Clarifications regarding RSCB/RECON/21-22/01
Sr
No
Page
#
Point /
Section#
Clarification
point as stated
in tender
document
Query/ Suggestions Clarifications from bank side
1 7 1.
INVITATI
ON FOR
BID (IFB)
& NOTICE
INVITING
BID (NIB)
Bid Fee & RISL
Processing Fee
Bid Document
fee is
Rs.5,000/-
RISL
Processing fee
is Rs.500
However on Page
number 8 under
sl.no.3.2 “In addition to
Bid Form Fees,
Processing Fees of
Rs.1000.00/
Rs.500.00 has to be
deposited by way of
D.D in+ favor of M.D,
RISL before
opening of the
Technical Bid”
Kindly confirm whether
the total amount
payable is Rs. 5,500 or
1,500?
Rs.5,500 payment is to be
made towards bid fee & RISL
processing fee.
2 12 10.
Offices
The bidder
should have
permanent
office in India
with easy
access. The
bidder should
have branch/
service centers
in Rajasthan. If
the bidder do
not have
branch/ service
centers in
Rajasthan, then
bidder shall
submit self
declaration
signed by
authorized
signatory,
certifying that
the bidder shall
open an office
in Rajasthan
within 90 days
of the receipt of
the PO/WO.
Since the propose
solution is to be
carried out on OPEX
model at Vendors
premises. If we
emerge as L1 Bidder,
we propose to offer
services from our
Mumbai Office. We
shall designate one of
our staff member to
co-ordinate with Bank
daily for smooth
operations.
As the bid is in OPEX model,
the criteria of having
branch/service center in
Rajasthan may be considered
for exemption.
3 13 4. SCOPE
OF
1) p. Bidder
shall conduct
In case of major
changes required that
As per RFP, reconciliation of
other payment channels which
WORK,
DELIVER
ABLES
AND
TIMELINE
S
reconciliation of
other payment
channels which
bank may join
during of the
contract period
will change the
application logic or
reconciliation process
or the reporting
formats, the successful
bidder will follow the
Change Management
Process and place
before the Bank the
efforts estimates with
applicable
commercials that will
be discussed with the
Bank depending on
the complexity of the
change.
banks joins during of the
contract period may have to be
done by the bidder without any
additional cost to bank.
4 13 4. SCOPE
OF
WORK,
DELIVER
ABLES
AND
TIMELINE
S
2) The bidder
shall provide
complete
software
solution &
network for
reconciliation of
RTGS, NEFT,
NACH, NECS
etc. with RBI,
NPCI, CBS etc.
We need more clarity
on this point as the
proposal is for hosted
model.
As per RFP, all services are in
scope of the bidder.
5 13 4. SCOPE
OF
WORK,
DELIVER
ABLES
AND
TIMELINE
S
3) Network
connectivity
between Data
Center of
Cooperative
banks & Data
Center of
vendor shall
also be in the
scope of
vendor. The
network
bandwidth
should be such
that response
time of each
transaction is
less than 5
seconds
(Minimum 5
MBps).
Request the Bank to
bear the connectivity
cost. Also let us know
where the DR is
located.
As per RFP, all services are in
scope of the bidder.
6 14 5) User
Acceptanc
e Test &
Project
1. Supply,
installation,
testing,
commissioning
Request the Bank to
allow 12 week’s time
for the date of
acceptance from the
As per RFP, all services to be
integrated in 4 weeks from
date of PO.
Deliverabl
es
of
Reconciliation
Solution along
with complete
software & real
time dashboard
along with
management
panel for
monitoring
transactions
and
reconciliation of
RTGS, NEFT,
NACH, NECS
etc. with RBI,
NPCI, CBS etc.
(including
network
connectivity
between DC of
Bank & vendor)
PO instead of 4
weeks. This request is
being made as we
have to carry out Gap
Study. Also will
discuss with the Bank
the moralities of
sharing the file
formats.
7 14 5) User
Acceptanc
e Test &
Project
Deliverabl
es
Monthly
reconciliation
services for
RSCB & 29
DCCBs (on per
transaction
basis)
Monthly
Bank has mentioned
as Monthly basis.
Reconciliation is being
carried out on daily
basis and need clarity
how it is been stated
Monthly.
Reconciliation is done on daily
basis but project deliverable
for for billing purpose is to
done on monthly basis.
8 14 5) User
Acceptanc
e Test &
Project
Deliverabl
es
ATM
reconciliation &
EJ Pulling
Monthly
EJ Pulling function is
the responsibility of the
ATM managed
services vendor & not
the recon vendor. SLA
is between Managed
services vendor and
Bank and not with
Bidder. Whether the
ATM managed service
provider will provide
access to successful
vendor to pull out the
EJs.
In respect of branches
where the cash is
managed by the
branch, how the EJ’s
will be made available.
ATM reconciliation is
being done on daily
Daily EJ pulling will be in
scope of bidder.
basis. We need EJs
from the vendors to
carry out this task and
also to resolve
Customer Complains if
any. Request the Bank
to clarity the reason
that why it has been
stated monthly.
9 14 18)
Payments
a) Payment will
be made on
monthly usage
of services, on
submission of
original invoice
(in two copies)
in specified
format along
with
RTGS/NEFT
bank account
details
(imprinted on
Invoice itself) of
the
supplier/service
provider.
Request the Bank to
make payment with 15
days from the date of
Invoice.
As per RFP, payment will be
done on monthly basis.
10 16 5.
INSTRUC
TION TO
BIDDERS
(ITB)
Nominal
membership:
The successful
bidder is
required to
become a
nominal
member of the
bank.
Define Nominal
member and the
criteria to become a
nominal member. We
need more clarity on
this.
As per RFP, The successful
bidder is required to become a
nominal member of the bank.
11 23 18)
Evaluation
&
Tabulation
of
Financial
Bids
f) the offers
shall be
evaluated and
marked L1, L2,
L3 etc. L1
being the
lowest offer and
then others in
ascending
order in case
price is the only
criteria, or
evaluated and
marked H1, H2,
H3 etc. in
descending
Kindly provide the
weightage percentage
of Technical and
Commercial to be
consider for evaluation
of Bid.
Financial bids of only
technically qualified bidders
shall be opened.
order. In case
quality is also a
criteria and the
combined score
of technical and
financial
evaluation is
considered;
12 28 29)
Execution
of
agreemen
t
d) The bidder
will be required
to execute the
agreement on a
non-judicial
stamp of
specified value
at its cost and
to be purchase
from anywhere
in Rajasthan
only.
Request the Bank to
allow the successful
Bidder to execute the
agreement on Non
Judicial Stamp of the
State Concern.
As per RFP, the bidder will be
required to execute the
agreement on a non-judicial
stamp of specified value at its
cost and to be purchase from
anywhere in Rajasthan only.
13 38 19)
Liquidated
Damages
(LD)
This may be discussed
with the successful
Bidder.
As per RFP only.
14 45 g) Exit
Managem
ent Plan
vii. In the event
of termination
or expiry of
SLA, Project
Implementation
, Operation and
Management
SLA or SOWs
each party shall
comply with the
Exit
Management
Plan.
We need more clarity
on this point.
As per RFP only.
15 46 B)
Penalties
for down
time of
Solution:
This may be discussed
with the successful
Bidder.
As per RFP only.
16 49 4)
Reconcilia
tion Terms
&
Conditions
Hardware,
Software
& other
infrastruct
ure:
f. The bidder
should be OEM
of the offered
software and
shall customize
the solution if
required during
the tenure of
the contract. No
additional cost
In case of major
changes required that
will change the
application logic or
reconciliation process
or the reporting
formats, the successful
bidder will follow the
Change Management
Process and place
As per RFP, reconciliation of
other payment channels which
banks joins during of the
contract period may have to be
done by the bidder without any
additional cost to bank.
for any form of
customization
to meet the
scope will be
paid by the
Bank.
before the Bank the
efforts estimates with
applicable
commercials that will
be discussed with the
Bank depending on
the complexity of the
change.
17 49 4)
Reconcilia
tion Terms
&
Conditions
Hardware,
Software
& other
infrastruct
ure:
m. The
turnaround time
for
reconciliation of
any transaction
shall be T+1
day. The bidder
will be required
to follow-up
with branches,
Banks ATM
Managed
Service
Providers and
Ministry of
Finance (MOF)
Service
Providers,
NPCI, other
Banks for
obtaining data
files/settlement
files/CBR/EJ/JP
/CCTV/DVR
Footage or any
other
information
required for
reconciliation of
ATMs, claim
settlement and
Network
Reconciliation
of Transaction.
The bidder will
be required to
handle queries
from
branches on
the reconciled
and pending
entries etc.
1) Can provide T+1
turnaround subject to
Correct and timely
receipt of the Data
duly certified by the
Bank officials for the
authenticity of the Data
It is the responsibility
of the Bank to provide
data from the
concerned regulatory
authority for smooth
reconciliation.
While all followup has
been pushed as
Bidder responsibility,
the agreement is
between Bank and
managed services,
npci or such other third
vendor with whom
bank has an
agreement.
Bidder is another third
party vendor and
cannot enforce
performance of other
third party vendors on
behalf of the bank.
As per RFP.
18 50 4)
Reconcilia
p. As per
requirement of
In case of major
changes required that
As per RFP, reconciliation of
other payment channels which
tion Terms
&
Conditions
Hardware,
Software
& other
infrastruct
ure:
the Bank, the
bidder has to
handle the
reconciliation of
all payment
systems like
Mobile
Banking, debit
card, KCC
cards, ATM
Rupay IMPS
(Immediate
Payment
Service), Pre
paid
Instruments
transactions,
Mobile Wallet,
Cardless
Payment, Pre-
Paid Card,
Internet
Banking, and
other Payment
Gateways,
mobile
recharge,
Online
Payment
Gateway, Micro
ATM
Transactions,
Bharat Bill
Payment,
AePS, Pay,
UPI,JCB,ATM,
BNA(Recyclers
) or any other
enhancement
and new
services from
time to time
during the
contract period
with the agreed
terms of
transaction
cost.
will change the
application logic or
reconciliation process
or the reporting
formats, the successful
bidder will follow the
Change Management
Process and place
before the Bank the
efforts estimates with
applicable
commercials that will
be discussed with the
Bank depending on
the complexity of the
change.
banks joins during of the
contract period may have to be
done by the bidder without any
additional cost to bank.
19 50 4)
Reconcilia
tion Terms
&
u. Selected
bidder has to
attend the call
and e-mail from
Trust the Bank will
provide dedicated
phone line and email.
We need more clarity
As per RFP
Conditions
Hardware,
Software
& other
infrastruct
ure:
the branches
as well as from
customers on
the dedicated
phone number
and e-mail
given by the
Bank and act
promptly in the
time bound
manner. The
bidder should
have a
separate
arrangement
for the same
with tracking of
the complaints.
regarding “separate
arrangement”.
Dedicated customer
support on call and
email if required, will
require additional
resources which must
be included as a
separate line item in
the commercials
format to
accommodate as the
transaction cost will
not be economically
sufficient to sustain
cost of additional
resources across all
30 Banks.
20 50 4)
Reconcilia
tion Terms
&
Conditions
Hardware,
Software
& other
infrastruct
ure:
x. Bidder
should be able
to store online
data upto 2
years in the
system and
store all the
data beyond
two years in
back up hard
drive or Backup
tapes.
Bidder is already
responsible for the
Hardware and
Infrastructure at both
its DC and its DR.
Additional cost on daily
backup will not be
economical for the
bidder. Request Bank
to provide its own
resources like Hard
Drive etc to initiate
Back-up on daily
basis.
As per RFP
21 50 4)
Reconcilia
tion Terms
&
Conditions
Hardware,
Software
& other
infrastruct
ure:
ee. Bank will
not customize
its existing files
structure i.e.
CBS file ,
Switch file ,EJ
or Network file
according to
Bidder, instead
Bidder has to
customize its
software.
To the extent that
Bank data conforms to
ISG standards there
will be no issue in
customizations.
However, where vital
and mandatory fields
required for
reconciliation are not
available on the data
structure, Bank will
have to ensure those
are provided so that
reconciliation is
seamless and
automated.
As per RFP
22 4)
Reconcilia
tion Terms
gg. Bidder
should be able
to develop
New products are
dependent on the
Scope of Work, Terms
As per RFP
&
Conditions
Hardware,
Software
& other
infrastruct
ure:
system for new
products within
60 days of
requirement/inti
mation. If the
deliverable
/product is not
covered under
this RFP the
bank will have
a mutual
discussion with
the selected
bidder and do
price
negotiation
and conditions
governing the
product/enhancement
and the complexity.
These factors will be
considered to arrive at
the time-lines. 60 days
time limit cannot be
pre-determined to
arrive at the delivery
date.
23 51 4)
Reconcilia
tion Terms
&
Conditions
Hardware,
Software
& other
infrastruct
ure:
hh. Bidder
should
download all
the raw files
from different
accessible
Network which
are necessary
for
reconciliation
and the
application able
to read the raw
files in given
format.
This is the
responsibility of the
bank and not the
Bidder. Bidder are not
members of schemes
so cannot login and
download the requisite
files. Moreover, Switch
and CBS data will be
pushed through a
specifically assigned
SFTP and timelines
will be specified for
receipt of data for
processing.
As per RFP
24 4)
Reconcilia
tion Terms
&
Conditions
Hardware,
Software
& other
infrastruct
ure:
ii. Bidder
should
reconcile all the
pool accounts
of the banks.
Request Bank to share
the list of Pool
accounts of the Bank
to help obtain
necessary information
and automate the Pool
account reconciliation.
As per RFP, shall be shared
with successful bidder.
25 52 5)
SECURIT
Y
REQUIRE
MENT :
c. The solution
should be
connected with
Bank's host
(such as- CBS
etc.) with
Straight
through
Processing
(STP).
Bank to highlight the
expectations on this
point.
Seamless Integration without
any manual intervention.
26 General Provide the following
details:
1) Present card
Base.
2) Name of the
CBS service
provider.
3) Modalities of
loading the
Cash in ATMs.
Is it by the
Branches of
by the
Vendors. If
partial the
break Up may
be furnished.
4) Number of
ATM
5) No of BNA
machine.
30 banks – 27 Lakh cards
TCS BaNCS 24
Presently by branches of bank
As per RFP
In process
27 74 ANNEXU
RE-7:
MANUFA
CTURER’
S
AUTHORI
ZATION
FORM
(MAF)
The solution being
offered to the Bank is
In-House Develop.
We own the IPR. We
shall provide an
undertaking for the
same.
As per RFP
28 75 ANNEXU
RE-8:
FINANCIA
L BID
FORMAT
CGST
SGST
IGST
Request the Bank to
allow the Bidders to
quote unit price plus
applicable GST.
As per the BOQ file given at
the e-procurement
portal.
29 General General Query Kindly advise whether
the present recon
solution is being
carried out in-house.
In case it is
outsourced, the vendor
has to provide the data
on the file format as
per the L1 vendor.
To be finalized with the
selected bidder.
30 2 Last Date
of upload
of e-Bid
6.7.2021, 1.00
PM
Request the Bank to
extend the Bid
Submission by 10
days from the Banks
clarification to queries.
Bid Submission date may be
extended to 16.7.2021.
Basic
Requirement
Specific
Requirement
Modification Requested Clarifications from bank side
Financial:
Net Worth
The net worth of
the bidder for the
last three years,
including as on
31/03/2020, should
be Positive
The net worth of the bidder
for any 2 of the last three
years, including as on
31/03/2020, should be
Positive
The net worth of the bidder for
any 2 of the last three years,
including as on 31/03/2020,
should be Positive may be
considered looking into the Covid
19 as well as for better
participation of bidders.
Offices The bidder should
have permanent
office in India with
easy access.
The bidder should
have branch/
service centers in
Rajasthan.
FIS requests this
requirement be removed.
FIS has a major presence
in locations in India
including Gurgaon which is
proximate to Jaipur
As the bid is in OPEX model, the
criteria of having branch/service
center in Rajasthan may be
exempted.
Sr. No. Query description Clarifications from bank side
1 CBS & Switch are same for 30 Banks
(RSCBL and 29 DCCB's) or it is from
different OEM. If yes then please
share the details of CBS and Switch
for each Bank.
CBS – TCS BaNCS 24 for all 30 banks
Switch – FIS for all 30 banks
2 Is DC and DR for all 30 Banks is
same or is it different.
DC & DR location for all 30 banks is same
3 Please share the Complete address
for DC & DR sites. This will be
required for Network Connectivity.
DC- Rajasthan State Data Centre, Jhalana,
Jaipur
DR- State DR site, Mahendra Arora Circle,
Jodhpur
4 We assume that 203 ATM's are for
all 30 Banks. Please confirm on our
understanding.
203 ATMs belong to 30 banks
5 How is the setup of CBS & Switch i.e.
In-Premise or Cloud based
CBS is Capex model
Switch is Opex model
6 203 ATM OEM is same or is it
different, share the OEM Details for
all ATM's
ATM OEM differ, NCR, Vortex, Wincor etc.
7 Does ATM also inlcuds Recyclers/
ARM/ BNA
In process of installation
8 Are all ATM's under branch control or
managed services
Presently under branch control
9 How is the current arrangement for
getting Swithc/CBS/ EJ files
Using FIS switch
10 Do you need a single RECON
instance for all 30 Banks or 30
separate RECON instances.
All bank will have own recon instances under
multi tenancy model.
11 SLA mentioned in the RFP will also
depend on the CBS, Switch
Connectivity and other touch points
and instances. Hence failure of these
touch points are not to be considered
while calulating the SLA's
As per RFP
12 Is 2 Crore transactions per year are
for all 30 banks or 1 bank. Request
you to provide the channel wise
transaction distribution.
As per RFP, for 30 banks
13 In RFP it is mentioned 5 Lakh
transaction per day.
This is for the capability purpose
14 Considering the Scope of work for all
30 banks, we request Bank to
increase the Implementation period
from 4 weeks to 12 weeks minimum.
As per RFP
15 In BoQ Excel sheet, for item no. 1.03
ATM reconciliation and EJ Pulling
charges.
In thi column what are the charges to
be inserted. i.e. per ATM per day, per
ATM per Year etc.
Per ATM per year
Sr.
No.
Query description Need more input Clarifications from bank side
1 Scope of Reconciliation - a. ATM b. POS- Issuer/acquirer. c. ECOM e. IMPS f. UPI g. BHIM h. Bharat bill payment system (BBPS) h. Bharat QR code acquirer/issuer i. Micro ATMs j. Mobile Banking k. AEPS l. RTGS/NEFT m. NACH n. Internet Banking o. BNA- recycler/interoperable p. Bidder shall conduct reconciliation of other payment channels which bank may join during of the contract period q. The Solution offered should be compatible with all guidelines issued by the regulatory / Government bodies from time to time. In case of disruption of services at the Primary Site, the Bidder should be capable of providing continuous services at an alternate location/ Disaster Recovery Site of the Bank without the disruption of services. Disaster Recovery Site has to be verified by the bank's Officials after enabling for the primary site. r. The reconciliation of the above channels/Products/services/networks shall be two-way, three-way, four-way or n-way reconciliation as the case may be.
Need clarity on reconciliation for Internet banking, mobile banking, RTGS/NEFT, Bharat QR code acquirer/issuer and BHIM.
As per RFP, reconciliation of
existing channels and other
payment channels which banks
joins during of the contract period
shall have to be done by the
bidder without any additional cost
to bank.
2 End Reconciliation Solution for card transaction, ATM, MicroATM and other digital channels (RTGS, NEFT, NECS, NACH, Mobile Banking, IMPS, UPI, BHIM etc.) on ASP/Opex model
Currently we are providing recon for ATM,POS-Ecom (issuer), IMPS, UPI, Micro-ATM.
As per RFP, all channels have to be integrated as per the scope of work.
3 The Solution offered by the Bidder should be PA-DSS & Payment Card Industry Data Security Standard (PCI-DSS) compliant solution.
Recon is going to happen on transactions which are already routed through certified switch which is PA DSS certified , the software used for recon, should that be PA DSS certified, please clarrify.
As per RFP, PA-DSS & PCI-DSS certificates wherever required are mandatory for submission.
4 Network connectivity between Data Center of Cooperative banks & Data Center of vendor shall also be in the scope of vendor. The network bandwidth Network connectivity between Data Center of Cooperative banks & Data Center of vendor shall also be in the scope of vendor. The network bandwidth should be such that response time of each transaction is less than 5 seconds (Minimum 5 MBps).
Reconciliation is going to happen on performed transactions, so need to have clarity on DC and DR requirement with response time.
As per RFP, Bank’s DC is at Jhalana , Jaipur & DR site is at State DR site, Jodhpur. Response time indicated in RFP.
5 The bidder shall provide real time dashboard along with management panel for monitoring transactions and reconciliations of the RTGS, NEFT, NACH, NECS etc. from RBI, NPCI, CBS etc. The dashboard along with management panel shall be customized separately for the RSCB & 29 DCCBs. Each of the 29 DCCBs shall be able to view its own transactions only using login and password issued to them while the RSCB bank shall be able to view the transactions of RSCB & 29 DCCBs.
As mention above reconciliation is happening on T+1 basis. So not clear about monitoring of transaction for RSCB and all 29 DCCBs.
As per RFP, a dashboard required for the real time monitoring of the reconciliation process. This shall include but is not limited to the completed, pending and disputed transaction in reconciliation.
6 User Acceptance - Supply, installation, testing, commissioning of Reconciliation Solution along with complete software & real time dashboard along with management panel for monitoring transactions and reconciliation of RTGS, NEFT, NACH, NECS etc. with RBI, NPCI, CBS etc. (including network connectivity between DC of Bank & vendor)
Why connectivity is required between bank and Vendor.
As per RFP.
7 Supply, installation, testing, commissioning of Reconciliation Solution along with complete software & real time dashboard along with management panel for monitoring transactions and reconciliation of RTGS, NEFT,
Reconciliation happen after the transaction happen. So want to know objective of monitoring of transaction.
As per RFP, a dashboard required for the real time monitoring of the reconciliation process. This shall include but is not limited to the completed, pending and disputed transaction in reconciliation.
NACH, NECS etc. with RBI, NPCI, CBS etc [100% after completion of the integration]
8 The project is to be provided an outsourced /OPEX Model on per transaction basis; where in the required application reconciliation software, hardware, database licenses, OS licenses or any other licenses required and the manpower for reconciliation services is to be supplied by the bidder and sized to meet the current and projected requirement.
Is vendor supposed to provide hardware and corresponding OS and database for reconciliation software.
As per RFP, All required infrastructure is in scope of vendor.
9 All required hardware (Servers, Database ,SAN Storage, PCs, network switch, Rack. Etc.), system software , database has to be provided by the Bidder for primary (PR) and disaster recovery site (DR) at their cost and the details of the location should be informed to the Bank. The Bidder has to specify the hardware specification including storage being offered in their technical bid. In all the cases the database Maintenance in line with application requirement including installation has to be managed by bidder.
Tender is for Recon Solution,why hardware required for primary (PR) and disaster recovery site (DR)
As per RFP, All required infrastructure is in scope of vendor.
10 The bidder should provide all interfaces required with CBS, ATM Switch, DCMS, Web services, other payment systems & packages provided by the networks, regulatory institutions., Dispute Tracker of the bidder and any other systems. No additional cost will be provided at a later date. Bidder should consider this before quoting the cost in this bid.
Why the interface require with CBS, ATM switch DCMS, Web services, other payment systems & packages provided by the networks, regulatory institutions., Dispute Tracker. For reconciliation CBS vendor needs to provide necessary data for processing.
As per RFP, interface required for pulling transactions for reconciliations have to developed by the vendor.
11 The turnaround time for reconciliation of any transaction shall be T+1 day. The bidder will be required to follow-up with branches, Banks ATM Managed Service Providers and Ministry of Finance (MOF) Service Providers, NPCI, other Banks for obtaining data files/settlement files/CBR/EJ/JP/CCTV/DVR Footage or any other information required for reconciliation of ATMs, claim settlement and
What is scope Ministry of Finance (MOF) Service Providers, other banks, branch for reconciliation.
As per RFP, all guidelines of the regulatory authorities have to be complied with in totality.
Network Reconciliation of Transaction. The bidder will be required to handle queries from branches on the reconciled and pending entries etc.
12 The bidder must have the provision to customize the solution without any additional cost to bank, if required during the tenure of the contract.
What type of customisation is required, please specify. Customisation will attract extra cost.
As per RFP, any required format for data for recon have to be converted by the vendor without any additional cost to bank.
13 Necessary EJ is to be pulled from the ATMs by the bidder in a centralized manner to help in reconciliation. In this connection bidder need to coordinate with ATM vendor for inputting the EJ component in ATMs. No additional cost shall be payable by the bank for this.
ATM's are connected to respective switch and EJ is getting available on switch. So we will require EJ data for reconciliation. Is the EJ component installation is in scope of reconciliation.
As per RFP
14 Bank want complete dispute management application.
Tender is for Reconcilliation and the said requirement of dispute management application is a complete product and not a part of reconciliation hence can we quote extra cost for the same
As per RFP
15 Receivable and Payable account reconciliation.
Tender is for Reconcilliation and the said requirement of Receivable and Payable account reconciliation is a complete product and not a part of reconciliation hence can we quote extra cost for the same
As per RFP
16 Accounting and third-party reconciliation.
Tender is for Reconcilliation and the said requirement of Accounting and third-party reconciliation is a complete product and not a part of reconciliation hence can we quote extra cost for the same
As per RFP
17 Fraud Monitoring system. Tender is for Reconcilliation and the said requirement of Fraud Monitoring system is a complete product and not a part
As per RFP
of reconciliation hence can we quote extra cost for the same
18 Customer complaint management.
Tender is for Reconcilliation and the said requirement of Customer complaint management is a complete product and not a part of reconciliation hence can we quote extra cost for the same
As per RFP
Sr. No. Query description Clarifications from bank side
1 We request for an extension of Tender Submission Date by 7 days.
Bid Submission date may be
extended to 16.7.2021.
Sr. No.
Page No.
Clause No.
Clause Description as per RFP
Comment Proposed clarifications from bank side
1 11 Clause 3, Point 1, sub point 7
Qualification/ Eligibility Criteria
The Solution offered by the Bidder should be PA-DSS & Payment Card Industry Data Security Standard (PCI- DSS) compliant solution
We are ready to provide declaration of Providing PCI-DSS complaint Solution
As per RFP
2 13 Clause 4 , Point 1
Scope of Work, Deliverables and Timelines
The details of channels/Products/services/networks which shall be covered under the End to End Reconciliation system are as given below:
Clarification required on reconciliation Mobile Banking, Internet Banking, RTGS/NEFT, Bharat QR Code acquirer/ issuer and other channels too.
As per RFP, reconciliation of existing channels and other payment channels which banks joins during of the contract period shall have to be done by the bidder without any additional cost to bank.
a. ATM
b. POS- Issuer/acquirer.
c. ECOM
d. IMPS
e. UPI
f. BHIM
g. Bharat bill payment system (BBPS)
h. Bharat QR code acquirer/issuer
i. Micro ATMs
j. Mobile Banking
k. AEPS
l. RTGS/NEFT
m. NACH
n. Internet Banking
o. BNA- recycler/interoperable
p. Bidder shall conduct reconciliation of other payment channels which bank may join during of the contract period
q. The Solution offered should be compatible with all guidelines issued by the regulatory / Government bodies from time to time. In case of disruption of services at the Primary Site, the Bidder should be capable of providing continuous services at
an alternate location/ Disaster Recovery Site of the Bank without the disruption of services. Disaster Recovery Site has to be verified by the bank's Officials after enabling for the primary site.
r. The reconciliation of the above channels/Products/services/networks shall be two-way, three-way, four-way or n-way reconciliation as the case may be.
3 13 Clause 4 , Point 3
Scope of Work, Deliverables and Timelines
Network connectivity between Data Center of Cooperative banks & Data Center of vendor shall also be in the scope of vendor. The network bandwidth should be such that response time of each transaction is less than 5 seconds (Minimum 5 MBps).
Clarification required on netwrok connectivity between Data Centre of Bank and Vendor and response time, as the tender is for conducting reconciliation activity
As per RFP, connectivity is in scope of vendor.
4 13 Clause 4 , Point 4
Scope of Work, Deliverables and Timelines
The bidder shall provide real time dashboard along with management panel for monitoring transactions and reconciliations of the RTGS, NEFT, NACH, NECS etc. from RBI, NPCI, CBS etc. The dashboard along with management panel shall be customized separately for the RSCB & 29 DCCBs. Each of the 29 DCCBs shall be able to view its own transactions only using login and password issued to them while the RSCB bank shall be able to view the transactions of RSCB & 29 DCCBs.
Clarification is required on monitoring of transactions for RSCB & 29 DCCBs, as reconciliation of transactions already happened will be done
As per RFP, a dashboard required for the real time monitoring of the reconciliation process. This shall include but is not limited to the completed, pending and disputed transaction in reconciliation.
5 14 Clause 4 , Point 5, sub point 1
User Acceptance Test & Project deliverables
Supply, installation, testing, commissioning of Reconciliation Solution along with complete software &
Clarification required on the requirement of Network
As per RFP, connectivity is in scope of vendor.
real time dashboard along with management panel for monitoring transactions and reconciliation of RTGS, NEFT, NACH, NECS etc. with RBI, NPCI, CBS etc. (including network connectivity between DC of Bank & vendor)
connectivity between DC of Bank and Vendor and reconciliation happens after the transactions happen, then why bank requires monitoring of transations
6 48 Clause 7, point 4, sub point II (b)
Special terms and conditions of Bid & Contract
All required hardware (Servers, Database ,SAN Storage, PCs, network switch, Rack. Etc.), system software , database has to be provided by the Bidder for primary (PR) and disaster recovery site (DR) at their cost and the details of the location should be informed to the Bank. The Bidder has to specify the hardware specification including storage being offered in their technical bid. In all the cases the database Maintenance in line with application requirement including installation has to be managed by bidder.
Vendor has to provide reconciliation software then why the cost of hardware,PR, DR, OS licenses, database licenses and others as mentioned to be borne by the Vendor
As per RFP, All required infrastructure is in scope of vendor.
7 48 Clause 7, point 4, sub point II (a)
Special terms and conditions of Bid & Contract
The project is to be provided an outsourced /OPEX Model on per transaction basis; where in the required application reconciliation software, hardware, database licenses, OS licenses or any other licenses required and the manpower for reconciliation services is to be supplied by the bidder and sized to meet the current and projected requirement.
As per RFP, All required infrastructure is in scope of vendor.
8 49 Clause 7, point 4, sub point II (l)
Special terms and conditions of Bid & Contract
The bidder should provide all interfaces required with CBS, ATM Switch, DCMS, Web services, other payment systems & packages provided by the networks, regulatory institutions., Dispute Tracker of the bidder and any other systems. No additional cost will be provided at a later date. Bidder should consider this before quoting the cost in this bid.
For reconciliation CBS vendor has to provide data
As per RFP, interface required for pulling transactions for reconciliations have to developed by the vendor.