1
CENTRAL CONTROL Please see correction IN CASE OF ANY CHANGES REQUIRED TO BE DONE AS PER APPROVED CONTROL & OPERATION PHILOSOPHY, SAME SHALL BE DONE BY M/s TSPL AS A "DCN" OR IN MFAP IN MAIN CONTROL ROOM

Clean Agent System

Embed Size (px)

DESCRIPTION

Clean Agent System

Citation preview

  • CENTRAL CONTROL

    Please see correction

    IN CASE OF ANY CHANGES REQUIRED TO BE DONE AS PER

    APPROVED CONTROL & OPERATION PHILOSOPHY, SAME

    SHALL BE DONE BY M/s TSPL AS A "DCN"

    OR IN MFAP IN MAINCONTROL ROOM

    6162312Typewriter3. THE INTERCONNECTION BETWEEN GAS RELEASE PANEL AND MFAP SHALL BE IN THE SCOPE OF VENDOR.4. REQUIRED INPUTS FOR MFAP SHALL BE GIVEN BY BIDDER IN THE DETAILED ENGINEERING STAGE.5. THE SCHEME IS INDICATIVE ONLY. BIDDER HAS TO SUBMIT THE P&ID OF INERGEN SYSTEM .

    6162312Typewriter

    6162312TypewriterSCHEMATIC OF INERT GAS EXTINGUISHING SYSTEMPROJECT: 2 X250 MW BSEB, BARAUNI, UNIT #8 & #9

    6162312Typewriter

    6162312Line

    6162312Arrow

    6162312Arrow

    6162312TypewriterFDAV

    6162312TypewriterIGEV

    6162312TypewriterIGEV : INERT GAS EXTINGUISHING SYSTEM PACKAGE VENDORFDAV: FIRE DETECTION AND ALARM SYSTEM VENDOR

    6162312TextboxFOR TENDER PURPOSE ONLY