The Tooley & Foster Partnership LLP Clapton Methodist Church and Wesley House, London client London Wharf Plc location London size 1083m 2 value Confidential status Complete project overview The original church building on Downs Road in the Clapton Pond Conservation Area was demolished in 2004. To fund a new church, a scheme of private residential accommodation was developed. Some land was also purchased at the rear of the site to facilitate access to these flats. There are eleven flats (including a ground floor wheelchair flat), some with balconies, and there is a common amenity deck. The design and massing was specifically carried out to avoid loss of daylight to neighbouring properties. Sound insulation was also critical to the design in order to reduce sound transmission from the church to the flats, and vice versa. The church contains a multi-use hall for worship with a Sunday school, vestry, kitchen, toilets and accessible toilets. This community building is modern and aesthetically pleasing. Render emphasises the vertical central element of the church which ‘points towards the heavens’. The glazed entrance to the church is open and transparent, encouraging people to come in. The ground floor reconstituted stonework adds solidity to the church, with brickwork above it to reduce the impact and visual weight along Downs Road. project services Architecture

Clapton Methodist Church + Wesley House · Clapton Methodist Church and Wesley House, London client London Wharf Plc size location London 1083m 2 value Confidential status Complete

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Clapton Methodist Church + Wesley House · Clapton Methodist Church and Wesley House, London client London Wharf Plc size location London 1083m 2 value Confidential status Complete

The Tooley & Foster Partnership LLP

Clapton Methodist Church and Wesley House, London client

London Wharf Plc

location London

size 1083m2

value Confidential

status Complete

project overview The original church building on Downs Road in the Clapton Pond Conservation Area was demolished in 2004. To fund a new church, a scheme of private residential accommodation was developed. Some land was also purchased at the rear of the site to facilitate access to these flats. There are eleven flats (including a ground floor wheelchair flat), some with balconies, and there is a common amenity deck. The design and massing was specifically carried out to avoid loss of daylight to neighbouring properties. Sound insulation was also critical to the design in order to reduce sound transmission from the church to the flats, and vice versa. The church contains a multi-use hall for worship with a Sunday school, vestry, kitchen, toilets and accessible toilets. This community building is modern and aesthetically pleasing. Render emphasises the vertical central element of the church which ‘points towards the heavens’. The glazed entrance to the church is open and transparent, encouraging people to come in. The ground floor reconstituted stonework adds solidity to the church, with brickwork above it to reduce the impact and visual weight along Downs Road. project services Architecture