EDMS №[Number]. CLIC TBM Prototype T0@CLEX Status update. Dmitry Gudkov. CONTENTS. TBM integration in CLEX Supporting system CLEX room in LAB-169. Status of the room preparation Preliminary planning for the TBM installation in CLEX. TBM Integration of the in CLEX. - PowerPoint PPT Presentation

Citation preview

Page 1: CLIC TBM  Prototype T0@CLEX  Status update

1[12-Feb-2014] «BE-RF-PM»

CLIC TBM Prototype T0@CLEX

Status update

EDMS №[Number]

Dmitry Gudkov

1

Page 2: CLIC TBM  Prototype T0@CLEX  Status update

2[12-Feb-2014] [CMWG Meeting] «BE-RF-PM» 2

CONTENTS

• TBM integration in CLEX

• Supporting system

• CLEX room in LAB-169. Status of the room preparation

• Preliminary planning for the TBM installation in CLEX

Page 3: CLIC TBM  Prototype T0@CLEX  Status update

3[12-Feb-2014] [CMWG Meeting] «BE-RF-PM» 3

TBM Integration of the in CLEX

• The integration is under way, but..• DB optics configuration has been changed (new input received from Jakob)

Position of center [m]Electromagnetic length of element []Type of element Name of element0.3475 0.295 '"QUADRUPOLE"' '"TL2.QDD01"'1.0425 0.295 '"QUADRUPOLE"' '"TL2.QFD02"'

3.265786468 0.451572936 '"RBEND"' '"TL2.BHC01"'6.233502936 0.325 '"QUADRUPOLE"' '"TL2.QFD04"'8.592002936 0.38 '"QUADRUPOLE"' '"TL2.QDD05"'10.95050294 0.325 '"QUADRUPOLE"' '"TL2.QFD06"'13.9177894 0.451572936 '"RBEND"' '"TL2.BHC02"'

15.06096587 0.325 '"QUADRUPOLE"' '"TL2.QDD07"'15.63596587 0.325 '"QUADRUPOLE"' '"TL2.QFD08"'20.76096587 0.325 '"QUADRUPOLE"' '"TL2.QDD09"'21.33596587 0.325 '"QUADRUPOLE"' '"TL2.QDD10"'23.29201587 0.22 '"QUADRUPOLE"' '"CM.QFD0310"'23.79201587 0.22 '"QUADRUPOLE"' '"CM.QDD0315"'24.29201587 0.22 '"QUADRUPOLE"' '"CM.QFD0320"'25.90225587 1.00048 '"RFCAVITY"' '"P1"'27.46643287 0.22 '"QUADRUPOLE"' '"CM.QFD0565A"'28.09777587 0.22 '"QUADRUPOLE"' '"CM.QFD0565B"'

29.05925 0.5235 '"RFCAVITY"' '"P2"'29.5625 0.27 '"QUADRUPOLE"' '"QTB1"'

30.05175 0.5235 '"RFCAVITY"' '"P3"'30.555 0.27 '"QUADRUPOLE"' '"QTB2"'

33.19201587 0.22 '"QUADRUPOLE"' '"CM.QFD0560"'34.19201587 0.22 '"QUADRUPOLE"' '"CM.QFD0570"'37.19399775 0.482161132 '"RBEND"' '"CM.BHB0600"'

Jakob Esberg

• The new study is needed in order to check:• If new positions of the components in CLEX can be applied• Components supporting girder, study is needed.

Page 4: CLIC TBM  Prototype T0@CLEX  Status update

4[12-Feb-2014] [CMWG Meeting] «BE-RF-PM» 4

Supporting system status

• All 4 girders have been controlled by metrology

• The cradles have been controlled by metrology

Results (axis straightness)MBO-2 :0.010 mmMBO-1 :0.014 mmDBO-1 :0.012 mmDBO-2 :0.012 mm

• ZTS visit for installation of the equipment is confirmed: 24.02 – 28.02

report is under preparation

We are waiting for the detailed visit program from ZTS.

• CLEX room in the LAB-169 is under preparationSee next slides

Page 5: CLIC TBM  Prototype T0@CLEX  Status update

5[12-Feb-2014] [CMWG Meeting] «BE-RF-PM»

CLEX room in LAB-169. Status of the room preparation

• The floor drilling is finished• Threaded inserts are installed• The location of the racks is defined

OPEN POINTS:• Acquisition and control needs?

• Electricity• Internet• Temperature in the LAB (18-28 deg.)

• Is everything ready? (SU)

RACKS

Page 6: CLIC TBM  Prototype T0@CLEX  Status update

6[12-Feb-2014] [CMWG Meeting] «BE-RF-PM» 6

Lab 169/S-039: Implantation drawing

Espace réservé pour manutention

Page 7: CLIC TBM  Prototype T0@CLEX  Status update

Perçage et installation des chevilles diamètre 20 et 16mm après le tracé du positionnement des supports par les géomètres

40 trous OK

Le lab. CLEX est prêt pour l’installation des supportsP. de Souza, S. Lebet

Page 8: CLIC TBM  Prototype T0@CLEX  Status update

Planéité des supports métrologique ???Rectitude environ 15mm

P. de Souza, S. Lebet

Page 9: CLIC TBM  Prototype T0@CLEX  Status update

9[12-Feb-2014] [CMWG Meeting] «BE-RF-PM» 9

Preliminary planning for the TBM installation in CLEX