Mayor Marilyn Strickland
City of Tacoma Welcome and Vision
City of Destiny
2
Economic Engine
4
Transportation Hub
5
To Gig Harbor &
Peninsula
To Seattle &
Vancouver, BC
To Portland, OR
Port of Tacoma
SR 167 Extension
Interstate 5 Sounder Rail
Tacoma Narrows Bridge
SR 167 ExtensionPort of Tacoma
City of Destiny
6
Dick McKinley, Public Works Director
Transportation Issues, Needs & Challenges
Regional Connection
8
To Gig Harbor &
Peninsula
To Seattle &
Vancouver, BC
To Portland, OR
SR 16 Interchange SR 167 Extension
Interstate 5 HOV
Amtrak By-Pass Interstate 5 at JBLM
Capital Project Funding
9
GAS TAX $3,803,292 , 4%
OTHER CITY FUNDS, $8,748,544 , 10%
UTILITY PARTICIPATION $4,448,723 , 5%
OUTSIDE PARTNERSHIPS $7,650,056 , 9%
FEDERAL & STATE GRANTS
$63,463,834, 72%
*2013-2014 Capital Budget
WSDOT Construction Cost Indices
10
Existing Pavement Condition
11
78 69
81 77 78 69
79 81
70 74
42
66
83
56
79
26
72
26
63 70
55 63
35
55
0102030405060708090
100
Network Score 2011 Future Network Score (10 yr)
Project Need – South/East 64th Street
• East-west connection to Pierce County
• 42 ft roadway
• Sidewalk, bike lanes, turn lane
• Extend storm drainage
• Relocate power poles
• Railroad track to proper grade
$7.3M Total Project Cost
12
Project Need - Puyallup River Bridge
13
• East-west connection to Fife and Port of Tacoma
• Parallel facility to I-5 and SR 509
• End of design life, weight restricted, overhead spans damaged
• 6 bridge segments
• 4 lanes, shared-use path on both sides
• Approx. 20,000 vehicles/day
$120M Full Bridge Replacement Cost
Project Need - Residential
14
Oil Mat
Asphalt Cobblestone
Sheet Asphalt
Asphalt Asphalt
AsphaltAsphalt
Funding Options
▫ Levy Lid Lift
▫ Transportation Benefit District
$20 Vehicle Fee
▫ Street Maintenance Utility
▫ City Road Levy
15
S 56th Street Tacoma Avenue Bridge 6th Avenue
Regional & Local Partnerships
16
Alaska Street Murray Morgan Bridge