Cleanup and Closure Design of a Former Shooting Range and Landfill in Adams County Colorado SWANA October 1, 2019

Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

Cleanup and Closure Design of a Former Shooting Range and

Landfill in Adams County

Colorado SWANAOctober 1, 2019

Page 2: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

2

Agenda► SITE HISTORY

► LEAD REMEDIATION WORK

► LANDFILL CLOSURE• AGENCY COLLABORATION AND VALUE ENGINEERING

• BENEFICIAL REUSE OF LANDFILL USING SOLAR

• WHAT WE LEARNED FROM LEAD REMEDIATION

• BRACKETING THE UNKNOWNS

Page 3: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

3

“Old” Shooting Range Landfill

Shooting Range Landfill

Page 4: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

4

Timeline of Site Development

Page 5: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

5

Pre-Remediation Property Conditions

Page 6: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

6

Preparatory Activitieso Blowdown and Abandon 4” O&G

Pipeline

o Abandon Texas Tea O&G Production Well

o Relocate United Power Poles

o Abandon Commercial Well

Page 7: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

7

Firearms Training Facilities (Lead-impacted Soil)

South Range North Range

SWAT Training Area Tactical Training Area

Page 8: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

8

Structures And Debris Piles

Page 9: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

9

Site Characterization Activities

o 30” CMP integrity

o Groundwater flow direction

o Shallow and deep groundwater quality (onsite and offsite)

o Surface water quality

o Landfill gas – VOCs (TO-15)

o Soil and sediment

Shooting Range COCs

o Waste limits

Page 10: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

10

Site Plan

Page 11: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

11

Site Layout Landfill Limits

North Range

Soil Placement Area

Texas Tea O&G Well

South Range

30” CMP

Waste Tires

South RangeSafety Fan

Anadarko O&G Pipeline

Page 12: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

12

Site Characterization Summary

WASTE MATERIAL DISPOSITION

2,158 cy of Excess-Risk Soil and Bullet Piles

Screen and Treat, then Soil Placement Area

700 cy of Munitions Debris Soil Soil Placement Area

13 Structures (1 with ACM) Off-Site Permitted Landfill

Asphalt and Concrete Range Floor (South Range)

Soil Placement Area

Miscellaneous Debris Piles Off-Site Permitted Landfill

Waste Tires Tire Recycler

Page 13: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

13

South Range Design Cut Depths

Page 14: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

14

Remediation – Main Elements

o Establish stormwater BMPs

o Remove RBMs from structures and recycle

o Demolish and remove structures

o Pump out septic tank and abandon in place

o Surficial lead recovery from South Range Safety Fan

o Excavate soils under cap to EPA Industrial Risk Regional Screening Levels (RSL)

Page 15: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

15

Remediation – Main Elements (Cont.)o Excavate soils not under cap to Residential RSL

o Screen lead and recycle

o Stabilize Excess Risk Soils

o Consolidate treated soil and MD soil in Soil Placement Area

o Remove debris piles

o Demolish South Range pavement and consolidate in Soil Placement Area

o Temporary soil cover over Soil Placement Area

Page 16: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

16

Overview Of Soil Remediation

Page 17: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

17

Page 18: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

18

Final Soil Placement Area

Page 19: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

19

Final Remediation VolumesWASTE MATERIAL DISPOSITION

2,200 cy of Excess-Risk Soil and Bullet Piles

Screen and Treat, then Soil Placement Area

700 cy of Munitions Debris Soil Soil Placement Area

13 Structures (1 with ACM) Tower Road Landfill

Asphalt and Concrete Range Floor (South Range)

Soil Placement Area

360 cy of Railroad Ties and Power Pole Debris

Various Recyle/Disposal Facilities

6,600 Waste Tires GeoCycle LLC, Colo. Spgs.

40,108 lbs Bullet Lead40,600 lbs Scrap Iron

Three Sisters Trading, LakeForest, IL

23 Drums of Investigation Wastes Soil Placement Area6 Drums treated first

Page 20: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

20

Landfill Closure► Agency Collaboration And Value Engineering

• Recreating Historic Drainage Through Site

• Onsite Waste Relocation

• Landfill Cover Material

► Beneficial Reuse Of Landfill Using Solar

► What We Learned During The Lead Remediation• Asbestos Containing Material (ACM) Present

• Literally Lead Everywhere

► Bracketing The Unknowns• Swale Alignment Borings

• Waste Test Pits

• Material Management Plan

Page 21: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

21

Recreating Historic Drainage

Todd Creek Farms Subdivision

► ~150 acre watershed

► ~142 cubic feet per second (cfs)

• 100-year, 24 hour storm event

Page 22: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

22

Grading and Site Plan

► Potential to bore new storm drain

► Excavating waste to create channel for stormwater

Page 23: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

23

Landfill Cover Material► Adams county animal shelter project

► Source for Water Balance Cover material

Shooting Range Landfill

Animal Shelter Property

Approx. 3.5 miles

Page 24: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

24

Landfill Cover Material► Flatrock Training Center

► Source for geosynthetics subgrade and cover material

Shooting Range Landfill

Flatrock FacilityApprox. 14 miles

Stockpile

Page 25: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

25

The Solar Six► Colorado school of mines capstone

design project• Landfill cover system analysis

• Solar support system analysis

• Solar racking system analysis

• Solar efficiency analysis

Page 26: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

26

Landfill Cover with Solar Design

Colorado School of Mines Capstone Project

Future Solar Developer

Page 27: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

27

Grading Plan with Solar Areas ► 1-2 MW solar farm

► Potential for battery storage

► Access to United Power infrastructure

Page 28: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

28

► Asbestos Containing Material (ACM)

► Lead Everywhere

What We Learned From the Lead Remediation

Page 29: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

29

► Site Assessment and Closure Plan Report

► Storm Drainage Swale Test Pits

► Storm Drainage Swale Alignment Borings

► Materials Management Plan

► ACM Areas Map

Bracketing the Unknowns

► Communication with Adams County and CDPHE on findings• Discuss next steps and options

► Making sure construction documents account for discovering the unknown

Page 30: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

30

Landfill Closure and Solar Reuse Design

Community and Economic Development

Landfill Cover CQA Asbestos Monitoring

Solid Waste RCRA

Hazardous Materials and Waste Management Division

Page 31: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

31

Landfill Closure and Solar Reuse Construction

Community and Economic Development

Landfill Cover CQA Asbestos Monitoring

Solid Waste RCRA

Hazardous Materials and Waste Management Division

Landfill Closure Construction

AMERESCOSolar Farm

Development

Page 32: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

32

Drone Site Photo

Photo Credit: Iron Woman Construction

Page 33: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

33

Site Renderings

Page 34: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

34

Site Renderings

Page 35: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

35

Site Renderings

Page 36: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

36

Site Renderings

Page 37: Cleanup and Closure Design of a Former Shooting Range and ......Tire Recycler: 13 South Range Design Cut Depths. 14 Remediation – Main Elements. ... o Excavate soils not under cap

37

Questions?Joshua Lee, PE

Senior Civil EngineerBurns & McDonnell Engineering

[email protected]

John Dellaport, P.E., P.G.Environmental Div. Manager

Quantum Water & [email protected]

720-524-4294

Chris Krajicek, P.G.Project Manager

Quantum Water & [email protected]

720-524-4294