1
TMS Maritime Ltd and TMS Plant Ltd • 22B Dawlish Business Park • Dawlish • Devon EX7 0NH T: +44(0)1626-866066 E: [email protected] www.tmsmaritime.co.uk Client: Bognor Regis Yacht Club Project: Slipway Construction Requirement: Design, construction and commissioning of a new 34 x 3 metre beach slipway, for dinghy launches and recovery, used during a busy annual schedule of club racing and open meetings. Solution: Working as the main contractor, TMS installed 22 x 6 meter greenheart piles, using one of their new high speed Movax pile driving units; together with longitudinal beams and braces, and decking in Ekki. This created a new working slipway from the dinghy park to sea level at low water. The club’s independent project engineer, praised TMS Maritime for their quality, timely completion of the project, project management, safety and skills. October 2014 TMS Maritime is a leading UK specialist in marine civil engineering, ancillary floating plant and diving services Project Case Study His commendation ended with the words, “the whole slipway is a beautiful work of craftsmanship. The site was cleared upon completion to such a degree that the next day it was impossible to identify the area as a working site”.

Client: Bognor Regis Yacht Club October 2014 Project ...tmsmaritime.co.uk/wp-content/uploads/2015/11/Bognor-Regis-Yacht … · Client: Bognor Regis Yacht Club Project: Slipway Construction

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Client: Bognor Regis Yacht Club October 2014 Project ...tmsmaritime.co.uk/wp-content/uploads/2015/11/Bognor-Regis-Yacht … · Client: Bognor Regis Yacht Club Project: Slipway Construction

TMS Maritime Ltd and TMS Plant Ltd • 22B Dawlish Business Park • Dawlish • Devon EX7 0NHT: +44(0)1626-866066 E: [email protected]

www.tmsmaritime.co.uk

Client: Bognor Regis Yacht Club Project: Slipway Construction

Requirement: Design, construction and commissioning of a new 34 x 3 metre beach slipway, for dinghy launches and recovery, used during a busy annual schedule of club racing and open meetings.

Solution: Working as the main contractor, TMS installed 22 x 6 meter greenheart piles, using one of their new high speed Movax pile driving units; together with longitudinal beams and braces, and decking in Ekki. This created a new working slipway from the dinghy park to sea level at low water.

The club’s independent project engineer, praised TMS Maritime for their quality, timely completion of the project, project management, safety and skills.

October 2014

TMS Maritime is a leading UK specialist in marine civil engineering, ancillary floating plant and diving services

Project Case Study

His commendation ended with the words, “the whole slipway is a beautiful work of craftsmanship. The site was cleared upon completion to such a degree that the next day it was impossible to identify the area as a working site”.