS Software implemented and approved;

Page 13: CMPC Guaíba Project CMPC GUAIBA PROJECT POWER DISTRIBUTION SYSTEM –PDS (SDEE) CMPC Guaíba – Rio Grande do Sul 4o Align Meeting – 09-10/APR/2014 POWER DISTRIBUTION

CMPC GUAIBA PROJECT

CMPC Guaíba Project

Issues & Concerns

Concerns:

Dates accuracy for the interface points;

Internal Logistic for Cabinets (from the Truck to the room)

and other Equipments;

Transformers Infrastructure / Erection delaying PDS

demobilization