Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
CITY OF GREATER DANDENONGClimate Emergency Strategy
2020 – 2030 ACTION PLAN
CITY OF GREATER DANDENONG 1
Contents
Introduction ........................................................................................................2
Theme 1. Leadership and Governance ............................................................6
Theme 2. Community Wellbeing and Culture ..................................................14
Theme 3. Business and Economy ...................................................................23
Theme 4. Energy and Buildings ......................................................................30
Theme 5. Biodiversity and Open Space ..........................................................42
Theme 6. Transport and Movement ..............................................................55
Theme 7. Assets, Infrastructure and Land Use Planning ................................63
Theme 8. Waste and Resources .....................................................................71
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN2
Council PlanThe Council Plan 2017–21 identifies six objectives that guide Council’s direction until 2021. These objectives represent a collaboration of ideas shared by Council and the community:
1. A vibrant, connected and safe community
2. A creative city that respects and embraces its diversity
3. A healthy, liveable and sustainable city
4. A city planned for the future
5. A diverse and growing economy
6. An open and effective Council
The Council Plan, recognising the need for the City to prepare for climate change, identified the development of a Climate Change Strategy as a key priority.
Climate Emergency DeclarationOn Tuesday 28 January 2020, Greater Dandenong Council voted unanimously on a Notice of Motion to declare a ‘Climate and Ecological Emergency’.
The notice of motion states that:
• The Climate Emergency Strategy and Action Plan gives priority to policy and actions that will provide for both mitigation and adaptation in response to accelerating global warming and climate change to drive emergency action to reduce greenhouse gases in line with global efforts to keep global warming below 1.5oC; and
That this continues to be emphasised as a key priority in the next Council Plan.
Climate Emergency StrategyThe Greater Dandenong Climate Emergency Strategy 2020–30 adopted by Council on 24 August 2020 sets out Council’s vision in response to the climate emergency:
The City of Greater Dandenong is a resilient, net zero carbon emissions city.To assist Council and the community to achieve this vision, the Strategy focused on eight specific themes, with goals, objectives and targets identified for each of these themes. Where council has direct operational control, Council objectives and targets have been identified. For those areas outside of Council’s direct control, community objectives and desired targets have been identified where Council can support the community.
The eight specific themes are:
1. Leadership and Governance
2. Community Wellbeing and Culture
3. Business and Economy
4. Biodiversity and Green Spaces
5. Energy and Buildings
6. Transport and Movement
7. Assets, Infrastructure and Land Development
8. Waste and Resources
The Climate Emergency Strategy Action Plan (‘the Action Plan’) sets out the detailed actions that Council will seek to implement over the coming 5 years. The Strategy’s themes, goals and objectives are summarised in Figure 1 on the following pages.
While Council can influence climate related outcomes, we cannot do it alone. If we are to achieve this vision, we need to provide leadership that helps mobilise our community, other levels of government, our partners and key stakeholders to act.
INTRODUCTION
CITY OF GREATER DANDENONG 3
VISIONReview in 10 years
The City of Greater Dandenong is a resilient, net zero carbon city.
THEMESReview in 10 years Leadership and
GovernanceCommunity
Wellbeing and Culture
Business and Economy
Energy and Buildings
Biodiversity and Green Spaces
Transport and Movement
Assets, Infrastructure and Land Development
Waste and Resources
GOALSReview in 10 years
A city leading its community’s climate change
response
A climate resilient city shaped by its community’s shared values
A city with a thriving and
resilient net zero carbon economy
A city of energy efficient buildings
powered by clean energy
A city that is cool and green
A city well connected through
Low Carbon transport
A city with a built environment
supporting the community’s resilience to
climate change
A city of low waste through efficient
resource use
COUNCIL OBJECTIVE
Review in 5 years
Lead the City of Greater
Dandenong's efforts to reduce emissions and
increase resilience to climate change
Council’s services supporting the
community remain resilient under a range of climate
scenarios
Council’s services supporting the local economy remain resilient
under a range of climate scenarios
Reducing Council’s carbon emissions through efficient
use of clean renewable energy
Increased canopy cover and carbon storage through Council’s streets and open spaces
Increasing Council’s use of active and low carbon
transport options
Reducing risks from climate
change impacts to Council’s assets and
infrastructure
Reducing the environmental impacts from Council’s use of resources
COMMUNITY OBJECTIVE
Review in 5 years
An engaged and mobilised
community responding
to the climate emergency
An engaged community
taking action to stay healthy in a changing climate
Engaged local business and industry taking
action to increase resilience and transition to a
net zero carbon economy
A reduction in the community’s
carbon emissions through efficient
use of clean renewable energy
A greener, cooler city reducing urban heat
island impacts and helping to drawdown carbon levels
Increasing community access to and use of active
and low carbon transport options
Reducing climate change risks to our community
through resilient assets and
infrastructure
Reducing the impacts from
our community’s use of resources and generation
of waste
ACTIONSReview in 5 years
Found in the body of the Climate Emergency Strategy Action Plan for each theme.Reviewed in 5 years.
INTRODUCTION
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN4
Role of CouncilThe Action Plan acknowledges that Council will take on a range of active and passive roles to achieve the implementation of the Climate Emergency Strategy’s vision, including:
• Planning and Decision Making• Asset Planning and Improvement• Strategy and Policy Development• Regulatory• Funding and Grants• Education and Engagement• Advocacy
Action Plan ImplementationThe Climate Emergency Strategy 2020-30 sets Council’s long-term vision. To achieve this vision, Council needs to provide leadership that helps mobilise our community, other levels of government, our partners and key stakeholders to act. This will require substantial changes to the way that Council and its community address climate change, in particular:
1. Council to take an integrated ‘whole-of-organisation’ approach to climate change across its own operations.
2. Council to support its community to lead effective responses to climate change. Council recognises that while everyone has a role to play, it must demonstrate leadership and empower others to act.
This Action Plan identifies Council’s actions over the next 5 years where it:
• It has direct operational control (Council Objectives)
• It seeks to influence and support the community, other levels of government, our partners and key stakeholders to act. (Community Objectives)
To further Council’s ability to effectively mobilise the community and others, the first few years of the Action Plan focuses on building Council’s capacity by putting in place actions that aim to create the ‘whole-of-organisation’ response to the Climate and Ecological Emergency required to achieve the best outcomes for the municipal community, including future generations.
INTRODUCTION
CITY OF GREATER DANDENONG 5
Action Plan Timeframes and ResourcesThe timings of each action are as follows:
Immediate actions already commenced, or to commence within the next 6 months (before 2021)
Short-term actions to commence within the next 6 – 18 months (before 2022)
Medium-term actions
to commence within the next 18 months to 3 years (before 2024)
Long-term actions to commence within the next 3 to 5 years (before 2025)
Ongoing occurring on an ongoing basis each year, or as opportunities arise
While the actions detailed in the Action Plan are currently considered within Council’s sphere of influence, the Action Plan does not indicate that resources are currently or will be available in the future for any specific action. Council’s resources are determined annually by Council and other stakeholders.
When resources are available, actions will generally be resourced according to their stated timeline as recommended by this plan.
This Action Plan recommends staged timelines for implementation. These recommended timeframes consider the complexity and nature of each action, some of which will require further investigation or collaboration with external parties before they can be implemented. The relevance of some actions, or their timing, may change due to the availability of resources.
Each of the actions has a stated Outcome / Indicator and each Directorate in Council has actions within this Action Plan. During the annual Business Planning and Budgeting process, each Directorate considers all endorsed Action Plans. The planning should take into account the recommended Action Plan timeframes and resourcing considerations set out in this plan.
Monitoring, Reporting and ReviewOngoing monitoring reporting and review of the implementation of the plan will involve:
• Council’s corporate reporting system will provide the framework for the annual monitoring and reporting of the Action Plan’s implementation.
• An annual progress summary report on the implementation of the Greater Dandenong Climate Emergency Strategy and Action Plan, which will be made public on Council’s website. The report will provide a summary of the key achievements of the past 12 months and progress to date.
• An internal operational evaluation of this Climate Emergency Strategy and Action Plan will occur after 5 years (2025–26) to enable a review of the effectiveness and relevance of the objectives and actions. A report on the five-year evaluation and review will be tabled at a Council meeting for noting.
• A full review of the Greater Dandenong Climate Emergency and Action Plan in 2030.
As implementation of this Action Plan progresses, Council anticipates further understanding of climate change impacts will develop, and new opportunities for climate mitigation and adaption will be identified. Additional opportunities will also emerge from changes to State and Federal government policies and programs, as well as available information, data and technology.
To ensure this Climate Change Emergency Strategy and Action Plan remains relevant, newly identified actions will be assessed and prioritised to ensure the continued implementation of the most effective climate change mitigation and adaptation measures. Where appropriate, new actions identified for implementation will be incorporated into Council’s internal monitoring and reporting processes and a revised Action Plan.
INTORUDCTION
Strategic Objective – Council
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN6
1.1 – Lead the City of Greater Dandenong’s efforts to reduce emissions and increase resilience to climate changeTarget: Reduce Council’s emissions to Net Zero Carbon by 2025
Measure: Council’s GHG emissions
Baseline: 2007/08 – 14,688t CO2e
Target: Embedding consideration of inherent risks and impacts of climate change into all relevant Council policies, strategies and plans by 2025.
Measure: Explicit reference to climate change in Council policies, strategies and plans.
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
1.1.1 – Highly engaged staff supporting a whole of organisation response to climate change
A
With support from leaders across Council, raise staff awareness of the global Climate and Ecological Emergency. Our united corporate culture will focus on embedding climate change mitigation and resilience into decision-making processes, through strategic policies and strategies, day-to-day service delivery and workplans and performance measures.
Education and Engagement
Planning and Decision Making
Policy and Strategy Development
OngoingCouncil’s Internal
Sustainability Advisory Group
Staff and Councillor survey (Benchmark established in 2020–21)
Develop an annual program of staff training activities
Within anticipated operational budgets
BIncrease capacity of Council’s Sustainability Team to facilitate implementation of the Climate Change Emergency Strategy and Action Plan.
Education and Engagement
Planning and Decision Making
Immediate Planning and Design
Employment of an additional Sustainability Planning Officer
(3 years – Full Time position
$84,000 allocated in 2020–21 Budget
CInclusion of roles and responsibilities in position descriptions that facilitate internal champions and accountability for Council’s response to the climate and ecological emergency.
Planning and Decision Making Immediate
Council’s Internal Sustainability
Advisory Group
Updated position descriptions for all staff
Within anticipated operational budgets
THEME 1
Theme 1. Leadership and Governance Goal: A City leading its community’s climate change response.
The next five years – Council’s Areas of Focus
CITY OF GREATER DANDENONG 7
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
1.1.2 – A sustainable Council that has embedded consideration of climate change impacts and risks into its key governance documents and decision-making processes
ADevelop a Climate and Ecological Emergency Policy to drive Council’s climate change mitigation and adaptation objectives and principles, along with organisational roles and responsibilities.
Policy and Strategy
DevelopmentImmediate
Council’s Internal Sustainability
Advisory Group
Climate and Ecological Emergency Policy adopted by Council in 2020–21
Within anticipated operational budgets
B
Development of next Council Plan (2021–25) – Continue to emphasise actions that will provide for both mitigation and adaptation in response to accelerating global warming and climate change processes. This is to place emphasis on responding to the Climate Emergency Strategy actions and reducing carbon emissions to meet the Paris Agreement’s lower target of keeping global warming below 1.5 degrees.
Policy and Strategy
Development
Planning and Decision Making
Immediate
Council’s Internal Sustainability
Advisory Group
Corporate Services
Council Plan (2021–24) Within anticipated operational budgets
CCouncil’s internal Sustainability Advisory Group will oversee the implementation of the Climate Emergency Strategy and provide leadership and guidance to management on decision making.
Planning and Decision Making Ongoing
Council’s Internal Sustainability
Advisory Group
Implementation of the Climate Emergency Strategy
Within anticipated operational budgets
D
Development or update of Council’s policies, strategies and plans – Implement processes to ensure explicit reference and consideration of climate change is aligned and incorporated into all corporate documents. All managers will need to ensure that their operational planning documents align to this need.
Policy and Strategy
Development
Planning and Decision Making
ImmediateCouncil’s Internal
Sustainability Advisory Group
Embedding and consideration of inherent risks and impacts of climate change into all Council policies, strategies and plans by 2025
Within anticipated operational budgets
E
To facilitate a whole of organisation response to the climate emergency, Council will broaden its understanding of the impacts of climate change across its operations by assessing the:
• Vulnerability of key Council assets and services across its operations to climate risks and the impacts on its service delivery and finances.
• Current adaptative capacity of Council to lead and mobilise the community to build environmental resilience in response to the declaration of a Climate and Ecological Emergency.
Planning and Decision Making Immediate
Council’s Internal Sustainability
Advisory Group
Significantly lowered risk profile for community members and Council’s fixed assets and services
See Actions as indicated in this document
$25,000 funded in 2019/20 for SECCCA Vulnerability Assessment Project
Funding subject to annual operational budgets being approved as part of Council’s annual budget
LEADERSHIP AND GOVERNANCE
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN8
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
FPrioritisation of possible actions identified through the vulnerability assessments to ensure Council focuses on implementation of the most effective mitigation and adaptation measures identified.
Planning and Decision Making Short
Council’s Internal Sustainability
Advisory Group
Development of relevant criteria used to assess and prioritise the suitability of possible options identified through vulnerability assessments and other means.
Funding subject to annual operational budgets being approved as part of Council’s annual budget
G
In line with the principles of continuous improvement, an evaluation framework will be developed (Evaluation Plan) to guide an internal operational review of this Strategy and Action Plan after 5 years to evaluate the effectiveness and relevance of the objectives and actions, with a report on the review to be tabled at a Council meeting for noting.
Additional monitoring and evaluation will be achieved through:
• Annual monitoring of the progress towards the objectives targets and actions outlined in this Action Plan through Council’s existing corporate reporting processes.
• Council will provide an annual summary on its website of the progress towards targets and highlight key outcomes.
• A complete evaluation and update of the Action Plan will be undertaken by FY 2024/25
Planning and Decision Making Ongoing
Planning and Design
Council’s Internal Sustainability
Advisory Group
Annual monitoring and reporting program
Review and update of Climate Emergency Strategy and Action Plan by FY 2025/25 through development of a comprehensive Evaluation Plan
Within existing operational budgets
HDevelop organisational KPIs to monitor Council’s progress towards key objectives and targets in the Climate Emergency Strategy.
Planning and Decision Making Short Corporate
Services
Organisational KPIs developed and incorporated into Council’s corporate reporting and risk register
Within existing operational budgets
IAssess Council’s opportunities to support global efforts to shift investment away from fossil fuels into clean energy alternatives and sustainable industries.
Policy and Strategy
DevelopmentShort Corporate
Services
Assessment of fossil fuel divestment as part of the review of Council’s Investment Policy
Within anticipated operational budget
JCouncil to continue considering and analysing the financial implications of climate change on Council’s assets and services and identify strategies to embed climate change into Council’s financial decision-making processes.
Planning and Decision Making
Policy and Strategy
Development
OngoingPlanning and
Design Corporate Services
Strategies to embed climate change into the budget process will be developed by June 2021
Explicit reference to climate change in Council’s Annual Budget and Long-Term Financial Strategy
Within anticipated operational budget
THEME 1
CITY OF GREATER DANDENONG 9
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
1.1.3 – Demonstrating leadership through Council’s actions to achieve net zero carbon emissions across its operations by 2025
A
Key measures to achieve Council’s target of Net Zero Carbon Emissions by 2025 include:
• PPA – 100% renewable electricity• New buildings being designed to achieve Net Zero Carbon
Emissions • Increasing energy efficiency of existing buildings• Increasing uptake of electric vehicles • Increase uptake of solar systems / distributed energy resources• Completing upgrade of streetlights to energy efficient
technologies• Refer to the Energy and Buildings Action Plan for further details.
Asset Planning and Improvement Ongoing
Corporate Services
Business, Engineering and major Projects
Refer to Energy and Buildings Action Plan within this Strategy
Funding subject to annual CIP and operational budgets being approved as part of Council’s annual budget
1.1.4 – Providing a forum to increase Greater Dandenong’s adaptive capacity to respond to the Climate and Ecological Emergency and interrelated challenges
A
Develop and facilitate forums to consider in greater depth the interrelated nature of the challenges and fundamental changes required by Council and the community to effectively respond to the Climate and Ecological Emergency
The purpose of these forums is to:
• Establish processes and ensure Council’s actions and formulation of decisions continue to be responsive to the evolving challenges that climate change and other issues brings.
• Provide ongoing opportunities to explore to a greater depth and breadth the consideration of the issues related to decision making and formulating actions,
• Explore the space between the ‘possible’ and ‘probable’. • Consider in greater depth the interrelated issues such as
population growth, sustainability, climate change, water, governance, health and wellbeing, economic development, infrastructure and biodiversity decline.
• Increase Greater Dandenong’s adaptive capacity to respond to the impacts of the climate emergency
• Realise potential opportunities arising, such as the global low-carbon energy revolution that will transform the global economy in coming decades.
Planning and Decision Making Short
Internal Sustainability
Advisory Group
Planning and Design
Management and staff-oriented forums will commence in 2020–21
Significantly lowered risk profile for community members and Council’s fixed assets
Within anticipated operational budgets
LEADERSHIP AND GOVERNANCE
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN10
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
1.1.5 – Council plans and policies provide a framework to assist in supporting an integrated and inclusive approach to community mitigation and adaptation
A
Embed consideration of climate change into the development of Council’s 2021–25 Council Plan and supporting strategic documents.
Council’s updated Community Wellbeing Plan will be incorporated into the new 2021–25 Council Plan. Under the Climate Change Act 2017, Councils are required to ‘have regard to climate change’ when preparing a municipal public health and wellbeing plan.
Other key supporting documents that will be the initial focus of embedding consideration of climate change impacts and risks include:
• Corporate Risk Register• Long Term Financial Strategy• Asset Management Plan• Local Economic and Employment Development Strategy• Access, Diversity and Equity Policy
Planning and Decision Making Ongoing Planning and
Design
All relevant Council Plans, Strategies and Policies to be updated with reference to climate change by FY 2024/25
Within existing operational budgets
THEME 1
CITY OF GREATER DANDENONG 11
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
1.2.1 – An engaged and mobilised community actively supporting efforts to make Greater Dandenong a resilient city doing its fair share to limit global warming to below 1.5o C.
AProcurement of a mobile Community Environment Centre to enhance Council’s provision of existing community environmental awareness and education programs.
Education and Engagement Immediate
Planning and Design / Business, Engineering and Major Projects
A mobile Community Environment Centre secured for Council by the end of 2020–21
$160,000 in 2020–21 Budget for mobile Centre
B
Assess current activities and new opportunities to inform and work with the community to increase awareness of climate change impacts to health and wellbeing and opportunities to reduce these risks in response to the Climate and Ecological Emergency.
Actions include:
• Opportunities to work with its diverse multicultural communities to raise awareness of climate change, and support community actions to mitigate greenhouse gas emissions and build environmental resilience.
• Delivery of awareness and engagement programs and activities through a diverse range of approaches to maximise effectiveness and reach within the community. This includes working with key local community groups and networks, including grassroots community climate organisations.
• Assessment of the current capacity of Council to mobilise the community to build environmental resilience in response to the declaration of a Climate and Ecological emergency.
Planning and Decision Making Short Planning and
Design
Development of Climate Change Community Engagement and Mobilisation Plan in 2020–21
Within existing operational budgets
Strategic Objective – Community
1.2 – An engaged and mobilised community responding to the climate emergencyTarget: Increased recognition by our community of the importance of responding to climate change
Measure: Climate change question incorporated into the Annual Community Satisfaction Survey
Baseline: Baseline: To be established
The next five years – Council’s Areas of Focus
LEADERSHIP AND GOVERNANCE
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN12
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
CIdentify opportunities that explain to the community the emerging risks due to climate change and develop a range of practical and realistic actions that the community can take or apply in their homes or at work.
Planning and Decision Making
Education and Engagement
Ongoing Planning and Design
Council’s community engagement material remains relevant and effective
Within existing operational budgets
1.2.2 – Council plans and policies provide a framework to assist in supporting an integrated and inclusive approach to community mitigation and adaptation.
A
Embed consideration of climate change into the development of Council’s 2021–25 Council Plan and supporting strategic documents.
Council’s updated Community Wellbeing Plan will be incorporated into the new 2021–25 Council Plan. Under the Climate Change Act 2017, Councils are required to ‘have regard to climate change’ when preparing a municipal public health and wellbeing plan.
Other key supporting documents that will be the initial focus of embedding consideration of climate change impacts and risks include:
• Corporate Risk Register• Long Term Financial Strategy• Asset Management Plan• Local Economic and Employment Development Strategy• Access, Diversity and Equity Policy
Planning and Decision Making Ongoing Planning and
Design
All relevant Council Plans, Strategies and Policies to be updated with reference to climate change by FY 2024/25
Within existing operational budgets
1.2.3 – Work with key stakeholders to participate in collaborative mitigation and adaptation opportunities across the municipality and region.
A
Advocacy by Greater Dandenong City Council calling for the State and Federal governments to:
i. Declare a Climate and Ecological Emergency
ii. Develop programs to drive emergency action to reduce greenhouse gases and meet the lower target of the Paris Agreement to keep global warming below 1.5 degrees
iii. Establish a National Climate Response Plan that involves the three levels of government mitigating climate-caused risks based on climate science evidence.
Advocacy Short Executive and Councillors
Significantly lowered risk profile for Council and the community Within existing
operational budgets
THEME 1
CITY OF GREATER DANDENONG 13
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
B
Advocacy by Greater Dandenong City Council calling for the State government to increase:
• Clarity on local governments roles and responsibilities.• Capacity of local governments to carry out their responsibilities• Clarity on potential legal liabilities faced by local government
and processes to manage these liabilities.
Advocacy Short Executive and Councillors
Significantly lowered risk profile for Council and the community
Within existing operational budgets
C
Council to work collaboratively with key partners and stakeholders to support and help facilitate regional and local responses that increase our resilience to climate change. For example:
• South East Melbourne (SEM) – whose priorities include creating the infrastructure needed for a connected community.
• Monash National Employment and Innovation Cluster – which has a focus on transforming the regions transport network and developing public open space and community infrastructure.
• Dandenong Integrated Water Management Forum – which has been established to identify, prioritise and implement collaborative integrated water management opportunities across the Dandenong Creek catchment.
• Municipal Association of Victoria (MAV) – whose priorities include supporting Councils in understanding and preparing for the risks of climate change.
Advocacy
Planning and Decision Making
Ongoing Relevant Departments
Significantly lowered risk profile for Council and the community
Within existing operational budgets
D
Continue to increase Council’s capacity to respond to the Climate and Ecological Emergency through participation in regional local government forums that provide opportunities for peer-to-peer learning and collaboration on activities and programs.
This includes Council’s continued participation in local government forums such as SECCCA, CASBE, Cities for Power Partnership, Climate Emergency Australia and other forums where appropriate.
Advocacy
Planning and Decision Making
Ongoing Planning and Design
Increased responsive capacity of Council through shared learnings and ability to participate in collaborative projects beyond the scale of an individual council
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget.
EAdvocate to key partners and stakeholders for support to enable local businesses to participate in a regional Power Purchase Agreement (PPA) to reduce energy costs and significant reductions in carbon emissions.
Advocacy
Planning and Decision Making
Funding and Grants
Short
Planning and Design / Business, Engineering and Major Projects
Advocacy seeking support to facilitate the ability of local businesses to participate in a PPA
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget.
LEADERSHIP AND GOVERNANCE
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN14
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
2.1.1 – Increasing awareness within Council of the risks to health and wellbeing associated with climate change
A
Support Council’s response to the Climate and Ecological Emergency by increasing organisational adaptive capacity and staff awareness to facilitate actions that help reduce climate change’s impacts on the health and wellbeing of our community.
This includes increasing awareness within Council that policies and initiatives across areas such as transport, roads, parks, urban forests, biodiversity, waste, land use, housing and urban planning, recreation, and creating safe public places can lead to improved health outcomes, as well as reduce emissions and support adaptation actions.
To assist this process, a schedule of climate change impact awareness and training programs for management and staff will be developed annually. The focus is to increase the organisation’s adaptative capacity.
Education and Engagement Ongoing
Council’s internal Sustainability
Advisory Group
Community Services
Develop an annual program of staff training activities
Within anticipated operational budgets
B
Inclusion of roles and responsibilities in position descriptions that facilitate internal champions and accountability for Council’s response to the climate and ecological emergency through its community health, well-being, and emergency management related actions.
Planning and
Decision MakingImmediate Community
ServicesUpdated position descriptions for all staff
Within anticipated operational budgets
Strategic Objective – Council
2.1 – Council’s services supporting the community to remain resilient under a range of climate scenarios.Target: Assessment of the vulnerability to climate change of key health and emergency management services provided by Council to its community.Measure: Vulnerability Assessments undertakenBaseline: Baseline to be established through vulnerability assessments
THEME 2
Theme 2. Community Wellbeing and CultureGoal: An engaged and mobilised community responding to the climate emergency
The next five years – Council’s Areas of Focus
CITY OF GREATER DANDENONG 15
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
CReview the climate change risks relevant to health, well-being, and emergency management as part of the review of Council’s Risk Register. This includes assigning identified risks to responsible risk owners.
Planning and Decision Making Immediate Corporate
Services
Climate Change embedded into council’s corporate risk register by June 2021
Within anticipated operational budget
2.1.2 – Enhancing the capability and capacity of Council’s services to respond to climate change’s impacts on the community’s health and wellbeing.
A
Embedding consideration of climate change into the development of Council’s 2021–25 Council Plan.
Council’s updated Community Wellbeing Plan will be incorporated into the new 2021–25 Council Plan. Under the Climate Change Act 2017, Councils are required to ‘have regard to climate change’ when preparing a municipal public health and wellbeing plan.
The Victorian Public Health and Wellbeing Plan 2019–2023 recognises that climate change is a leading threat to health and wellbeing and tackling climate change and its impact on health is included as one of four key focus areas in the plan.
Policy and Strategy
DevelopmentShort
Corporate Services
Community Services
Climate Change emphasised as a key priority in the next Council Plan (2021–25)
Within anticipated operational budget
B
Incorporate community health and well-being as part of the vulnerability assessments to climate change to increase understanding of physical and financial impacts to Council’s assets and service delivery.
A pilot project assessing the vulnerability of Council’s open space assets and services will be undertaken as part of SECCCA’s Vulnerability Assessment Project.
This pilot project will inform further vulnerability assessments of Council’s assets and services to commence in 2021.
Planning and
Decision MakingShort – Medium
Community Services
Vulnerability assessments of key community services to commence in 2020/21
$25k from 2019/20 budget
Funding subject to annual operational budgets being approved as part of Council's annual budget
C
Assess Council’s adaptive capacity to respond to the impacts of the climate emergency on community health, well-being, and emergency management actions.
Take advantage of opportunities to increase resilience in these above areas.
Planning and Decision Making Short Community
Services
Review of the adaptative capacity as part of vulnerability assessments
Within anticipated operational budgets
COMMUNITY WELLBEING AND CULTURE
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN16
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
D Assess and plan for the implementation of prioritised actions based on the outcomes of the vulnerability assessments.
Planning and
Decision MakingMedium Community
Services
Prioritisation of actions from vulnerability assessments as part of broader decision-making approach
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget.
E
Continue Council’s participation in the project to further develop How Well Are We Adapting, a web-based climate change adaptation monitoring, evaluation and reporting tool for Victorian local governments.
Through an internal reporting section, the tool has been developed to help local government staff track the impacts on Council services and assets and evaluate responses over the long term to understand how well they are adapting to climate change. One of the focus areas for the tool is monitoring and reporting Council’s approach to Community Wellbeing and Emergency Management.
Planning and
Decision MakingOngoing
Planning and Design
Community Services
Use of How Well Are We Adapting to monitor, evaluate and report how Council is adapting to climate change
$5,000 for 2020/21
2.1.3 – Enhancing Council’s emergency management capability and capacity to increase community resilience to climate change impacts.
AReview the climate change risks relevant to Council’s emergency management as part of the review of Council’s Risk Register. This includes assigning identified risks to responsible risk owners.
Planning and Decision Making Immediate Corporate
Services
Climate change embedded into Council’s revised Corporate Risk Register by June 2021
Within anticipated operational budgets
BAssess emergency management as part of the vulnerability assessments to climate change to increase understanding of physical and financial impacts to Council’s assets and service delivery.
Planning and
Decision MakingShort – Medium
Corporate Services
Vulnerability assessments of key assets and services to commence in 2020/21
$25,000 from 2019/20 budget
Funding subject to annual operational budgets being approved as part of Council's annual budget.
CAssess Council’s adaptive capacity to respond to the climate and ecological emergency’s impacts to community health and well-being and emergency management related actions and to take advantage of opportunities to increase resilience.
Planning and Decision Making
Short – Medium
Corporate Services
Review of the adaptative capacity as part of vulnerability assessments
Within anticipated operational budgets
THEME 2
CITY OF GREATER DANDENONG 17
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
D Assess and plan for the implementation of prioritised actions based on the outcomes of the vulnerability assessments.
Planning and
Decision MakingMedium Corporate
Services
Prioritisation of actions from vulnerability assessments as part of broader decision-making approach
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
E
Embed consideration of climate change risks into Council’s risk and emergency management system and processes to strengthen preparation for more frequent and severe emergency weather events.
Documents to be reviewed and updated include:
• Risk Management Strategy 2014-18• Risk Management Policy 2015• Risk Management Procedures 2015• Community Safety Plan 2015–22• Fire Management Plan 2015-17• CGD Heatwave Subplan 2016• OH&S Policy – Extreme Weather Guidelines 2016• Municipal Emergency Management Plan 2018• Occupational Health and Safety Policy• Overarching Business Continuity Plan
Policy and Strategy
DevelopmentShort Corporate
Services
Climate change embedded into update of 2018 Municipal Emergency Management Strategy
Emergency management plans reviewed and updated to include consideration of climate change
Within anticipated operational budgets
COMMUNITY WELLBEING AND CULTURE
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN18
Strategic Objective – Community
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
2.2.1 – Increased community awareness of risks to health and wellbeing from climate change and their ability to manage these risks.
AContinue to implement Council's existing programs and activities that aim to increase community awareness of climate change impacts to health and wellbeing, and opportunities to reduce these risks.
Education and Awareness Ongoing Community
Services
Environmental Events and activities
Information promoted through Council’s website, social media platforms and other publications
Within anticipated operational budgets
B
Assess current activities and new opportunities to inform and work with the community to increase awareness of climate change impacts to health and wellbeing and opportunities to reduce these risks in response to the climate and ecological emergency.
This includes opportunities to encourage and support:
• Community understanding by providing solution-based engagement and education activities
• Preparation for the increased severity and frequency of climate related emergencies
• Its diverse multicultural communities’ actions to reduce emissions and build resilience
Planning and Decision Making Short Planning and
Design
Development of Climate Change Community Engagement and Mobilisation Plan in 2020–21
Within existing operational budgets
C
Continue to collaborate with Councils on the development of How Well Are We Adapting, a web-based climate change adaptation monitoring, evaluation and reporting tool for Victorian local governments.
For residents of participating municipalities, the tool is designed to raise awareness of local climate change impacts and how to address them.
Education and Engagement Ongoing Planning and
Design
Continued development of the How Well Are We Adapting tool for Council and the community
$5,000 for 2020/21
2.2 – An engaged and mobilised community responding to the climate emergency.Target: A reduction in the vulnerability of our community to the impacts of climate change. Measure: Climate Vulnerability Index Assessment (Baseline to be established 2020–21)
The next five years – Council’s Areas of Focus
THEME 2
CITY OF GREATER DANDENONG 19
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
DContinue to support the effort of partners and key stakeholders’ increase awareness and other activities that assist the community to prepare and manage health and wellbeing impacts from climate change.
Education and Engagement Ongoing Community
Services
Information promoted through Council’s website, social media platforms and other publications
Within anticipated operational budgets
2.2.2 – Support that helps to facilitate a prepared and resilient community managing their climate change risks.
A
Undertake community consultation to better understand how prepared our community feel they are for significant weather events, and what changes they have implemented to cope with climate change.
Consultation findings will provide an evidence base for the planning of future Council programs and activities focussed on facilitating a prepared and resilient community managing their climate change risks.
Planning and Decision Making Short Planning and
DesignReport outlining key findings from consultation
Within anticipated operational budgets
B
Continue to provide support through Council’s Community Grants Programs for community events, capacity building activities or programs focussed on environmental sustainability outcomes that:
• Contribute to Council’s vision and strategic priorities• Enhance community capacity in responding to local needs• Increase community collaboration, partnerships and
intercultural connections• Contribute to improvement of community safety, health and
wellbeing• Have the best sustainable outcomes for the local community.
Funding and Grants
Education and Engagement
Ongoing Community Services
No. and value of grants provided through the Community Grants Programs that include a focus on environmental sustainability outcomes
Within anticipated operational budgets
C
The Greater Dandenong Sustainability Advisory Committee will support Council’s response to climate change by providing input, guidance and support:
• on the implementation of the key community priorities and community objectives of the Climate Change Strategy
• communication, engagement and consultation by Council with the local community on relevant climate change matters
• on the evaluation and review of the Climate Change Strategy and Action Plan
Advocacy
Education and Engagement
Ongoing Planning and Design
Regular scheduled meetings with the Sustainability Advisory Committee
Within anticipated operational budgets
COMMUNITY WELLBEING AND CULTURE
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN20
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
D
Continue to work collaboratively with our partners and key stakeholders to find effective ways to inform and engage the community to build their adaptive capacity and resilience to the climate emergency.
This is to include actions such as:
• Continue working with partners (including ENLIVEN, The Lord Mayor’s Charitable Foundation and the Southern Migrant Resource Centre) to implement Stage 2 of the Hot Spots project, through health promotion activities focused on community members who are vulnerable on days of extreme heat, including newly arrived migrants, older people and parents with babies and young children.
• Continued participation in Operation Emergency Ready, an emergency preparedness campaign organised by Greater Dandenong in partnership with Kingston Council, Frankston Council and Mornington Peninsula Shire to educate the community and ensure they are emergency ready.
Education and Engagement Immediate Community
Services
Programs and activities undertaken with partners
Information promoted through Council’s website, social media platforms and other publications
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
E
Climate change is a topic of concern for young people as they will be the most impacted as the effects of climate change become more pronounced over time. Council will provide forums to enable our youth to get involved and take positive steps through its programs that:
• Support our youth to participate in civic and community activities which enhance leadership and personal development
• Publicise and positively profile our youth and their valuable contributions to the community, through online social media platforms and print media
• Facilitate opportunities for our youth to engage in community consultation.
Education and Engagement Ongoing Community
ServicesPrograms and activities undertaken to support youth
Within anticipated operational budgets
FContinue to work collaboratively with our regional partners such as ENLIVEN and SECCCA to support capacity building programs targeting key community sectors to reduce the health and safety impacts of climate change.
Advocacy
Education and Engagement
Planning and Decision Making
Ongoing Planning and Design
Programs and activities undertaken with partners
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
THEME 2
CITY OF GREATER DANDENONG 21
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
2.2.3 – Support that facilitates accessible and equitable climate responses for our community
AWork with the local members of the community, community groups and health care providers to increase awareness of transport options amongst elderly members of our community and help to address barriers to access.
Education and Engagement Short Community
Services
A part time Community Transport Officer employed in 2020–21
$42,000 in 2020/21 budget
B
To help understand and address the impacts of climate change on the vulnerable members of our community and ensure fair and equitable benefits from climate change responses, Council will seek to both inform and receive input from its advisory and reference committees, including:• Multicultural Leaders Network• Disability Advisory Committee• Positive Ageing Advisory Committee• Sustainability Advisory Committee• Community Safety Advisory Committee.The input we will be seeking includes:• Advice to inform decision making• Involvement in planning community engagement • Testing engagement techniques to improve community
engagement outcomes • Assisting communication between Council and the community
Advocacy
Education and Engagement
Planning and Decision Making
Ongoing Planning and Design
Participation in design and implementation of Community Engagement Plan
Identification of specific actions aimed at reducing inequality and maximising benefits for vulnerable members of our community
Within anticipated operational budgets
C
Work with key stakeholders and local community service providers to facilitate increased community awareness of existing programs that:
• Support disadvantaged households in reducing their exposure to climate risks, and minimising utility usage and costs
• Assist residents’ equitable access to energy
Advocacy
Education and Engagement
Ongoing Planning and Design
Activities undertaken with key stakeholders such as
the Energy and Water Ombudsman Victoria and local community organisations
Within anticipated operational budgets
D Continue to provide support to individual local vulnerable households to manage potential climate impacts and risks.
Education and Engagement Ongoing Community
Services
Activities provided by Council’s Community Care services that support vulnerable older people and people with disabilities to maintain and enhance their quality of life while responding to climate change impacts
Within anticipated operational budgets
COMMUNITY WELLBEING AND CULTURE
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN22
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
2.2.5 – Advocacy that helps address our community’s climate change related health and safety needs and priorities.
AAdvocate to the Australian and Victorian governments for measures that provide equitable protection for vulnerable groups as part of their policies to provide stable, low cost emission reductions through the energy sector.
Advocacy Ongoing Community Services Advocacy activities undertaken Within anticipated
operational budget
B
Advocate for increased clarity from the Victorian Government on the local government sector’s roles and responsibilities regarding climate change and community health and wellbeing.
Building a shared understanding of the roles and responsibilities of state and local government is a priority action in Victoria's Climate Change Adaptation Plan 2017 – 2020.
Advocacy Immediate Community Services
Greater clarity provided by Victorian Government on role of local government. For example: Updating of Municipal Public Health and Wellbeing Planning: Having Regard to Climate Change (2012)
Within anticipated operational budget
C
Advocate to the Australian and Victorian governments for:
• for increased financial and other forms of support to improve the local government sectors’ capacity to respond to community needs.
• support for Council to assist the more vulnerable sectors of our community
Advocacy Ongoing Community Services
Advocacy with key stakeholders
Funding and grants receivedWithin existing operational budgets
THEME 2
CITY OF GREATER DANDENONG 23
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
3.1.1 – Increased awareness within Council of the impacts to local businesses of climate change, the transition to a net zero carbon emissions economy and the need to manage exposure to risks.
A
Support Council’s response to the Climate and Ecological Emergency by increasing staff awareness and organisational adaptive capacity to facilitate actions that assist local businesses in preparing for the transition to a zero carbon economy and increase resilience to the impacts of climate change to maintain their viability.
To assist this process, a schedule of climate change impact awareness and training programs for management and staff will be developed annually. The focus is to increase the organisation’s adaptative capacity.
Education and Engagement Ongoing
Council’s internal Sustainability
Advisory Group
Business, Engineering and Major Projects
Develop an annual program of staff training activities
Within anticipated operational budgets
B
Inclusion of roles and responsibilities in position descriptions that facilitate internal champions and accountability for Council’s response to the Climate and Ecological Emergency through its actions related to local business and economic development.
Planning and
Decision MakingImmediate
Business, Engineering and Major Projects
Updated position descriptions for all staff
Within existing operational budgets
Strategic Objective – Council
3.1 – Council’s services supporting the local economy to remain resilient under a range of climate scenariosTarget: Achieve a net zero carbon emissions
local economy by 2040.
Measure: Reduction of 2,442,000 tCO2e by 2025.
Target: Increase Council’s sustainable procurement through embedded consideration of climate change in Council’s Capital Improvement Project bid submissions and tender weightings. (Baseline to be developed.)
Measure: Metric to be developed by 2022
Theme 3. Business and EconomyGoal: A city with a thriving and resilient net zero carbon emissions economy.
THEME 3
The next five years – Council’s Areas of Focus
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN24
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
C
Impacts to the local business sector and economic development will be included as part of Council’s overall program to assess the vulnerability of Council’s key assets and services to increase understanding of physical and financial impacts of climate change to Council’s assets and service delivery.
Planning and Decision Making Short
Corporate Services and Community
Services
Climate change vulnerability assessments undertaken across Council’s key assets and services.
Initial pilot project commencing in 2020/21 will inform rollout of the program more broadly across Council’s operations.
$25,000 from 2019/20 budget to undertake initial pilot project
Funding subject to annual operational budgets being approved as part of Council's annual budget.
D
Review the risks relevant to local businesses and economic development as part of the review of Council’s Risk Register. This includes assigning identified risks to responsible risk owners.
Planning and Decision Making Immediate Corporate Services
Climate change embedded into Council’s corporate risk register by June 2021
Within existing operational budgets
3.1.2 – Council services supporting our local economy and businesses remain resilient as climate change impacts increase.
AAssess Council’s adaptive capacity to respond to the Climate and Ecological Emergency through its programs and activities that provide economic development and support to local businesses.
Planning and Decision Making Short
Council’s Internal Sustainability
Advisory Group
Business, Engineering and Major Projects
Review of Council’s adaptative capacity to commence in 2020/21
Within anticipated operational budgets
B
Prioritisation of potential actions identified through the vulnerability and capacity assessments to ensure Council focuses on implementation of the most effective mitigation and adaptation measures identified to support the local economy.
Options will be assessed against agreed criteria, including consideration of Council’s levers of control, capacity and resources required.
Planning and Decision Making
Short to Medium
Council’s Internal Sustainability
Advisory Group
Business, Engineering and Major Projects
Identification of the most effective mitigation and adaptation measures for implementation identified through the vulnerability assessments
Funding subject to annual operational budgets being approved as part of Council's annual budget
THEME 3
CITY OF GREATER DANDENONG 25
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
CWork in partnership with education institutions, training providers, social enterprises and other businesses to help provide residents with skills for an innovative and sustainable future.
Planning and Decision Making
Short to Medium
Business, Engineering and Major Projects
Community Services
Updated Economic and Employment Strategy by 2021 to include focus increasing training opportunities
Activities and programs undertaken
Funding subject to annual operational budgets being approved as part of Council's annual budget
3.1.3 – Council’s purchasing power supports sustainable local businesses.
A
Continue to implement the objective of Council’s Procurement Policy to influence sustainability outcomes by actively promoting green procurement throughout its supply chain and supporting local businesses wherever possible.
Develop processes and metrics to enable monitoring and reporting of Council’s:
• Total sustainable procurement
• Sustainable procurement from local businesses
Planning and Decision Making Ongoing Corporate Services
Processes and metrics developed by 2022 to enable monitoring and reporting of sustainability outcomes from Council’s Procurement Policy
BUSINESS AND ECONOMY
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN26
Strategic Objective – Community
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
3.2.1 – Increased business awareness of climate change risks, opportunities and the transition to a net zero carbon emissions economy.
A
Include consideration of local businesses in the development of the Community Engagement and Mobilisation Plan. This plan will guide Council’s approach to increasing community awareness and action in response to the Climate and Ecological Emergency.
The focus of the Engagement and Mobilisation Plan for local business and industry in Greater Dandenong will be to:
• Increase awareness of information on how business can prepare for the future impacts of climate change, and access resources
• Target approaches that directly increase awareness and engagement through existing programs, networks, events and other forums
• Identify and address the needs and priorities of the business community.
Planning and Decision Making Short
City Planning, Design and
Amenity
Business, Engineering and Major Projects
A Community Climate Change Engagement and Mobilisation Plan adopted by 2021/22
Engagement activities undertaken with local business
Increased understanding of local businesses views, needs and priorities regarding climate change
Within anticipated operational budgets
THEME 3
3.2 – Engaged local business and industry taking action to increase resilience and transition to a net zero carbon economy.Target: Maintain the business rate base at
a higher proportion than that from residential properties (54.5% 2020–21)
Measure: CGD Annual Budget
Target: Increase the percentage of Greater Dandenong residents employed locally (20% in 2020)
Measure: ABS Census data
Target: Maintain Greater Dandenong’s role as an employment hub in the region (26.9% of people working in Melbourne’s South)
Measure: ABS Census data
The next five years – Council’s Areas of Focus
CITY OF GREATER DANDENONG 27
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
B
Facilitate a series of business and industry roundtable forums to share the latest advice regarding the impacts of climate change on CGD’s local economy, with a focus on:
• Maintaining viability• Compliance and risk management• Opportunities to expand products and services.Leverage the roundtable forums to assist business to:
• identify new processes, products and services• assist in strengthening Council’s capacity to respond to climate
change impacts
The above actions will both enhance Council’s overall sustainability profile and build the economic viability of local business and industry.
Education and Engagement Short
Business, Engineering and Major Projects
Increased understanding of local businesses views, needs and priorities regarding climate change
Development of new businesses, new products and new services in the Climate and sustainability space
Within anticipated operational budgets
C
Council’s South East Business Networks and Economic Development Unit will identify and implement measures through its existing forums targeted at increasing local business awareness of climate change impacts, and actions that can be taken to increase resilience and to take advantage of potential opportunities.
Education and Engagement Ongoing
Business, Engineering and Major Projects
Activities and programs undertaken
Funding subject to annual operational budgets being approved as part of Council's annual budget
D
Seek opportunities to expand current programs and activities with partners and key stakeholders that aim to:
• Provide information that supports local businesses to prepare for and manage their risks from climate change
• Find effective ways to engage local businesses to build adaptive capacity and resilience
• Support local businesses in the transition to a zero carbon economy
• Support businesses to take advantage of potential opportunities resulting from expanding market demand for adaptation and carbon-reducing technology, products and services for use across a variety of industries.
• Recognise and celebrate local businesses responding to climate change, to help facilitate peer-to-peer learnings and a shared community of practice.
Education and Engagement Ongoing
Business, Engineering and Major Projects
Significantly lowered risk profile for local businesses
Activities and programs undertaken
Funding subject to annual operational budgets being approved as part of Council's annual budget
BUSINESS AND ECONOMY
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN28
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
3.2.2 – Support that facilitates action by local businesses to reduce their carbon emissions and increase their resilience to climate change impacts.
ASupport businesses response to climate change through implementation of relevant actions in the Greater Dandenong Local Economic and Employment Development Strategy.
Advocacy
Education and Engagement
Planning and Decision Making
OngoingBusiness,
Engineering and Major Projects
Updated Economic and Employment Strategy by 2021 to include focus on responding to climate change risks and impacts
Activities and programs undertaken
BContinue working with the Sustainable Australia Fund to support local businesses transition to the zero carbon economy through provision of Environmental Upgrade Agreements (EUAs).
Education and Engagement
Funding and Grants
Ongoing
City Planning, Design and
Amenity
Business, Engineering and Major Projects
Increased promotion of EUAs to local businesses
Uptake of Environmental Upgrade Agreements by local businesses
Within anticipated operational budgets
C
Lead efforts to facilitate uptake of Power Purchase Agreements (PPAs) by local businesses to reduce their energy costs and carbon emissions. This is to include actions like:
• Working with key stakeholders and local businesses to promote benefits and generate interest
• Analysing potential local energy demand and opportunities for participation in a PPA
• Investigating barriers limiting local businesses uptake of PPAs, and ways to overcome these barriers
• Advocacy to key partners and stakeholders for support to enable participation by local businesses.
Advocacy
Planning and Decision Making
Funding and Grants
Short
City Planning, Design and
Amenity
Business, Engineering and Major Projects
Participation by local businesses in Power Purchasing Agreements
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
DContinue to inform local businesses of programs and other forms of support available through other agencies to reduce emissions and increase resilience.
Funding and Grants
Education and Engagement
OngoingBusiness,
Engineering and Major Projects
Information on Council’s website, in publications etc
Within anticipated operational budgets
THEME 3
CITY OF GREATER DANDENONG 29
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
E Provision of Business Grants that support environmental outcomes.
Funding and Grants Ongoing
Business, Engineering and Major Projects
No. and value of grants provided through the Business Grants program that include a focus on environmental sustainability outcomes
Within anticipated operational budgets
FAdvocate to the Federal and State governments for increased support to improve Council’s capacity to respond to local business needs.
Advocacy OngoingBusiness,
Engineering and Major Projects
Advocacy activities undertaken Within anticipated operational budgets
G
Lead advocacy efforts with our regional partners in seeking increased Federal and State Government support to meet the needs and priorities of local businesses to respond to climate change, including:
• Increase awareness of climate change impacts and associated risks
• Increased information and guidance• Research into potential opportunities• Transitioning to a net zero carbon emissions economy.
Advocacy OngoingBusiness,
Engineering and Major Projects
Advocacy activities undertaken Within anticipated operational budgets
HWork in partnership to support and encourage the establishment, location or expansion of suitable green businesses within Greater Dandenong.
Education and Engagement Short
Business, Engineering and Major Projects
Updated Economic and Employment Strategy by 2021 to include focus on attracting green businesses
Activities and programs undertaken
Within anticipated operational budgets
BUSINESS AND ECONOMY
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN30
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
4.1.1 – Increased awareness and uptake of energy efficiency and renewable energy within Council, to transition to a net zero carbon emissions future.
A
Support Council’s response to the Climate and Ecological Emergency by increasing staff awareness and organisational adaptive capacity to achieve a city of energy efficient buildings powered by clean energy.
Staff awareness and training activities will focus on:
• Increasing internal awareness of Council’s greenhouse gas emissions and energy goals, and establishing the expectation that everyone has a role to play
• Specific capacity building training for staff, such as building managers, maintenance staff and project managers
Education and Engagement Ongoing
Internal Sustainability
Advisory Group
Business, Engineering and Major Projects
Develop an annual program of staff training and awareness activities
Within anticipated operational budgets
THEME 4
Strategic Objective – Council
4.1 – Reducing Council’s carbon emissions through efficient use of clean renewable energy.Target: Net zero carbon emissions
from Council’s buildings and streetlights by 2025
Measure: 2007/08 – 14,688t CO2e
Target: 20% reduction in energy use from Council’s buildings by 2025
Baseline: 2007/08 – 6,344 MWhMeasure: Council’s installed
solar capacity
Target: Increase the capacity of solar systems in Council buildings to 1mW by 2025
Baseline: 129 kW in 2019Measure: Council’s installed
solar capacity
Target: All Council’s street and park lights to use energy efficient lighting by 2027.
Baseline: 7,500 (52%) of 14,500 lights energy efficient – 2020
Measure: % lighting energy efficient
Theme 4. Energy and BuildingsGoal: A City of energy efficient buildings powered by clean energy.
The next five years – Council’s Areas of Focus
CITY OF GREATER DANDENONG 31
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
BInclusion of roles and responsibilities in position descriptions that facilitate internal champions and accountability for Council’s response to the climate and ecological emergency through its energy use, design and operation of buildings.
Planning and Decision Making Immediate
Building, Engineering and Major Projects
Updated position descriptions for all staff to specifically reference expected behaviours and contributions to council’s net zero carbon emissions plan
Within anticipated operational budgets
D
Undertake assessments of the vulnerability of Council’s key assets and infrastructure to climate change, to increase understanding of physical and financial impacts as well as impacts on service delivery.
A pilot project to assess the vulnerability of Council’s open space assets and service delivery will be undertaken in 2020/21 as part of SECCCA’s Vulnerability Assessment Project ‘Assessing Climate Change Impacts – Council Assets, Services, Expenditure and Income’.
This pilot project will inform the rollout of further vulnerability assessments of Council’s assets and services, including consideration of energy usage and buildings.
Planning and Decision Making Immediate
Business, Engineering and Major Projects
Vulnerability assessments of key assets to commence in 2020/21
$25,000 funded in 2019/20 for SECCCA Vulnerability Assessment Project
Funding subject to annual operational budgets being approved as part of Council's annual budget
EAssess Council’s asset management adaptive capacity to reduce risks from the impacts of climate change and increase resilience.
Planning and Decision making Immediate
Business, Engineering and Major Projects
Review of the adaptative capacity as part of vulnerability assessments
Funding requirements to be determined from Vulnerability Assessment pilot project
FReview the risks relevant to Council’s buildings and energy use as part of the review of Council’s Risk Register. This includes assigning identified risks to responsible risk owners to increase accountability.
Planning and Decision Making Immediate Corporate
Services
Council’s Risk Management Procedures updated
Climate change embedded into Council’s revised Corporate Risk Register by June 2021
Within anticipated operational budgets
ENERGY AND BUILDING
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN32
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
4.1.2 – All new Council buildings energy use designed to be net zero carbon emissions from 2020
AAll new Council buildings (from 2020 onwards) to be designed, built and maintained to achieve net zero carbon emissions in accordance with Council’s Sustainable Buildings Policy (as revised from time to time).
Planning and Decision Making
Regulatory
OngoingBusiness,
Engineering and Major Projects
All new Council buildings to be designed, built and maintained to achieve net zero carbon emissions from 2020
Within anticipated Capital Works budget (between 5% to 10% marginal cost depending on ESD standard, with payback via ongoing operational saving on utilities)
BUndertake energy performance assessments of new Council buildings to ensure operational performance meets design intent.
Planning and Decision Making Ongoing
Business, Engineering and Major Projects
Performance assessments of new buildings constructed from 2020 using NABERS or equivalent
Within anticipated operational budgets
4.1.3 – All energy use by existing Council buildings to be net zero carbon emissions by 2025.
A
Undertake performance assessments of Council’s existing buildings to:
• Ensure operational performance meets design intent• Enable benchmarking of building performance• Inform scope of building refurbishments • Guide selection of future energy audits / funding bids to
increase energy efficiency
Planning and Decision Making Ongoing
Business, Engineering and Major Projects
Planning and Design
NABERS assessments (or equivalent for non-office buildings) to be undertaken of all key Council buildings by 2025
Within anticipated operational budgets
BAll applicable refurbishments of Council’s existing buildings to be designed and built in accordance with Council’s Sustainable Buildings Policy requirements.
Planning and Decision Making Ongoing
Building, Engineering and Major Projects
All moderate and major Council building refurbishments to be designed and built to achieve net zero carbon emissions
Within anticipated Capital Works budget (between 5% to 10% marginal cost depending on ESD standard, with payback via ongoing operational saving on utilities).
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
THEME 4
CITY OF GREATER DANDENONG 33
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
CImplement Council’s Building Energy Management Plan (as revised from time to time) to reduce existing buildings’ energy usage and increase uptake of renewable energy.
Asset Planning and Improvement
Planning and Decision Making
OngoingBuilding,
Engineering and Major Projects
No. of existing building projects completed per year
BEMP updated by 2022
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
D
Embed climate change risk management into the review and update of Council’s 2015–22 Asset Management Strategy and 2015 Asset Management Plan – Buildings and Facilities.
(Please refer to Asset, Infrastructure and Land Use Planning Action Plan 7.1.3 for further details).
Planning and Decision Making
Strategy and Policy
Development
ImmediateBuilding,
Engineering and Major Projects
Climate change embedded into updated 2022 Asset Management Strategy
Within anticipated operational budgets
EReduce Council’s energy usage and costs through an increased focus on optimising Council's buildings, fixtures, appliances, and control systems to the most energy efficient available with real-time (IOT-based) monitoring capabilities.
Asset Planning and Improvement Ongoing
Building, Engineering and Major Projects
Annual program to optimise building energy usage
Funding subject to annual CIP budgets being approved as part of Council's annual budget
FConsider mechanisms such as Energy Performance Contracts to reduce Council’s energy use and GHG emissions.
Strategy and Policy
DevelopmentMedium
Building, Engineering and Major Projects
Mechanisms to reduce energy use and GHG emissions included as part of project business case/feasibility
Within anticipated operational budgets
GInvestigate and trial new and innovative energy efficiency and renewable energy technologies on council building projects to help accelerate market adoption.
Planning and Decision Making Ongoing
Building, Engineering and Major Projects
Trials incorporating new technology or concept
Publication of Project Case Study
Funding subject to annual CIP, operational budgets and external funds as part of Council's annual budget
HInvestigate opportunities to expand Council’s current monitoring and reporting of GHG emissions to include all Council owned buildings. As of 2020, only monitoring those utility accounts Council is directly responsible for paying.
Planning and Decision Making Immediate Corporate
Services
Council’s GHG emissions reporting expanded to include all Council owned buildings from 2021 onward
Within anticipated operational budgets
ENERGY AND BUILDING
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN34
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
4.1.4 – All Council’s electricity usage from clean renewable sources by 2025.
A
Utilise Power Purchasing Agreements (PPA) to reduce GHG emissions from Council’s streetlights and buildings*.
Additionally, investigate opportunities to source electricity for all buildings owned by Council from 100% renewable sources through a Power Purchasing Agreement (PPA), where Council is not responsible for the payment of the relevant utility account. *Where Council is responsible for payment of utility account
Planning and Decision Making Immediate Corporate
Services
PPA resulting in Council’s purchase of electricity from 100% renewable sources for all Council owned building
Council’s electricity costs are anticipated to be lowered through participation in PPA
B
Council will help support the transition to a secure and reliable energy grid with a high share of renewables by demonstrating the effective use of distributed energy resources. This includes:
• Increasing Council’s on-site generation of renewable energy through installation of solar panels in accordance with the Sustainable Buildings Policy and Building Energy Management Plan
• Utilising on-site energy storage systems. To build Council’s capacity to facilitate a broader rollout when more economically viable, a pilot trial of energy storage will be undertaken to:• maximise benefits from installed solar systems• provide reliability of supply during power outage• building staff capacity• help prepare Council’s future uptake of Virtual Power
Networks
Planning and Decision Making Ongoing
Building, Engineering and Major Projects
Implementation of Sustainable Buildings Policy and Building Energy Management Plan
Pilot on-site energy storage project scope prepared for 2021/2022 budget bid
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
CMonitor and implement where appropriate mechanisms such as Virtual Power Networks to reduce Council’s GHG emissions.
Strategy and Policy
DevelopmentMedium Corporate
Services
Mechanisms to reduce greenhouse gas emissions included as part of project business case/feasibility
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
THEME 4
CITY OF GREATER DANDENONG 35
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
4.1.5 – Transition Council’s energy use away from natural gas.
ACommission feasibility report that investigates the options and timing of an accelerated phase-out of natural gas from existing council facilities.
Planning and Decision Making Medium
Building, Engineering and Major Projects
Feasibility report completed by 2021
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
BAll new council buildings and facilities to utilise electricity as their only energy source in accordance with the Sustainable Buildings Policy (SBP).
Asset Planning and Improvement Ongoing
Building, Engineering and Major Projects
All new council buildings free of natural gas in accordance with the SBP
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
CAll upgrades to natural gas appliances and services to existing council buildings and facilities are to be replaced with electrical systems (in accordance with the Sustainable Buildings Policy).
Asset Planning and Improvement Ongoing
Building, Engineering and Major Projects
All refurbishments to existing council buildings in accordance with the SBP
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
4.1.6 – All Council’s street and park lights to use energy efficient lighting technology by 2027.
A Implement the Lighting up Greater Dandenong program to switch all streetlighting to energy efficient lighting technology.
Asset Planning and Improvement Ongoing
Building, Engineering and Major Projects
Annual program to achieve 100% energy efficient streetlights by 2027
Funding subject to annual CIP budgets being approved as part of Council's annual budget
BContinue to advocate to industry for improved standards and technologies for street lighting that reduce greenhouse gas emissions.
Advocacy OngoingBuilding,
Engineering and Major Projects
Advocacy with key stakeholders
Funding subject to annual CIP budgets being approved as part of Council's annual budget
C Investigate and apply for grants for the implementation of energy efficient public lighting projects.
Funding and Grant
applicationsOngoing
Building, Engineering and Major Projects
Funding and grants received
Funding subject to annual operational budgets being approved as part of Council's annual budget
Receipt of grants funding
ENERGY AND BUILDING
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN36
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
4.2.1 – Increased awareness within the community of energy efficiency and renewable energy to facilitate the transition to a net zero carbon emission city.
AContinue to implement Council's existing Environmental Education programs and activities that encourage community action towards sustainable buildings, energy efficiency and renewable energy.
Education and Engagement Ongoing Planning and
Design
No. of Environmental Events and Activities Sustainable Design Assessment in the Planning Process (SDAPP) Fact Sheets
Information promoted through Council’s website, social media platforms and other publications
Within anticipated operational budgets
BContinue to showcase and promote actions taken by leaders in our community that encourage uptake by the broader community of low carbon actions and technologies through Council’s Annual Sustainability Awards Program.
Education and Engagement Ongoing Planning and
DesignSustainability Awards
Case studiesWithin anticipated operational budgets
C
Continue to provide support through Council’s Community Grants Programs for community events, capacity building activities or programs focused on environmental sustainability outcomes that:
• Contribute to Council’s vision and strategic priorities• Enhance community capacity in responding to local needs• Increase community collaboration, partnerships and
intercultural connections• Contribute to improvement of community safety, health
and wellbeing
Education and Engagement Ongoing Community
Services
No. and value of grants provided through the Community Grants program that include a focus on environmental sustainability outcomes
Within anticipated operational budgets
Strategic Objective – Community
4.2 – A reduction in the community’s carbon emissions through efficient use of clean renewable energy.Target: Net zero carbon emissions from the
municipality’s buildings by 2040.Baseline: 3,083,000t CO2e (Stationary emissions,
CPG Basic reporting 2016/17)Measure: Community GHG emissions profile
Target: 100% renewable energy for the City by 2040.Baseline: Scope 2 emission factors for consumption of
purchased electricity in Victoria: 1.02 in 2019Measure: National Greenhouse Account Factors
Target: Triple small scale onsite renewable energy generation capacity for the City by 2025.
Baseline: 11,979 kW (2013)Measure: Community’s solar kW capacity
The next five years – Council’s Areas of Focus
THEME 4
CITY OF GREATER DANDENONG 37
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
D
Assess existing activities and new opportunities to partner with the community to increase awareness through education and solution-based activities to trigger community mobilisation and action on the urgent need to transition to a net zero carbon emissions city, in response to the climate and ecological emergency.
Education and Engagement Short Planning and
Design
Development of Climate Change Community Engagement and Mobilisation Plan in 2020/21
Within anticipated operational budgets
ESupport the Victorian Government’s actions to drive the transition to a net zero carbon emissions economy by promoting programs such as TAKE2 that aim to increase community awareness and uptake of transitional measures.
Advocacy
Education and Engagement
Ongoing Planning and Design
Programs and activities promoted in Council Publications,
No. of businesses and households that have made pledges through TAKE2
Within anticipated operational budgets
F
Work with partners and key stakeholders to facilitate increased awareness and uptake of programs designed to assist households and businesses to increase the energy efficiency and climate change resilience of their buildings.
This includes promoting to local residents and businesses:
• Information and training opportunities • Grant funding opportunities from the Victorian and
Federal governments• Mechanisms such as Environmental Upgrade Agreements
(EUAs) and Power Purchase Agreements (PPAs)
Advocacy
Education and Engagement
Regulatory
Ongoing Planning and Design
Information promoted through Council’s website, social media platforms and other publications
Programs and activities undertaken with partners such as SECCCA, CASBE and Sustainability Victoria
Industry and Community Events
No. of EUAs and PPAs implemented within the community
Within anticipated operational budgets
G
Work with key stakeholders and local community service providers to facilitate increased community awareness of existing programs that:
• Support disadvantaged households in reducing their exposure to climate risks, and minimising utility consumption and associated costs
• Assist residents’ equitable access to energy.
Advocacy
Education and Engagement
Ongoing Planning and Design
Activities undertaken with key stakeholders such as
the Energy and Water Ombudsman Victoria and local community organisations
Within anticipated operational budgets
ENERGY AND BUILDING
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN38
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
4.2.2 – Support that helps the community transition to energy efficient net zero carbon emission buildings by 2040.
A
Continue to facilitate inclusion of key environmental performance considerations through Environmentally Sustainable Design (ESD) into the planning permit approvals process in order to achieve long term sustainable outcomes for new residential, commercial and industrial buildings.
Planning and Decision Making
RegulatoryOngoing Planning and
Design
Implementation of the Greater Dandenong Planning Scheme’s Policy: Clause 22.06 Environmentally Sustainable DevelopmentAll applicable planning applications subject to Sustainability Assessments
Within anticipated operational budgets
B
Work with key stakeholders to help facilitate climate change resilient, zero net carbon emission buildings or equivalent outcomes into Planning Precinct Structure Plans, Development Plans, Park Plans and other relevant masterplans.
Advocacy
Planning and Decision Making
Regulatory
Ongoing Planning and Design
Embedding climate change risk management into the development of all applicable Precinct Structure Plans and Development Plans.
Current plans being developed include:Noble Park Activity Centre Structure Plan
Proposed Development Plan – Sandown Racecourse Redevelopment
Within anticipated operational budgets
C
Support collaborative projects that aim to raise the standards of Environmentally Sustainable Design (ESD) required in new homes, commercial and industrial developments.
Continue supporting Moreland Council’s Towards Zero Carbon in the Planning Scheme project which aims to provide an evidence base for updating ESD requirements in the Planning Schemes Local Planning Policies*.
Complete and provide a background report to Council by August 2020 detailing the options CGD has to participate in ESDV2.0 amendments moving forward. *Please note, any updates to Local Planning Provision requires Ministerial Approval
Advocacy
Regulatory
Strategy and Policy
Development
Immediate Planning and Design
Continued collaboration with other councils through membership of CASBE
Support Moreland Council’s background work to establish options for a potential ESD V2.0 in 2021
Provision of ESDV2.0 background report to Council in August 2020.
$15,000 Funded through 2019/20 Budget
Future funding subject to annual operational budgets being approved as part of Council's annual budget
Approximately $40,000 required to be allocated for planning amendment
THEME 4
CITY OF GREATER DANDENONG 39
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
DContinue to support partners and key stakeholders’ programs that facilitate the uptake of energy efficiency, renewable energy access and finance for home environment upgrades for residential properties (including low-income households).
Advocacy
Education and Engagement
Ongoing Planning and Design
Collaboration with the Sustainable Melbourne Fund to expand provision of EUAs to include residential properties
Implementation of relevant programs
Within anticipated operational budgets
E
Continue to investigate and act upon opportunities to work collaboratively with government departments, local governments, universities, energy providers and other stakeholders on projects that can support our residents and businesses in the transition to a net zero emissions economy.
This includes a focus on expanding uptake of existing, well-proven technologies as well as innovative new ideas and products.
Advocacy
Planning and Decision Making
Ongoing Planning and Design
No. of partnerships entered
New collaborative project opportunities Council has acted upon
Within anticipated operational budgets
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
4.2.3 – Support the community to transition to 100% renewable energy sources by 2040.
A
Work with the Sustainable Australia Fund and other key stakeholders to increase uptake in Greater Dandenong of Environmental Upgrade Agreements (EUAs). This program provides finance to support businesses to upgrade their buildings, achieve savings through energy efficiencies and uptake of renewables, as well as addressing the impacts of climate change.
Advocacy
Education and Engagement
Ongoing Planning and Design
Promotion and engagement activities undertaken
Monitor and report uptake of EUAs
Within anticipated operational budgets
BPromote and advocate to local developers and building owners the rationale and relevant cost savings associated with the transition of energy use from gas to electricity.
Advocacy
Education and Engagement
Ongoing Planning and Design
All applicable planning applications subject to Sustainability Assessments
Within anticipated operational budgets
ENERGY AND BUILDING
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN40
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
C
Work with electricity and gas distributors and other key stakeholders to improve both availability and accuracy of data required to update the Community Emissions Profile prepared as part of the 2019 Greater Dandenong Greenhouse Gas Emissions Profile and Mitigation Report.
Advocacy
Planning and Decision Making
Medium Planning and Design
Improved availability of data to enable annual updates to Community Emissions Profile
Within anticipated operational budgets
D
Identify evidence-based and cost-effective actions that enable Council to facilitate community emissions reductions based on recommendations from the SECCCA Community Climate Action Planning Project. This will increase understanding of realistic opportunities for councils based on potential:
• Abatement opportunities for Councils • Science-derived targets • Market barriers• Stakeholders• Costs, and intervention effectiveness in $/tCO2e • Probability of success
Strategy and Policy
DevelopmentImmediate Planning and
Design
Community Climate Action Planning Project Report, including:
• A plan for regional interventions that Councils will collaborate on
• An outline of individual interventions for each Council
$25,000 funded in 2019/20 for SECCCA Community Climate Action Planning Project
EInvestigate opportunities to community renewable energy projects in Greater Dandenong and the role of council to support and reduce barriers.
Planning and Decision Making Medium Planning and
Design
Collaboration undertaken through membership of SECCCA and Industry Partners
Within anticipated operational budgets
F
Investigate opportunities for Greater Dandenong Council to facilitate increased uptake of distributed energy resources across the municipality. Areas for consideration include:
• Support for local residents, businesses, community groups and service providers
• Uptake of large-scale renewable systems within the municipality
• Reducing barriers • Use of mechanisms available such as the Community
Solar Portal
Planning and Decision Making Medium Planning and
Design
Development of Greater Dandenong Distributed Energy Resource Plan
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
THEME 4
CITY OF GREATER DANDENONG 41
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
4.2.4 – Advocacy that supports the achievement of a net zero carbon city by 2040.
A Advocate for the strengthening of Federal and State Governments’ GHG emissions and clean energy targets. Advocacy Ongoing Planning and
Design
Lower emission factors for consumption of purchased electricity in Victoria
Advocacy undertaken through membership of CASBE, SECCCA and Industry Partners
Within anticipated operational budgets
B Advocate for support to increase community uptake of energy efficiency and clean energy. Advocacy Ongoing Planning and
Design
Advocacy activities undertaken through membership of SECCCA, Cities Power Partnership
Within anticipated operational budgets
C
Advocate for elevated ESD outcomes for new and existing buildings through planning policy, state and national building codes and standards.
This includes advocacy for updates to building regulations to promote carbon neutrality by 2030 in line with best Practice approaches such as the Green Building Council of Australia (GBCA) Carbon Positive Roadmap.
Advocacy
RegulatoryOngoing Planning and
Design
Advocacy activities undertaken through membership of GBCA, CASBE, SECCCA and other industry partners
Within anticipated operational budgets
D
In collaboration with CASBE and other key stakeholders, continue to advocate to the Victorian Government for a strengthening of the Planning Scheme to facilitate climate resilient, zero net carbon emission buildings or equivalent outcomes through both Victorian Planning Provisions and Local Planning Policies
Advocacy
RegulatoryOngoing Planning and
Design
Continued advocacy in collaboration with other councils through membership of CASBE for strengthening of climate change resilience and ESD in Victorian Planning Provisions and Local Planning Policies
Within anticipated operational budgets
ENERGY AND BUILDING
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN42
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
5.1.1 – Increasing awareness within Council of the impacts of climate change and the benefits of local biodiversity and a greener cooler environment.
A
Support Council’s response to the Climate and Ecological Emergency by increasing organisational adaptive capacity and staff awareness to facilitate achievement of its goal of increasing its urban forest to help cool our environment.
This is to include the development of a schedule of climate change impact awareness and training program for management and staff. The focus is to increase the organisation’s adaptative capacity.
Education and Engagement Ongoing
Council’s internal Sustainability
Advisory Group
Develop an annual program of staff training activities
Within anticipated operational budgets
B
Assess the vulnerability of Council’s open space assets and services to the impacts of climate change, through a pilot project to undertake a vulnerability assessment of Council’s open space assets and services as part of SECCCA’s Vulnerability Assessment Project – ‘Assessing Climate Change Impacts – Council Assets, Services, Expenditure and Income’.
This pilot project will inform further vulnerability assessments of Council’s assets and services to commence in 2021.
Planning and Decision Making Short
Parks, Infrastructure Services and
Planning
Planning and Design
Vulnerability assessment of Council’s open space assets and services to commence in 2020–21
$25k funded in 2019/20 for SECCCA Vulnerability Assessment Project.
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget.
THEME 5
Strategic Objective – Council
5.1 – Increased canopy cover and carbon storage through Council’s streets and open spaces.Target: Minimum of 2,178 Street trees and 18,000 indigenous seedlings planted
each year.
Measure: Council’s annual Tree and Indigenous Seedling Planting Program.
Target: Establish benchmark of Carbon stored in Council’s trees and reserves to offset its carbon emissions by 2025.
Measure: Tonnes of carbon stored in Council’s street trees and reserves.
Theme 5. Biodiversity and Open SpaceGoal: A city that is cool and green.
The next five years – Council’s Areas of Focus
CITY OF GREATER DANDENONG 43
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
CInclusion of roles and responsibilities in position descriptions that facilitate internal champions and accountability for Council’s response to the climate and ecological emergency through its biodiversity and open space related actions.
Planning and Decision Making Immediate
Parks, Infrastructure Services and
Planning
People and Procurement
Updated position descriptions for all staff
Within anticipated operational budgets
5.1.2 – Increased canopy cover and carbon storage across Council’s streets and open spaces.
A Assess and plan for the implementation of prioritised actions based on the outcomes of the vulnerability assessments.
Planning and Decision Making Medium
Parks, Infrastructure Services and
Planning
Prioritisation of actions from vulnerability assessments as part of broader decision-making approach
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
BImplementation of Council's Greening Our City – Urban Tree Strategy 2018–28.
The Urban Tree Strategy sets the direction for managing Council’s street and park trees.
Asset Planning and Improvement Ongoing
Parks, Infrastructure Services and
Planning
Implementation of Council's Greening Our City – Urban Tree Strategy 2018–28.
$600,000 funded in 2020/21 operational budget to support the Strategy’s Tree Planting Program
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
C Implementation of relevant actions from Council's Open Space Strategy 2020–2030.
Asset Planning and Improvement Ongoing
Planning and Design
Parks, Infrastructure Services and
Planning
Transport and Civil Development
Implementation of Open Space Strategy 2020–2030
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
DCouncil’s internal Urban Forest Working Group to provide leadership, policy direction, and technical support to facilitate implementation of the Urban Tree Strategy’s Action Plan.
Planning and Decision Making Ongoing
Parks, Infrastructure Services and
Planning
Planning and Design
Implementation of Urban Forest Working Group’s actions.
Within anticipated operational budget
BIODIVERSITY AND OPEN SPACE
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN44
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
E Continue to seek external funding grants to increase local biodiversity and the urban forest.
Funding and Grants Ongoing
Parks, Infrastructure Services and
Planning
Funding and grants received
Number of projects delivered
Within anticipated operational budget
FAssess Council’s adaptative capacity to respond to the Climate and Ecological Emergency’s impacts on the local environment and to take advantage of opportunities to green the city.
Planning and Decision Making Immediate
Parks, Infrastructure Services and
Planning
Review of the adaptative capacity as part of 2020–21 open space vulnerability assessment pilot project with SECCCA
$25k funded in 2019/20 for SECCCA Vulnerability Assessment Project
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
GInvestigate and report on available opportunities to utilise Council’s trees and reserves to offset its carbon emissions and draw down carbon.
Planning and Decision Making Medium
Planning and Design
Parks, Infrastructure Services and
Planning
Report prepared on opportunities for offsetting carbon using Council’s trees and reserves by 2022/23
Council trees and reserves used to offset Council emissions by 2025
Within anticipated operational budget
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
H
Implementation of the Activity Centres Placemaking Framework to ensure that placemaking and revitalisation of the activity centres is focused on supporting the sustainability of key community destinations and self-sustaining activation of shared spaces.
Activities include:
• Activity Centres Tree Planting Plan, which identifies actions over 10 years to increase canopy cover and reduce urban heat impacts in Greater Dandenong’s Activity Centres.
• Increasing use of tree planter boxes to improve tree canopy coverage where there are high levels of hard surfaces and to increase the biodiversity offer in the activity centres.
Asset Planning and Improvement Immediate
Business and Revitalisation.
Parks, Infrastructure Services and
Planning
Transport and Civil Development
Implementation of Activity Centres Tree Planting Plan
2020–21 funded CIP Projects:
Dandenong $25,000
Noble Park $25,000
Springvale $25,000
Funding for future years is subject to the approval of CIP bids as part of annual Council budget process
THEME 5
CITY OF GREATER DANDENONG 45
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
I
Identify suitable sites and commence implementation of urban woodlots at Council reserves specifically planted to provide for Council’s carbon offsets and/or future sources of sustainable wood for Council’s asset management and construction activities.
Asset Planning and Improvement Immediate
Parks, Infrastructure Services and
Planning
Suitable sites identified by 2021/22
Minimum of 1 new woodlot created every second year
Funding for future years is subject to the approval of CIP bids as part of annual Council budget process.
J Work in collaboration with partners to facilitate implementation of the Living Melbourne Urban Forest Project.
Advocacy
Planning and Decision Making
Ongoing
Planning and Design
Parks, Infrastructure Services and
Planning
Ongoing participation as a partner in the Living Melbourne Urban Forest Project
Funding for future years is subject to the approval of CIP bids as part of annual Council budget process
5.1.3 – Increased use of water sensitive urban design used to support resilience of biodiversity and green spaces on Council land
AImplement the Waste Sensitive Urban Design requirements of Council's Sustainable Buildings Policy design requirements (as updated from time to time).
Asset Planning and Improvement Ongoing
Business, Engineering and Major Projects
Implementation of Council’s Sustainable Buildings Policy
Monitoring and reporting to be undertaken in accordance with the Sustainable Buildings Policy
Funding for future years is subject to the approval of CIP bids as part of annual Council budget process
B
Embed consideration of climate change, including responses to direct and indirect impacts, as part of Council’s Capital Improvement Project Bid submissions and evaluation processes. This includes driving technical specifications and tender weightings for procurement purposes.
Policy and Strategy
DevelopmentImmediate
Business, Engineering and Major Projects
Capital Improvement Project bids must include consideration of climate change and life cycle costs as part of submission process from 2020/21
Within anticipated operational budget
CIncrease Integrated Water Management’s contribution to the community’s sense of place, health and well-being by actively promoting the creation of blue green infrastructure.
Advocacy
Asset Planning and Improvement
Ongoing
Parks, Infrastructure Services and
Planning
Transport and Civil Development
Hectares of blue-green infrastructure created or enhanced by integrated water management
Funding for future years is subject to the approval of CIP bids as part of annual Council budget process
BIODIVERSITY AND OPEN SPACE
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN46
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
DIdentify and implement opportunities to utilise alternative water supplies to provide the irrigation of reserves and tree plantings across the City of Greater Dandenong.
Asset Planning and Improvement Ongoing
Parks, Infrastructure Services and
Planning
Percentage of reserves and tree plantings across CGD that are supported by irrigation from an alternative water supply
Identification of projects, with case studies provided of project outcomes
Funding for future years is subject to the approval of CIP bids as part of annual Council budget process
E Seek CIP funding and grants to complete the Tatterson Park and Coomoora Reserve stormwater harvesting projects.
Asset Planning and Improvement
Subject to funding
Parks, Infrastructure Services and
Planning
No. and dollar value of funding and grants received
Funding for future years is subject to access to grant funds and the approval of CIP bids as part of annual Council budget process
FContinue monitoring changes in ground water and vegetation at Council bushland reserves to monitor long term trends to facilitate evidence-based responses.
Planning and Decision Making Ongoing
Parks, Infrastructure Services and
Planning
Ongoing implementation of monitoring program
Within anticipated operational budgets
G
Collaborate with Melbourne Water and other key stakeholders on their Water for Greening and Cooling project which is assessing future water demands for Melbourne’s open space network and opportunities for alternative water sources to reduce demand on the city’s drinking water supplies.
Planning and Decision Making Immediate
Parks, Infrastructure Services and
Planning
Ongoing collaboration with Melbourne Water and key stakeholders to support completion of Water for Greening and Cooling project
Following completion of Melbourne Water project, Council to consider recommendations for implementation opportunities
Within anticipated operational budget
Funding for future years is subject to access to grant funds and the approval of CIP bids as part of annual Council budget process
THEME 5
CITY OF GREATER DANDENONG 47
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
H
Continue to collaborate with the Department of Environment, Land, Water and Planning (DELWP), Melbourne Water (MW) and other key stakeholders through participation in the Dandenong Integrated Water Management Forum.
The long-term goal of the forum is to design and deliver effective solutions to address the combined challenges of population growth, rapid urban development and climate change in this unique region of Victoria.
Advocacy
Asset Planning and Improvement
OngoingParks, Infrastructure
Services and Planning
Ongoing collaboration with DEWLP, MW and other key stakeholders to develop a master plan for the Dandenong Creek corridor
Funding and grants received
Within anticipated operational budgets
ICollaborate with Melbourne Water (MW) to develop a masterplan to guide the rehabilitation of channelised sections of waterways within the City of Greater Dandenong’s Parks, Reserves and Waterways.
Asset Planning and Improvement Immediate
Parks, Infrastructure Services and
Planning
Ongoing activities in collaboration with MW
Masterplan prepared by MW
Within anticipated operational budgets
5.1.4 – Increased resilience of biodiversity on Council land to climate change impacts
APrepare a Biodiversity Action Plan to enhance quality and extant of local biodiversity and increasing resilience of biodiversity across Greater Dandenong in response to Council’s declaration of a Climate and Ecological Emergency.
Policy and Strategy
DevelopmentShort
Parks, Infrastructure Services and
Planning
Commence preparation of Biodiversity Action Plan in 2020–21
$50,000 allocated in the 2020–21 Budget
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
B
Develop a benchmark to monitor impacts of climate change on biodiversity within Council reserves through:
• Continued use of Habitat Hectare assessment as part of the development / review of Council’s bushland reserves management plans to assess the quality and extent of indigenous vegetation within bushland reserves
• Ongoing identification and analysis of additional opportunities to improve biodiversity data collection and management.
Asset Planning and Improvement Ongoing
Parks, Infrastructure Services and
Planning
Habitat hectare assessments undertaken to inform bushland reserves management plans
Funding for future years is subject to the approval of CIP bids as part of annual Council budget process
BIODIVERSITY AND OPEN SPACE
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN48
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
C
Review, update and prepare new Reserve Management Plans to include consideration of opportunities to increase and enhance resilience of Council’s bushland reserves against loss of biodiversity from climate change.
This includes maintenance, experimentation and modification where necessary to maintain or enhance ecological functioning areas of biodiversity.
Asset Planning and Improvement Immediate
Parks, Infrastructure Services and
Planning
Number of Reserve Management Plans prepared or reviewed – one per year
Tatterson Park Management Plan updated in 2020/21
Funding for future years is subject to the approval of CIP bids as part of annual Council budget process
DInvestigate opportunities to improve existing wildlife corridor links and establish new ones where appropriate through the implementation of the Open Space Strategy 2020–2030 and as part of the development of the Biodiversity Action Plan.
Planning and Decision Making
Asset Planning and Improvement
Ongoing
Parks, Infrastructure Services and
Planning
Planning and Design
Asset Management
Governance
Investigate opportunities to improve existing wildlife corridor links and establish new ones where appropriate through the implementation of the Open Space Strategy and the development of the Biodiversity Action Plan in 2020/21
Two wildlife corridor links tree planting projects completed by 2022/23
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
THEME 5
CITY OF GREATER DANDENONG 49
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
5.2.1 – Increased awareness within the community of the benefits of local biodiversity and a greener cooler environment.
A Continue to implement Council's existing Environmental Education programs and activities.
Education and Engagement Ongoing
Parks, Infrastructure Services and
Planning
No. of environmental events and activities/year
Within anticipated operational budgets
BIncrease community awareness through education and involvement in ecological improvements in accordance with the Greater Dandenong Green Wedge Action Plan.
Education and Engagement Ongoing
Planning and Design
Parks, Infrastructure Services and
Planning
Implementation of Green Wedge Action Plan
Funding subject to annual operational budgets being approved as part of Council's annual budget
C
As part of the development of Council’s Cooling the City: Urban Forest Strategy, consider engagement and education opportunities to work with the community to increase their awareness and learning of the benefits greener and cooler environments.
Education and Engagement
Policy and Strategy
Development
Immediate
Planning and Design
Parks, Infrastructure Services and
Planning
Development of the Cooling the City: Urban Forest Strategy by mid–2021
Within anticipated operational budgets
D Work with Council’s partners to update planning information fact sheets on opportunities to enhance urban ecology.
Education and Engagement Ongoing Planning and
DesignUpdated SDAPP and BESS Urban Ecology fact sheets
Funding subject to annual operational budgets being approved as part of Council's annual budget
BIODIVERSITY AND OPEN SPACE
Strategic Objective – Community
5.2 – A greener, cooler city reducing urban heat island impacts and helping to drawdown carbon levels.Target: 15% by 2028 (Current baseline 9.9%)
Measure: Canopy cover across Greater Dandenong.
Target: Achieve a reduction in the 2018 average summer Urban Heat Island reading of 9.26oC by 2028
Measure: Urban Heat Island rating for Greater Dandenong.
The next five years – Council’s Areas of Focus
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN50
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
E
In partnership with RMIT and other stakeholders, seek external funding to undertake a 3-year project to:
• Benchmark community attitudes to trees in Greater Dandenong in comparison with other local government areas.
• Develop and test public participation activities which engage residents with understanding the value of tree planting and urban canopy.
• Develop and test messaging to engage residents with understanding the value of tree planting and urban canopy.
Funding and Grants
Education and Engagement
Immediate
Parks, Infrastructure Services and
Planning
Grant funding secured for this 3-year project
Project is subject to receiving grant funding
5.2.2 – Increased awareness within the community of the benefits of urban food production.
AContinue to promote the uptake of urban food production through the demonstration of edible food gardens in Council’s public spaces and reserves.
Education and Engagement Ongoing
Parks, Infrastructure Services and
Planning
Edible food garden displays prepared.
Within anticipated operational budgets
B Council to provide ongoing support for community gardens within Council reserves and local schools.
Education and Engagement Immediate
Parks, Infrastructure Services and
Planning
2020–21 -establishment of a community garden at Chandler Road Reserve
Ongoing Council support and advocacy
$20k funded in 2020–21 budget to facilitate establishment of a community garden at Chandler Road Reserve
Funding for future years is subject to the approval of CIP bids as part of annual Council budget process
CContinue to implement Council’s environmental education programs focused on increasing community awareness and involvement in urban food production.
Education and Engagement Ongoing
Parks, Infrastructure Services and
Planning
Vegetable gardens displays and tours at Council’s reserves and events
Within anticipated operational budgets
D
Prepare a strategic local policy that guides Council’s support for local food growing activities (such as community gardens and edible food gardens) that aims to help increase the community’s capacity to make healthy and sustainable food choices.
Policy and Strategy
DevelopmentShort Community
DevelopmentLocal Community Gardens Policy completed in 2020/21
$20K allocated in 2020–21 operational budget
THEME 5
CITY OF GREATER DANDENONG 51
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
EContinue to work collaboratively with partners to deliver urban food production projects focused on increasing community awareness and participation.
Education and Engagement Ongoing
Parks, Infrastructure Services and
Planning
Community Development
Programs and activities undertaken with partners
Estimated area (acres) of urban food production
Initial project work completed at Chandler Road Community garden.
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
F
Implementation of relevant actions from the Greater Dandenong Green Wedge Management Plan (Revised 2017), in particular:
• Actively encouraging the establishment of niche and specialised agricultural activities in the Greater Dandenong Green Wedge, particularly those supporting food security.
• Providing advice and assistance to landowners to maintain and improve land management practices including options for food production.
Education and Engagement Ongoing Planning and
Design
Implementation of the Greater Dandenong Green Wedge Management Plan (Revised 2017)
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
5.2.3 – Increased use of greenery and integrated water management to provide cooling effects to create a more liveable urban environment and drawdown carbon levels.
A
Collaborate with key stakeholders and partners to:
• Source access to the most accurate and up to date tree canopy and Urban Heat Island data for Greater Dandenong
• Identify and implement actions to increase canopy cover and reduce impacts of urban heat island effect.
Advocacy
Planning and Decision Making
Ongoing
Planning and Design
Parks, Infrastructure Services and
Planning
Access to regularly updated detailed Tree Canopy and Urban Heat Island data for Greater Dandenong
Within anticipated operational budgets
B Implement the Greater Dandenong Green Wedge Management Plan’s integrated water management actions.
Asset Planning and Improvement Ongoing
Infrastructure Services and
Planning
Implementation of Green Wedge Management Action Plan
Implementation of Green Wedge Management Plan’ subject to annual CIP and operational budgets being approved as part of Council's annual budget
BIODIVERSITY AND OPEN SPACE
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN52
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
C
Prepare Cooling the City: Urban Forest Strategy to protect and increase the urban canopy on private land (building on Council’s Greening Our City – Urban Tree Strategy 2018–28).
This will enable Council to provide a strategic approach to protecting and enhancing vegetation across the whole of the municipality to increase community health and liveability in the area.
Policy and Strategy
DevelopmentImmediate Planning and
Design
Development of Cooling the City: Urban Forest Strategy by mid–2021
Within anticipated operational budgets
DImplementation of Local Planning Provision Clause 22.06 Environmentally Sustainable Development to achieve benefits including increased urban ecology and integrated water management outcomes.
Planning and Decision Making Ongoing Planning and
Design
ESD requirements assessed for all applicable planning applications
Within anticipated operational budgets
EWork with partners to identify opportunities to enhance urban ecology and integrated water management outcomes through the planning process to mitigate the impact of the urban heat island effect.
Policy and Strategy
DevelopmentImmediate Planning and
Design
Support Moreland Council’s background work to establish options for a potential ESD V2.0 in 2021
CGD has contributed $15k in 2020 for background work
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
F Investigate opportunities for carbon sinks in the Greater Dandenong Green Wedge.
Planning and Decision Making Medium
Planning and Design
Parks, Infrastructure Services and
Planning
Opportunities for carbon sinks investigated by 2024
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
THEME 5
CITY OF GREATER DANDENONG 53
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
5.2.4 – Increased resilience of biodiversity across the municipality to impacts of climate change.
APrepare a Biodiversity Action Plan to enhance quality and extant of local biodiversity across Greater Dandenong in response to Council’s declaration of a Climate and Ecological Emergency.
Policy and Strategy
DevelopmentImmediate
Parks, Infrastructure Services and
Planning
Commence preparation of Biodiversity Action Plan in 2020–21
$50,000 in 2020–21 budget
BInvestigate opportunities to collaborate with residents to establish an affiliate Gardens for Wildlife program in Greater Dandenong.
Planning and Decision Making Medium
Parks, Infrastructure Services and
Planning
Opportunities to facilitate establishment of Gardens for Wildlife program in Greater Dandenong investigated by 2022
Within anticipated operational budget
CContinue Council's membership of Living Links, to support a regional approach to increase biodiversity and connection of green spaces across the Dandenong Creek catchment.
Asset Planning and Improvement Ongoing
Parks, Infrastructure Services and
Planning
Annual Living Links membership
Grant funding
Habitat connectivity improvements achieved
2020/21 Budget $7,500 for annual membership of Living Links
DContinue Council's participation in regional alliances that facilitate increased consideration and protection of local biodiversity through the planning process.
Planning and Decision Making Ongoing Planning and
Design
Participation in CASBE and LGPro SIG Biodiversity Planners Network
Within anticipated operational budget
EContinue to implement the Planning Scheme’s Green Wedge Vegetation Protection Overlay to protect and enhance the existing ecological values.
Planning and Decision Making Ongoing Planning and
Design
No. of Permits issued / refused for native vegetation removal
Within anticipated operational budget
F Provide information that supports protection and enhancement of the Greater Dandenong Green Wedge's biodiversity values.
Education and Engagement Ongoing
Parks, Infrastructure Services and
Planning
Information on Council’s website and in annual newsletter update to Green Wedge owners and occupiers
Within anticipated operational budget
BIODIVERSITY AND OPEN SPACE
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN54
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
5.2.5 – Advocacy that supports conservation of Greater Dandenong’s local biodiversity and transition to a greener, cooler city.
AAdvocate for the State Government to facilitate local green infrastructure in accordance with Plan Melbourne’s Cooling and Greening policies and plans.
Advocacy Ongoing
Parks, Infrastructure Services and
Planning
Advocacy activities undertaken with key stakeholders
Within anticipated operational budget
B Advocacy with partners and key stakeholders for increased protection of biodiversity of local significance. Advocacy Ongoing
Parks, Infrastructure Services and
Planning
Advocacy activities undertaken through the LGPro: Biodiversity Planning Network and Living Links
Within anticipated operational budget
C
Advocate to the Victorian government and key stakeholders of Council’s and our community’s local priorities through participation in regional forums focussed on:
• Sustainable social infrastructure and open space• Integrated Water Management outcomes.
Advocacy Ongoing
Parks, Infrastructure Services and
Planning
Advocacy activities undertaken through the Dandenong IWM Forum and National Employment and Innovation Clusters (Monash and Dandenong)
Within anticipated operational budget
DAdvocacy with partners and key stakeholders to protect existing wildlife corridor links and establish new ones where appropriate.
Asset Planning and Improvement Medium
Parks, Infrastructure Services and
Planning
Advocacy activities undertaken through Living Links
Within anticipated operational budget
THEME 5
CITY OF GREATER DANDENONG 55
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
6.1.1 – Increased awareness within Council of the benefits of active and low carbon transport
A
Support Council’s response to the Climate and Ecological Emergency by increasing organisational adaptive capacity and staff awareness to facilitate achievement of its goal of a well-connected low carbon Greater Dandenong.
Education and Engagement Ongoing
Council’s internal Sustainability
Advisory Group
Develop an annual program of staff training activities
Within anticipated operational budgets
B
Inclusion of roles and responsibilities in position descriptions that facilitate internal champions and accountability for Council’s response to the climate and ecological emergency through its transport related actions.
Planning and Decision Making Immediate
Transport and Civil Development
People and Procurement
Updated position descriptions for all staff
Within anticipated operational budgets
THEME 6
Strategic Objective – Council
6.1 – Increasing Council’s use of active and low carbon transport options.Target: 15% decrease in the use of single
occupancy private vehicles as a method of travel to work for Council staff by 2026
Measure: Staff Travel Survey.
Target: Vulnerability to the impact of climate change assessed and incorporated into management plans for all critical Transport related assets and services by 2025
Measure: Asset Management System
Target: Council Fleet 100% low emission vehicles by 2030*
Measure: Council’s fleet’s annual GHG emissions inventory.
* Dependent on availability of suitable low emission vehicles that meet Council’s operational needs.
Theme 6. Transport and Movement Goal: A City well connected through low carbon transport.
The next five years – Council’s Areas of Focus
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN56
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
6.1.2 – Increased staff usage of active and low carbon transport options
AReview and update Council's Green Travel Plan to support increases in staff usage of active and public transport.
Policy and Strategy
DevelopmentShort
Transport and Civil Development
People and Procurement
Staff Travel Survey to occur every 4 years
Within anticipated operational budgets
BAll new Council buildings to be designed and built to achieve sustainable transport goals and objectives in accordance with Council’s Sustainable Buildings Policy.
Planning and Decision Making Ongoing
Building, Engineering and Major Projects
All new Council buildings to be designed and built to be net zero carbon emissions
Within anticipated Capital Works budget (between 5% to 10% marginal cost depending on ESD standard, with payback via ongoing operational saving on utilities).
C
Consideration of transport as part of the embedding of climate change risk management into the review and update of Council’s 2015–22 Asset Management Strategy and 2015 Asset Management Plan – Buildings and Facilities.
Strategy and Policy
DevelopmentMedium
Building, Engineering and Major Projects
Climate change embedded into updated 2022 Asset Management Strategy and relevant Asset Management Plans
Within anticipated operational budgets
D
Demonstrate a built environment designed to promote the use of walking, cycling and public transport through Council’s Sustainable Buildings Policy and 2015–22 Asset Management Plan – Buildings and Facilities.
Strategy and Policy
DevelopmentMedium
Building, Engineering and Major Projects
Active and low carbon transport options aligned with CGD’s Sustainable Buildings Policy and embedded into updated 2022 Asset Management Plan – Buildings and Facilities.
Within anticipated operational budgets
THEME 6
CITY OF GREATER DANDENONG 57
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
6.1.3 – Increased awareness within Council of impacts of climate change on Transport service delivery
AAssess Council’s adaptive capacity to respond to the climate and ecological emergency through transport related actions.
Planning and Decision Making Immediate
Transport and Civil Development
Infrastructure Services and
Planning
Review of Council’s adaptative capacity completed by December 2020
Within anticipated operational budgets
B
Include Transport as part of the vulnerability assessments to climate change, to increase understanding of physical and financial impacts to Council’s transport related assets as well as impacts on service delivery.
This pilot project will inform further vulnerability assessments of Council’s transport related assets and physical and financial impacts on service delivery to commence in 2021.
Planning and Decision Making Short
Transport and Civil Development
Infrastructure Services and
Planning
Vulnerability assessments of Council’s key assets to commence in 2020/21
Impact of climate change on service delivery recognised in asset value by 2022/23
$25,000 funded in 2019/20 for SECCCA Vulnerability Assessment Project.
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
CApply updated Risk Management Procedures to Council’s Climate Change Risk Assessment that review risks relevant to transport and assign responsible risk owners.
Planning and Decision Making Immediate Corporate
Services
Climate Change embedded into Council’s corporate risk register by June 2021
Within anticipated operational budgets
D
Consider the performance of transport service delivery in terms of greenhouse gas emissions (e.g. are vehicles operating at the speeds at which they are more energy efficient) to increase understanding of the impact of transport on the environment.
Planning and Decision Making Short
Transport and Civil Development
Infrastructure Services and
Planning
Greenhouse gas emissions recognised as a performance indicator for Council’s Transport assets by 2022/23
Within anticipated operational budgets
TRANSPORT AND MOVEMENT
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN58
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
6.1.4 – A reduction in GHG emissions from Council’s vehicle fleet
AContinue to assess and implement opportunities to increase Council’s use of low emission vehicles. Planning and
Decision Making ShortInfrastructure Services and
Planning
Council's fleet’s annual GHG emissions inventory
Within anticipated operational budgets
B Prepare a Fleet Transition Plan to facilitate Council’s uptake of low emission vehicles.
Asset Planning and Improvement Medium
Infrastructure Services and
PlanningFleet Transition Plan
$20,000 allocated in 2020/21 operational budget
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
C Consider opportunities to influence key contractors’ vehicle emissions through procurement processes.
Planning and Decision Making Ongoing
Corporate Services
Infrastructure Services and
Planning
Implementation of CGD’s Procurement Policy
Within anticipated operational budgets
DSupport and promote increased use by staff of information technology (IT) (such as use of video conferencing and webinars) to reduce travel requirements, including working from home.
Education and Engagement Ongoing Corporate
Services
Reduction in Council’s transport related GHG emissions through staff uptake of IT
CGD Staff Travel survey
Within anticipated operational budgets
E
Support and promote elements of Council’s Green Travel Plan that result in increased use by staff of low emission transport during work hours, including:
• Public transport for work in-hours commuting• Car sharing• Active transport options, including use of e-bikes.
Education and Engagement Short
Building, Engineering and Major Projects
CGD Staff Travel Survey $1,000 per annum operational budget
THEME 6
CITY OF GREATER DANDENONG 59
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
6.2.1 – Increased community awareness of the benefits from use of active and low carbon transport
ASupport local programs that increase active travel by the community through partnerships with VicHealth to support local schools’ participation in the 'Walk to School' and ‘Ride to School’ programs.
Education and Engagement Ongoing Community
Development
No. of schools involved in ‘Walk to School’ and ‘Ride to School’ programs.
Within anticipated operational budgets
BIn association with RoadSafe South East, continue to advocate for and promote programs that promote safe cycling, motorcycling and walking e.g. Bike Education.
Advocacy, Education and Engagement Ongoing Transport and Civil
DevelopmentNo. of schools participating in initiatives
Within anticipated operational budgets
C Increased provision and visibility of Public Electric Vehicle Charging Stations and Car Share Services
Infrastructure Planning and Improvement Ongoing Transport and Civil
Development
No. Electric Vehicle Charging Stations and Car Share Pods
Within anticipated operational budgets
D Promote success stories from Green Travel Initiatives undertaken by Council and other businesses.
Education and Engagement Ongoing Transport and Civil
Development
Promotion material developed and distributed.
$1,000 per annum operational budget
TRANSPORT AND MOVEMENT
Strategic Objective – Community
6.2 – Increasing community access to and use of active and low carbon transport options.Target: 15% increase in
public transport use within Greater Dandenong by 2030
Measure: Public transport patronage data
Target: 10% reduction in single occupancy private vehicle as method of travel to work by 2028 (compared with 2016 census data)
Measure: ABS Census Data
Target: Double the number of trips to work undertaken by bicycle by 2028 (compared with 2016 census data)
Measure: ABS Census data
Target: Completion of the Strategic Cycling Corridors by 2030 and upgrade and completion of new path networks through funding from all level of government
Measure: Upgraded networks
The next five years – Council’s Areas of Focus
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN60
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
6.2.2 – Increased travel by modes other than single occupant private vehicle trips within Greater Dandenong to reduce emissions and build resilience
A Continue to implement the Greater Dandenong Cycling and Walking Strategies.
Advocacy, Education and Engagement
Planning and Decision Making
Infrastructure Planning and Improvement
Ongoing
Transport and Civil Development
Infrastructure Services and
Planning
Community Development
Implementation of Greater Dandenong Walking and Cycling Strategies
Within anticipated operational budgets and CIP bids
BContinue to apply for state and federal government funding for the implementation of road and path infrastructure to address safety concerns, e.g. the Black Spot Program.
Funding and Grants Ongoing Transport and Civil Development
Funding and grants received to implement improvements to road and path safety
No. of projects delivered
Within anticipated operational budgets and grants awarded
C Implement the Active Transport Infrastructure Priority Program improving pedestrian and cycling infrastructure.
Infrastructure Planning and Improvement
Ongoing
Transport and Civil Development
Infrastructure Services and
Planning
No. projects delivered that provide improved access for pedestrians and cyclists
$200,000 funded in 2020/21 capital works budget
Funding subject to annual CIP budgets being approved as part of Council's annual budget.
DFacilitate a built environment designed to promote the use of walking, cycling and public transport through Council’s Environmentally Sustainable Development (ESD) Planning Policy requirements.
Planning and Decision Making Ongoing
Planning and Design
Transport and Civil Development
Implementation of Council’s ESD Planning Policy (Clause 22.06)
Within anticipated operational budgets
E Investigate options to improve planning scheme sustainable transport outcomes through development of elevated ESD policy requirements (ESDV2.0).
Policy and Strategy Development Ongoing Planning and
Design
Investigate and finalise ESD Planning Policy V2.0 options
Within anticipated operational budgets
FCollaborate with local governments through CASBE to update BESS and other tools to facilitate increased community use of active travel, public transport and electric vehicles through the planning process.
Planning and Decision Making Ongoing Planning and
DesignAdvocacy activities undertaken
Within anticipated operational budgets
THEME 6
CITY OF GREATER DANDENONG 61
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
GWork with primary and secondary schools to implement infrastructure that promotes safe travel to and from school as pedestrians, cyclists and passengers. (Active Transport Infrastructure Priority Program).
Infrastructure Planning and Improvement
OngoingBuilding,
Engineering and Major Projects
Implementation of infrastructure projects associated with schools
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
HIn conjunction with our partners, work towards providing safe, connected and well-serviced public transport options for the community.
Advocacy Ongoing Transport and Civil Development
Advocacy activities undertaken
Within anticipated operational budgets
IAdvocate for additional government investment in improvements to Public Transport services and access to Public Transport Services in accordance with Council’s Public Transport Advocacy Statement.
Advocacy Ongoing Transport and Civil Development
Advocacy activities undertaken
Within anticipated operational budgets
JDevelop and facilitate the implementation of Multi Modal Transport Infrastructure Plans for areas subject to significant change.
Infrastructure Planning and Improvement Immediate Transport and Civil
Development
Multi Modal Transport Infrastructure Plans completed by 2021.
Within anticipated operational budgets
K Develop a new Integrated Transport Plan for the City of Greater Dandenong.
Planning and Decision Making Medium Transport and Civil
DevelopmentNew Integrated Transport Plan developed by 2023
Within anticipated operational budgets
L
Work with and advocate to external organisations such as the Victorian Government and neighbouring municipalities to reduce barriers to cycling. This includes advocating for:
• Stronger policies, road rules and design guidelines that improve cyclist safety and amenity.
• Routes/paths to be delivered that connect bicycle paths and shared user paths between municipalities.
Advocacy Ongoing Transport and Civil Development
Advocacy activities undertaken
Within anticipated operational budgets
MContinue regional collaboration through South East Melbourne and the Eastern Transport Coalition's advocacy for sustainable and integrated transport services that reduce car dependency.
Advocacy Ongoing Transport and Civil Development
Continued participation in groups
Within anticipated operational budgets
NManage Council parking assets in a manner that discourages car use and encourages use of other modes of transport (e.g. setting permit fees at a level that does not discriminate against public transport users)
Planning and Decision Making Ongoing Transport and Civil
Development
Parking management decisions made with consideration given to climate change
Within anticipated operational budgets
TRANSPORT AND MOVEMENT
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN62
Actions Council’s Role Timeframe Responsibility Outcome / Indicator Resources
6.2.3 – Increased uptake by the Greater Dandenong community of low emission vehicles
A Implement Council's 2019 Public Electric Vehicle Charging Infrastructure Policy.
Planning and Decision Making Ongoing Transport and Civil
DevelopmentNo. of Public Electric Vehicle Charging points
Within anticipated operational budgets
BAdvocate to the Victorian and Federal Governments for policy reform to encourage uptake of low emission vehicles (fuel emission standards, mobility subsidy etc.)
Advocacy Short Planning and Design
Advocacy activities undertaken
Within anticipated operational budgets
CImplement Council's ESD Planning Policy requirements to facilitate use of low emissions vehicle technologies and supporting infrastructure.
Planning and Decision Making Ongoing
Planning and Design
Transport and Civil Development
% developments that incorporate infrastructure for low emission vehicles
Within anticipated operational budgets
6.2.4 – Reduced car ownership across the municipality
A Implement Council’s 2019 Public Car Share Policy to support increased community access and use of share cars.
Planning and Decision Making Ongoing Transport and Civil
Development
No. of Car Share vehicles available within Greater Dandenong
Within anticipated operational budgets
BPromotion of availability of car share services within Greater Dandenong to the community to increase awareness and use.
Education and Engagement Ongoing Transport and Civil
Development
No. and patronage of Car Share vehicles available within Greater Dandenong
Within anticipated operational budgets
CImplement Council's ESD Planning Policy requirements to facilitate a built environment designed to minimise car dependency.
Planning and Decision Making Ongoing
Planning and Design
Transport and Civil Development
Implementation of Council’s ESD Planning Policy (Clause 22.06)
Within anticipated operational budgets
THEME 6
CITY OF GREATER DANDENONG 63
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
7.1.1 – Increasing awareness within Council of the impacts from climate change on assets, infrastructure and land use development
A Support Council’s response to the Climate and Ecological Emergency by increasing staff awareness and organisational adaptive capacity to deliver infrastructure that supports community resilience to climate change.
Education and Engagement Ongoing
Internal Sustainability
Advisory Group
Develop an annual program of staff training activities
Within anticipated operational budgets
B
Inclusion of roles and responsibilities in position descriptions that facilitate internal champions and accountability for Council’s response to the climate and ecological emergency
to ensure that climate change related risks relevant to assets, infrastructure and land use development are specifically considered and that reasonable precautions are implemented to minimise both impacts to the community and Council’s liability risks.
Planning and Decision
Making Immediate
Infrastructure Services and
Planning
Planning and Design
Updated position descriptions for all staff
Within anticipated operational budgets
7.1.2 – Increased understanding of the vulnerability of Council’s assets and infrastructure to climate change risks.
A Review the risks relevant to Council’s assets and land use planning as part of the review of Council’s Risk Register. This includes assigning identified risks to responsible risk owners.
Planning and Decision Making Immediate Corporate
Services
Climate change embedded into Council’s revised Corporate Risk Register by June 2021
Within anticipated operational budgets
THEME 7
Strategic Objective – Council
7.1 – Reducing risks from climate change impacts to Council’s assets and infrastructure.Target: That all Council’s asset management plans address climate change impacts by 2025.
Measure: % of Council’s Asset Management Plans that include consideration of climate change (Baseline to be established 2020–21)
Theme 7. Assets, Infrastructure and Land Use PlanningGoal: A city with a built environment supporting the community’s resilience to climate change.
The next five years – Council’s Areas of Focus
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN64
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
B
Undertake assessments of the vulnerability of Council’s key tassets and infrastructure to climate change, to increase understanding of physical and financial impacts as well as impacts on service delivery.
A pilot project to assess the vulnerability of Council’s assets and infrastructure will be undertaken in 2020–21 as part of SECCCA’s Vulnerability Assessment Project ‘Assessing Climate Change Impacts – Council Assets, Services, Expenditure and Income’.
This pilot project will inform the rollout of further vulnerability assessments of Council’s assets and services, including consideration of assets and infrastructure.
Planning and Decision Making Immediate Planning and
Design
SECCCA’s project used as pilot to inform future vulnerability assessments to be undertaken by Council
$25,000 from 2019/20 budget
C Undertake vulnerability assessments of Council’s key assets and infrastructure to climate change, to increase understanding of physical and financial impacts as well as impacts on service delivery.
Planning and Decision Making Short
Infrastructure Services and
Planning
Vulnerability assessments of key assets completed by 2022/23
Funding requirements to be determined from Vulnerability Assessment pilot project
D Assess Council’s asset management adaptive capacity to reduce risks from the impacts of climate change and increase resilience.
Planning and Decision Making Immediate
Infrastructure Services and
Planning
Review of the adaptative capacity as part of vulnerability assessments
Funding requirements to be determined from Vulnerability Assessment pilot project
F
Advocate for increased clarity from the Victorian Government on the local government sectors’ roles and responsibilities and potential legal liability and insurance issues associated with Council assets, infrastructure and land use planning services.
Building a shared understanding of the roles and responsibilities of state and local government is a priority action in Victoria’s Climate Change Adaptation Plan 2017 – 2020.
Advocacy Immediate
Infrastructure Services and
Planning
Planning and Design
Increased clarity provided by the Victorian Government on Local Governments roles and responsibilities
Within anticipated operational budget
7.1.3 – Embedding of climate change risks into Council’s asset management plans and processes.
A Incorporate requirement to undertake vulnerability assessments into Council’s existing Asset Management Processes.
Planning and Decision Making Medium
Infrastructure Services and
Planning
Vulnerability Assessments embedded into Asset Management Planning process
$50,000 in 2021/22 Budget
Funding subject to annual operational budgets being approved as part of Council’s annual budget
THEME 7
CITY OF GREATER DANDENONG 65
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
B Utilise the outcomes of the vulnerability assessments to assess options, prioritise actions and develop a budgeted implementation plan for integration into Council’s Capital Expenditure Program and Long-Term Financial Plan.
Planning and Decision Making Medium
Infrastructure Services and
Planning
Implementation Plan for priority actions by June 2023
$50,000 in 2022/23 Budget
Funding subject to annual operational budgets being approved as part of Council's annual budget
C Identify and assess potential mechanisms to fund asset and infrastructure upgrades that increase resilience to climate change impacts.
Planning and Decision Making Medium
Infrastructure Services and
Planning
Assessment of potential mechanisms to fund asset and infrastructure upgrades prepared by 2021/22
Within anticipated operational budgets
D Work collaboratively with SECCCA, local government partners and key stakeholders to identify regional infrastructure adaptation projects and consider potential funding mechanisms to help address financial barriers.
Planning and Decision Making Medium Planning and
Design
Collaborative approach with key stakeholders
Consideration of potential pathways forward
Within anticipated operational budgets
G
Embed consideration of climate change into Council’s Asset Management Strategy and Plans as they are reviewed and updated. This will:
• Be in accordance with the Council Plan and other key strategies
• Include applying the asset vulnerability assessment framework (to be developed: Action 4.3.1.a) to all asset types within the Risk Section of the Asset Management Plans
• Embed climate change into Council’s financial decision-making processes through Council’s Long-Term Financial Strategy and Annual Budget
• Be aligned with international and national standards on assessment of climate change risks and adaptation planning
• Be guided by industry standards addressing impacts of climate change on Assets and Infrastructure set by Institute of Public Works Engineering Australasia (IPWEA) through NAMS Plus (National Asset Management Standards) as developed and updated.
Planning and Decision Making
Policy and Strategy
Development
ImmediateInfrastructure Services and
Planning
Baseline established in 2020/21 for number of Asset Management Plans incorporating climate change
Climate change embedded into updated 2022 Asset Management Strategy
Asset Management Plans reviewed and updated
An asset vulnerability assessment framework to be applied to all asset types within the Risk Section of the Asset Management Plans
Within anticipated operational budgets
ASSETS, INFRASTRUCTURE AND LAND USE PLANNING
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN66
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
H Review and update Council’s Civil Engineering Standards and associated standard design drawings to ensure consideration of climate change impacts.
Strategy and Policy
Development
Short / Medium
Infrastructure Services and
Planning
Council’s Civil Engineering Standards and associated standard design drawings updated by 2021
Within anticipated operational budgets
I
Embed consideration of climate change, including responses to direct and indirect impacts, as part of Council’s Capital Improvement Project Bid submissions and evaluation processes. This includes driving technical specifications and tender weightings for procurement purposes.
Planning and Decision Making Short
Infrastructure Services and
Planning
Capital Improvement Project bids and evaluation processes must include consideration of climate change as part of the submission process from 2020–21
Within anticipated operational budgets
J Embed lifecycle cost benefit analysis, including climate change resilience, by creating a framework in the Asset Management Planning process including CIP bids.
Planning and Decision Making Immediate
Infrastructure Services and
Planning
Framework established to embed lifecycle cost benefit analysis into Asset Management and CIP processes from 2020/21.
Within anticipated operational budgets
K In collaboration with Melbourne Water, investigate and identify flood mitigation opportunities to address risks and review and develop a forward capital works program for drainage upgrades based on priority, risk and cost-benefit analysis.
Planning and Decision Making Ongoing
Infrastructure Services and
Planning
Review and update flood mitigation works program in 2020/21
Within anticipated operational budgets
7.1.4 – Advocacy that supports investment in Council’s infrastructure that helps build the local community’s resilience to the impacts of climate change.
A Advocate for increased information, tools and capacity for the local government sector to reduce exposure to climate risk through the planning, design, construction and management of its infrastructure.
Advocacy OngoingInfrastructure Services and
Planning
No. of advocacy activities undertaken
Within anticipated operational budgets
B Advocate for increased financial support for the local government sector to help ensure its infrastructure continues to meet a growing community’s needs in the face of climate change.
Advocacy OngoingInfrastructure Services and
Planning
Dollar value of funding obtained
Within anticipated operational budgets
THEME 7
CITY OF GREATER DANDENONG 67
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
7.1.5 – Embedding consideration of climate change impacts and risks into Council’s Land Use planning processes.
A
Undertake vulnerability assessments of Council’s land use planning processes consideration of climate change, to increase Council’s understanding of risks and liabilities and impacts on service delivery.
This is to include an assessment of Council’s land use planning services adaptive capacity to reduce risks and liabilities and identify opportunities.
Planning and
Decision MakingShort
Planning and Design
Infrastructure Services and
Planning
Vulnerability assessments of land use planning services completed
Funding requirements to be determined from Vulnerability Assessment pilot project
B
Develop a budgeted implementation plan that is based on the outcomes of the vulnerability assessments to:
• Assess options • Identify the prioritisation actions
The implementation plan is to be integrated into Council’s Budget and Long-term Financial Plan and aligned with the development of a strategy that integrates the recognition of climate change into the budget process.
Planning and Decision Making Medium Planning and
DesignImplementation Plan for priority actions by June 2023
Funding subject to annual CIP and operational budgets being approved as part of Council’s annual budget
C Work with key stakeholders to implement planning controls to alleviate the impact of urban consolidation, infill development and climate change on existing drainage infrastructure.
Planning and Decisions Making Immediate
Infrastructure Services and
Planning
Support from DELWP and the VPA to implement controls
Within anticipated operational budgets
D Investigate options for the potential development of a Developer Contribution Policy and Plan that enables Council to recover costs required to upgrade existing infrastructure to accommodate infill development.
Funding ImmediateInfrastructure Services and
Planning
Options for a Developer of Contribution Policy investigated in 2020/21
Within anticipated operational budgets
ASSETS, INFRASTRUCTURE AND LAND USE PLANNING
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN68
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
7.2.1 – Increased awareness across the municipality of the risks of climate change to assets and land use
A Work with CASBE and other key stakeholders to continue to update planning information fact sheets on opportunities to increase the resilience of the community’s assets and land use to climate change.
Education and Engagement Ongoing Planning and
Design
Updated Sustainable Design Assessment in the Planning Process (SDAPP) and Built Environment Sustainability Scorecard (BESS) fact sheets
Within anticipated operational budgets
B Review opportunities to increase Council’s community awareness programs that focus on the role and importance of infrastructure in response to the climate and ecological emergency.
Education and Engagement Ongoing
Infrastructure Services and
Planning
Community Climate Change mobilisation prepared
Within anticipated operational budgets
C Review and update information and reports on council’s website (Sustainability and the environment section) regarding asset planning and management (Building, drainage, open space etc.)
Education and Engagement Ongoing
Infrastructure Services and
Planning
Information on Council’s website regularly updated
Within anticipated operational budgets
7.2.2 – A community better prepared to manage risks that climate change impacts may have on their assets and land use.
A Embed consideration of climate change resilience into Council’s Design Manual for the Subdivision of Land.
Strategy and Policy
development Ongoing
Infrastructure Services and
Planning
Updated Design Manual for the Subdivision of Land by 2022
Funding subject to annual CIP and operational budgets being approved as part of Council’s annual budget
THEME 7
Strategic Objective – Community
7.2 – Reducing climate change risks to our community through resilient assets and infrastructure.Target: A reduction in the vulnerability of our community to the impacts of climate change.
Measure: Climate Vulnerability Index Assessment (Baseline to be established 2020–21)
The next five years – Council’s Areas of Focus
CITY OF GREATER DANDENONG 69
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
B Continue to collaborate with Melbourne Water to identify and implement measures to reduce flood risks across the municipality.
Asset Planning and Improvement Ongoing
Infrastructure Services and
Planning
Implementation of the 2018 Dandenong Flood Management Plan
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
C
Work in collaboration with other key stakeholders (including Melbourne Water, DELWP and South East Water) to ensure the Melbourne Racing Club’s (MRC) Comprehensive Development Plan being prepared for the proposed Sandown Park Racecourse re-development adequately responds to flooding and integrated water management requirements.
Advocacy
Planning and Decisions Making
Immediate Infrastructure Services and
Planning
Flooding and integrated water management requirements incorporated into the MRC’s Comprehensive Development Plan for the Sandown Park Racecourse re-development
Within anticipated operational budgets
D
Work in collaboration with the Victorian Planning Authority and other key stakeholders to facilitate the implementation of the Monash National Employment and Innovation Cluster Framework’s vision for the region and the community. The framework’s guiding principles to achieve the vision include:
• Integrated transport networks • Sustainable social infrastructure and open space • Sustainable development with increased climate change
resilience, integrated water management and resource efficiencies.
Advocacy
Planning and Decisions Making
Ongoing
Planning and Design
Infrastructure Services and
Planning
Advocacy activities undertaken resulting in facilitation and stronger alignment of infrastructure assets and plans with Council
Within anticipated operational budgets
7.2.3 – Advocacy that supports investment in local and regional infrastructure that helps build the local community’s resilience to the impacts of climate change.
A
Advocacy that supports investment in infrastructure that helps build the local community’s resilience to the impacts of climate change. This includes advocacy undertaken by Council directly and through its membership of local government alliances such as South East Melbourne, the Eastern Transport Coalition and the Monash National Employment and Innovation Cluster.
Advocacy Short Infrastructure Services and
Planning
Advocacy activities undertaken resulting in investment in infrastructure outcomes for the community
Within anticipated operational budgets
ASSETS, INFRASTRUCTURE AND LAND USE PLANNING
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN70
Actions Council’s Role Timeframe Responsibility Outcome / indicator Resources
B Advocate for Melbourne Water to review and update the geographical extent of the Land Subject to Inundation Overlay (LSIO) and Special Building Overlay (SBO) within CGD Planning Scheme.
Advocacy Medium Infrastructure Services and
Planning
Updated LSIO and SBO incorporated into the Planning Scheme
Within anticipated operational budgets
C Advocate for the review and update of climate change adaptation and risk-mitigation strategies in the Victoria Planning Provisions.
Advocacy Ongoing Planning and Design
Advocacy activities undertaken through membership of CASBE and SECCCA
Within anticipated operational budgets
D
Advocate on behalf of the local community to other government bodies, key stakeholders and organisations to ensure that plans for infrastructure assets, transport and stormwater drainage services are integrated with Council’s future infrastructure plans. Advocacy Ongoing
Infrastructure Services and
Planning
Advocacy activities undertaken resulting in facilitation and stronger alignment of infrastructure assets and plans with Council
Within anticipated operational budgets
E
Investigate the need for a supporting Public Infrastructure Plan (PIP) prepared by the Melbourne Racing Club (MRC) for the Sandown Racecourse re-development in collaboration with Council and other key stakeholders (including DELWP, Melbourne Water, South East Water and VPA).
Advocacy Immediate Infrastructure Services and
Planning
Investigation undertaken into the need for a supporting Public Infrastructure Plan (PIP)
Within anticipated operational budgets
F
Advocate to key stakeholders:
• For public lighting reforms • To invest in integrated demand management, renewables and
battery storage to assist with network reliability and to defer network augmentations and associated costs.
Advocacy Ongoing Infrastructure Services and
Planning
Advocacy activities undertaken
Within anticipated operational budgets
THEME 7
CITY OF GREATER DANDENONG 71
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
8.1.1 – Increased awareness within Council of the environmental impacts resulting from use of resources as well as opportunities to reduce generation of waste
A
Support Council’s response to the Climate and Ecological Emergency by increasing organisational adaptive capacity and staff awareness through the promotion of internal waste management goals and expectations to all Council staff to reduce waste and increase resource recovery across Council offices.
Education and Engagement Ongoing
Council’s internal Sustainability
Advisory Group
Develop an annual program of staff training activities
Within anticipated operational budgets
BDevelop and deliver a communications strategy across council to foster decreased material generation, increased uptake of recycling, and understanding of avenues for re-use of materials.
Policy and Strategy
DevelopmentImmediate
Business, Engineering and Major Projects
Communications Strategy prepared by 2021
As per funding for Waste and Litter Strategy
THEME 8
Strategic Objective – Council
8.1 – Reducing the environmental impacts from Council’s use of resources.Target: Reduce office waste to landfill to 30% by 2025
Measure: Council office waste audit
Baseline: 2019: 46%
Target: Increase office waste recycled to 70% by 2025
Measure: Council office waste audit
Baseline: 2019: 54%
Theme 8. Waste and ResourcesGoal: A city of low waste through efficient resource use.
The next five years – Council’s Areas of Focus
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN72
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
C
Inclusion of roles and responsibilities in position descriptions that facilitate internal champions and accountability for Council’s response to the Climate and Ecological Emergency through management of waste and procurement processes.
Planning and Decision Making Immediate
Infrastructure Services and
Planning
City Planning, Design and
Amenity
Reference to Council’s declaration of a Climate and Ecological Emergency included in all new role’s position descriptions.
Commence update of existing position descriptions for all staff as part of Staff Personal Development Plan reviews in 2020/21
Within anticipated operational budgets
DAssess Council’s capacity to adapt its waste management to reduce risks and increase resilience to the impacts of climate change.
Planning and Decision Making Short
Business, Engineering and Major Projects
Review of adaptative capacity as part of vulnerability assessments
Funding requirements to be determined from Vulnerability Assessment pilot project
E
As part of Council’s overall program of vulnerability assessments, include waste management and resource procurement as part of the vulnerability assessments to climate change, to increase understanding of physical and financial impacts to Council’s waste management assets and procurement processes as well as impacts on service delivery.
This pilot project will inform further vulnerability assessments of Council’s waste management assets, procurement processes and physical and financial impacts on service delivery to commence in 2021
Planning and Decision Making Short
Business, Engineering and Major Projects
Corporate Services
Vulnerability assessments of Council’s key assets to commence in 2020/21
Impact of climate change on service delivery recognised in asset value by 2022/23
$25,000 funded in 2019/20 for SECCCA Vulnerability Assessment Project
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
THEME 8
CITY OF GREATER DANDENONG 73
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
8.1.2 – Reducing waste sent to landfill from Council’s facilities and events
AOngoing implementation of programs to reduce waste and increase resource recovery across Council’s offices and community events (e.g. Waste Wise).
Planning and Decision Making Ongoing
Business, Engineering and Major Projects
Implementation of Council’s Waste Wise Office program.
Within anticipated operational budgets
As per funding for Waste and Litter Strategy
BImplementation of Council’s Plastic Use Policy across its corporate operations and service delivery, as well as at festivals, events and applicable activities on any land or building owned and managed by Council
Planning and Decision Making Ongoing
City Planning, Design and
Amenity
Implementation of Council’s Plastics Use Policy to Council operations and procurement
Within anticipated operational budgets
CImplementation of Council’s Procurement Policy to encourage sustainable procurement outcomes by using products and services which have minimal impact on the environment and human health
Planning and Decision Making Ongoing Corporate
ServicesDevelopment of indicators to procurement performance
Within anticipated operational budgets
DExpand public place recycling bins across the municipality, to include shopping precincts, regional parks and sporting venues
Infrastructure Planning and Improvement
OngoingBusiness,
Engineering and Major Projects
No. of recycling bins installed in CGD
Funding subject to annual CIP budgets being approved as part of Council's annual budget
EAssess the potential to better recover materials from Council operations and works, and investigate further opportunities for both recovery and re-use of recycled materials
Planning and Decision Making Short
Business, Engineering and Major Projects
No. of recycling bins installed in CGD
Funding subject to annual CIP and operational budgets being approved as part of Council's annual budget
F
All new Council buildings to be designed and built to achieve sustainable waste management and materials use goals and objectives in accordance with Council’s Sustainable Buildings Policy
Asset Planning and
Improvement Ongoing
Business, Engineering and Major Projects
Implementation of Council’s Sustainable Buildings Policy.
Monitoring and reporting to be undertaken in accordance with the Sustainable Buildings Policy
Funding for future years is subject to the approval of CIP bids as part of annual Council budget process
WASTE AND RESOURCES
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN74
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
8.1.3 – Sustainable procurement practices that positively influence Council's supply chain
AInvestigate opportunities to increase use of recycled materials and products across Council’s operations to assist in achieving circular economy goals, in line with the Waste and Litter Prevention Strategy.
Planning and Decision Making Short
Corporate Services
Business, Engineering and Major Projects
Opportunities reported on Within anticipated operational budgets
BImplement Council’s Procurement Policy which aims to reduce its environmental impacts by actively promoting green procurement throughout its supply chain.
Planning and Decision Making Ongoing
Corporate Services
Business, Engineering and Major Projects
No. of contracts awarded addressing sustainability criteria
Within anticipated operational budgets
CImplement a Procurement Education Program to help inform Council staff with procurement responsibilities of sustainability considerations within the procurement process
Engagement and Education Short Corporate
ServicesImplementation of Procurement Education Program
Within anticipated operational budgets
DAssess Council’s capacity to adapt procurement and resource processes to climate risks and increase resilience to the impacts of climate change.
Planning and Decision Making Short
Business, Engineering and Major Projects
Review of adaptative capacity as part of vulnerability assessments
Funding requirements to be determined from Vulnerability Assessment pilot project
THEME 8
CITY OF GREATER DANDENONG 75
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
8.2.1 – Increasing our community’s awareness of the environmental impacts of their resource use and waste management
ADevelopment and implementation of an Annual Waste Education Plan in accordance with Council’s 2015 Waste and Litter Strategy (as revised from time to time).
Education and Engagement Ongoing
Business, Engineering and Major Projects
Implementation of Annual Waste Education Plan
$247,195 funded in the 2020/21 financial year
BReview, update and deliver communications campaigns including waste education materials, tools and programs to the community to increase engagement and awareness focused on waste avoidance and sustainable consumption.
Education and Engagement Ongoing
Business, Engineering and Major Projects
Implementation of Annual Waste Education Plan and promotional education campaigns
Within anticipated operational budgets
CContinue to promote and support opportunities for community diversion and recycling of soft plastics in line with Council’s Plastic Use Policy.
Education and Engagement Ongoing
Business, Engineering and Major Projects
Reduction in household plastic usage and contamination as determined through annual kerbside contamination audits
Within existing budget
D
Collaborate with key stakeholders and partners to ensure waste education material and resources are more accessible to Culturally and Linguistically Diverse communities to increase awareness in response to the climate and ecological emergency we are facing.
Education and Engagement Ongoing
Planning and Design
Business, Engineering and Major Projects
Translate existing waste education materials into other commonly spoken community languages
Within anticipated operational budgets
Strategic Objective – Community
8.2 – Reducing the impacts from our community’s use of resources and generation of waste.Target: A 10% reduction in total household
kerbside waste collected by 2025
Measure: Household kerbside waste collection data
Baseline: 54.5 Mg (2018/19)
Target: 50% household kerbside waste to landfill by 2025
Measure: Household kerbside waste collection data
Baseline: 54% (2018/19)
Target: 50% household kerbside waste diverted from landfill by 2025
Measure: Household kerbside waste collection data
Baseline: 46% (2018/19)
The next five years – Council’s Areas of Focus
WASTE AND RESOURCES
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN76
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
EContinue to engage with the education sector (early learning, kinder, primary, secondary and specialist schools) to facilitate behaviour change that supports sustainable consumption of resources and appropriate waste disposal practices.
Education and Engagement Ongoing
Business, Engineering and Major Projects
Delivery Waste Minimisation School Education Program to schools
Within anticipated operational budgets
FContinue to engage with real estate agents to support behaviour change and compliant waste and recycling practices across rental properties.
Education and Engagement Ongoing
Business, Engineering and Major Projects
Engagement with property managers’ information guides
Within anticipated operational budgets
G
Review the provision of waste services and the scope of for improvement communication and collaboration with:
• Commercial properties• Schools and children's services• Sporting clubs.
Policy and Strategy
DevelopmentMedium
Business, Engineering and Major Projects
Opportunity report delivered by 2021
HWork with Council’s partners to update planning information fact sheets on opportunities to enhance waste management and building materials selection.
Education and Engagement Ongoing
City Planning, Design and
Amenity
Updated SDAPP Waste and Materials fact sheets
Funding subject to annual operational budgets being approved as part of Council's annual budget.
IContinue to implement councils Litter Prevention services across the municipality to discourage unlawful waste disposal practices.
Education and Engagement Ongoing
Business, Engineering and Major Projects
Litter prevention programs and engagement activities
Within anticipated operational budgets
J Promote existing programs and collaborate with the business community to stimulate circular economy programs.
Education and Engagement Ongoing
Business, Engineering and Major Projects
No. of businesses engaged Within anticipated operational budgets
KContinue to complete strategic snapshot contamination audits of kerbside bins. This will assist in determining the most common contaminants, as well as areas to prioritise.
Policy and Strategy
Development Medium
Business, Engineering and Major Projects
Kerbside bin contamination audit report
Funding subject to annual operational budgets being approved as part of Council's annual budget
THEME 8
CITY OF GREATER DANDENONG 77
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
8.2.2 – Increasing services and infrastructure to support our community’s efforts to reduce the amount of waste sent to landfill
A
Advocacy with partners and key stakeholders for Federal Government action to address Australia’s waste crisis, in particular:
• Implementation of the National Waste Strategy and its focus on a circular economy
• Mandatory product stewardship requirements for all toxic and other relevant products to lower their lifecycle impacts.
Advocacy OngoingBusiness,
Engineering and Major Projects
Advocacy undertaken with key stakeholders
Within anticipated operational budgets
B
Partner with the Municipal Association of Victoria (MAV) and Metropolitan Waste and Resource Recovery Group (MWRRG) in advocacy efforts to the State and Federal Government for:
• Waste and resource recovery infrastructure in line with the Metropolitan Waste and Resource Recovery Implementation Plan and regional needs
• National and state-wide waste minimisation and resource awareness programs
• Legislation to increase product stewardship.
Advocacy OngoingBusiness,
Engineering and Major Projects
Advocacy undertaken through Council’s participation in the MAV and MWRRG
Within anticipated operational budgets
C
Implementation of Council’s Waste and Litter Strategy (as revised from time to time), to focus on:
• Delivering best practice waste management services and promoting resource recovery
• Collaboration with a broad range of partners• Educating and informing the community• Provide leadership in the planning of future waste services
and infrastructure.
Infrastructure Planning and Improvement
OngoingBusiness,
Engineering and Major Projects
Reporting of progress of the annual action plan under the Waste and Litter Strategy
Within anticipated operational budgets
DReview and update Council’s 2015 Waste and Litter Strategy to ensure it continues to address the unsustainable use of resources, generation of waste to landfill, and more ambitious diversion targets stipulated.
Policy and Strategy
DevelopmentImmediate
Business, Engineering and Major Projects
New Waste and Litter Strategy by December 2020
Within anticipated operational budgets
WASTE AND RESOURCES
CLIMATE EMERGENCY STRATEGY 2020 – 2030 ACTION PLAN78
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
E
Actively participate in the procurement process for key services in accordance with the MWRRG project plan including:
• Introduction of Advanced Waste and Resource Recovery Services as an alternative to landfill
• Waste landfill and transfer services• Co-mingled recycling processing services.
Infrastructure Planning and Improvement
Ongoing Business,
Engineering and Major Projects
MWRRG Project Plan Procurement Services Contracts
Within anticipated operational budgets
F Investigate partnership opportunities with local industries to enable diversion of ‘other’ household waste materials.
Planning and Decision Making Short
Business, Engineering and Major Projects
Partnership agreements developed
Within anticipated operational budgets
GImplementation of Local Planning Provision Clause 22.06 Environmentally Sustainable Development to achieve best practice waste management outcomes design, construction and operational outcomes.
Planning and Decision Making Ongoing
City Planning, Design and
Amenity
ESD requirements assessed for all applicable planning applications
Within anticipated operational budgets
HCollaborate with local governments through CASBE to update BESS and other tools to facilitate best practice waste management processes and minimisation of resource use through the planning process.
Planning and Decision Making Ongoing
City Planning, Design and
AmenityAdvocacy actions undertaken Within anticipated
operational budgets
ICollaborate with and continue to support local community groups working to create a circular economy and/or reduce waste sent to landfill. (e.g. Boomerang Bags).
Education and Engagement Ongoing
City Planning, Design and
Amenity
No. of collaboration activities undertaken with community groups
Within anticipated operational budgets
THEME 8
CITY OF GREATER DANDENONG 79
Actions Council’s Role Timeframe Responsible Council Unit Outcome / Indicator Resources
8.2.3 – A reduction in community greenhouse gas emissions from food waste
AContinue to implement Council’s existing waste education programs to encourage community uptake of home composting initiatives to reduce food waste to landfill.
Education and Engagement Ongoing
Business, Engineering and Major Projects
No. of composting workshops and activities held
No. of participants
Within anticipated operational budgets
BExpansion of existing household kerbside waste collection to include Household Food Organics to reduce waste sent to landfill.
Service Planning and Improvement Immediate
Business, Engineering and Major Projects
Introduction of Food Organics household service by April 2021
$200,000
funded for 2020/21 financial year
CDevelop and implement a food and organic waste education and behaviour change program to support the introduction of the Food Organics Garden Organics kerbside collection service.
Education and Engagement Immediate
Business, Engineering and Major Projects
Food Organics waste education program developed by January 2021
$191,416 funded for 2020/21 financial year
$88,416 per annum funded for 2022–2025
DPromote the participation of cafes and restaurants in the free “Love Food Hate Waste” program which provides hospitality businesses with the ability to reduce both operating costs and food waste.
Education and Engagement Medium
Business, Engineering and Major Projects
No. of businesses participating
Within anticipated operational budgets
WASTE AND RESOURCES