18
CJK IMT 28 Xi’an, China 2-3 Jun. 2011 CJK IMT 28, Xi’an, China 1/18 CJK-IMT28-005 Activities Update from ARIB MORIWAKI, Tetsuro ([email protected])

CJK IMT 28 Xi’an, China 2-3 Jun. 2011 CJK IMT 28, Xi’an, China 1/18 CJK-IMT28-005 Activities Update from ARIB MORIWAKI, Tetsuro ([email protected])

Embed Size (px)

Citation preview

CJK IMT 28

Xi’an, China

2-3 Jun. 2011

CJK IMT 28, Xi’an, China 1/18

CJK-IMT28-005

Activities Update from ARIB

MORIWAKI, Tetsuro

([email protected])

2/18CJK IMT 28, Xi'an, China

Trends of Mobile Communication Systems in Japan

3/18CJK IMT 28, Xi'an, China

Trends of Mobile Communication Systems in Japan

The number of mobile phone subscribers except PHS 120.18 Million (as of Apr. 2011)

• 98.92% 3G penetration rate in mobile phone• 2G services will be terminated by March 2012• LTE service: 39,800

Activities on IMT (IMT-2000 and IMT-Advanced) Report by Telecommunications Council to Ministry of Internal

Affairs and Communications (MIC) on technical conditions for 3.9G including enhanced 3.5G in Dec. 2008

Submission of two IMT-Advanced radio interface candidate technology proposals to ITU-R in Oct. 2009

Report by Telecommunications Council to MIC on technical conditions for enhanced CDMA 2000 high speed data mobile communication system (EVDO Multi-Carrier) in Dec. 2009

4/18CJK IMT 28, Xi'an, China

Trends of Mobile Communication Systems in Japan

Activities on IMT (IMT-2000 and IMT-Advanced) Start to study on technical conditions for mobile communication systems

utilizing 700/900MHz bands in Dec. 2009, and partial report was issued on 17th May, 2011

KDDI started commercial service based on enhanced CDMA 2000 high speed data mobile communication system (EVDO Multi-Carrier (up to 3 carriers) /800MHz & 2GHz band) in Nov. 2010

EMOBILE started enhanced 3.5G commercial service (DC-HSDPA /1.7GHz band) in Dec. 2010

NTT DOCOMO started 3.9G commercial service (LTE/2GHz band) in Dec. 2010

SOFTBANK MOBILE started enhanced 3.5G commercial service (DC-HSDPA/1.5GHz band) in Feb. 2011.

Activities on 2.5GHz Band BWA systems UQ Communications started mobile WiMAX (IEEE802.16e) commercial

service in July 2009 Willcom started XGP(eXtended Global Platform) commercial service in Oct.

2009

5/18CJK IMT 28, Xi'an, China

Study on technical conditions for mobile communication systems utilizing 700/900MHz bands

In Dec. 2009, Telecommunications Council under MIC started the following studies;

Study on technical conditions for mobile communication systems utilizing 700/900MHz bands

Followings are taken into account:- Effective frequency arrangement utilizing 700/900MHz bands - Conditions to coexist with other systems for the introduction of the mobile communication systems utilizing 700/900MHz bands

Spectrum bands of 700/900MHz (scheduled to be available after July 2012) are considered - 700MHz band will be available after the termination of analog broadcasting - 900MHz band will be available after the reallocation of mobile phone frequencies in 800MHz band

6/18CJK IMT 28, Xi'an, China

Study on technical conditions for mobile communication systems utilizing 700/900MHz bands

According to results of the study, the Telecommunications Council issued the partial final report on 17th May, 2011

The report concludes that LTE FDD, W-CDMA/ HSPA, HSPA Evolution and DC-HSDPA are technically applicable in 900 MHz band in Japan

Study result of 700 MHz band will be reported at later occasion because further study will be needed

ARIB had submitted the input contribution on this issue to 3GPP TSG-RAN#51 and RAN WG4#59 as information

7/18CJK IMT 28, Xi'an, China

Broadcast Auxiliary Service/Radio Microphone  

710 715 725 730                   770                  810 815      830      845        860      875       890        915                 950

NTT docomo(3G)

KDDI(au)( 3 G)

820 840 860 880 900 920 940800760 960740720(MHz)

710

MCA MCA

Personal Radio Communication

ITSDigital TV

Broadcasting

Discussion point 1: Availability of paring of 700 MHz and 900 MHz bands

Discussion point 2: Harmonization with other Asian and North American countries

Discussion point 3: Harmonization with European countries

RFID

Need to ensure a smooth transition of existing systems to other frequency bands

Need to ensure a smooth transition of existing systems to other frequency bands

780

Study on technical conditions for mobile communication systems utilizing 700/900MHz bands

Frequency reorganization plan to use LTE FDD, W-CDMA/ HSPA, HSPA Evolution and DC-HSDPA in 900 MHz band was approved in MIC as the objective of Japan on 14th December 2010 (next slide)

8/18CJK IMT 28, Xi'an, China

Study on technical conditions for mobile communication systems utilizing 900MHz bands

•10 MHz bandwidths will be added to the UL and DL after 2012

•900 - 905 MHz for UL and 945 - 950 MHz for DL will be assigned in 2012

Frequency reorganization plan in 900 MHz band (decided on 14th December 2010)

•Keep 45 MHz duplex separation between UL and DL in consideration of 3GPP UTRA FDD Band VIII or E-UTRAN Band 8

Blue blocks indicate the bands for the mobile systems

903

current

*Mobile system excluding 3G

900 920 940 960 MHz950910 930890

* *915

903

in 2012 900 920 940 960 MHz950910 930890

915

GB

by 2015 900 920 940 960 MHz950910 930890

915

GB

928

Orange: Personal radio communicationPink: MCAYellow: RFIDGreen: Broadcast auxiliary service

•Eventually 900 - 915 MHz for UL and 945 - 960 MHz for DL will be assigned by 2015

9/18CJK IMT 28, Xi'an, China

Activities of ARIB

10/18CJK IMT 28, Xi'an, China

Advanced Wireless Communications Study Committee in ARIB

Responsibilities To conduct technical studies on advanced wireless communication systems

in cooperation with other related international/domestic organizations To contribute to the global standardization

Structure of the Study Committee (as of April 2011) IMT-Advanced Subcommittee has been renamed to Standardization

Subcommittee on April 2011 Groups under the Standardization Subcommittee were restructured

Mobile Commerce Subcommittee

SteeringCommittee

Advanced Wireless Communications Study Committee(ADWICS)

IMT Partnership Subcommittee

BWA Subcommittee

Standardization Subcommittee

11/18CJK IMT 28, Xi'an, China

Standardization Subcommittee

Standardization Subcommittee

Collaboration Group

IMT-Advanced RIT Study GroupWP5D WG

(Structure as of April 2011)

Future IMT WG

WirelessMAN-Advanced WG

Dormant state as of April 2011

Newly established on October 2010

Newly established on October 2010

12/18CJK IMT 28, Xi'an, China

Supplemental slides

13/18CJK IMT 28, Xi'an, China

Introduction of 3.9G system in Japan

In 2008, Telecommunications Council under MIC has conducted the following studies;

• Study on technical measures for the enhancement of the third-generation mobile communications system

• Study on conditions to coexist with other systems for the introduction of the enhanced third-generation mobile communications system

• Spectrum bands of 2GHz, 800MHz, 1.5GHz and 1.7GHz considered

Candidate Enhanced Systems (FDD) studied by the council including 3.5G

• LTE, UMB and Mobile WiMAX for 3.9G system

• Note: Mobile WiMAX was studied, but was not included in the final report because its FDD mode specs had not been completed yet

• HSPA Evolution and DC-HSDPA for enhanced 3.5G system

14/18CJK IMT 28, Xi'an, China

Introduction of 3.9G system in Japan

Study process• 2008. April 21: Study started by Telecommunications Council• 2008. Oct.27 : Draft technical measures for advancement of IMT-2000• 2008. Oct.31 : Public comment invited on the draft report • 2008. Dec.11 : Final report on technical measures by the council

Schedule for introduction• 2009. Jan.21 : Consulting Radio Regulatory Council (RRC) on radio regulations• 2009. Jan.23 : Draft license policy released and public comment invited• 2009. March 11 : Report on radio regulations by RRC• 2009. March 11 : Consulting RRC and report on draft license policy by RRC• 2009. April 3 : Public announcement of license policy, etc.• 2009. April 3 - May 7 : Approval application period / 4 applications received• 2009. June 10 : All of 4 applications and their deployment plans approved

15/18CJK IMT 28, Xi'an, China

Introduction of 3.9G system in Japan

RRC report on draft license policy on March 11th in 2009

Draft license policy titled “Draft guidelines for establishment of specified base stations for the introduction of the 3.9-generation mobile Communications system” states(1) 2 blocks of 10MHz and 1 block of 15MHz in 1.5GHz band and 1 block of

10MHz in 1.7GHz band will be newly allocated to 4 applicants regardless of the incumbent operators and new entrants

(2) Within 5 years from the date of approval, more than 50 % population coverage by 3.9G and enhanced 3.5G systems using newly allocated frequency band should be realized

(3) 3G and 3.5G system can also be used in order to flexibly cope with various scenarios of 3.9G system introduction

Note: texts shown above are unofficial translations from original material in Japanese

①①10MHz10MHz

②②10MHz10MHz

③③15MHz15MHz

** ④④10MHz10MHz

1.5GHz band1.5GHz band 1.7GHz band1.7GHz band

1475.9 1510.9 (MHz)1475.9 1510.9 (MHz)* The band 1503.35MHz -1510.9MHz is prohibited from being used until end of March 2014 in some regions of Japan* The band 1503.35MHz -1510.9MHz is prohibited from being used until end of March 2014 in some regions of Japan

1844.9 1854.9 (MHz)1844.9 1854.9 (MHz)

16/18CJK IMT 28, Xi'an, China

Introduction of 3.9G system in Japan

Operator EMOBILE NTT DOCOMO SOFTBANK MOBILE KDDI

Frequency band

applied for1.7GHz band

/ 10MHz

1.5GHz band

/ 15MHz

1.5GHz band

/ 10MHz

1.5GHz band

/ 10MHz

3.9G

/e3.5G

system

System DC-HSDPA

LTE(5MHz,2X2MIMO)

LTE(15MHz,2X2MIMO) DC-HSDPA

LTE(5MHz,2X2MIMO)

LTE

(10MHz,2X2MIMO)

Freq. band 1.7GHz band

(DC-HSDPA,LTE)

1.5G/2GHz band (LTE) 1.5GHz (DC-HSDPA)

2GHz band (LTE)

800M/1.5GHz band

(LTE)

Service launch date

September 2010 December 2010 July 2011 December 2012

Area deploymentBy Mar. 2015

75.2%

6,388 base stations

51.10%

20,700 base stations

60.63%

9,000 base stations

96.5%

29,361 base stations

Estimated number of subscribes

by Mar. 2015

2.95M 17.74M 5.41M 9.84M

1.5GHz

/1.7GHzband usage

System HSPA, DC-HSDPA

LTE

LTE HSPA, DC-HSDPA LTE

Service launch date

January 2010 4Q 2012 April 2010 December 2012

Area deploymentBy Mar. 2015

75.2%

6,676 base stations

50.62%

5,700 base stations

81.47%

10,000 base stations

53.0%

6,361 base stations

Deployment plans proposed by applicants (unofficial translation)

17/18CJK IMT 28, Xi'an, China

Introduction of enhanced CDMA high speed data mobile communication system in Japan

In July 2009, Telecommunications Council under MIC started the following studies;

Study on technical conditions for the enhancement of CDMA high

speed data mobile communication system Taking into account conditions to coexist with other systems for the

introduction of the enhanced CDMA high speed data mobile

communication system Spectrum bands of 800MHz and 2GHz considered

In Dec. 2009, the council reported to MIC on the technical conditions for enhanced CDMA high speed data mobile communication system

Based on 3GPP2 specification: cdma2000 1X EVDO Multi-Carrier Multi-carrier of up to 3 carriers DL:14.7Mbps MAX / UL:5.5Mbps MAX

18/18CJK IMT 28, Xi'an, China

Introduction of enhanced CDMA high speed data mobile communication system in Japan

CDMA2000 1X CDMA2000 1XEVDO Rev.0

CDMA2000 1XEVDO Rev.A

CDMA2000 1XEVDO Rev.B

LTE

W-CDMA W-CDMA HSDPA

DC-HSDPA

DL:144kbps MAX

DL:384kbps MAXDL:384kbps MAX

DL:2.4Mbps MAX DL:3.1Mbps MAX

DL:14Mbps MAX

DL:43.2Mbps MAX

DL:73.5Mbps MAX(up to 15 carriers)

DL: Down LinkNote: The picture shown in this page is extracted and unofficially translated from the MIC’s

overview document describing enhanced CDMA high speed data mobile radio system written in Japanese.

DL:100Mbps MAX

CDMA2000 1XEVDO Multi-Carrier

DL:14.7Mbps MAX(up to 3 carriers)