D. Caprion Royal Meteorological Institute of Belgium. CM-SAF TOA radiation status report. Overview. Main problems since lastest meeting Changes to operational chains Status input products: GERB Status input products: CERES. Main problems. Hardware problems beginning of September - PowerPoint PPT Presentation
Citation preview
CM-SAF Board Meeting , De Bilt, October 2005
CM-SAF TOA radiation status report
D. Caprion
Royal Meteorological Institute of Belgium
CM-SAF Board Meeting , De Bilt, October 2005
Overview Main problems since lastest meeting Changes to operational chains Status input products: GERB Status input products: CERES
CM-SAF Board Meeting , De Bilt, October 2005
Main problems Hardware problems beginning of September
– Unfortunately check our backup systemNot so bad, not so good: so need of improvements !
– Consequences: delays to deliver products: High resolution: OK now
TOA fluxes: July and August coming soon...
Definition of the grid:– What kind of grid shall we have to use ?
CM-SAF Board Meeting , De Bilt, October 2005
Grid ? What do we want ?
– Equal-area grid with a resolution of:
either (15 km)² or (45 km)² Answer :
– Sinusoidal grid with 2N x N pixels– Tuning of N to get the resolution
But does it fully answer the requirements ?
CM-SAF Board Meeting , De Bilt, October 2005
Grid ? Yes… And no ? Why?
– The Earth is an ellipsoid
– What do we need: fixed pixel location or fixed pixel size ?
CM-SAF Board Meeting , De Bilt, October 2005
Grid ? In other words:
– What kind of implementation ?
DWD RMIB
CM-SAF Board Meeting , De Bilt, October 2005
Grid ? Consequences:
– DWD» Exact Equal-area grid but non-linear dependence of
the latitude with the pixel index !
– RMIB» Linear dependence of the latitude with pixel index
but nearly Equal-area grid !
Open questions ?
CM-SAF Board Meeting , De Bilt, October 2005
Grid ? Try and be a user:
– 1. Do I really need an exact Equal-area grid in which geolocation is not trivial ?
– 2. Do I need an easy geolocation even if I lost the exact Equal-area property of my grid ?
– 3. How do I manage to pass from the low resolution to the high resolution grid ? If not implemented in the same way !
CM-SAF Board Meeting , De Bilt, October 2005
Grid ? From RMIB point of view:
– No definitive answer, except:» It is always easier to use:
lat =90-180*y/N
lon=(x-N)*180/(N*cos(lat))» Than implement an elliptic integral needed to compute the
fixed size of the pixels.
» The user should easily go from one grid to the other one !!
CM-SAF Board Meeting , De Bilt, October 2005
Changes to operational chain Implementation of three parallel chains:
– 1 mixed (GERB/GERB-like) chain: current one– 1 pure GERB– 1 pure GERB-like
test on data from May 2005 to now
CM-SAF Board Meeting , De Bilt, October 2005
Changes to operational chain
GERB GERB-like
Regridding
Merge with CERES
Averaging
GERB GERB-like
Regridding
Averaging
Regridding
Averaging
Final products in HDF files
+
CM-SAF Board Meeting , De Bilt, October 2005
GERB status Instrument currently in safe mode
– Till mid-October (eclipse seasons) Planned release: beginning 2006
– GIST meeting end of December 2005 to give official approval
Planned reprocessing: as soon as possible– Preliminary tests on June and July 2004 seems to
be positive.
CM-SAF Board Meeting , De Bilt, October 2005
CERES status Currently used: ES9, Terra, FM1, Edition 1
– Available up to August 2005
More advanced: SRBAVG– Better angular models, better spatial resolution– Still waiting for ! – Decision beginning of November ?
CM-SAF Board Meeting , De Bilt, October 2005
Conclusions Continue to check operational chains. Should we change the grid ?!? GERB data release planned for...
Beginning 2006
So reprocessing.....