CLIPPER COVE PROMENADE & MARINA DEVELOPMENTTreasure Island Development AuthorityInfrastructure and Transportation CommitteeApril 29 2015
NORTH
1APRIL 29, 2015TREASURE ISLAND TIDA ITC Review
CLIPPER COVE PROMENADE & MARINA DEVELOPMENT
CLIPPER COVE PROMENADE
NORTH
2APRIL 29, 2015TREASURE ISLAND TIDA ITC Review EXISTING MARINA
VIEW OF EXISTING MARINA
NORTH
3APRIL 29, 2015TREASURE ISLAND TIDA ITC Review EXISTING MARINA
EXISTING MARINACHARACTERISTICS & LAYOUT
SLIP LENGTH (ft)162024323655
NUMBER OF SLIPS21433202810
108 TOTAL SLIPS
NORTH
4APRIL 29, 2015TREASURE ISLAND TIDA ITC Review EXISTING MARINA PHOTOS
VIEW TO THE NORTH
NORTH
5APRIL 29, 2015TREASURE ISLAND TIDA ITC Review EXISTING MARINA PHOTOS
VIEW TO THE SOUTH
NORTH
6APRIL 29, 2015TREASURE ISLAND TIDA ITC Review PROPOSED MARINA
• removal of all existing docks and piles
• dredging in the marina basin and entrance channel
• installation of:• eight new docks containing approx 420
slips (ranging from 40 to 80 ft long)• 385 square concrete piles• concrete transient dock/wave attenuator
• additional upland components to be negotiated with the Treasure Island Master Developer, including marina offices, restrooms, locker rooms, yacht club facilities and parking
PROPOSED MARINA PROJECT OVERVIEW
PILE DRIVING SHOWING SILT CURTAIN USE
NORTH
7APRIL 29, 2015TREASURE ISLAND TIDA ITC Review PROPOSED MARINA
PROPOSED MARINA LAYOUT (2015 PLAN)PHASE 1PHASE 2PHASE 3PHASE 4
1,269 FT
1,465 FT
NORTH
8APRIL 29, 2015TREASURE ISLAND TIDA ITC Review PROPOSED MARINA
CONSISTENT WITH BCDC BAY PLAN’S APPLICABLE POLICIES
NORTH
9APRIL 29, 2015TREASURE ISLAND TIDA ITC Review PROPOSED MARINA
EXAMPLES OF MARINA CONSTRUCTION AND CONCRETE DOCKS
NORTH
10APRIL 29, 2015TREASURE ISLAND TIDA ITC Review PROPOSED MARINA
EXAMPLES OF MARINA CONSTRUCTION AND CONCRETE DOCKS
NORTH
11APRIL 29, 2015TREASURE ISLAND TIDA ITC Review PROPOSED MARINA
PROPOSED PROJECT FILL IMPACTS• installation of docks, piles and wave attenuator will result in:
• 155,120 sf of fill area• 11,440 cy of fill volume
• net increase of approximately:• 110,690 sf in fill area• 8,780 cy in fill volume
NORTH
12APRIL 29, 2015TREASURE ISLAND TIDA ITC Review CLIPPER COVE PROMENADE
VIEW OF CLIPPER COVE PROMENADE & MARINA
NORTH
13APRIL 29, 2015TREASURE ISLAND TIDA ITC Review CLIPPER COVE PROMENADE
0 20 50 100 200
CLIPPER COVE TERRACE ISLAND LOOKOUT BRIDGE OVERLOOK
FUTURE SAILING CENTER
picnic porchcove overlookwaterfront seatingrain gardensmarina access
outdoor loungerain gardensmarina access
future sailing center accesscafe + seatingbridge view terracebrea kwater access
CITY SIDE BALCONYbus drop off city view balconywaterfront seatingrain gardensmarina access
OVERVIEW & IDENTITY
NORTH
14APRIL 29, 2015TREASURE ISLAND TIDA ITC Review CLIPPER COVE PROMENADE
ACCESS AND CIRCULATION
METERED PARKINGACCESSIBLE PARKING WITH LOADING ZONE
BUS DROP OFF
CLASS 3 BIKE/AUTO TWO WAY CYCLE TRACK
tototooottootoototootoootototoototottototototo bbbbbbbbbbbbbbbbbrerereeakakkakaka wawawawawateteteteeer
CLASS 1 BIKE ONLYCLASS 2 ONE WAY BIKE LANE
0’ 160’80’ 320’
N
CLIPPER COVE PROMENADE VEHICULAR CIRCULATION DIAGRAM
CLIPPER COVE PROMENADE BICYCLE CIRCULATION DIAGRAM
CLIPPER COVE PROMENADE PEDESTRIAN CIRCULATION DIAGRAM
MARINA ACCESS
PROMENADE
CROSSING AT NODES
0 20 50 100 200
2240’
100’ 390’ 70’ 30’355’ 175’ 500’
NORTH
15APRIL 29, 2015TREASURE ISLAND TIDA ITC Review CLIPPER COVE PROMENADE
MARINA ACCESSCIRCULATION FROM LONG-TERM AND OTHER STREET PARKING
NORTH
16APRIL 29, 2015TREASURE ISLAND TIDA ITC Review CLIPPER COVE PROMENADE
VIEW FROM AVENUE C
MARINA ACCESS
PROMENADE
METERED PARKING
TOTAL NUMBER OF PARKING:
SOUTH:7 +1 ADA +1 LOADING
NORTH:12 + 1 LOADING
NORTH:13 +1 ADA + 1 LOADING
NORTH:3 +1 LOADING
NORTH:16 +1 ADA + 1 LOADING
SOUTH:14 +1 ADA +1 LOADING
SOUTH:13 +1 ADA +2 LOADING
SOUTH:24 +2 ADA +2 LOADING
102 (METERED, SHORT-TERM)
7 ADA (NOT METERED, NO TIME LIMIT)
10 LOADING (NOT METERED, SHORT-TERM)
0 20 50 100 200
2240 FT
668’ 355 260 360
NORTH
17APRIL 29, 2015TREASURE ISLAND TIDA ITC Review CLIPPER COVE PROMENADE
MARINA ACCESSCIRCULATION FROM STREET PARKING ON CLIPPER COVE AVENUE
NORTH
18APRIL 29, 2015TREASURE ISLAND TIDA ITC Review CLIPPER COVE PROMENADE
VIEW FROM AVENUE CVIEW AT END OF AVENUE C
105 EXISTING STREET PARKING (APPROX
150 EXISTING OFF STREET PARKING (APPROX)
43 NEW STREET PARKING
790 OFF STREET PARKING
PARKING WITHIN A 5 MIN WALK
PP
PP P
TI LANDSIDE DEVELOPMENT STAGE 1
PUBLIC RESTROOMS
TEMPORARY RESTROOMS
NORTH
19APRIL 29, 2015TREASURE ISLAND TIDA ITC Review TREASURE ISLAND PHASING
AMENITIESLANDSIDE DEVELOPMENT STAGE 1
2.5 MIN WALK 2.5 MIN WALK
2.5 MIN WALK2.5 MIN WALK
5 MIN WALK 5 MIN WALK
5 MIN WALK3.5 MIN WALK 3.5 MIN WALK
2.5 MIN WALK 2.5 MIN WALK2.5 MIN WALK
2.5 MIN WALK
5 MIN WALK 5 MIN WALK5 MIN WALK
5 MIN WALK
SHORT-TERM METERED PARKING (< 30 MIN)
LONG-TERM PARKING STRUCTURE
MARINA AMENITY LOCATIONS
SHUTTLE STOP
SHUTTLE ROUTE
UTILITY CONNECTIONS
(5000 SQ FT - POTENTIAL AMENITY SIZE)
SAILING CENTER
278 STREET PARKING
1,520 LONG-TERM PARKING
PARKING WITHIN A 5 MIN WALK
PP
P
NORTH
20APRIL 29, 2015TREASURE ISLAND TIDA ITC Review TREASURE ISLAND PHASING
AMENITIESFULL BUILT OUT PHASE
760
760
NORTH
21APRIL 29, 2015TREASURE ISLAND TIDA ITC Review PUBLIC WATER ACCESS
OTHER BOAT ACCESS POINTSTREASURE ISLAND & YERBA BUENA ISLAND
NORTH
22APRIL 29, 2015TREASURE ISLAND TIDA ITC Review CLIPPER COVE PROMENADE