Cleco Power’s Madison 3 unit is in service and producing power that will benefit its customers today and into the future. The 2 x 300 MW (net) power plant utilizes Sumitomo SHI FW’s circulating fluidized-bed technology that can accommodate multiple solid fuels to generate power. Initially petroleum coke, an oil refining byproduct, will fuel the unit; however, the plant’s technology also allows for the use of renewable fuels. Woody biomass is a potential fuel since the new facility is located in a timber-rich area. u Two boilers supply single turbine/generator u Designed to fire 100% petroleum coke, Illinois #6 coal or PRB coal u Designed for co-firing lignite (92%), paper sludge (5%), wood waste (5%) u Polishing scrubber provides 98%+ overall SO2 and mercury removal u On-site limestone sizing mills Cleco’s Madison Unit 3 Petcoke-fired utility CFB Plant Electrical Output (Gross/Net) Steam Flow (SH/RH) Steam Pressure (SH/RH) Steam Temperature (SH/RH) Feedwater Temperature Fuel 2 x 330/2 x 300 MWe 972/889 tph 2140/1954 kpph 172/34 barg 2500/495 psig 568/568°C 1055/1055°F 243°C 470°F Petroleum coke, bituminous coal, east US coal, PRB, lignite Project summary Location: Boyce, LA, USA Customer: Shaw Group & Cleco Power LLC Duration: 2006-2010 Scope: Design and supply of 2 CFB boilers

Cleco’s Madison Unit 3 - Sumitomo SHI FWshi-fw.com/wp-content/uploads/2017/06/Factsheet_Cleco.pdfCleco Power’s Madison 3 unit is in service and producing power that will benefit

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Cleco’s Madison Unit 3 - Sumitomo SHI FWshi-fw.com/wp-content/uploads/2017/06/Factsheet_Cleco.pdfCleco Power’s Madison 3 unit is in service and producing power that will benefit

Cleco Power’s Madison 3 unit is in service and producing power that will benefit its customers today and into the future. The 2 x 300 MW (net) power plant utilizes Sumitomo SHI FW’s circulating fluidized-bed technology that can accommodate multiple solid fuels to generate power. Initially petroleum coke, an oil refining byproduct, will fuel the unit; however, the plant’s technology also allows for the use of renewable fuels. Woody biomass is a potential fuel since the new facility is located in a timber-rich area.

u Two boilers supply single turbine/generator

u Designed to fire 100% petroleum coke, Illinois #6 coal or PRB coal

u Designed for co-firing lignite (92%), paper sludge (5%), wood waste (5%)

u Polishing scrubber provides 98%+ overall SO2 and mercury removal

u On-site limestone sizing mills

Cleco’s Madison Unit 3Petcoke-fired utility CFB

Plant Electrical Output (Gross/Net)

Steam Flow (SH/RH)

Steam Pressure (SH/RH)

Steam Temperature (SH/RH)

Feedwater Temperature

Fuel

2 x 330/2 x 300 MWe

972/889 tph 2140/1954 kpph

172/34 barg 2500/495 psig

568/568°C 1055/1055°F

243°C 470°F Petroleum coke, bituminous coal, east US coal, PRB, lignite

Project summaryLocation: Boyce, LA, USACustomer: Shaw Group & Cleco Power LLCDuration: 2006-2010Scope: Design and supply of 2 CFB boilers

Page 2: Cleco’s Madison Unit 3 - Sumitomo SHI FWshi-fw.com/wp-content/uploads/2017/06/Factsheet_Cleco.pdfCleco Power’s Madison 3 unit is in service and producing power that will benefit

Metsänneidonkuja 8Fl-02130 Espoo, FinlandT +358 (0) 10 393 11

Relanderinkatu 2Fl-78201 Varkaus, FinlandT +358 (0) 10 393 11

ul. Staszica 3141-200 Sosnowiec, PolandT +48 (0) 32 368 1300

ul. Chmielna 85/87 00-805 Warsaw, PolandT +48 (0) 22 581 00 36

Lindövägen 75602 28 Norrköping, SwedenT +46 (0) 11 285 330

Petersstrasse 12047798 Krefeld, GermanyT +49 151 108 51366

53 Frontage Rd, PO Box 9000Hampton, NJ 08827 USAT +1 908 713 2700

8th Floor, UC Tower 500 Fushan RdPudong New AreaShanghai 200122 ChinaT +86 (0) 21 5058 2266

20th Floor Bhiraj Tower at EmQuartier, 689 Sukhumvit Rd Klongton Nuea, WattanaBangkok 10110 ThailandT +66 (0) 2 0417140 3

Suite 706-708, 7th Floor, Central Bldg31 Hai Ba Trung St Hanoi, VietnamT +84 (0) 4 39393809

7th floor, 621, Yeong-dong-daero, Gangnam-gu, Seoul, Korea 06087 T +82 2 3446 8325

Room 901A, 9th Floor Vicente Madrigal Bldg, Ayala AveMakati City 6793, Philippines

ThinkPark Tower, 1-1 Osaki 2-chome Shinagawa-ku, Tokyo 141-6025, JapanT +81 (0) 3 6737 2000

We are the premier global supplier of innovative circulating fluidized bed (CFB) technologies, providing sustainable value to our customers through our relentless drive for environmentally sound and reliable power solutions while we grow.