CLdN GROUP | INTRODUCTION
- 25 owned vessels
- 100 sailings per week
- Freight: containers, trailers, cars and other heavy rolling equipment
CLdN ro-ro SA
- 10 Ro-Ro terminals in the Netherlands, Belgium and UK
- (Un)loading ownships or third party stevedoring
- Handling, storage and on-carriage of trailers, containers, vehicles and general cargo
- Door-to-door services
- Worldwide freightmanagement
- Logistics solutionsacross Europe
- Worldwide transportation
- Around 50 million ton per annum of coal, iron ore, bauxite and other dry bulk products
- Freight contracts with industrial and mineral groups
C.RoPorts
CLdNCargo
Bulk shipping
CLdN GROUP
25owned vessels
CLdN ro-ro SA
25 owned vessels
12 Ports of Call
12 Ro-Ro terminals
NEW: Cadevesa in Santander
8 sales offices
Own staff!
100 plus sailings per week
Santander and Lyon recently added!
CLdN GROUP
CLdN GROUP | SAILINGS
Sailings operated by CLdN ro-ro SA:
Zeebrugge – Purfleet 3x/day
Zeebrugge – Killingholme 1x/day
Zeebrugge – Dublin 4x/week
Zeebrugge – Gothenburg 5x/week
Zeebrugge – Esbjerg 1x/week
Zeebrugge – Hirtshals 1x/week
Rotterdam – Purfleet 1x/day
Rotterdam – Killingholme 1x/day
Rotterdam – Dublin 4x/week
Leixões – Rotterdam/Zee 3x/week
Santander – Rotterdam/Zee 2x/week
Through sailings:
Leixões – Dublin 2x/week
Leixões – Purfleet 2x/week
Leixões – Killingholme 2x/week
Leixões – Gothenburg 1x/week
Leixões – Esbjerg 1x/week
Gothenburg – Purfleet 5x/week
Gothenburg – Killingholme 5x/week
Gothenburg – Dublin 3x/week
Esbjerg – Purfleet 1x/week
Esbjerg – Killingholme 1x/week
Esbjerg – Dublin 1x/week
HISTORY
- Started in Jan 2013 with Leixoes-Rotterdam- One lo-lo vessel – One sailing each way every week
- September 2013 - switched lo-lo vessel with ro-ro vessel- Possibilities to accommodate all kind of cargo
- December 2013 - increased capacity with bigger ro-ro vessel
- May 2014- Introduction of a second vessel (lo-lo) on the trade- Two sailings each way every week
- September2014- switched lo-lo vessel with ro-ro vessel- 2 ro-ro sailings per week each way- Enables quick turn around of equipment on the trade
HISTORY
- 2016 extended Conro added
- Santander call added to the loop - Zeebrugge call added - 3rd sailing / vessel added - Frequency + capacity
- RORO Business in Tons 2013/2016 Leixoes Port
2013 - 75.171 - 2014 – 407.475 – 2015 - 704 .982 – 2016- 838.260
Tons 2013/2016 + 1015,13% - Tons 2015/2016 + 18,91%
Tons Jan 2016- Jan 2017 + 21 %
Future:
▪ Require more and bigger ships to extend our services
• More capacity and/or frequency on current
routes
• Develop new routes
“LNG ready” class notification
▪ Interchangeability of vessels between different routes
required
▪ Economy and High manoeuvrability
▪ Integrated flexibility with hoistable decks
CLdN GROUP | FUTURE
▪ Fleet expansion with 12 new vessels▪ 2 firm orders placed for 8.000lm vessels (G9)
• South Korean ship yard• 235m length – 35m beam• Delivery Q3 & Q4 2017•
▪ 4 firm orders placed for 5.500lm vessels • Croatian ship yard• 211m length – 32m beam• Delivery mid 2018•
▪ 4 more vessels (between 4.700 and 8.000lm) to be confirmed soonest• Europe and Far East
▪ 70% additional capacity increase over the next 4 years▪ € 200 million investment in our terminals: Rotterdam, London (Purfleet),
Killingholme, Zeebrugge
CLdN GROUP | FUTURE
HUMBERMAX vessels CONRO vessels
Kyokuyo vessels KHI vessels
CLdN GROUP | FLEET
CLdN GROUP