City of Tshwane Metropolitan MunicipalityFIFA 2010 World Soccer Cup READINESS PROGRAMME
Presented by:
Mr. Jackie T. Makgobola29 August 2006
CONTENTS
• City Vision• CDS• 5 Year Programme• Tshwane in Context• Our Approach• Stadium Development• Loftus Versfeld• Transport• Training Venues• Projects Budget• ICT• Accommodation• Tourism• Marketing, Communication and Signage• Emergency Management• Safety and Security• Institutional Arrangements• Anticipated Benefits• Other Strategic Initiatives• Way Forward
The leading international African Capital City of
Excellence that empowers the community to prosper in a
safe and healthy environment
THE CITY OF TSHWANE VISION
• Action plan for equitable growth in the city to improve the quality of life for all
• Public investment to be guided by the City Development Strategy
• Two of the strategic objectives of the City Development Strategy are -• Development of the North• Celebrating the National Capital and
Repositioning the Inner City• 2010 Soccer World Cup a mechanism to
direct investment to these areas
FIFA WSC 2010 AND THE CITY OF TSHWANE CDS
CITY OF TSHWANE 5 YEAR PROGRAMMESTRATEGIC OBJECTIVES AND PRIORITIES
• Provide quality basic infrastructure• Accelerated shared higher economic growth• Fight poverty, build clean healthy safe and
sustainable communities• Foster participatory democracy and Batho
Pele principles• Ensure good governance, financial viability,
optimal institutional transformation
TshwaneNORTH
TSHWANE IN CONTEXT
CBD
Loftus Versfeld
H.M. Ptije
Super Stadium
Giant Stadium
ODI Stadium
Pilditch
2010 Stadiums in the City of Tshwane
OUR APPROACH
• People driven• Pro-poor• Address first and second economy
disparities• Post 2010 legacy• Address social and economic
imbalances• Sustainable and quality infrastructure• Strategic partnership, e.g. PSL Teams
OUR APPROACH TO STADIUM DEVELOPMENT
• Precinct development and management
• Labour intensive methods / EPWP• Local entrepreneur / sub-contracting• Further strengthening of local
economies• Alignment with existing programmes,
e.g. Top 20 Townships
LOFTUS VERSFELD
LOFTUS VERSFELD
LOFTUS VERSFELDUPGRADES
• New Board Halls• North Entry Upgrades• South Entry Upgrades• New Bridge between gymnasium and
stadium• Conference Facilities• Gymnasium Facilities • Additional Ablution Facilities• New Ticket Offices• Camera Platform• Additional Lift
LOFTUS VERSFELD
• Turnstiles• Upgraded Concession stalls• Upgrade existing VOC• Upgrade and expand existing VIP suite• Roof over Eastern Pavilion• New Seats • New Plant Rooms• Temporary Facilities for Media• Dug-outs for Reserves • Pull out Shelter for Tunnel • Electrical and Electronic Upgrade
LOFTUS VERSFELD
• Surveys are taking place to determine Electricity Capacity
• The water and sewer pipe lines will be upgraded
• Upgrading of roads & transport facilities in vicinity of Loftus Versfeld Stadium and training venues
TRANSPORT
• Develop critical PT corridors and linkages (airports, hotels & venues)
• Improve linkages to 3 airports• Make use of available transport
services incl. recapitalised mini-bus taxis
• Upgrade commuter rail service• Establish Inner City PT
Distribution System• Recapitalised City Bus Service
• Tshwane Integrated Transport Plan to coordinate all transport related issues for 2010
• Pedestrian linkage at Loftus Station to be constructed with NDOT funds Development
• Finalising the Loftus Precinct Framework
• Western bypass (PWV 9) • Mabopane - Hammanskraal rail link• Light rail
TRANSPORT CONTINUED…
TRAINING VENUES
• Super Stadium in Atteridgeville• H.M. Pitje Stadium in Mamelodi• Giant Stadium in Soshanguve• Odi Stadium• Pilditch Stadium
TRAINING VENUES
• All plans and frameworks for the upgrading of the training venues are in process• Budget frameworks• Infrastructure frameworks• Implementation frameworks
• All plans for the upgrading of facilities are done according to required FIFA standards.
• The vision of the development of internationally recognised soccer venues is taking shape
SUPERSTADIUM –ATTERIDGEVILLE PRECINCT
H.M. PITJE STADIUM –MAMELODI PRECINCT
GIANT STADIUM –SOSHANGUVE PRECINCT
PROJECTS BUDGET
PROJECT 06/07 07/08 08/09
1 Tourism Signage 500 000 1 000 000 1 500 000
2Pta. North Public:2010 0 200 000 0
3Acquisition: Fire Fighting
Vehicles 10 000 000 10 000 000 10 000 000
4Refurbishment Of Fire
Fighting Vehicles 1 500 000 1 000 000 1 000 000
5Establishment Of Metro
Police Office Region 5
0 5 000 000 7 000 000
6Establishment of Metro
Police Office Region 5 000 000 7 000 000 0
72010 World Cup Soccer
(Command vehicles, etc)
0 0 3 000 000
PROJECT 06/07 07/08 08/09
8Establishment of Metro Police Office: Region 3 Pretoria North
0 0 4 000 000
9Mobile Support Centres: Police Dept 5 000 000 0 0
10 Tshwane Overload Control Programme (City Wide)
4 000 000 6 000 000 0
11 Upgrade of the Road Network in Hatfield 7 000 000 0 3 000 000
12 Improving of Hans Strijdom Drive (West) 0 3 000 000 19 000 000
14 Soshanguve Giant Stadium C 35 820 000 10 848 000 13 000 000
15HM Pitje Stadium 16 000 000 0 0
13 Atteridgeville Super Stadium 35 000 000 14 000 000 14 000 000
16Atteridgeville Training Venue: Roads upgrade 4 800 000 0 0
PROJECTS BUDGET Continued…
PROJECT 06/07 07/08 08/09
17Giant Training Venue: Roads upgrade: Buitekant Street 1 000 000
18Wonderboom Airport Access Lindveldt Road 1 000 000
19K69 between Waterkloof Air Force Base and R 21 5 000 000
20Upgrading/Strengthening of Existing Electrical Network Schemes
5 000 000 6 380 000 6 500 000
21Communication Upgrade: Optical Fibre Net 8 000 000 7 000 000 12 000 000
22Tshwane Public Lighting Program 21 500 000 25 500 000 26 178 000
23Power Stations refurbishment – City Wide 3 000 000 3 000 000 3 000 000
24Renovation & Upgrading of Facilities- Emergency Management
2 200 000 1 000 000 0
25Landscaping of Traffic Islands and entrances- City Wide
1 000 000 2 000 000 2 000 000
PROJECTS BUDGET Continued…
PROJECT 06/07 07/08 08/09
33Improving of Hans StrijdomDrive (West) (Access to Waterkloof Air Force Base)
0 3 000 000 19 000 000
26Establishment of Network Infrastructure- Metro Police 1 000 000 4 000 000 0
27Upgrading of Metro Police Control Room 3 000 000 4 000 000 3 000 000
28Replacement of Traffic Signs City Wide 4 000 000 3 675 000 3 858 750
29Cycle and Pedestrian Paths for Tshwane 3 000 000 3 000 000 2 000 000
30Traffic Calming and Pedestrian Safety forTshwane
4 300 000 5 000 000 3 000 000
31 Traffic Lights/Traffic Signal System 2 500 000 2 600 000 3 000 000
32Implement Real Time Traffic Control Pilot Project 1 000 000 4 000 000 4 000 000
PROJECTS BUDGET Continued…
PROJECT 06/07 07/08 08/09
PROJECTS BUDGET Summary 06/07 07/08 08/09
Annual Totals (ZAR) 197,120,000 137,703,000 149,436,750
34Upgrading of Lavender Road (Access to Wonderboom Airport)
200 000 0 0
35 Potgieter Street Safety Measures 300 000 0 0
36 Traffic flow and Safety on Corridors City Wide 1 500 000 1 500 000 1 500 000
37Traffic Flow Improvement at Intersections City Wide
2 000 000 2 000 000 2 000 000
38Water and Sanitation Network Upgrading in Hatfield (Loftus)
2 000 000 2 000 000 0
PROJECTS BUDGET Continued…
INFORMATION COMMUNICATION &TECHNOLOGY (ICT)• Digital Hub• Innovation Hub• North Call Centre• Power line Communications (PLC)• Existing optical fiber and wireless
telecommunication infrastructure provides opportunities
• Previous world broadcast events in the city were of the highest standards
• Tshwane Metro Police Dept (TMPD) Communication Centre
• TETRA Systems• One Integrated Transaction Processing
System (SAP platform)
ACCOMMODATION
• Adequate accommodation establishments that adhere to the FIFA requirements for Official Accommodation
• Total no. of beds in accommodation establishments in Tshwane = 17 956:Hotels : 11 475 bedsGuest Houses : 2 955 bedsB&B’s : 1 539 bedsLodges : 1 314 beds
• Past events have led to a strategy to deal with normal inflow of tourists vs. fans
• Requirement: 25 550 beds• Deficit= 7594
TOURISM
• Tshwane Tourism Plan• Tourism Master Plan ImplementationProgrammes:- Events Programme- Location-Based Tourism Development- Tourism Training & Sills Development- Struggle History Tourism Product Development- Addressing Critical Success factors
• Tshwane Regional Tourism Organization• Freedom Park• Tswaing Crater• Cooperative(s)
• Stakeholder Management• Marketing Rights• Media Relations• International Broadcast Centre• Fan Parks/ Fan Mobilization• Training of SMME’s and Informal
Traders• By-law Enforcement• Language Services and Signage
MARKETING, COMMUNICATION AND SIGNAGE
EMERGENCY MANAGEMENT• Existing Tshwane Disaster Management
Centre• Emergency and Evacuation plans in place for
all stadiums• All Stadiums have an Emergency
Management Service station within 8 minutes arrival time and support stations within 13 minutes arrival time
• Emergency and Evacuation plans in place for all stadiums
• A fire truck, an ambulance, primary response vehicle, 2 doctors and disaster management official will be at all venues during matches
• Flight for life helicopter service• 30 Advanced Life Support Paramedics will be
employedby 2010
• Testing preparedness ongoing at Loftus Versfeld Stadium
• 23 hospitals, 8 hospitals with 24-hour emergency services
• Fire Safety inspections at facilities declared as designated buildings
EMERGENCY MANAGEMENT CONTINUED…
SAFETY AND SECURITY
• Safety and Security responsibility of theTshwane Metropolitan Police Department in cooperation with South African Police Service, South African National Defense Force and National Intelligence Agency
• Strong liaison and cooperation with all relevant bodies, government departments and neighboring metropolitan areas during the event
• National and Regional Policing efforts to be coordinated to pool resources for specific events
• Joint Operational Safety And Security Plan for Soccer World Cup 2010
• CCTV in Inner City and various venues
INSTITUTIONAL ARRANGEMENTS
• Steering Committee composing of CoT; SAFA Tshwane; and Stadium Management
• P.M.O. led by CFO to be appointed• Political leadership by Political
Cluster
Programme Management Office
Council
Steering Committee
Joint Project Management Agreement
Team
Political Cluster
Dept. 1
Technical Team 1
Dept. 2
Technical Team 2
Dept. 3 Dept. 4 Dept. 5
Technical Team 3
Technical Team 4
Technical Team 5
Mayoral Committee
ANTICIPATED BENEFITS
• Number of jobs created – social and economic impact assessment to be completed
• Number of new entrepreneurs given a kick-start
• World class facilities, e.g. sports facilities in previously disadvantaged areas
• Taking world class events to the people• Deepening local economic development• Public Transport related
Infrastructure/Systems
CHALLENGES
• Co-ordination- Horizontal and Vertical
• Complacency?• Competing Demands on the Fiscus• Capacity• Procurement is a possible challenge
OTHER STRATEGIC INITIATIVES
• Re Kgabisa Tshwane- NDPW funded programme (R10 billion)
• City Development Strategy - 8 Key Programmes e.g. Logistics Cluster
incl. International Freight Airport
• Development of the North - Mabopane-Hammanskraal Rail Link
WAY FORWARD
• Start upgrading of Loftus Versfeldby January 2007
• Appointment of the 2010 CEO by 1 October 2006
• Finalise 2010 Strategy by 30 September 2006
• Finalise financing strategy by 30 September 2006
• Complete Giant Stadium by 2008• Complete Super Stadium by 2008• Complete H.M. Pitje by 2007
Thank You