Lead RevitalizationLead RevitalizationCIVIC PROJECT UPDATECIVIC PROJECT UPDATE
Presented to Presented to Lead City CommissionLead City Commission
January 22, 2013January 22, 2013
Lead Downtown RevitalizationLead Downtown Revitalization
Reconstruct Main Street, as it is, Reconstruct Main Street, as it is, improving sidewalks, curb & gutter and improving sidewalks, curb & gutter and lightinglighting
Improve pedestrian walkways with wayImprove pedestrian walkways with way--finding and improved signagefinding and improved signage
Improve stairway between Julius Street & Improve stairway between Julius Street & Main Street, next to BH Mining MuseumMain Street, next to BH Mining Museum
Move library to Opera HouseMove library to Opera House
Lead Downtown RevitalizationLead Downtown Revitalization
Demolish libraryDemolish library Expand Opera House courtyard into old Expand Opera House courtyard into old
library area, add new stairway down to library area, add new stairway down to Julius Street Julius Street
Extend/improve parking area behind Post Extend/improve parking area behind Post Office down to Opera HouseOffice down to Opera House
Add midAdd mid--block pedestrian crosswalk across block pedestrian crosswalk across Main St in front of Opera HouseMain St in front of Opera House
Bus loading zone, west of Silver StarBus loading zone, west of Silver Star
Lead Downtown RevitalizationLead Downtown Revitalization
Expand/improve parking area west of Expand/improve parking area west of Silver Star and include parking garage into Silver Star and include parking garage into landscapelandscape
Develop north section of this parking area Develop north section of this parking area into event location with possible raised into event location with possible raised area as stagearea as stage
Move leased parking from lower level to Move leased parking from lower level to upper rear areaupper rear area
New parking garage faNew parking garage faççadeade
Lead RevitalizationLead RevitalizationCIVIC PROJECT UPDATECIVIC PROJECT UPDATE
LIBRARY STUDYLIBRARY STUDY
Remember this?Julius Street Parking Lot Redesign
COMBINED LIBRARY-TENANT SPACE
LIBRARY MAIN FLOOR—CONCEPT A
LIBRARY LOWER FLOOR—CONCEPT A
Square FootageSquare Footage 10,200 ft10,200 ft²²Shared with BH Mining MuseumShared with BH Mining Museum Main Entry/LobbyMain Entry/Lobby RestroomsRestrooms ElevatorElevator
Estimated CostEstimated Cost $2,595,000$2,595,000--$2,739,000$2,739,000
LIBRARYLIBRARY——CONCEPT ACONCEPT A
LIBRARY MAIN FLOOR—CONCEPT B
LIBRARY LOWER FLOOR—CONCEPT B
Square FootageSquare Footage 13,800 ft13,800 ft²²Unfinished tenant spaceUnfinished tenant spaceShared with BH Mining MuseumShared with BH Mining Museum Main Entry/LobbyMain Entry/Lobby RestroomsRestrooms ElevatorElevator
Estimated CostEstimated Cost $3,425,000$3,425,000--$3,559,000$3,559,000
LIBRARYLIBRARY——CONCEPT BCONCEPT B
LIBRARYLIBRARY——SLABSLAB--ONON--GRADEGRADE
Square FootageSquare Footage 9,750 ft9,750 ft²²Parking NeedsParking Needs 24 spaces minimum24 spaces minimumArea RequiredArea Required 1 acre recommended1 acre recommendedEstimated CostEstimated Cost $2,200,000$2,200,000--$2,344,000$2,344,000
Concept A (minimum courtyard)Concept A (minimum courtyard)10,200 ft10,200 ft²²
$2,595,000$2,595,000--$2,739,000$2,739,000Concept B (larger courtyard)Concept B (larger courtyard)
13,800 ft13,800 ft²²$3,425,000$3,425,000--$3,559,000$3,559,000
SlabSlab--onon--GradeGrade9,750 ft9,750 ft²²$2,200,000$2,200,000--$2,344,000$2,344,000
LIBRARY OPTIONS SUMMARYLIBRARY OPTIONS SUMMARY
LIBRARY OPTIONS LIBRARY OPTIONS
QUESTIONS/COMMENTSQUESTIONS/COMMENTS
Lead RevitalizationLead Revitalization
CIVIC PROJECT UPDATECIVIC PROJECT UPDATE
WAYFINDING PROJECTWAYFINDING PROJECT
WAYFINDINGWAYFINDINGThe benefits of knowing where you are and The benefits of knowing where you are and
where you are goingwhere you are goingThis is for the This is for the entireentire community, not just community, not just
downtowndowntown
WAYFINDINGWAYFINDING
A preliminary cost estimate to develop A preliminary cost estimate to develop a wayfinding program was $10,000a wayfinding program was $10,000
Group of interested citizens organized Group of interested citizens organized a wayfinding committeea wayfinding committee
They have been meeting every two They have been meeting every two weeks since Octoberweeks since October
A lot of progress has been madeA lot of progress has been made There is more to doThere is more to do
WAYFINDINGWAYFINDING
Who is our target audienceWho is our target audience–– TouristsTourists–– Hikers/bikers/hunters/fishermenHikers/bikers/hunters/fishermen–– Skiers/snowmobilersSkiers/snowmobilers–– History interestHistory interest–– Work related (city, school, lab, mall)Work related (city, school, lab, mall)–– Lots of othersLots of others
WAYFINDINGWAYFINDING
What do they need and wantWhat do they need and want–– LodgingLodging–– Gas/foodGas/food–– TrailsTrails–– Churches/cemeteriesChurches/cemeteries–– Arts/performing artsArts/performing arts–– Parks/restrooms/picnic tablesParks/restrooms/picnic tables
WAYFINDINGWAYFINDING
DESIGN RESULTSDESIGN RESULTS
Wayfinding Sign Wayfinding Sign RequirementsRequirements Types of SignsTypes of Signs
–– Entry SignsEntry Signs–– Primary SignsPrimary Signs–– Secondary SignsSecondary Signs–– Proximity SignsProximity Signs–– Special PurposeSpecial Purpose
Location of SignsLocation of Signs Design of SignsDesign of Signs State Wayfinding Application ProcessState Wayfinding Application Process
COMMUNITY PROJECTCOMMUNITY PROJECT Local designLocal design Local constructionLocal construction Local installationLocal installation
ENTRY SIGNSENTRY SIGNS——THREE EACHTHREE EACH
ENTRY SIGN
Wayfinding Sign Requirements
Wayfinding Sign Requirements3 Signs
Wayfinding Sign Requirements3 Signs
Wayfinding Sign Requirements7 Signs
Wayfinding Sign Requirements6+ Signs
Directional Sign ConceptDirectional Sign Concept
WAYFINDINGWAYFINDING
What remains?What remains?–– Finalize the entrance signsFinalize the entrance signs–– Finish the design for all of the smaller Finish the design for all of the smaller
signs signs –– Start state wayfinding program processStart state wayfinding program process–– Develop RFP for all signs except entry Develop RFP for all signs except entry
signssigns–– Develop budget/timeline for installDevelop budget/timeline for install
QUESTIONS/COMMENTSQUESTIONS/COMMENTS
WAYFINDINGWAYFINDING
Lead RevitalizationLead Revitalization
CIVIC PROJECT UPDATECIVIC PROJECT UPDATE
HANDLEY RECREATION HANDLEY RECREATION CENTERCENTER
HANDLEY RECREATION CENTERHANDLEY RECREATION CENTER
Brief HistoryBrief History Financed by City of Lead through bonds in Financed by City of Lead through bonds in
1988 for $1,950,000, initially a YMCA1988 for $1,950,000, initially a YMCA Refinanced in 1995 for $1,595,000Refinanced in 1995 for $1,595,000 Paid approx $180,000 annuallyPaid approx $180,000 annually Paid off in 2007Paid off in 2007
HANDLEY RECREATION CENTERHANDLEY RECREATION CENTER
History of Recent City SupportHistory of Recent City Support
20072007 $107,000$107,000 20082008 $123,000$123,000 20092009 $121,000$121,000 20102010 $152,000 (38% of income)$152,000 (38% of income) 20112011 $186,000 (52% of income)$186,000 (52% of income) 20122012 $122,000 (56% of income)$122,000 (56% of income) 20132013 $115,000 (Budgeted)$115,000 (Budgeted)
HANDLEY RECREATION CENTERHANDLEY RECREATION CENTER
Summary of Recent Cash FlowSummary of Recent Cash Flow
2010 20112010 2011 20122012Gross Profit $347,000 $325,000 $188,000Gross Profit $347,000 $325,000 $188,000Expenses $373,000 $294,000 $201,000Expenses $373,000 $294,000 $201,000
Net ($26,000) $31,000 ($13,000)Net ($26,000) $31,000 ($13,000)
HANDLEY RECREATION CENTERHANDLEY RECREATION CENTEROther FactsOther Facts
Additional City SupportAdditional City Support–– No water charges, approx $2,100/yrNo water charges, approx $2,100/yr–– Main Bldg Insurance, approx $4,300/yrMain Bldg Insurance, approx $4,300/yr
Current Membership 135 individualsCurrent Membership 135 individuals Usage is counted as individuals using different Usage is counted as individuals using different
areas of Handley Centerareas of Handley Center Usage does not include ArmoryUsage does not include Armory City financed a HC building study in Jan, 2010City financed a HC building study in Jan, 2010
–– Estimated cost of remaining improvementsEstimated cost of remaining improvements--$60,000$60,000
HANDLEY RECREATION CENTERHANDLEY RECREATION CENTER
Handley Center Usage/Programs• Weight Room (fixed and free weights)• Walking Track• Sauna• Lockers/Showers• Dance/Exercise Area• Racquetball Courts
HANDLEY RECREATION CENTERHANDLEY RECREATION CENTER
Armory Usage/Programs• Pre-School• Alternative School• Roller Skating• Boxing• Indoor Soccer• Noon Hoops
HANDLEY RECREATION CENTER
PROBLEMThe Handley Center continues to struggle with
staffing, programming and building repair/maintenance. While there is good usage of several programs (weights, walking, pre-school, alternative school, gym), other areas have a definite lack of interest (outdoor programs, racquetball) or are too expensive to pursue (pool area usage, needed upgrades to both facilities)
HANDLEY RECREATION HANDLEY RECREATION CENTERCENTER
SOME SOLUTION OPTIONSSOME SOLUTION OPTIONS Shut down both facilities and Shut down both facilities and
research/study the recreational needs of research/study the recreational needs of the communitythe community Shut down the Armory and operate the Shut down the Armory and operate the
Handley Center & review needsHandley Center & review needs Shut down the Handley Center and Shut down the Handley Center and
operate the Armory & review needsoperate the Armory & review needs Operate asOperate as--is & review needsis & review needs
HANDLEY RECREATION HANDLEY RECREATION CENTERCENTER
PROS/CONS OF COMPLETE SHUTDOWNPROS/CONS OF COMPLETE SHUTDOWNPROSPROS Minimum expendituresMinimum expenditures City support on holdCity support on holdCONSCONS Loss of important programsLoss of important programs $2M investment walked away from 5 yrs $2M investment walked away from 5 yrs laterlater Momentum/interest will be lostMomentum/interest will be lost Public perception of quitting/not moving Public perception of quitting/not moving
forwardforward
HANDLEY RECREATION HANDLEY RECREATION CENTERCENTER
PROS/CONS OF OPERATING ARMORY ONLYPROS/CONS OF OPERATING ARMORY ONLYPROSPROS Cost savings not operating HCCost savings not operating HC Save money as HC reviewedSave money as HC reviewed Consolidation of staffConsolidation of staffCONSCONS Facility needs improvementsFacility needs improvements Restroom/locker area/staff areaRestroom/locker area/staff area Heating/utilities needs evaluationHeating/utilities needs evaluation
Insufficient room to move all programs from HCInsufficient room to move all programs from HC
HANDLEY RECREATION HANDLEY RECREATION CENTERCENTER
PROS/CONS OF OPERATING PROS/CONS OF OPERATING HANDLEY CENTER ONLYHANDLEY CENTER ONLY
PROSPROS Cost savings not operating ArmoryCost savings not operating Armory Less maintenance/managementLess maintenance/managementCONSCONS Loss of more important Loss of more important pgmspgms (schools, gym use)(schools, gym use) Not sufficient room to move all Not sufficient room to move all pgmspgms to HCto HC Building needs improvements ($60,000)Building needs improvements ($60,000) Floor over pool installation is cost prohibitive ($300KFloor over pool installation is cost prohibitive ($300K--
$500K)$500K)
HANDLEY RECREATION HANDLEY RECREATION CENTERCENTER
PROS/CONS OF OPERATING ASPROS/CONS OF OPERATING AS--ISISPROSPROS All programs have adequate areasAll programs have adequate areas City can afford current supportCity can afford current supportCONSCONS No improvements or moving forwardNo improvements or moving forward Poor membership/usagePoor membership/usage Programming poorProgramming poor
HANDLEY RECREATION CENTERHANDLEY RECREATION CENTER
ECONOMICS TO OPERATE AS ECONOMICS TO OPERATE AS CITY DEPARTMENTCITY DEPARTMENT
ExpensesExpenses $410,000$410,000IncomeIncome $159,000$159,000Cost to CityCost to City $251,000$251,000
Estimated Capital Improvements $120,000Estimated Capital Improvements $120,000($60,000 from TSP study, ($60,000 from TSP study, addadd’’ll $60,000 identified by staff)$60,000 identified by staff)
HANDLEY RECREATION CENTERHANDLEY RECREATION CENTER
Survey RecommendationSurvey Recommendation Develop a comprehensive communityDevelop a comprehensive community--wide wide
survey of all recreational needssurvey of all recreational needs——Handley Handley Center, parks system, trail information.Center, parks system, trail information.
Focus one area of the survey specifically Focus one area of the survey specifically on indoor recreationon indoor recreation
Utilize availability of Survey Monkey Utilize availability of Survey Monkey membership through BHCLGmembership through BHCLG
HANDLEY RECREATION CENTERHANDLEY RECREATION CENTER
Pursue relationship with Deadwood Pursue relationship with Deadwood Recreation CenterRecreation Center
Minimize duplicate programsMinimize duplicate programs ““HandshakeHandshake”” eventsevents——(for instance, BMX (for instance, BMX
bike race in bike race in DwdDwd, road race in Lead; , road race in Lead; triathlon in both communities, etc)triathlon in both communities, etc)
One membership fee?One membership fee?
HANDLEY RECREATION CENTERHANDLEY RECREATION CENTER
Ideas for Improvements in Handley CenterIdeas for Improvements in Handley Center Climbing wall in pool areaClimbing wall in pool area Stationary lap swimmersStationary lap swimmers Repair/improve weight roomRepair/improve weight room ProgrammingProgramming——basketball, volleyball, football, basketball, volleyball, football,
biking, bowlingbiking, bowling Fitness eventsFitness events——Biking, running, triathlons, Biking, running, triathlons,
muddersmudders Billiards, snooker, pingBilliards, snooker, ping--pongpong
HANDLEY RECREATION CENTERHANDLEY RECREATION CENTER
Ideas for Improvements to ArmoryIdeas for Improvements to Armory Upgrade restrooms/locker rooms (this Upgrade restrooms/locker rooms (this
may be expensive/difficult)may be expensive/difficult) Utilize as part of the programming area Utilize as part of the programming area
(basketball, volleyball, soccer)(basketball, volleyball, soccer) Improve side entrance for ADAImprove side entrance for ADA
QUESTIONS/COMMENTSQUESTIONS/COMMENTS
HANDLEY RECREATION CENTERHANDLEY RECREATION CENTER