CENTRAL CONTROL
Please see correction
IN CASE OF ANY CHANGES REQUIRED TO BE DONE AS PER
APPROVED CONTROL & OPERATION PHILOSOPHY, SAME
SHALL BE DONE BY M/s TSPL AS A "DCN"
OR IN MFAP IN MAINCONTROL ROOM
6162312Typewriter3. THE INTERCONNECTION BETWEEN GAS RELEASE PANEL AND MFAP SHALL BE IN THE SCOPE OF VENDOR.4. REQUIRED INPUTS FOR MFAP SHALL BE GIVEN BY BIDDER IN THE DETAILED ENGINEERING STAGE.5. THE SCHEME IS INDICATIVE ONLY. BIDDER HAS TO SUBMIT THE P&ID OF INERGEN SYSTEM .
6162312Typewriter
6162312TypewriterSCHEMATIC OF INERT GAS EXTINGUISHING SYSTEMPROJECT: 2 X250 MW BSEB, BARAUNI, UNIT #8 & #9
6162312Typewriter
6162312Line
6162312Arrow
6162312Arrow
6162312TypewriterFDAV
6162312TypewriterIGEV
6162312TypewriterIGEV : INERT GAS EXTINGUISHING SYSTEM PACKAGE VENDORFDAV: FIRE DETECTION AND ALARM SYSTEM VENDOR
6162312TextboxFOR TENDER PURPOSE ONLY