Upload
benedict-tyler
View
55
Download
4
Embed Size (px)
DESCRIPTION
CMAC Process for PBN CDR. Asia and Pacific Regional Sub-Office 2014. BEIJING, CHINA; 30 JUN-11 JUL 2014. CONTENTS. CDR Concept and Categories CDR and PBN CMAC Process for CDR CDR Best Practices. CDR Concept and categories. Conditional Route ( CDR ) Concept. - PowerPoint PPT Presentation
Citation preview
April 19, 2023 Page 1
CMAC Process for PBN CDRCMAC Process for PBN CDR
Asia and Pacific Regional Sub-Office2014
BEIJING, CHINA; 30 JUN-11 JUL 2014
April 19, 2023 Page 2
CONTENTSCONTENTS
• CDR Concept and Categories • CDR and PBN • CMAC Process for CDR• CDR Best Practices
April 19, 2023 Page 3
April 19, 2023 Page 4
Conditional Route (CDR)ConceptConditional Route (CDR)Concept
CDR—A non-permanent ATS route or portion thereof which can be planned and used under specified conditions. – Through TRA or TSA or CBA– Opening/closure result from associated military
activities or purely civil needs– Usually be established and utilized as pre-planned
routing scenarios– Permit the definition of more direct and alternative
routes by complementing and linking to the existing ATS route network
April 19, 2023 Page 5
CDR CDR CATEGORIESCATEGORIES
TRA/TSA
Conditional Route Cat1
Cond
itional
Route
Cat1
Applicable date, time period and FL are published
in AIP
X1, X24th Jul-4th Oct
2300-0600 UTCAbove FL290
April 19, 2023 Page 6
CDR CDR CATEGORIESCATEGORIES
TRA/TSA
Conditional Route Cat2
Cond
ition
al Ro
ute C
at2
Applicable date, time period and
FL are notified by NOTAM
CDR ARE ESTABLISHED AS FLW: X1
1406042300/1406050600ABOVE FL290
April 19, 2023 Page 7
CDR CDR CATEGORIESCATEGORIES
TRA/TSA
April 19, 2023 Page 8
CDR CDR CATEGORIESCATEGORIES
TRA/TSA
Conditional Route Cat3
Cond
ition
al Rou
te Ca
t3
Applicable time period and FL are Notified real time
X1, X2is available from now to 0600 UTC
Above FL290
April 19, 2023 Page 9
CDR CATEGORIESCDR CATEGORIES
Foreseen availability
Flight Planning
possibilities
Expected level of
Activity of TSA
April 19, 2023 Page 10
Examples: CDR 1 & 3Examples: CDR 1 & 3UM601 ORVEX RONABTIME UTC: CDR1: FM 21 SEP-20 JUN:MON-FRI:0500-0659,1701-2200; 21 JUN-20 SEP:MON-FRI:0500-2200.
ALTN ROUTE:UL12-UM603.
CDR3:FM 21 SEP-20 JUN:MON-FRI:0700-1700.
LEVEL: CDR1: FL195 to FL460
April 19, 2023 Page 11
Examples: CDR 2Examples: CDR 2
UL150 LEASTRO LABROTIME: CDR2:MON-FRI EXC HOL:SUMMER 0630-1430;WINTER 0730-1530;AFFECTED BY LED26;
ALTN ROUTE:SADAF- SURIB-IBZ-VLC-CLS-CJN.
LEVEL: CDR2:FL250 TO FL460
April 19, 2023 Page 12
Examples: CDR 1, 2 & 3Examples: CDR 1, 2 & 3
UL612 (LG) TRL SITCDR1:ABOVE FL245 H24.BELOW FL245:MON-THU 2100-0400, FRI 1300 - MON 0400 AND HOL 2100 THE DAY BEFORE - 0400 THE DAYAFTER.CDR 2:FL205-FL245 MON-THU 0400-2100 AND FRI 0400-1300.CDR 3:BELOW FL205 MON-THU 0400-2100 AND FRI 0400-1300.
April 19, 2023 Page 13
Example: Multi States, Sectors, CDRsExample: Multi States, Sectors, CDRs
UL15 EG SANDY MOTOXTIME: CDR2: H24LEVEL: CDR2: FL245 to FL460
UL15 LF MOTOX LESDOTIME: CDR2: H24. RE-ROUTING VIA UL607 BY KOK IN CASE OF DEFENCE ACTIVITY.LEVEL: CDR2: FL345-FL500. ODD FL
UL15 LF LESDO BEGARTIME: CDR1: WEEK-END AND NIGHTS. RE-ROUTING VIA LESDO-UG42-LUVAL-UN491-BEGAR IN CASE OF DEFENCE ACTIVITY.LEVEL: CDR1: FL345-FL500 (OBAKI-BEGAR FL195-FL500), ODD FL.
April 19, 2023 Page 14
ExampleExample
• UK AIP ENR 1-1-1-1• 1.6 Conditional Routes (CDRs) are ATS Routes which are usable only
under specified conditions. Three types of Conditional• Routes are used as described below.• (a) Category One — A route which is permanently plannable during
the times published in ENR 3.• (b) Category Two — A route which is only plannable in accordance
with the conditions stated in the daily Conditional Route Availability Message (CRAM) issued by the Central Flow Management Unit (CFMU).
• (c) Category Three — A route which is not plannable per se but may be used tactically at the discretion of ATC.
• A CDR may have more than one Category
April 19, 2023 Page 15
April 19, 2023 Page 16
CDR and PBNCDR and PBN
Characteristic of CDR– “Short Cut” through TRA or TSA or CBA– Few Ground Nav aids will be built to support CDR– Usually from point to point wherever the airspace is
available
Characteristic of PBN– More Flexible, support point to point operation– More accurate, support less airspace separation– More capable, support parallel route structure– More safety, OPMA IN RNP CASE
April 19, 2023 Page 17
CDR and PBNCDR and PBN
PBN applications on CDR–Night Routes• During night time ,Less traffic, Less training ,Large scope
of available airspace from border to border–Holiday Routes• During holiday, More traffic, Less training, some
available airspace near trunk route or busy TMA –Bypass Routes• When Military expand or active TSA, need to establish a
bypass routes to ensure the operation of civil flights–Short Cut Routes
April 19, 2023 Page 18
April 19, 2023 Page 19
CMAC Process for CDRCMAC Process for CDR
• Conditional Routes will be established by the Level 1, allocated at Level 2 by the Airspace Management Cell (AMC) and utilized at Level 3 by Area Control Centers or APP. CDRs will usually be established and utilized as pre-planned routing scenarios. CDRs will permit the definition of more direct and alternative routes by complementing and linking to the existing ATS route network
April 19, 2023 Page 21
Level 1 (Strategic) CMAC ProcessLevel 1 (Strategic) CMAC Process
April 19, 2023 Page 22
April 19, 2023 Page 23
Level 2 (Pre-tactical) CMAC ProcessLevel 2 (Pre-tactical) CMAC Process
Create CDR2With Applicable time
period and FL
Provide schedule of Training/Testing Area
Noted
Accepted
Provide infoCheck CDR2
Check infoSend NOTAM
Civil ATC Unit
Military Unit
MilitaryLiasion
ATM Officer
April 19, 2023 Page 24
Level 3 (Tactical) CMAC ProcessLevel 3 (Tactical) CMAC Process
Training Area A
Route X
Request Route X
Clear to Route X
Coordination
Airspace is not active
April 19, 2023 Page 25
April 19, 2023 Page 26
CDR BEST PRACTICESCDR BEST PRACTICES
April 19, 2023 Page 27
CDR BEST PRACTICESCDR BEST PRACTICES
April 19, 2023 Page 28
CDR BEST PRACTICESCDR BEST PRACTICES
April 19, 2023 Page 29
Thank YouThank YouThank YouThank You
Asia and Pacific Regional Sub-OfficeBeijing (APAC RSO)
ICAO Headquarter Montreal