Civil Works component plays a predominant role in SSA, as construction of Civil Works
activities is directly visible to all the stakeholders and can be evaluated by one and all. A good
school building or additional classroom can certainly promote a proper
pursue their education. With the introduction of Child Friendly Element and BALA Concept and
other special features, the Civil Works intervention is getting popular day by day
stakeholders.
SSA Delhi has entrusted the ex
there was no technical manpower available with UEEM and further the Directorate of Education,
Delhi has also engaged PWD for construction of various project
school building, additional classrooms
provision of drinking water facility, compound wall, development of play ground, repair of
existing building etc. The 3rd
Party Evaluation of monitoring and supervision has been done b
the agency (Delhi Technological University) appointed by SSA.
Achievements
1. Construction of New School Building
Sl. No. District
1 North West Govt. School Savada Ghewra, A
2 North West Govt. School Savada Ghewra,
3 North West Govt. School Kalyan Vihar
4 North West MCPS, Savada Ghewra, F
5 North West MCPS, Savada Ghewra, I
6 East Govt. Co
7 North East Govt. Co
8 West Govt. School Ranhaula
9 South West Govt. S. Co
10 South West MCD Primary school, Kapashera
11 North West MCPS, Sec
12 North West MCPS,
Some of the school buildings constructed under SSA
MCPS Sec-22, Rohini
Civil Works- SSA
Civil Works component plays a predominant role in SSA, as construction of Civil Works
activities is directly visible to all the stakeholders and can be evaluated by one and all. A good
school building or additional classroom can certainly promote a proper ambience for children to
pursue their education. With the introduction of Child Friendly Element and BALA Concept and
other special features, the Civil Works intervention is getting popular day by day
SSA Delhi has entrusted the execution of Civil Work to Delhi PWD for the reason that
there was no technical manpower available with UEEM and further the Directorate of Education,
Delhi has also engaged PWD for construction of various projects including,
additional classrooms, toilets for Girls, Boys & CWSN alongwith ramps,
provision of drinking water facility, compound wall, development of play ground, repair of
Party Evaluation of monitoring and supervision has been done b
the agency (Delhi Technological University) appointed by SSA.
Construction of New School Buildings
School Building
Govt. School Savada Ghewra, A-Block
Govt. School Savada Ghewra, B-Block
Govt. School Kalyan Vihar
MCPS, Savada Ghewra, F-Block
MCPS, Savada Ghewra, I-Block
Govt. Co-Ed SS, J.J. Colony Khichripur
Govt. Co-Ed School Buland Masjid Shastri Park
Govt. School Ranhaula
Govt. S. Co-Ed Vidyalaya Nangli Sakrawati
MCD Primary school, Kapashera
MCPS, Sec -22, Rohini
MCPS, Sec-27, Rohini
Some of the school buildings constructed under SSA
MCPS Sec-27, Rohini
Civil Works component plays a predominant role in SSA, as construction of Civil Works
activities is directly visible to all the stakeholders and can be evaluated by one and all. A good
ambience for children to
pursue their education. With the introduction of Child Friendly Element and BALA Concept and
other special features, the Civil Works intervention is getting popular day by day among the
ecution of Civil Work to Delhi PWD for the reason that
there was no technical manpower available with UEEM and further the Directorate of Education,
including, construction of
for Girls, Boys & CWSN alongwith ramps,
provision of drinking water facility, compound wall, development of play ground, repair of
Party Evaluation of monitoring and supervision has been done by
Year
2006-07
2006-07
2007-08
2007-08
2007-08
2007-08
2008-09
2008-09
2008-09
2008-09
2011-12
2011-12
Block Urban Resource Coordinator Centre Building
Sr.
No.
DISTRICT 2007-08
BURCC
1 East 1
2 North East 1
3 North 1
4 North West 1
5 West 1
6 South West 1
7 South 1
8 New Delhi 1
9 Central 1
Total 9
2. Construction of Additional Classrooms :-
Sr. District 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2010-11 2011-12 Total Porta
Cabins
Additional
Classroom
Additional
Classroom
Additional
Classroom
Additional
Classroom
Additional
Classroom
Additional
Classroom
Additional
Classroom
Completed
1 East 43 0 20 36 0 20 21 20 160
2 North East 48 82 29 30 0 15 46 10 260
3 North 40 22 10 6 0 20 12 10 120
4 North West 148 118 91 30 70 49 18 40 564
5 West 95 0 0 32 25 40 17 30 239
6 South West 87 24 0 27 41 44 10 25 258
7 South 74 104 10 10 25 30 26 20 299
8 New Delhi 8 0 0 0 0 0 0 0 8
9 Central 10 0 0 4 0 5 15 0 34
Total 553 350 160 175 161 223 165 155 1942
Sr. District 2012-13 2013-14 2014-15
Approved Comp In prog. Approved Comp In prog. Approved Comp In prog.
1 East 26 20 6 25 10 15 48 0 48
2 North East 30 6 24 20 0 20 40 0 40
3 North 26 6 20 0 0 0 21 0 21
4 North West 50 18 32 0 0 0 75 0 75
5 West 44 38 6 5 0 5 44 0 44
6 South West 44 37 7 5 0 5 77 0 77
7 South 56 42 14 5 5 0 59 0 59
8 New Delhi 10 5 5 0 0 0 0 0 0
9 Central 14 0 14 0 0 0 0 0 0
Total 300 172 128 60 15 45 364 0 364
3. Construction of Additional Toilets
Sr.
No.
DISTRICT 2007-08 2010-11 2010-11 2011-12 Total
Toilets Toilets Toilets Toilets Completed
1 East 98 15 1 10 124
2 North East 132 15 8 10 165
3 North 34 10 5 10 59
4 North West 122 20 10 20 172
5 West 111 10 12 15 148
6 South West 70 15 5 15 105
7 South 8 10 19 10 47
8 New Delhi 0 0 0 0 0
9 Central 35 5 1 5 46
Total 610 100 61 95 866
GBSSS Jharoda Kalan GBSSS Pochan Pur
GSKV, East Vinod Nagar
Sr. District 2012
Approved Comp
1 East 22
2 North East 32
3 North 20
4 North West 48
5 West 30
6 South West 33
7 South 37
8 New Delhi 5
9 Central 0
Total 227
GBSSS Sec-7, Rohini, Delhi
GSKV Sec-6, Dwarka
2012-13 2013-14
Comp In prog. Approved Comp In prog. Approved
10 12 5 0 5
20 12 4 0 4
8 12 0 0 0
32 16 0 0 0
26 4 6 5 1
29 4 6 5 1
33 4 6 6 0
2 3 0 0 0
0 0 0 0 0
160 67 27 16 11
GSKV Mangolpuri
SKV No.2 Sagar Pur, Delhi
2014-15
Approved Comp In prog.
15 0 15
20 0 20
8 0 8
30 0 30
32 0 32
54 0 54
65 0 65
0 0 0
2 0 2
226 0 226
4. Providing of Drinking Water Facilities
Sr. District Physical Unit
1 East 6
2 North East 8
3 North 2
4 North West 11
5 West 9
6 South West 14
7 South 11
8 New Delhi 0
9 Central 7
Total 68
Budget Year Wise
Sr. No Name of the Project Amount
Sanctioned
in Year
Amount
Sanctioned
(In lakh)
Expenditure
incurred
(In lakh)
Balance
(In lakh)
BUDGET 2005-06
1 Construction of 553 Porta Cabins (2005-06) 2005-06 2101.40 2036.67 64.73
2 Provision of Drinking water facilities to 68 schools
(2005-06) 2005-06 10.20 10.20 0.00
BUDGET 2006-07
3 350 Additional Class Room (2006-07) 2006-07 1050.00 1050.00 0.00
4 School Building (Savada Ghewra (2006-07) 2006-07 80.00 80.00 0.00
5 Construction of 610 Toilet (2006-07) 2006-07 122.00 122.00 0.00
BUDGET 2007-08
6 160 Additional Class Room (2007-08) 2007-08 480.00 480.00 0.00
7 a) School Building (Khichri Pur & Kalyan Pur 2007-08 80.00 80.00 0.00
b) School building (savada Ghewra) I & F-block 2007-08 80.00 80.00 0.00
8
DURC (1. Pitam Pura, 2. Moti Bagh, 3. Daryaganj,
4.Keshavpuram, 5. Rajinder Nagar, 6.Najafgarh, 7.
Dilshad Garden, 8. Anand Vihar, 9. Kitchner Road
2007-08 54.00 54.00 0.00
BUDGET 2008-09
9 Construction of 175 ACR (2008-09) 2008-09 875.00 875.00 0.00
10 4 New School Building (2008-09) (Buland Masjid,
Ranhaula, Nangli Sakrawati & Kapashera)
2008-09 200.00 200.00 0.00
BUDGET 2009-10
11 Construction of 161 ACR (2009-10) 2009-10 966.00 966.00 0.00
BUDGET 2010-11
12 C/o of 223 ACRs (2010-11) 2010-11 1338.00 1840.15
41.970
C/o of 223 ACRs (Revised Budget) 2010-11 544.12
13 C/o of 2 New School Building (2010-11) 2010-11 156.00 223.68
14.000
C/o of 2 New School Building (Revised Budget) 2010-11 81.68
14 C/o of 100 Toilets (2010-11) 2010-11 220.00 510.00 0.000
C/o of 100 Toilets (Revised Budget) 2010-11 290.00
15 Library (Primary) 2010-11 45.75 45.75 0.000
16 Library (Upper Primary) 80.10 80.10 0.000
Supplementary Budget 2010-11
17 Additional Class Room -165 (2010-11) 2010-11 990.00 965.970 24.030
Additional Class Room -165 (Revised Budget) 2010-11 402.60 386.950 15.650
18 Separate Girl Total-61 (2010-11) 2010-11 134.20 132.35 1.850
Separate Girl Total-61 (Revised Budget) 2010-11 176.90 175.0445 1.8555
19 Augmentation of Training Facilities-9 (2010-11) 45.00 0.00 45.000
BUDGET 2011-12
20 Additional Class Room -155 2011-12 1317.50 1286.85 30.650
21 Separate Girl Total-95 2011-12 522.50 485.578 36.922
22 BURC Centre-19 2011-12 323.00 0.00 323.000
23 Augmentation of Training Facilities-19 2011-12 95.00 0.00 95.000
24a Library (Primary) 2011-12 23.01 23.01 0.000
24b Library (Upper Primary) 2011-12 47.50 47.50 0.000
BUDGET 2012-13
25 New School Building 2012-13 101.84 76.38 25.460
26 Construction of ACR (300) 2012-13 2550.00 1917.600 632.400
27 Construction of Toilets (Boys) 27 2012-13 143.10 108.100 35.000
28 Construction of Toilets (Girls) 200 2012-13 1060.00 780.960 279.040
29 Construction of Ramps (100) 2012-13 70.00 50.170 19.830
BUDGET 2013-14
30 Additional Class Room -60 2013-14 582.00 436.500 145.500
31 Construction of Toilets-27 2013-14 159.30 119.475 39.825
BUDGET 2014-15
32 Additional Class Room -364 2014-15 4113.20 1888.225 2224.975
33 Construction of Toilets-226 2014-15 1371.82 573.460 798.360
GRAND TOTAL 23082.72 18272.266 4810.454
Salient Features in the construction of School buildings, Additional Classrooms:
i. Proper soil testing is done on each site to assess the suitability of the foundation and
design of the building.
ii. Earthquake Resistance:- Proper earthquake provisions as per National Building Code are
being adopted for construction (Bands at Plinth level, lintel level, roof level etc.)
iii. RCC Roof is being considered as per design for the roofing.
iv. Water proofing mud phaska/coba work on the roof.
v. The width of the Stair Case have been kept as 1.5 mtr with Handrail have been provided
keeping in view of fire protection norms, Stair Case with mumty lead up to the top of
the roof, parapet wall on the roof and proper door fixed in the entry to the roof.
vi. One cupboard have been provided for storage of books and teaching material in each
ACR
vii. One ventilator, three window, two doors are being provided for each classroom for
sufficient air ventilation and to meet out fire safety.
viii. One green board for writing surface, one pinup board is being provided in each ACR
and multiple Colours used in Walls/Doors
ix. Suitable size Ramp with Railing in 1:10 or 1:12 slope is being provided for each
building block..
x. Kota Stone flooring/suitable tiles flooring
xi. Verandah – 1.8 mtr – 2 mtr width- covered with tiles upto 2 mtr.
xii. Room size: 42-44 Sq. mtr. (approx.) with Double door (1 door-3ft., 1 door-4ft., with 2
panels of 1 ft. & 3ft.)
xiii. Four ceiling fans & 5 tube lights, 1 power point, 2 switch boards with power points one
near the door and one near the black board.
xiv. Specification and estimate to be based on CPWD norms & DSR
xv. Drinking water facility, developmental work as per requirement (for school building).
xvi. Provision of BaLA concepts as per requirement (like Geometrical shape grills, Green
black board, dot board, pinup board & Pictograph, Paintings on walls with different
colors, Protractor near the door etc.)
xvii. Entire building from one end to other end be covered with steps
xviii. Writable surface be constructed on walls of the verandah.
xix. Rain Water harvesting in newly constructed schools are also provided
xx. Fire Safety measures are also provided in various schools.
Provision in the construction of Toilets
1. One W.C & one for Handicapped unit & three Urinal closet
2. Hand wash provision
3. Incinerator for disposal of Sanitary pads preferably electrical operation
4. PVC storage tank of 1000 litre.
5. Tiles flooring, cistern etc.
6. Tiles in the wall upto 2-1 mtr.
7. Drainage to the existing available disposable system.
8. Electrical- one exhaust Fan & Two or three energy efficient lights
9. Covered area – approx 25 sq. mtr.
Ramps:
1. Gradient 1:12
2. Railing on either side with mixed colours
3. Anti skid tiles with smooth finishing
4. Hand railing with some BaLA concepts
5. Width 1.6 -1.8 mtr.