Cityproject Acad Elevsm

Embed Size (px)

Citation preview

  • 7/31/2019 Cityproject Acad Elevsm

    1/1

    Alcove

    beam

    3

    Beam

    PostPipes (approx. 10'-02"

    fromfloortobaseof

    first row)

    Beam

    approx. indications of piping-they start

    at 10'10" frombase of floor

    2

    B1

    Into

    The

    Kitchen

    (Door: 98" tall)

    approx. indications of piping-they start

    at 10'10" frombaseof floor

    Window

    Glass

    Note: Photo shows this wall from an exterior view (reverse)

    Glass

    Window

    Glass

    4'-9"

    TheColumnandThis wallextendmuchhigher-This marks theheight of theoverhangandcoveredinwalkway.

    14'-0"

    Window

    3

    C1

    Elevator

    Wall FeatureWall

    Alcove

    Lokkingthroughthewindow

    tothevestibuleand

    totheexteriorwalkway.

    TheBalcony is just around

    theleft corner.

    Exhibit Spacestarts here, wherethe ElevatorWallandFeatureWallBegin.

    TheExhibit goes intothe Alcove, carries throughthe Vesibule, andaround

    thecorneroutsideto theleft, ontothe Balcony.

    Alcove

    A1

    1VIEW OF EXHIBIT SPACE ELEVATION : ELEVATOR WALL ELEVATION : FEATURE WALL

    1

    A3

    ELEVATION : VESTIBULE : KITCHEN DOOR WALL ELEVATION : VESTIBULE : VESTIBULE WALL, BACK ENTRANCE/EXIT ELEVATION : VESTIBULE : WALL OPPOSITE KITCHEN DOORB3

    2

    2

    B2ELEVATION : BALCONY EXTERIOR : WINDOW WALL

    ELEVATION DRAWINGS : MAIN EXHIBIT SPACE

    14'-10"

    4'-0"

    2'-0"

    12'-10"

    10'-10"

    1

    A2ELEVATION : ENTRY INTO VESTIBULE

    7'-2"

    14'-81/2"

    4'-4"

    14'-10"

    8'-2"

    10'-10"

    1'-6"

    7'-9"

    ELEVATION DRAWINGS : VESTIBULE

    ELEVATION DRAWING : BALCONY - EXTERIOR BUILDING WALL

    Thiswallextendsmuchlonger-

    Thismarkstheendofthebalcony,andthebalcony

    exhibitspace.

    3'-0"

    1'-4"

    Concrete

    Column

    DATE:

    Ralph Kle

    DRAWN BY:

    TITLE:

    LOCATION:

    Plan : Ex

    Oct. 30,

    J.