1
PROJECT Our team was appointed by Kier Construction to install a Sika intermediate deck system to a 12,000m² car park. CHALLENGE Polydeck were up against a competitor specification and overturned the system in cooperation with Sika. SOLUTION Kier required a suitable intermediate deck system with a 10-year warranty form the supplier which Polydeck and Sika could deliver. Polydeck had a team of 8 men on site for 8 weeks working on one deck at a time whilst other trades moved around the car park. “Excellent workmanship and professional service by all operatives and management.” Case Studies CLIENT Kier Construction SECTOR Car Parks SERVICE Industrial Resin Flooring FINISH Car Parks POLYDECK GROUP HEAD OFFICE Polydeck Group Ltd, 3 Rowan House, Sheldon Business Park, Chippenham, Wiltshire, SN14 0SQ T: +44 (0) 845 873 1460 E: [email protected] MIDLANDS OFFICE Polydeck Group Ltd, Unit E8a Holly Court, Holly Farm Business Park, Honiley, Kenilworth, Warwickshire, CV8 1NP T: +44 (0) 1926 484033 E: [email protected] EASTERN OFFICE Polydeck Group Ltd, Unit 25 & 26, Alpha Park, Bretton Way, Peterborough, PE3 8YG T: +44 (0) 1733 260845 E: [email protected] SCOTLAND OFFICE Polydeck Group Ltd, Thomson House, 4A Forth Street, Edinburgh, EH1 3LD T: +44 (0) 131 557 8390 E: [email protected] GROUNDWORKS OFFICE Offices FF 1-3 Bunkers Hill Walsingham Norfolk NR22 6BD T: 01328 822295 E: [email protected]

CLIENT Kier Construction Car Parks SERVICE GROUP FINISH ... · Case Studies CLIENT Kier Construction SECTOR Car Parks SERVICE Industrial Resin Flooring FINISH Car Parks POLYDECK GROUP

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CLIENT Kier Construction Car Parks SERVICE GROUP FINISH ... · Case Studies CLIENT Kier Construction SECTOR Car Parks SERVICE Industrial Resin Flooring FINISH Car Parks POLYDECK GROUP

PROJECTOur team was appointed by Kier Construction to install a Sika intermediate deck system to a 12,000m² car park.

CHALLENGEPolydeck were up against a competitor specification and overturned the system in cooperation with Sika.

SOLUTIONKier required a suitable intermediate deck system with a 10-year warranty form the supplier which Polydeck and Sika could deliver.

Polydeck had a team of 8 men on site for 8 weeks working on one deck at a time whilst other trades moved around the car park.

“Excellent workmanship and professional service by all operatives and management.”

Case Studies CLIENT Kier Construction SECTOR Car Parks SERVICE Industrial Resin Flooring FINISH Car Parks POLYDECK

GROUP

HEAD OFFICEPolydeck Group Ltd,3 Rowan House,Sheldon Business Park,Chippenham,Wiltshire, SN14 0SQT: +44 (0) 845 873 1460E: [email protected]

MIDLANDS OFFICEPolydeck Group Ltd,Unit E8a Holly Court,Holly Farm Business Park,Honiley, Kenilworth,Warwickshire, CV8 1NPT: +44 (0) 1926 484033E: [email protected]

EASTERN OFFICEPolydeck Group Ltd,Unit 25 & 26,Alpha Park,Bretton Way,Peterborough, PE3 8YGT: +44 (0) 1733 260845E: [email protected]

SCOTLAND OFFICEPolydeck Group Ltd,Thomson House,4A Forth Street,Edinburgh,EH1 3LDT: +44 (0) 131 557 8390E: [email protected]

GROUNDWORKS OFFICEOffices FF 1-3Bunkers HillWalsinghamNorfolkNR22 6BDT: 01328 822295E: [email protected]