CITY HALL PARKING LOT CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DESIGN AND CONSULTING INC.

CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

CITY HALL PARKING LOT CITY OF COLD LAKE, ALBERTA

CONTRACT DOCUMENTS

City of Cold Lake

S E D E S I G N A N D C O N S U L T I N G I N C .

Page 2: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A
Page 3: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

CL-0021

INVITATION TO TENDER

CITY OF COLD LAKE COLD LAKE CITY HALL PARKING LOT

Sealed tenders marked "Cold Lake City Hall Parking Lot”, will be received at office of the City of Cold Lake up to 2.00 P.M., 17 February, 2016. The work generally involves the construction of:

Cold Lake City Hall Parking Lot

1. Remove and dispose of 100mm thick concrete 60 sqm

2. Remove and dispose of 100mm thick existing asphalt 335 sqm

3. Borrow excavation and compaction 1,720 cum

4. Trenching and backfilling 56 l.m.

5. Supply and install 1200 catchbasin manhole 1 ea

6. Supply and install 300mm storm pipe 56 l.m.

7. Standard Subgrade Preparation c/w 15kg cement stabilization 2,500 sqm

8. 200mm Depth Crushed Gravel Base 2500 sqm

9. 75 mm Depth Hot Mix Asphalt 2450 sqm

10. Line Painting 440 l.m.

11. Supply and install electrical conduits 50 m

12. Supply and install concrete posts 5 ea Tender documents may be obtained from the office of the Engineer on or after 2:00 PM 2 February, 2016 upon payment of a non-refundable deposit of $150.00 paid by cash or a cheque made payable to the Engineer. Documents can also be downloaded for free from www.sedesign.ca website. Tenders must be accompanied by a Bid Bond or Certified Cheque in the amount of 10% of the tender amount and made payable to the City of Cold Lake. The lowest or any tender will not necessarily be accepted. The prices tendered will not be the only consideration in evaluating whether to accept the tender from a qualified tenderer. Experience of personnel, nature of equipment used, proposed construction scheduling and references on previous work undertaken by the tenderer will also be considerations.

Mr. Mario Gagnon, PEng SE Design and Consulting Inc. 713 Lakeshore Drive Cold Lake, Alberta T9M 0C4

PHONE: 780-594-5380 FAX: 780-594-4486

Page 4: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE DESIGN AND CONSULTING INC. -i- CL-0021

City Hall Parking Lot Project

City of Cold Lake

TABLE OF CONTENTS NO.OF PAGES

INSTRUCTIONS TO TENDERERS 4

CONTRACT AGREEMENT 3

CONTRACT TENDER FORM 4

GENERAL CONDITIONS - TABLE OF CONTENTS 1

GENERAL CONDITIONS 34 SPECIFICATIONS SECTION NO. TITLE 01000 SPECIAL PROVISIONS 7 01005 GENERAL INSTRUCTIONS 4 01501 GENERAL PROJECT REQUIREMENTS 12 01502 TRAFFIC ACCOMODATION 4 01503 SAFEGUARDING UTILITY INSTALLATIONS 5 01545 SAFETY REQUIREMENTS 3 01560 ENVIRONMENTAL PROTECTION 2 02000 SPECIAL PROVISIONS 5 02070 PROTECTION AND REMOVALS 1 02111 CLEARING AND GRUBBING 2 02225 AGGREGATES – GENERAL 4 02230 ROADWAY EXCAVATION, EMBANKMENT AND COMPACTION 4 02232 CEMENT MODIFIED SUBGRADE 2 02311 SITE GRADING 4 02315 TRENCHING AND BACKFILLING 11 02340 SUBGRADE CONSTRUCTION 4 02630 SEWER MAINS 14 02721 GRANULAR BASE COURSE 3 02741 HOT MIX ASPHALT PAVEMENT 14 02745 PRIME AND TACK COATS 4 02760 PAVEMENT MARKING – GENERAL 8 02761 PAINTED TRAFFIC LINES AND MARKINGS 3 02770 CONCRETE CURBS AND GUTTERS 10 02821 CHAIN LINK FENCE 5 02911 TOPSOIL REPLACEMENT 1

Page 5: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE DESIGN AND CONSULTING INC. -ii- CL-0021

City Hall Parking Lot Project

City of Cold Lake

TABLE OF CONTENTS

SPECIFICATIONS NO.OF PAGES

SECTION NO. TITLE 02911 HYDROSEEDING 3 02966 PAVEMENT SURFACE CLEANING 1 22205 SITE WORK DEMOLITION 2 33000 CAST IN PLACE CONCRETE 7 260534 CONDUITS 2

APPENDIX PRIME CONTRACTOR AGREEMENT PERMISSION FOR LAND USE FORM SOLID EARTH GEOTECHNICAL REPORT

Page 6: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE DESIGN AND CONSULTING INC. - i - I.T. 02/2013

INSTRUCTIONS TO TENDERERS

TABLE OF CONTENTS

Article Description Page No.

1 Tender Submission 1

2 Refund of Tender Document Deposit 1

3 Examination of Documents and Site 1

4 Tenderer's Questionnaire 2

5 Subcontractors 2

6 Materials 2

7 Tender Price 2

8 Bid Bond or Certified Cheque 2

9 Surety Bonding and Insurance 3

10 Withdrawal of Tender 3

11 Tender Rejection 3

12 Alternative Materials and Equipment 4

13 Award 4

Page 7: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

INSTRUCTION TO TENDERERS

SE DESIGN AND CONSULTING INC. - 1 -

1.0 Tender Submission

.1 Submit tender in sealed, clearly marked envelope. .2 Submit on Contract Tender Forms provided. Two copies are

provided with the Tender documents. Retain one copy for rough copy or records.

.3 All bid prices and other information required in the Tender Form to

be completed. .4 Alternations to the Tender Form or conditional letters may make

tender submission liable to rejection. .5 Sign Tender Form and provide business address and telephone

number. .6 Only duly authorized official may sign Tender Form. .7 Tenders of corporations must be sealed with the corporate seal.

2.0 Tender Document Deposit

.1 The Tender deposit will be non-refundable.

3.0 Examination of Documents and Site

.1 Carefully examine the Contract Documents and the site of the

works prior to submitting Tender. .2 No claims for misunderstanding with respect to the conditions

imposed by the Contract will be considered. .3 The Contract Documents contain a section referred to as Special

Provisions which contain any changes or modifications to any specific sections of the Contract Documents.

.4 Changes to the Contract Documents which occur during the tender

period will be made by the issuance of Addenda.

Page 8: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

INSTRUCTION TO TENDERERS

SE DESIGN AND CONSULTING INC. - 2 -

.5 Report to the Engineer any discrepancies in or omissions from the

drawings and other documents. .6 No verbal agreement or conversation with any officer, agent or

employee of the Owner or the Engineer shall affect or modify any of the terms or obligation herein stated.

4.0 Tenderer's Questionnaire

.1 Complete questionnaire provided with Tender Documents

identifying the necessary equipment and personnel to carry out the work satisfactorily within the time stated in the Tender Form.

.2 Failure to complete this questionnaire may result in tender

rejection.

5.0 Subcontractors

.1 Submit names of all subcontractors that will be employed on the

work. .2 Changes in subcontractors will not be permitted without the written

consent of the Engineer.

6.0 Materials

.1 Submit names of materials suppliers, trade and brand names of

materials. .2 Changes will not be permitted without written consent of the

Engineer.

7.0 Tender Price

.1 Complete unit prices where required on Tender Form. .2 Extend product of unit prices and tender quantities and provide

total tender amount. .3 Unit prices will govern where there is a discrepancy between unit

prices and extended totals. .4 Engineer will correct errors in extended totals where these occur.

Page 9: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

INSTRUCTION TO TENDERERS

SE DESIGN AND CONSULTING INC. - 3 -

8.0 Bid Bond or Certified Cheque

.1 Provide with tender submission a Bid Bond or Certified Cheque in

the amount of 10% of the tender prices. .2 Bid Bond must be issued by a Surety company licensed to conduct

business in Alberta.

.3 A portion of or the entire amount of the Bid Bond or certified cheque will be forfeited to the Owner in the event the Tenderer fails to execute the Contract agreement or to provide the stipulated Surety Bonds.

.4 Amount retained by Owner will be equal to the difference between

the Tenderer's price and that price which the Owner may legally contract with another party to perform the work.

.5 Bid Bonds and certified cheques furnished by unsuccessful

tenderers will be returned to them as soon as possible after Contract is awarded or as otherwise determined.

9.0 Surety Bonding and Insurance

.1 If awarded Contract, provide Labour and Materials Bond and

Performance Bond each in the amount of 50% of the Contract amount in accordance with the requirements of the General Conditions.

.2 If awarded Contract, provide certification of insurance coverage as

required by General Conditions. .3 Provide bonding and certification of insurance coverage with the

executed Contract Agreement within the (10) days after being notified of award of Contract.

.4 Bonds to be submitted in format illustrated in the Contract

Documents.

10.0 Withdrawal of Tender

.1 Tenders may be withdrawn by the Tenderer any time prior to one

(1) hour of the time set for the closing of the tenders.

Page 10: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

INSTRUCTION TO TENDERERS

SE DESIGN AND CONSULTING INC. - 4 -

11.0 Tender Rejection

.1 Owner reserves the right to reject any or all tenders. .2 The lowest tender will not necessarily be accepted. .3 Any tender may be rejected which is incomplete, obscure or

irregular, which has erasures or corrections in the Tender Form, in which prices are omitted or are unbalanced, or which has insufficient or irregular surety.

12.0 Alternative Materials and Equipment

.1 Contractor must construct the work using the product type and brand specified unless alternative products are approved by the Engineer.

.2 Contractor to submit alternate products 7 days before tender

closing for engineer review. Alternate products submitted for engineer review 6 days before tender closing will not be accepted.

.3 The Engineer will evaluate alternative products an issue an

addendum if alternate product is approved.

13.0 Award

.1 Owner or the Consultant on behalf of the Owner will issue in writing a Notice of Award to the successful Tenderer.

.2 Notice will be given not later than sixty (60) days following the

closing of tenders.

Page 11: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE DESIGN AND CONSULTING INC. 1

CONTRACT AGREEMENT THIS CONTRACT AGREEMENT made in triplicate on the day of 2016 by and between: City of Cold Lake Hereinafter called the "Owner" and

Hereinafter called the "Contractor" The Owner and the Contractor agree as follows: 1. SCOPE OF THE WORK

The Contractor agrees to furnish all the material (except as otherwise specified to be supplied by others) together with all of the equipment and labour and transportation necessary to perform the entire Work described in the Contract Documents for the entire project entitled: City Hall Parking Lot City of Cold Lake, AB which Contract Documents have been prepared by SE Design and Consulting Inc. The Invitation to Tender, Tender Form, and drawings incorporated herein are included therein. The Contract Documents are an integral part of this Contract Agreement.

2. CONFLICTS AND PRECEDENCE OF DOCUMENTS

In the case of any inconsistency or conflict between the provisions of the separate parts of the Contract Documents, the separate parts shall take precedence and govern in accordance with the following order:

1. Contract Agreement 2. Invitation to Tender – SE Design and Consulting Inc. 3. Specifications – City of Cold Lake 4. Drawings – SE Design and Consulting Inc. 5. Tender Form – SE Design and Consulting Inc.

Page 12: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE DESIGN AND CONSULTING INC. 2

CONTRACT AGREEMENT

3. TIME OF COMPLETION

The work to be performed under this Contract shall be fully completed by the 30th day of August, 2016. The contractor will perform his work faithfully and diligently to complete the project within this timeframe.

4. PAYMENT

The Owner shall pay the Contractor for the performance of the Contract in current funds, at the prices named in the Contract Tender Form. An acceptable invoice must be submitted to the engineer within sixty (60) days from payment cut off period or payment will not be made to the contractor. Payment cutoff period will be at the end of every month during which the Work was performed. Payment will be made within 30 days of receipt of an acceptable invoice. Ten percent (10%) of the value of work performed will be withheld from payment to the Contractor in accordance with the Builders’ Lien Act and will be released to the Contractor in accordance with the provisions of the Act, upon completion of the entire project including correction of deficiencies and upon submission by the Contractor of the following documentation: 1. Letter from the Contractor stating that he has submitted all claims for

payment related to the contract. 2. Letter of Clearance from the Workers’ Compensation Board. Statutory

Declaration from the Contractor stating that there are no outstanding claims for payment related to the project from suppliers, subcontractors, labourers or any other parties affected by the work

5. INSURANCE

Prior to commencing construction provide certification of insurance coverage for personal injury and property damage (minimum $2,000,000.00).

6. WRITTEN NOTICE

Written notice shall be deemed to have been duly served if delivered in person to the individual, or to a member of the firm, or to an officer of the corporation for which it is intended, or if delivered or sent prepaid registered mail to its business address, and it shall be deemed received on the day next following the day of mailing.

Page 13: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE DESIGN AND CONSULTING INC. 3

CONTRACT AGREEMENT

IN WITNESS WHEREOF the Parties have executed this Contract Agreement, on the day and year first above written.

SIGNED, SEALED AND DELIVERED in the presence of: Witness to the Signature of the City of Cold Lake City of Cold Lake 1. 1. Title: Address: Address:

SEAL

2. 2. Title: Address: Address:

Witness to the Signature of the Contractor CONTRACTOR 1. 1. Title: Address: Address: 2. 2. Title: Address: Address:

Page 14: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE DESIGN AND CONSULTING INC.

CONTRACT TENDER FORM

TENDER OF:

NAME

ADDRESS

TO: City of Cold Lake. 5513 - 48 Ave Cold Lake, AB T9M 1A1 GENTLEMEN: The undersigned Tenderer, having carefully examined the Contract Documents and the locality of the proposed work, and having full knowledge of the work required and of the materials to be furnished and used, hereby agrees to provide all necessary materials, supervision, labour and equipment and perform and complete all work and fulfill everything as set forth and in strict accordance with the Contract Documents and Addenda numbered for the prices stated in the Tender Form Schedule of Quantities and Prices. The undersigned agree also:

1. That the Owner is not obligated to accept this tender. 2. That this tender is made without any connection, knowledge, comparison of figures or

arrangements with any other company, firm, or person making a tender for the same work.

3. That no person or firm other than the Tenderer whose signature is affixed below has any interest in this tender or in the proposed Contract.

4. That this tender is irrevocable for thirty (60) days after tender submission or closing time.

5. To execute the Contract Agreement within ten (10) days of the date of the Notice of Award of the

Contract, such time limit being extended only on the written approval of the Owner.

Page 15: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE DESIGN AND CONSULTING INC.

CONTRACT TENDER FORM

6. To commence and actively proceed with the work within seven (7) days of the date of the Notice

to Proceed, and to complete all work under the Contract within the time period indicated in the contract agreement and subject to the provisions of Article 41 of the General Conditions for extension of Contract time.

7. The work to be performed under this contract shall be fully completed by 30th day of August 2016.

8. That should he fail to complete the work within the contract time, he shall be required to

compensate the Owner in accordance with the Contract Documents.

9. That no bonus will be allowed for completion in less time than that stated above.

10. To do all extra work not reasonable inferable from the specifications or drawings but called for in writing by the Engineer and to accept as full compensation therefore payment in accordance with the provisions of Article 39 of the General Conditions.

11. That the estimate of quantities shown in the Tender Form serves only to provide a basis for

comparing tenders and that the actual job quantities will not necessarily correspond with the quantities shown in the Tender Form, and further, that the Owner has the right to increase or decrease the quantities in any or all items and to eliminate items entirely from the work.

12. That payment for the work done will be made on the basis of the quantities measured by the

Engineer and at the prices shown in the Tender Form which shall be compensation in full for the work done under the terms of the Contract.

13. Subject to budget limitation, the Owner has the right to increase or decrease the quantities shown in the tender form, and further, that the Owner has the right to increase or decrease the quantities in any or all items and to eliminate or cancel projects entirely from the work.

14. That payment of the Contingency Allowance or portions thereof shall only be made in the event that the Engineer authorizes additional work, in which case the amount of the payment shall be determined as specified in the general Conditions.

Page 16: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE DESIGN AND CONSULTING INC.

CONTRACT TENDER FORM

This tender is executed under seal at , this day of , 20 .

NAME OF FIRM:

ADDRESS:

FOR INDIVIDUAL OR PARTNERSHIP: SIGNED, SEALED AND DELIVERED BY (TENDERER - PLEASE PRINT) (SIGNATURE OF TENDERER) in the presence of: NAME:

ADDRESS:

SEAL

OCCUPATION: FOR LIMITED COMPANY: The Corporate Seal of: (TENDERER - PLEASE PRINT) (SIGNATURE OF TENDERER) was hereto affixed in the presence (APPOINTMENT) SEAL (APPOINTMENT) NOTE: If the Tenderer is by a joint venture, add additional forms of execution for each member

of the joint venture in the appropriate form or forms as above.

Page 17: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

City Hall Parking Lot

City of Cold Lake

Schedule of Quantities

Item

Spec. No. Description Unit

Price

$

Contract

Value

$

SCHEDULE 1.0 - GENERAL

1.1 1501 General project requirements 1 l.s.

TOTAL FOR SCHEDULE 1.0

SCHEDULE 2.0 - CITY HALL PARKING LOT

2.1 22205 Remove existing chainlink fence 4 l.m.

2.2 2000 Remove and Dispose of concrete 100mm thickness 60 m2

2.3 2000 Removal of existing asphalt to 100mm depth 335 m2

2.4 2000 Subcut and dispose of waste material offsite 2,115 m3

2.5 2000Borrow excavation and compaction to 100% standard

proctor density. 1,720 m

3

2.6 2315Trenching & backfilling to 98% Std. Proctor Density

including disposal of surplus trench excavation.56 l.m.

2.7 2630Supply and install 1200 mm catchbasin manhole

c/w K-7 frame & cover and 70mm orifice1 ea.

2.8 2630Supply and install 1200 mm catchbasin manhole

c/w K-7 frame & cover1 ea.

2.9 2630 Tie to existing storm stub 1 ea.

2.10 2630 Supply and install 300 mm storm pipe 56 l.m.

2.11 2340/2232

Subgrade preparation to 200mm depth c/w 15kg

cement stabilization and compaction to 100% standard

proctor density

2,500 m2

2.12 2721Supply, place and compact 200mm depth minus 20mm

gravel to 100% Std. Proctor 2,500 m

2

2.13 2745 Prime Coat 2,450 m2

2.14 2741Supply, place and finish 75mm, 12.5 mm (ACR)

hot-mix asphalt 2,450 m

2

2.15 2770 Supply and install pin-on barrier curb 170 l.m.

2.16 330000Supply, place, and finish 100mm concrete pad c/w

rebars5 m

2

2.17 2911/2921Supply and place new 100mm topsoil c/w hydroseed in

landscaped areas166 m

2

2.18 2821 Supply and install chainlink fence (match existing) 7 l.m.

NOTE: The specitication number refers to specification covering measurements and payment of the respective item

Quantity and/or

Unit

SE DESIGN AND CONSULTING INC.

Project: CL-0021 Page 1 of 2

Page 18: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

City Hall Parking Lot

City of Cold Lake

Schedule of Quantities

Item

Spec. No. Description Unit

Price

$

Contract

Value

$

NOTE: The specitication number refers to specification covering measurements and payment of the respective item

Quantity and/or

Unit

2.19 2761 Line painting 440 l.m.

2.20 2760 Handicap Zone Paint 3 ea.

2.21 2760 Loading Zone Paint 1 ea.

TOTAL FOR SCHEDULE 2.0

SCHEDULE 3.0 - ELECTRICAL (OPTIONAL)

3.1 260534 Electrical

.1 Remove 40 m of existing electrical conduits and 5

concrete posts 1 l.s.

.2 Supply, trench and Install 25mm conduits 50 l.m.

.3 Supply and install concrete posts c/w inside electrical

conduits as per detail5 ea

TOTAL FOR SCHEDULE 3.0

Contractor to note that Schedule 3.0 is optional. Contractor is to price out all items in Schedule 3.0.

Depending on the City Cold Lake budget, schedule 3.0 may be deleted from the contract.

SCHEDULE 1.0 - GENERAL $

SCHEDULE 2.0 - CITY HALL PARKING LOT $

SCHEDULE 3.0 - ELECTRICAL (OPTIONAL) $

SUBTOTAL ALL SCHEDULES $

GOODS AND SERVICES TAX (5%) $

TOTAL CONSTRUCTION COSTS $

TENDER SUMMARY

SE DESIGN AND CONSULTING INC.

Project: CL-0021 Page 2 of 2

Page 19: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE DESIGN AND CONSULTING INC.

CONTRACT TENDER FORM

This tender is executed under seal at , this day of , 20 .

NAME OF FIRM:

ADDRESS:

FOR INDIVIDUAL OR PARTNERSHIP: SIGNED, SEALED AND DELIVERED BY (TENDERER - PLEASE PRINT) (SIGNATURE OF TENDERER) in the presence of: NAME:

ADDRESS:

SEAL

OCCUPATION: FOR LIMITED COMPANY: The Corporate Seal of: (TENDERER - PLEASE PRINT) (SIGNATURE OF TENDERER) was hereto affixed in the presence (APPOINTMENT) SEAL (APPOINTMENT) NOTE: If the Tenderer is by a joint venture, add additional forms of execution for each member

of the joint venture in the appropriate form or forms as above.

Page 20: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

CONTRACT TENDER FORM

SE DESIGN AND CONSULTING INC. PAGE 1 OF 1 T.Q. 02/2013

TENDERER'S QUESTIONNAIRE The Tenderer shall provide the following information in order that the Owner may judge his ability to fulfill the Contract requirements. 1. The size, model, and make of the equipment which the Tenderer will place on the project

and use during the course of the work is as follows:

Equipment Size Model Make

2. The average number of men the Tenderer will employ and maintain on the project is

. 3. The name of the superintendent that the Tenderer will place on the project and his

previous experience on this type of construction is as follows:

4. It is the intention of the Tenderer that the following work will, on approval of the

Engineer, be subcontracted to the firms indicated below:

Trade Subcontractor

Page 21: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -i-

TABLE OF CONTENTS

ART. DESCRIPTION PAGE NO. ART. DESCRIPTION PAGE NO.

1 Definition of Terms 1 25 Rejected Work or Materials 16 2 Intent of Contract Documents 3 26 Correction of Deficiencies 17 3 Drawing and Specifications 3 27 Guarantee Period 17 4 Document Conflict 4 28 Guarantee Fund 19 5 Discrepancies 5 29 Insurance 19 6 Shop Drawings 5 30 Damage to Work 23 7 Reference Points and Layout 7 31 Indemnity 23 8 Engineer’s Status 8 32 Bonds 23 9 Arbitration 8 33 Patents and Royalties 24 10 Inspection of Work 9 34 Permits and Regulations 24 11 Supervision and Labour 9 35 Injury or Damage 24 12 Lands by Owner 10 36 Notice to Proceed 25 13 Lands by Contractor 10 37 Failure to Complete on Time 25 14 Private Land 11 38 Schedule of Completion 26 15 Owner’s Right to do Work 11 39 Changes in the Work 26 16 Owner’s Termination of Contract 12 40 Unclassified Work 26 17 Contractor’s Termination of Contract 13 41 Extension of Contract Time 28 18 Assignment of Contract 14 42 Use of Competed Portions 29 19 Separate Contract 14 43 Payments 29 20 Sub-Contract 14 43 Removal of Liens 31 21 Oral Agreement 15 45 Completion and Acceptance 32 22 Materials by Contractor 15 46 Traffic 32 23 Materials by Owner 16 47 Variation of Information 33 24 Materials Storage 16 48 Existing Services 33 49 Prime Contractor 34

50. Engineer Safety Program 34

Page 22: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -1-

1. DEFINITION OF TERMS

.1 "OWNER" is the Owner named in the Contract Agreement. .2 "CONTRACTOR" is the Contractor named in the Contract

Agreement. .3 "ENGINEER" is SE DESIGN AND CONSULTING INC., or

such other Engineer as may from time to time be duly authorized and appointed in writing by the Owner.

.4 "SUBCONTRACTOR" shall mean any person, firm, or

corporation having a contract for the execution of a part or parts of the work included in this Contract, and a person, firm, or corporation furnishing material called for in this Contract and worked to a special design according to the drawings or specifications but does not include one who merely furnishes material not so worked.

.5 "OTHER CONTRACTOR" wherever used in these

documents means any person or firm or corporation employed by or having a Contract directly or indirectly with the Owner other than through the Contractor.

.6 "CONTRACT" shall be the executed Contract Agreement

between the Owner and the Contractor. .7 "CONTRACT DOCUMENTS" shall mean and include the

complete set of documents, specifications, drawings, and addenda incorporated therein, as listed in the Index of Contract Documents.

.8 "CONTRACT PRICE" shall mean the amount of the Contract

as shown in the Contract Tender Form. .9 "WORK" wherever used in these documents shall mean the

entire Work, including materials, labour, equipment, transportation or other facilities or items ancillary to the foregoing, required to be done, furnished and performed by the Contractor to complete the Contract in accordance with the Contract Documents.

.10 "UNCLASSIFIED WORK" shall mean work not covered in

unit prices or lump sum amounts in the Tender Form. .11 "GUARANTEE PERIOD" shall be a specified period of time

beginning on the date stated in the "Notice of Acceptance". .12 "GUARANTEE FUND" is an amount held by the Owner

during the Guarantee Period to ensure correction of deficiencies.

Page 23: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -2-

.13 "CERTIFICATES"

.1 Monthly Progress Certificate shall mean a certificate issued

by the Engineer periodically, based on which payments on account are made.

.2 Interim Completion Certificate shall mean a certificate

issued by the Engineer upon substantial completion of the Work.

.3 Final Completion Certificates shall mean a certificate issued

by the Engineer upon completion of the Work including cleanup and rectification of all deficiencies.

.4 Release of Holdback Certificate shall mean a certificate

issued by the Engineer upon expiration of the 45 day Statutory Limitation period authorizing the payment of Holdback.

.5 Final Acceptance Certificate shall mean a certificate issued

by the Engineer within 14 days after the end of the period of guarantee provided that the Conditions of the Contract have been met.

.14 '"FIELD ORDER" is a written communication from the

Engineer, at the site, to the Contractor, ordering changes in the Work, clarifying the Contract Documents, issuing instructions or requesting information.

.15 "NOTICE OF PROPOSED CHANGE" is a written

communication issued from the Office of the Engineer during the course of the Work informing of the changes to be made in the Work.

.16 "CHANGE ORDER" is a written communication issued by

the Owner, setting forth the authorized amount by which the Contract Price is to be altered as a result of changes in the Work ordered by a Notice of Proposed Change.

.17 "NOTICE OF ACCEPTANCE" is a written communication

issued by the Owner, acknowledging the interim or final completion and setting the commencement of Guarantee Periods.

Page 24: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -3-

2. INTENT OF CONTRACT DOCUMENTS

.1 The intent of the Contract Documents is that the Contractor shall

provide all necessary materials, supervision, labour, equipment, and all else necessary for the proper execution of the Work unless specifically noted otherwise.

.2 The Contractor shall do all the Work shown on the drawings and

described in the specifications and all incidental Work necessary to complete the project.

3. DRAWINGS AND SPECIFICATIONS

.1 Except as provided for otherwise, a maximum of two (2) copies of

drawings and specifications for the execution of the Work shall be furnished to the Contractor without charge.

.2 Additional instructions may be issued by the Engineer during the

progress of the Work by means of drawings or otherwise for clarification of the drawings and specifications, or as may be necessary to explain or illustrate changes in the Work to be done.

.3 One (1) complete set of all drawings and specifications shall be

maintained at the job site and shall be available to the Engineer at all times.

4. DOCUMENT CONFLICT

.1 In case of any inconsistency or conflict between the provisions of

the Contract Documents, the provisions of such documents and addenda thereto shall take precedence and govern in the following order:

.1 Contract Agreement .2 Special Provisions .3 General Conditions .4 Specifications .5 Drawings .6 Tender Form

Page 25: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -4-

.7 Instructions to Tenderers .8 Invitation to Tender .9 All other Documents

.2 Figured dimensions on a drawing take precedence over

measurements scaled from the drawing, and large-scale drawings take precedence over those of smaller scale.

.3 Supplementary drawings and specifications supersede their

antecedents. .4 In case of conflict between figured dimensions on a drawing and

the dimensions of a specified product, the dimensions of the specified product shall govern.

.5 In case of conflict in materials and methods, the specifications

govern. .6 The drawings and specifications complement each other and

anything called for by one shall be as binding as if called for by both.

.7 The apparent generality of the drawings and specifications as to

any detail or the apparent omission from them of a detailed description concerning any point, shall be regarded as meaning that only the best general practice is to prevail and that only material and workmanship of the first quality are to be used.

5. DISCREPANCIES

.1 Any discrepancies found between the drawings and specifications

or any errors or omissions in the drawings or specifications shall immediately be reported to the Engineer, who shall promptly correct such error or omission in writing.

.2 Any Work done after discovery of such discrepancies, errors, or

omissions shall be done at the Contractor's risk.

6. SHOP DRAWINGS

.1 The Contractor shall arrange for the preparation of a minimum of 6

sets of clearly identified shop drawings, 4 of which will be retained by the Engineer.

.2 The Contractor shall ensure that the drawings conform to the

following standards:

Page 26: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -5-

.1 All drawings are to be metric. .2 All dimensions are to be in metres or millimetres. .3 Drawings are to be done to one of the following scales: 1:20 - Small Intricate Details 1:50 - General Details 1:500 - Overall Layout and Large Plans 1:1000- Key Plans .4 Sheet sizes are to be one of the following: 216 X 280 280 X 432 432 X 559 559 X 864 864 X 1118

.5 Imperial catalogue sheets will be accepted if the dimensions given are converted to metric.

.3 Prior to submission to the Engineer the Contractor shall review all

shop drawings. .4 By this review the Contractor represents that he has determined

and verified all field measurements, field construction criteria, materials, catalogue numbers and similar data or will do so and that he has checked and coordinated each shop drawing with the requirements of the Work and of the Contract Documents.

.5 The Contractor's review of each shop drawing shall be indicated by

stamp, date and signature of a responsible person. .6 The Contractor shall submit shop drawings to the Engineer for his

review with reasonable promptness and in orderly sequence so as to cause no delay in the Work or in the Work of Other Contractors.

.7 If either the Contractor or the Engineer so requests they shall jointly

prepare a schedule fixing the dates for submission and return of shop drawings.

.8 Shop drawings shall be submitted in the form of a reproducible

transparency or prints as the Engineer may direct. .9 At the time of submission the Contractor shall notify the Engineer in

writing of any deviations in the shop drawings from the requirements of the Contract Documents.

.10 The Engineer will review and return shop drawings in accordance

with any schedule agreed upon, or otherwise with reasonable

Page 27: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -6-

promptness and in no case will the period between receipt of shop drawings and return of the submissions exceed 14 days.

.11 The Engineer's review shall be for conformity to the design concept

and for general arrangement only and such review shall not relieve the Contractor of responsibility for errors or omissions in the shop drawings or of responsibility for meeting all requirements of the Contract Documents unless a specific deviation on the shop drawings has been approved in writing by the Engineer.

.12 The Contractor shall make any changes in shop drawings which

the Engineer may require consistent with the Contract Documents and re-submit unless otherwise directed by the Engineer.

.13 When re-submitting, the Contractor shall notify the Engineer in

writing of any revisions other than those requested by the Engineer.

7. REFERENCE POINTS AND LAYOUT

.1 The Engineer shall establish base lines and reference points, for

the location of principal components of the Work, as well as bench marks in reasonable proximity to the Work.

.2 The Contractor shall carefully preserve bench marks, reference

points and stakes, and legal survey pins, and in case of willful or careless destruction, the Contractor will be charged with the resulting expense and shall be responsible for any mistakes that may be caused by their loss or disturbance.

.3 The Contractor shall provide all detailed layout of dimensions,

locations, and elevations of the Work from the base lines, reference points, and bench marks set by the Engineer.

.4 The Contractor shall not proceed with the Work until he has made

timely demands upon the Engineer for, and has received from the Engineer, such base lines, reference points, elevations and other points and instructions required for the execution of the Work.

.5 In some cases, if so specified in the Special Provisions, the

Engineer will provide detailed layout of the Work. When it is the Engineer's responsibility to lay out the Work, the Contractor shall provide reasonable and necessary opportunity and facilities for setting points and making measurements. The Work shall be done in strict conformity with such points and instructions.

.6 Unless otherwise specified in the Special Conditions, the

Contractor shall furnish all assistants necessary to measure in and drive stakes and shall furnish such lines, straight edges and stakes

Page 28: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -7-

as the Engineer may direct for setting line and grade, and other detailed layout.

.7 The Contractor, shall, before commencing Work at any point,

satisfy himself as to the meaning and correctness of all stakes and Works and no claims shall be considered for any allowance based on alleged inaccuracies or for alternatives on account of his failure to read same correctly.

.8 If the Contractor, in the course of the Work, finds any discrepancy

between the drawings and the physical conditions of the locality or any errors or omissions in drawings or in the layout as given by points and instruction, it shall be his duty to immediately inform the Engineer in writing, and the Engineer shall promptly verify the same and issue appropriate instructions. Any Work done after such discovery, before further Work is authorized, will be done at the Contractor's risk.

8. ENGINEER'S STATUS

.1 The Engineer shall be the Owner's representative during the construction

period and shall observe the Work in progress on behalf of the Owner. .2 He shall have the authority to stop the Work whenever such stoppage

may be necessary, in his reasonable opinion, to ensure the proper execution of the Contract.

.3 The Engineer is, in the first instance, the sole interpreter of the Contract

and the sole judge of the performance thereunder by both parties to the Contract.

.4 The Contract shall obey, perform, and comply with the Engineer's orders

or instructions with respect to the Work, or concerning the conduct thereof, promptly, efficiently, and to the satisfaction of the Engineer.

.5 The contractor shall not enter into any contractual discussion and or

contractual changes with the owner without the presence of the engineer. .6 However, should the Contractor hold such orders or instructions to be at

variance with the Contract Documents or to involve changes in Work already done, ordered, or underway in excess of the Contract, he shall notify the Engineer accordingly in writing within ten (10) days of the receipt of such orders or instructions and before proceeding to carry them out.

.7 Nothing contained in the Contract Documents shall create any contractual

relationship between the Engineer and the Contractor.

Page 29: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -8-

9. ARBITRATION

.1 The Engineer shall, in the first instance, be the sole interpreter of the

Contract in the event of any dispute or misunderstanding between the Owner and the Contractor in relation to the stipulation and provisions of this Contract, or to the manner and performance of the whole or any part of the Contract by either of the parties.

.2 Should either party not agree with the decisions of the Engineer in any

such dispute, the matter shall be submitted to arbitration as provided for by the "Arbitration Act" of the Province or Territory wherein the Work is situated, and amendments thereto.

.3 No action at law shall be commenced by either the Contractor or the

Owner until the arbitration proceedings have been completed. .4 The Contractor shall not cause a delay of the Work while the arbitration

proceedings are pending or in progress.

10. INSPECTION OF WORK

.1 The Contractor shall allow the Engineer and/or Owner access and provide

adequate facilities for access to any part of the Works at all times. .2 If the specifications, Engineer's instruction, laws, ordinances, or any public

authority requires any Work to be specially tested or approved, the Contractor shall give the Engineer advance notice of his preparedness for such inspection, and if the inspection is by an authority other than the Engineer, of the date fixed for such inspection.

.3 The Engineer shall inspect the Work promptly and without causing

unreasonable delay to the Contractor. .4 Extra payment will not be made to the Contractor for delay occasioned by

any inspection, and extension of the completion time will not be allowed for delay resulting therefrom.

.5 On request by the Engineer, the Contractor shall open for inspection any

part of the Work that has been covered up. If the Contractor refuses to comply with such request, the Owner may employ other persons to uncover the Work.

.6 If the Work is found to be in accordance with the Contract requirements

then the cost of uncovering and recovering the Work shall be borne by the Owner.

Page 30: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -9-

.7 If any of the Work was covered by the Contractor in contravention of the Engineer's instruction, or if the uncovered Work is found not to be in accordance with the Contract requirements, then the cost of uncovering the Work shall be charged to the Contractor.

.8 The acceptance, or the lack of comment on the part of the Engineer, of

the methods, techniques or sequence of construction employed by the Contractor shall not relieve the Contractor of his responsibility for the Work.

.9 At anytime during the warranty period the underground piping (Storm &

sanitary) system experiences failure, blockages etc. Under the direction of the Engineer the contractor will have to CCTV the pipes to determine the reason for failure and then carry-out the necessary repairs under the supervision of the Engineer. Once the repairs is completed, the contractor will have to CCTV the pipe to confirm the repairs is satisfactory. Contractor to pay for the CCTV and the repairs.

11. SUPERVISION AND LABOUR

.1 The Contractor shall keep on the Work at all times during its progress a

competent superintendent who is acceptable to the Engineer. .2 The superintendent shall represent the Contractor in his absence and

directions given to him shall be held to be given to the Contractor. .3 The superintendent shall give sufficient supervision to the Work until its

completion. .4 The Contractor shall comply with the requirements of the Worker's

Compensation Act of the Province or Territory in which the Work is carried out, and all other federal and provincial legislation regarding wages and labour regulations.

.5 All workmen must have sufficient knowledge, skill and experience to

perform properly the Work assigned to them. .6 Any foreman or workman employed by the Contractor or Subcontractor

who, in the opinion of the Engineer, does not perform his Work in a skillful manner, or appears to be incompetent or to act in a disorderly or intemperate manner shall, at the written request of the Engineer, be discharged immediately and shall not be employed again in any portion of the Work without the approval of the Engineer.

Page 31: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -10-

12. LANDS BY OWNER

.1 The Owner shall provide the lands upon which the Work is to be

performed. Where Work is to be performed on lands owned by others, the Owner shall obtain the necessary easements or rights-of-way.

.2 Delay in providing these lands, or obtaining easements or rights-of-way

which, in the opinion of the Engineer, delays the Work or results in extra cost to the Contractor, shall be deemed proper cause for adjustment in the time of completion or adjustment of the Contract Price to cover the extra cost to the Contractor.

13. LANDS BY CONTRACTOR

.1 Any lands other than those upon which the Work is to be performed which

may be required for temporary facilities, storage purposes, or access to the Work site, other than those provided by the Owner, shall be provided by the Contractor with no liability to the Owner.

14. PRIVATE LAND

.1 It shall be the Contractor's responsibility to ascertain the boundaries within

which the Work must be confined. The Contractor shall not enter upon lands other than those provided by the Owner for any purpose without obtaining prior written permission of the property Owner.

.2 The Contractor shall not enter upon lands owned by others on which the

Owner has easements or right-of-entry without having received the written authorization of the Owner for such entry.

.3 It shall be the Contractor's responsibility to ascertain from the Owner the

conditions on which easements or rights-of-entry have been granted on private lands and to abide by these condition throughout the course of construction.

.4 Contractor is to be notified that if he/she makes a contractual arrangement

with the client without the presence of the Engineer who is the contractual authority, the contractor may not be financially compensated for his/her effort.

.5 If the Contractor requires access to private land to conduct his/her activity,

(for example using land as laydown area, or spill pile dirt from excavation), contractor is to make sure the terms are made clear in writing and signed by the land owner and the contractor. Terms of the agreement must indicate what is agreed upon between both parties and restauration that is

Page 32: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -11-

required after work is completed. A copy of this agreement must be provided to the Engineer. Contractor to note that the Owner will be absolved of any responsibility towards potential claim that may occur between the land owner and the contractor.

15. OWNER'S RIGHT TO DO WORK

.1 The Owner, subject to the approval of the Engineer, may notify the

Contractor and his surety, in writing, that the Contractor is in default of his contractual obligations and instruct him to correct the default within five (5) working days, if the Contractor should:

.1 Refuse or fail to supply sufficient properly skilled

workmanship, products, or construction machinery and equipment for the scheduled performance of the Work.

.2 Neglect to prosecute the Work properly, or fail to perform

any of the provisions of the Contract.

.2 If the correction of the default cannot be completed within the five (5) working days specified, the Contractor shall be considered to be in compliance with the Owner's instruction if he:

.1 Commences the correction of the default within the

specified time. .2 Provides the Owner with an acceptable schedule for such

correction. .3 Completes the correction in accordance with such

schedule. .3 If the Contractor fails to comply with these provisions, the Owner may,

without prejudice to any other right or remedy he may have, correct such default and may deduct the cost thereof from the payment then or thereafter due the Contractor, provided however, that the Engineer shall approve both the action and the amount subsequently charged to the Contractor.

16. OWNER'S TERMINATION OF THE CONTRACT

.1 The Owner shall have the right to terminate the Contractor for any of the

following reasons:

.1 If the Contractor at any time becomes bankrupt, makes an assignment of his property for the benefit of his creditors, or

Page 33: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -12-

if a receiver should be appointed. Such termination shall be effective upon the Owner giving notice thereof.

.2 If the Contractor should default in any of the following ways

and fail to remedy such default within the ten (10) days of notice to do so. Such termination shall be effective upon the Owner giving notice thereof:

.1 Fail to commence Work within the time specified in

the Contract Agreement. .2 Fail to use diligence or to make such progress with

the Work as, in the opinion of the Engineer, is necessary to ensure the completion of the Work in the time specified in the Contract Agreement.

.3 Fail, in the opinion of the Engineer, to supply enough

competent workmen, management, and suitable equipment.

.4 Become, in any way, in the opinion of the Engineer,

unable to carry on the construction of the Works.

.2 Upon termination of the Contract, the Owner may take all the Work out of the Contractor's hands and employ such means as he may see fit to complete the Works.

.3 Upon termination of the Contract, the Contractor shall have no claim for

any further payment in respect of Work performed, but shall be liable for all loss of profits, damages, and expenses which may be suffered by the Owner by reason of such default or delay, or the non-completion by the Contractor of the Works.

.4 Upon termination of the Contract, no objection or claim shall be raised or

made by the Contractor by reason or on account of the ultimate cost of the Works so taken over for any reason proving greater than, in the opinion of the Contractor, it should have been.

.5 Upon termination of the Contract, all materials, articles and things

whatsoever, and all equipment and all rights, proprietary or otherwise, licenses, powers and privileges, whether relating to or affecting real estate or personal property, acquired, possessed, or provided by the Contractor for the purposes of the Work under the provisions of this Contract shall remain and be the property of the Owner for all purposes incidental to the completion of the Works and may be used, exercised, and enjoyed by the Owner as fully to all intents and purposes connected with the Works as they might therefore have been used, exercised, and enjoyed by the Contractor.

Page 34: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -13-

17. CONTRACTOR'S TERMINATION OF THE CONTRACT

.1 The Contractor shall have the right to terminate the Contract for any of the

following reasons:

.1 In the event of an Order of any court or other public authority, other than the Owner, causing the Work to be stopped or suspended, and when the period of such stoppage or suspension exceeds ninety (90) days, and when such stoppage or suspension occurs through no act or fault of the Contractor, his agents, or servants. In such event, the Contractor shall receive from the Owner payment for the Work performed and losses sustained in respect of materials. The Owner shall not be liable for any loss of profits, damages or expenses incurred by the Contractor as a result of such stoppage or suspension. Such termination shall be effective upon the Contractor giving notice thereof.

.2 In the event the Owner fails to pay, except as provided in

Article 43 of the General Conditions, any sum certified by the Engineer within twenty (20) days from the specified date of payment, and fails to remedy such default within ten (10) days of the Contractor's written notice to do so. In such event, the Contractor shall receive from the Owner payment for the Work performed and losses sustained in respect of any materials and payment for loss of profits, damages, and expenses. Such termination shall be effective upon the Contractor giving notice thereof.

18. ASSIGNMENT OF CONTRACT

.1 The Contractor shall not assign the Contract or any part thereof or any

benefit or interest therein or thereunder without the prior written consent of the Owner.

.2 This shall not exclude a charge in favour of the Contractor's bankers of

any monies due or to become due under this Contract. .3 Such assignment shall be promptly notified in writing to the Owner.

19. SEPARATE CONTRACTS

.1 The Owner reserves the right to let other contracts in connection with the Work.

Page 35: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -14-

.2 The Contractor shall afford Other Contractors reasonable opportunity for the introduction and storage of their materials and the execution of their Work and shall properly connect and co-ordinate his Work with theirs.

.3 If any of the Contractor's Work as specified herein and shown on the

drawings depends upon the Work of any Other Contractor, the Contractor shall inspect and measure the Work in place and determine whether anything in such Work renders it unsuitable for proper execution of his Work.

.4 He shall promptly report the results of such inspection and measurement

to the Engineer if anything in such Work renders it unsuitable for proper execution of his Work.

.5 His failure to inspect and report promptly shall constitute an acceptance of

the Other Contractor's Work and he shall have no claim against the Owner by reason of anything in such Work rendering the same unsuitable for proper execution of his Work.

20. SUBCONTRACTS

.1 The Subcontractors named in the Tenderer's Questionnaire, and others

as may be approved by the Engineer following execution of the Contract Agreement shall not be changed nor shall additional Subcontractors be employed except with the written approval of the Engineer.

.2 The Contractor is responsible to the Owner for the acts and omissions of

his Subcontractors and of their employees, to the same extent that he is responsible for the acts or omissions of persons employed by himself.

.3 Nothing in the Contract Documents shall create any contractual relation

between any Subcontractor and the Owner. .4 The Contractor shall bind every Subcontractor by the terms of the

Contract Documents.

21. ORAL AGREEMENTS

.1 No oral instruction, objection, claim or notice by any party to the others

shall affect or modify any of the terms or obligations contained in any of the Contract Documents.

.2 None of the provisions of the Contract Documents shall be held to be

waived or modified by reason of any act whatsoever, other than by an agreed waiver or modification thereof in writing.

Page 36: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -15-

.3 Under no circumstances is the contractor allowed to enter into a separate contract with other parties that may impact the signed contract with the owner. If contractor requires permission from the land owner to use as a laydown area or any other general purpose during construction, contractor is to get the permission in writing from the owner and provide a copy to the Engineer.

22. MATERIALS BY CONTRACTOR

.1 The Contractor shall supply materials to construct the Work unless it is

expressly stipulated to the contrary. .2 Materials used in the Work shall meet the requirements of the

specifications, or where not detailed in the specifications, shall be to the Engineer's satisfaction.

.3 Unless otherwise specified, all materials shall be new. .4 Unless otherwise stipulated, the Contractor shall provide all water, light

and power necessary for the execution of the Work. .5 Schedules of piping, fittings, reinforcing, or other materials indicating

quantity and/or dimension, which are shown on the drawings or in the applicable sections of the specifications, are intended only to assist the Contractor in his quantity takeoff. Quantities and dimensions shown therein are not guaranteed to be accurate and shall be checked by the Contractor prior to placing an order for such materials.

23. MATERIALS BY OWNER

.1 The Owner will provide only such materials as are specifically listed as

being supplied by the Owner. .2 Materials supplied by the Owner already on the site or other designated

location at the time of Contract execution, and materials delivered following execution of the Contract, shall be examined by the Contractor for quantity and defects, and the Contractor shall sign a statement of materials acceptance specifically listing materials and quantities thereof, and noting all defective material. In so accepting these materials, the Contractor shall assume responsibility for their protection and, except for latent defects not reasonably noticeable at the time of examination, for their quality.

.3 Unless otherwise specified, the Contractor shall take delivery of materials

supplied by the Owner at the point of delivery nearest to the Works and shall, at his own cost, pay all demurrage, insurance, standby charges,

Page 37: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -16-

wharfage, and other unloading costs, and costs of transporting such materials from the point of delivery to the job site.

.4 The Contractor shall verify the delivery dates of materials provided by the

Owner and shall arrange Work schedules to comply therewith.

24. MATERIALS STORAGE

.1 The Contractor, at his own cost, shall store all materials provided for the

Work either by himself or the Owner until they have been incorporated into the completed Works.

.2 Materials shall be so stored as to ensure the preservation of their quality

and fitness for the Work, and shall be protected from vandalism and theft. .3 Stored materials shall be located so as to facilitate prompt inspection. .4 Faulty materials shall not be stored on the site.

25. REJECTED WORK OR MATERIALS

.1 All materials which do not conform to the requirements of the Contract

Documents, or not approved by the Engineer, or are in any way unsatisfactory or unsuited to the purpose for which they are intended, will be rejected.

.2 Any defective Work, which shall include materials, whatever the cause

thereof, and without limiting the generality of the foregoing, whether the result of poor workmanship or use of defective materials shall be removed within ten (10) days after written notice is given by the Engineer, and the Work shall be re-executed by the Contractor.

.3 The fact that the Engineer may have previously overlooked such defective

Work shall not constitute an acceptance. .4 The removal of Work and the re-execution thereof shall be at the expense

of the Contractor, and he shall pay the cost of replacing the Work which shall include materials of Other Contractors destroyed or damaged by the removal of the rejected Work or materials and the subsequent replacement with acceptable Work.

.5 If, in the opinion of the Engineer, it is not expedient to re-execute

defective Work, the Owner may deduct from the Contract price the difference in value between the Work as done and the Work called for by the Contract, the amount of which shall be determined by the Engineer.

Page 38: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -17-

26. CORRECTION OF DEFICIENCIES

.1 Upon failure of the Contractor to perform the Work in accordance with the

Contract Documents, and after ten (10) days written notice to the Contractor, or without notice if an emergency or danger to the Work or public exists, the Owner may, without prejudice to any other remedy he may have, correct such deficiencies.

.2 The cost of Work performed by the Owner in correcting deficiencies shall

be paid by the Contractor.

27. GUARANTEE PERIOD

.1 Neither the final progress payment nor the Notice of Acceptance shall relieve the Contractor of responsibility for faulty materials or defective workmanship.

.2 The Contractor, unless specifically stated otherwise herein, guarantees all

materials furnished and Work performed by him during construction and warranty period. The guarantee period includes the construction period (from the Notice of Acceptance to Construction Completion Certificate) and one (1) year warranty period following the Construction Completion Certificate until Final Acceptance Certificate (FAC).

.3 Faulty materials shall be replaced and defects discovered and failures

which occur during the one (1) year Guarantee Period shall be rectified to the satisfaction of the Engineer and in accordance with the Contract Documents, including, if deemed necessary by the Engineer, replacement of all or a portion of the Work.

.4 If the Owner observes through use of the Works, or if it is discovered by

tests or inspection of the Works prior to the end of the Guarantee Period, that a deficiency or defect exists in the materials or workmanship in respect to the specified Works, the Owner shall immediately notify the Contractor, by whatever means are available, of the defect or deficiency and instruct him to rectify the fault. Such notification shall be confirmed by the Owner in writing to the Contractor.

.5 In the event that this Work, in the opinion of the Owner, must be done

immediately to prevent serious damage, injury, or loss of life, the Owner may perform or cause to be performed, the necessary Work and shall notify the Contractor accordingly.

Page 39: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -18-

.6 Work required under guarantee shall, except as otherwise provided herein for emergencies, be carried out by the Contractor or his representative within ten (10) days of the Owner's written instruction to perform the Work.

.7 In the event that this Work is not done by the Contractor within five (5)

days, the Owner may take whatever action is necessary to have the Work done.

.8 All costs resulting from the necessity to do Work under the guarantee

requirement, whether it be done by the Contractor, his representative, or the Owner, as provided herein, shall be borne by the Contractor.

.9 The Contractor shall, in addition, be liable to the Owner for all expenses,

losses, or damages incurred by the Owner as a result of such faulty materials and defective workmanship or as a result of the Contractor's failure to meet the guarantee requirements as specified herein.

.10 This Article shall not restrict the liability of the Contractor in any way.

28. GUARANTEE FUND

.1 To ensure the correction of all deficiencies or defects occurring during the Guarantee Period, the Owner shall be entitled to retain from the 10% Holdback Payment an amount double to that of the contract price for any outstanding deficiencies or defects as noted by the engineer unless otherwise specified in the Special Provisions hereinafter referred to as the "Guarantee Fund".

.2 The Owner shall retain the Guarantee Fund until at which time the

deficiencies or defects have been corrected to the satisfaction of the owner and engineer.

.3 Should the Contractor fail to correct all deficiencies and defects occurring

in the Work during the Guarantee Period, the Owner shall be entitled to make withdrawals from the Guarantee Fund sufficient to correct all such deficiencies and defects.

.4 In the event the Contractor proceeds to correct all deficiencies and

defects in the Work, occurring during the Guarantee Period, the Owner shall pay to the Contractor all monies remaining in the Guarantee Fund.

.5 No interest will be paid on the Guarantee Fund.

Page 40: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -19-

29. INSURANCE

.1 The Contractor shall, at his own expense, provide the insurance coverage

as identified in this article. .2 Each policy shall contain a clause stating that "This policy shall not be

cancelled or materially changed without the Insurance Company giving at least fifteen (15) days notice by registered mail to the Owner".

.3 Certified copies of these policies shall be filed by the Contractor with the

Owner prior to commencement of the Work. .4 Wherever the word Owner or Engineer is to appear in these policies, the

legal name shall be inserted. .5 The Contractor shall be solely responsible for all deductible amounts

under the Insurance Policies. .6 Builder's Risk Course of Construction Insurance

.1 The Contractor shall at all times during construction and until all conditions of this Contract (except guarantee provisions) have been fully complied with, keep all buildings, structures, Works, equipment (other than Contractor's mobile equipment) and supplies, including materials which will form part of such building, Works, or structure, which is the subject matter of this Contract, insured in the joint name of the Owner, Engineer and the Contractor for an amount not less than the Contract Price against the following perils: "All risks of direct physical loss or damage from any cause whatsoever, including flood and earthquake, and subject to a maximum deductible of three percent (3%) of the Contract Price".

.2 Such insurance shall be with Insurers and on forms

acceptable to the Owner and shall contain the following clause: "It is agreed that the right to subrogation against the Owner and the Engineer or any of their parent, subsidiary, affiliated, or associated companies or corporations is hereby waived."

.3 The following exclusions shall be deemed permissible

(additional or modified exclusions subject to permission of the Owner).

.1 Any loss of use or occupancy however

caused.

Page 41: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -20-

.2 Penalties for non-completion of or delay in completion of Contract or non-compliance with Contract conditions.

.3 Cost of making good faulty

workmanship, construction, or design, but this exclusion shall not be deemed to exclude loss or damage arising as a consequence of faulty workmanship, construction or design.

.4 Wear, tear, normal upkeep, and normal

making good, but this exclusion shall not be deemed to exclude loss or damage arising as a consequence of wear, tear, normal upkeep and normal making good.

.5 Loss, damage, or liability occasioned by,

happening through or in consequence of war, invasion, hostilities, acts of foreign enemies, civil war, rebellion, insurrection, military or usurped power or martial law or confiscation by order of any government or public authority.

.6 Any weapon of war employing atomic

fission or radioactive force whether in time of peace or war.

.7 Claims or liability arising directly or

indirectly from nuclear fission, nuclear fusion or radioactive contamination.

.8 Loss or damage caused by frost or

freezing unless resulting from damage occasioned by fire and/or lightning and/or windstorm and/or hail and/or riot attending a strike and/or civil commotion and/or vehicles and/or smoke.

.9 Loss due to disappearance or revealed

by inventory shortage. .10 Mechanical breakdown, but this

exclusion shall not be deemed to exclude loss or damage arising as a consequence of mechanical breakdown.

.11 Infidelity of the Assured's employees.

Page 42: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -21-

.12 Loss or damage to material and/or equipment while in the course of ocean marine shipment, but this exclusion shall not apply to shipments by regular coastwise vessels, regular ferry lines or railway car transfer barges.

13. Automobiles or Contractor's equipment

of every description.

.7 Liability Insurance

.1 The Contractor shall buy and keep in force until twelve (12) months after the date of acceptance, Personal Injury and Property Damage Liability Insurance.

.2 Such insurance shall be in the name of the Contractor and

the Owner, and shall include a Cross Liability or Severability of Interests clause.

.3 Such insurance shall be on a form and with an Insurer

acceptable to the Owner. .4 Both Personal Injury and Property Damage sections are to

provide coverage on an "Occurrence Basis". .5 Exclusions pertaining to the following operations are to be

deleted, if such operations are to be performed by the Contractor or anyone on his behalf.

.1 Blasting or use of explosives .2 Pile driving .3 Excavation

. 4 Underpinning, shoring or removal or rebuilding of support

.5 Demolition

.6 Such insurance shall indemnify the Contractor, Owner and

Engineer for claims arising out of all premises, operations, subcontracted operations, elevators (if any), completed operations, products, and for all liability for personal injury or property damage assumed by the Contractor under any contract or agreement (including this Contract).

.7 Such insurance shall be for the following minimum limits:

Personal Injury and Property Damage - $2,000,000.00 Inclusive per occasion.

Page 43: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -22-

.8 Automobile Insurance

.1 The Contractor shall buy and keep in force until all

conditions of the Contract have been fully complied with, a Standard Automobile Policy covering all licensed vehicles owned by him, registered in his name, or leased to him.

.2 Such insurance shall include Liability Insurance for

the following minimum limits: Personal Injury and Property Damage - $1,000,000.00 Inclusive per occasion.

.9 Non-Owned Automobile Insurance

.1 The Contractor shall buy and keep in force until all

conditions of the Contract have been fully complied with, a Standard Non-Owned Automobile Policy including Contractual Liability.

.2 Such insurance shall be for the following limits:

Personal Injury and Property Damage - $2,000,000.00 Inclusive per occasion.

.10 Contractor's Equipment Insurance

.1 Notwithstanding anything contained elsewhere

herein, it is understood and agreed that the Owner and/or Engineer shall not be liable for any loss or damage to Contractor's equipment including loss of use thereof.

.2 Each and every policy insuring Contractor's

equipment to be used on this project shall contain the following clause: "It is agreed that the right to subrogation against the Owner and the Engineer or any of their parent, subsidiary, affiliated, or associated companies or corporation is hereby waived".

30. DAMAGE TO WORK

.1 The Contractor shall bear all loss or damage whatsoever which may arise or occur to the Work or any portion thereof until the same are fully and finally completed and delivered to and accepted by the Owner.

.2 If any such damage or loss occurs before such final completion, delivery

and acceptance, the Contractor shall immediately, at his own expense, repair, restore and re-execute the Work.

Page 44: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -23-

31. INDEMNITY

.1 The Contractor shall indemnify and save harmless the Owner and

Engineer from and against all losses and all claims, demands, payments, suits, actions, recoveries and judgements of every nature and description brought or recovered against him and/or the Owner or Engineer by reason of any act or omission of the said Contractor, his agents, or employees in the execution of the Work.

32. BONDS

.1 To ensure the faithful execution and proper fulfillment of this Contract, the

Contractor shall provide the Owner with the following bonds at the time of his execution of the Contract Agreement:

.1 A Performance Bond in the amount of fifty percent (50%) of the Contract Price covering the faithful performance of the Contract including the corrections after completion provided for in Article 27 hereof, and the payment of all obligations arising under the Contract.

.2 A Labour and Material Payment Bond in the amount of fifty

percent (50 %) of the Contract Price covering the payment of all labour and material used or reasonably required in the performance of the Contract.

.2 These bonds must be issued by a surety company licensed to conduct

business in the province or territory wherein the Work is located and shall be provided on forms acceptable to the Engineer and compatible with the forms contained within the Contract Documents.

33. PATENTS AND ROYALTIES

.1 The Contractor shall pay all royalties and license fees and shall save the

Owner and Engineer harmless from loss on account of suits or claims which may arise by reason of the Work for infringement of patents in force at the time of execution of the Contract Documents.

34. PERMITS AND REGULATIONS

.1 The Contractor shall, at his own expense, procure all permits, certificates

and licenses required by law for the execution of the Work and shall comply with all federal, territorial, provincial and local laws, regulations and ordinances affecting the execution of the Work.

Page 45: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -24-

35. INJURY OR DAMAGE

.1 The Contractor shall use due care and take all necessary precautions to

ensure the protection of persons and property and shall comply with the provisions of the Worker's Compensation Act of the province or territory in which the Work is carried out.

.2 The Contractor shall be liable for any and all injury or damage which may

occur to persons or to property due to any act, omission, neglect or default of the Contractor, or of his employees, workmen or agents.

.3 The Contractor shall, without further order, provide and maintain at all

times during the progress or suspension of the Work, suitable barricades, fences, signs, signal lights and flagmen as are necessary to ensure the safety of the public and those engaged in the Work.

.4 In an emergency affecting the safety of life, or of the work, or of adjoining

property, the Contractor, without the necessity of authorization from the Engineer, shall act in a reasonable manner to prevent loss or injury.

.5 The Work shall be carried out in a manner that will cause the least

interruption to vehicular and pedestrian traffic. .6 Where Work is to be carried out on highways or properties other than

those of the Owner, the Contractor shall familiarize himself with the requirements of the owner or controllers of these highways or properties which pertain to traffic control and safety or which place limitations on the Work and shall comply with these requirements.

36. NOTICE TO PROCEED

.1 Written notice to proceed with the Work shall be given to the Contractor

by the Owner. .2 The Contractor will commence Work at such time as to complement the

Work schedule in the Tender Form and shall prosecute the Work regularly and uninterruptedly thereafter, unless otherwise directed in writing by the Engineer or Owner, in such a manner as to secure completion of the Work contracted for within the time stated in the Contract Agreement.

.3 Time shall be of the essence in this Contract.

Page 46: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -25-

37. FAILURE TO COMPLETE ON TIME

.1 Should the Contractor fail to complete the Work under this Contract within the time specified, the Owner shall be entitled to make deductions from payments due to the Contractor to compensate himself for the following:

.1 Loss of revenue during the extra time required to complete

the Contract if the completed project is revenue-producing. This loss shall, where the same is available, be calculated on the basis of the approved schedule of rates, rents, tolls and/or property assessments established by the Owner.

.2 The cost of engineering services incurred during the extra

time required to complete the Contract.

.3 Any expenses or damages which are incurred by the Owner as a result of the Contractor's failure to complete the Work under this Contract within the time specified.

.2 No bonus will be allowed by the Owner for completion of the Works in less

time than specified in the Contract Agreement.

38. SCHEDULE OF COMPLETION

.1 At such times as the Engineer may request, the Contractor shall provide a

complete construction schedule showing proposed dates for completion of the various phases of the Work.

39. CHANGES IN THE WORK

.1 The Owner may, as the need arises, order changes in the Work through

additions, deletions, modifications or variations, without invalidating the Contract.

.2 The value, if any, of such changes shall be taken into account in

ascertaining the final amount of the Contract Price. .3 All such Work shall be executed under the conditions of the Contract. .4 No extra Work shall be carried out and no charge shall be made, unless

pursuant to a Notice of Proposed Change and no payment for extra Work shall be made without a Change Order.

.5 If the Contractor claims that any instruction by drawings, or otherwise,

involves extra costs under this Contract, he shall give the Engineer written

Page 47: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -26-

notice thereof immediately and he shall then follow the Engineer's instructions regarding doing the Work in question.

.6 No such claim shall be valid unless so made. If the Contractor's claim is

approved it shall be paid as outlined herein. .7 The value of any change in the Work shall be determined in the following

manner for either an increase or decrease in the Work: .1 By unit prices provided for in the Tender Form. .2 By unit prices agreed upon. .3 By estimate and acceptance in a lump sum. .4 By Unclassified Work.

40. UNCLASSIFIED WORK

.1 When there is a change in the Work, not covered by Contract Unit Prices,

the value of such "Unclassified Work" shall be determined either by an agreement in each instance between the Owner and the Contractor, or, on a cost basis in accordance with the following provisions.

.2 The Contractor shall be paid for Work performed by him as follows:

.1 Approved hourly rates for equipment and labour as set forth using Construction Alberta guidelines or approved hourly rate schedule deemed reasonable within industry standard.

.2 Plus, the Contractor's cost of providing room and board for

labour. .3 Plus, the Contractor's cost for materials on site, less trade

discounts, as established by invoices. .4 Plus 10% fee on the sum of items 40.2.1, 40.2.2 and 40.2.3

to cover overhead, use of small tools and profit. Overhead includes superintendents, time keepers and other administrative and supervisory personnel and shall include the cost of their vehicles.

.5 Plus, the rental of equipment for the hours worked, at

locally accepted rates, or at current provincial or territorial rates, for complete equipment units including operator, fuel, grease, maintenance and such costs as are normal to an operating unit.

Page 48: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -27-

.6 Plus 5% markup on 40.2.5 to the Contractor (but not Sub-Contractors) provided the Contractor does not own the equipment himself.

.7 Plus, valid transportation costs for bringing in and taking out

equipment specifically required for Unclassified Work, but with no markup.

.3 The Contractor shall be paid for Work performed by his direct Sub-

Contractors, the cost for Sub-Contractors, determined as in 40.2.1, 40.2.2, 40.2.3, 40.2.4 and 40.2.5 and plus 10% to cover the Contractor's coordination.

.4 When Unclassified Work is being done on the cost basis, the Contractor

shall submit to the Engineer, daily, an account, in triplicate, for Work done on the preceding day. The account shall include the man hours, equipment hours and materials used. The Engineer shall, each day, check the account and when he is satisfied that it is correct, he shall sign the three copies and return one signed copy to the Contractor.

.5 If, on any day, the Contractor fails to submit an account for Unclassified

Work, the Engineer shall prepare the account and this shall be used as the basis for payment for that portion of the Work and no payment will be made for any account subsequently submitted by the Contractor for that portion of the Work.

41. EXTENSION OF CONTRACT TIME

.1 The time for completion of the Work under the Contract may be extended

in the event of one (1) or more of the following:

.1 Where extra Work as herein provided is added to the Work under this Contract.

.2 Where the Work is delayed on account of conditions which

could not have been foreseen or which were beyond the control of the Contractor, and which were not the result of the fault or negligence of the Contractor, his agent, or employees, provided however, rain, wind, flood or other natural phenomena of normal intensity for the area shall not be construed as cause for an extension of time for completion of the Work.

.3 Where delay occurs in the progress of the Work as a result

of the act or neglect of the Owner or his employees, or by other contractors employed by the Owner.

Page 49: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -28-

.4 Where delay occurs as a result of an act of a public authority.

.5 Where the Engineer causes delay in the furnishing of

drawings or necessary information. .6 Where, in the opinion of the Engineer, the Contractor is

entitled to an extension of time.

.2 A claim for extension of Contract time shall only be considered when submitted by the Contractor to the Engineer in writing within seven (7) days of the occurrence of the delay on which the claim is based, provided, however, that in the case of a continuing cause of delay only one (1) claim shall be necessary.

.3 Within a reasonable period after the Contractor submits a request for an

extension of time, the Engineer will present his written recommendation to the Owner stating his opinion on whether or not the delay justifies an extension of time; and, if so, the number of days extension due to the Contractor.

.4 The Owner will make the final decision on all requests for extension of

time.

42. USE OF COMPLETED PORTIONS

.1 The Owner shall have the right to take possession of and use any

completed or partially completed portions of the Work, notwithstanding that the time for completing the entire Work or such portions may not have expired; but such taking possession and use shall not be deemed an acceptance of any Work not completed in accordance with the Contract Documents.

.2 If such prior use increases the cost of, or delays the completion of,

uncompleted Work or causes refinishing of completed Work, the Contractor shall be entitled to such extra compensation or extension of time, or both, as the Engineer may determine.

43. PAYMENTS

.1 At the end of each month, during performance of the Work, the Engineer

shall prepare a Monthly Progress Certificate. .2 A holdback of ten (10%) percent of the total value of all Work performed

and materials on site, as shown on the Monthly Progress Claim, shall be retained, along with any other deductions which the Engineer considers

Page 50: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -29-

warranted or which may be required in accordance with the conditions of this Contract.

.3 The amount of the Monthly Progress Claim shall be certified by the

Engineer and shall be submitted to the Owner within ten (10) days following the end of the month during which the Work was performed. An acceptable invoice must be submitted by the contractor to the engineer. The Owner must receive contractors invoice within sixty (60) days following the end of the month during which the Work was performed or payment will not be made.

.4 Upon certification by the Engineer, the Owner shall, within twenty (20)

days make payment to the Contractor in the amount certified on the Monthly Progress Claim provided that there is no valid reason for withholding payment.

.5 The Owner may withhold payment, of any Monthly Progress Claim, or the

Final Monthly Progress Claim as may be necessary or prudent to protect himself from loss on account of:

.1 The Contractor not making satisfactory progress. .2 Defective Work which is not remedied. .3 Claims filed, or reasonable expectation that claims will be

filed against the Owner or the Contractor. .4 The failure of the Contractor to make payments properly to

Subcontractors or for materials, labour or otherwise. .5 Damages caused by the Contractor to another Contractor. .6 Any other evidence of loss or danger of loss by the Owner,

on account of the Contractor's operations.

.6 When the grounds identified in 43.5 are removed, payment shall be made of accounts withheld because of them.

.7 The 10% Holdback shall be retained until the 45 day Statutory Limitations

Period has expired. .8 Payment of the 10% Holdback less the Guarantee Fund in accordance

with Article 28 shall be made to the Contractor by the Owner after the following conditions have been met.

.1 The Engineer has issued a Completion Certificate or

Interim Completion Certificate in accordance with Article 45.

Page 51: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -30-

.2 The Contractor has filed with the Engineer, a statutory declaration stating that all claims and demands for payment in connection with this Contract have been submitted and approved, thus establishing the Final Contract Price.

.3 The Contractor has filed with the Engineer, a certification

from the Worker's Compensation Board, stating that all assessment due to them from the Contractor have been paid.

.4 The Contractor has filed with the Engineer, a statutory

declaration that all claims for payment of materials, labour and sub-contract Work, incurred by the Contractor directly or indirectly on account of the Work have been paid or reported to the Owner and that no claim exists against the premises in respect of anything done or furnished under this Contract. This statutory declaration shall be dated five (5) days after the expiry of the Statutory Limitation Period for filing claims, applicable in the location where the Work has been performed.

.9 Final payment does not constitute Final Acceptance, nor shall it or

attendant acts of the Engineer or the Owner prejudice their rights under any requirement of the Contract, nor relieve the Contractor of any of his responsibilities thereunder.

.10 In the event that the Work has been completed, but minor items remain

uncompleted and deficiencies have not all been rectified, the Owner may withhold payment of Monthly Progress Claim amounts sufficient, in the estimation of the Engineer, to ensure that the Contractor will complete such items and rectify such deficiencies in a timely manner.

.11 The Owner, in consideration of the performance by the Contractor of his

covenants and agreements, undertakes and agrees to pay the Contract price which shall be determined as follows:

.1 The total of those amounts determined for each item or

Work in the Tender actually performed at the unit price stated therein.

.2 Plus, where no unit price is indicated for any item or Work

in the tender, the amount of any Lump Sum specified in lieu thereof, providing that such Work is required and actually performed under and by virtue of the Contract Documents.

.3 Plus or less any additions, deductions, retention, penalty or

other sum that may be ascertained in accordance with the Contract Document

Page 52: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -31-

.4 Should the quantities of performed Work or any individual item of Work specified in the Tender vary, the Contractor understands that the Owner, through the authority of the Engineer, reserves the right to increase, decrease, delete or vary any portion of the Work and the Contractor agrees to do the Work whether the quantities are increased or decreased, at the unit prices listed in the Tender.

44. REMOVAL OF LIENS

.1 The Contractor shall forthwith remove at his own expense all affidavits of

claim of lien, or liens, filed or registered against the lands and premises on which the Work is done or is being done.

.2 The Contractor shall indemnify and save harmless the Owner from liability

arising out of any such affidavit or affidavits of claim of lien. .3 Should the Contractor have reasonable evidence of the probable filing of

such affidavit or affidavits of claim of lien or of the probable filing or registration of lien or liens he shall promptly notify the Owner in writing by Registered Mail.

45. COMPLETION AND ACCEPTANCE

.1 On completion of construction, all portions of the Work shall be reviewed

carefully by the Contractor who shall satisfy himself that every item has been completed, and that the whole Works are in a clean and tidy condition, and ready in all respects for acceptance by the Owner.

.2 The Contractor shall then, by writing to the Engineer, request that a final

inspection of the Works be carried out. .3 The Engineer shall issue a Final Certificate of Completion on the day that:

.1 the Work has been completed to the best of the Engineer's knowledge, information and belief, and

.2 the Contractor has complied fully with the Contract

Documents and all orders, rulings and directions made pursuant thereto.

.4 If the Engineer is satisfied that the Work is substantially completed (not

necessarily synonymous with substantial performance as defined in the lien legislation applicable to the place of building) and is acceptable for use by the Owner, the Engineer may at any time before issuance of a Final Certificate of Completion, issue an Interim Certificate of Completion and shall describe therein the portions of the Work not completed to his

Page 53: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -32-

satisfaction and all things which must be done by the Contractor before a Final Certificate of Completion can be issued.

.5 On receipt of a written recommendation from the Engineer, the Owner

shall issue the Notice of Acceptance. Such recommendation will be made by the Engineer following final inspection of the Works.

46. TRAFFIC

.1 It will be the Contractor's responsibility to control traffic, supply adequate

direction for detours, barriers and warning lights so as to provide the minimum of inconvenience to the public.

47. VARIATION OF INFORMATION

.1 Information shown on the drawings or described in the specifications,

including topographic lines, locations of existing facilities, ground surveys and soil conditions is approximate only.

.2 The Owner assumes no responsibility for the accuracy of the information

described above, nor does the Owner represent that materials or conditions other than those indicated will not be encountered.

.3 The Contractor shall understand that any borings or other investigations

made by the Engineer and which may be shown on the Drawings or as Appendices to the Specifications are for the Engineer's own information.

.4 If any information as to the character of the materials likely to be

encountered in performing the Work, or any other information as to the condition of the site is taken from this information, it shall be distinctly understood that the Engineer shall not be responsible if the information does not correctly set forth the facts or if the boring sheets or other written documents provided by the Engineer do not correctly set forth the results of borings or other investigations made.

.5 Each Tenderer or Contractor must make himself personally acquainted

with the location, extent and purpose of the proposed Work. .6 He shall inform himself by borings, test pits or by such other means as he

may prefer as to the actual conditions of the subsurface and the Work prior to submitting his tender.

.7 The Contractor shall assume all risk arising from, or out of, the nature of

the materials to be excavated or used.

Page 54: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -33-

48. EXISTING SERVICES

.1 The plans show the approximate location of known existing utilities, such

as watermains, sewers, etc. However, these services may not be all the existing services and the Contractor shall use care and caution in his excavation operation so as not to break any existing services and structures that are not shown.

.2 Existing services and structures include pipes, culverts, ditches and/or

other items which are part of an existing drainage, sewerage, or water system or are a part of a gas, power, telephone, T.V. or other system. Also included are sidewalks, curbs, gutters, swales, poles, fences, trees or buildings.

.3 The Contractor shall supply all labour and materials to locate, protect,

remove or replace existing structures, or to repair and make good any damage which may occur to any existing services.

.4 The Contractor shall establish locations and state the use of all existing

utilities that may affect the Work.

49. PRIME CONTRACTOR

.1 The Contractor is the “Prime Contractor” as defined by Occupational

Health and Safety Act and shall fulfil all obligations and responsibilities associated with this designation.

.2 The “Contractor” is required to fully comply with all Alberta Occupational Health and Safety Act, Regulation and Code. For this reason, this letter is to certify that the “Contractor” referenced above will be acting as the “Prime Contractor” for this contract. The Contractor is the “Prime Contractor” as defined by Alberta Occupational Health and Safety Act , Regulation, Code as per: Section 3 (2) The Prime Contractor for a work site is: (a) the contractor, employer or other person who enters into an agreement with the owner of the work site to be the prime contractor, or (3) If a work site is required to have a prime contractor under subsection (1), the prime contractor shall ensure, as far as it is reasonably practicable to do so, that this Act and the regulations are complied with in respect of the work site.

Page 55: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

GENERAL CONDITIONS

SE DESIGN AND CONSULTING INC. -34-

(4) One of the ways in which a prime contractor of a work site may meet the obligation under subsection (3) is for the prime contractor to do everything that is reasonably practicable to establish and maintain a system or process that will ensure compliance with this Act and the regulations in respect of the work site.” The Contractor shall be the “Prime Contractor” for the full duration from the issuance of “Notice to Proceed” through to the issuance of “Final Completion Certificate”. He shall also be the Prime Contractor whenever the Contractor’s personnel, equipment or subcontractors are on site between the period of issuance of the “Certificate of Construction Completion” and “Final Acceptance Certificate”.

In any case where, pursuant to the provisions of the Alberta Occupational Health and Safety Act, Regulation, Code, an order is given to the Contractor or any of his Subcontractors in respect to their operations under this Contract to cease operations because of failure to install or adopt safety devices or appliance or methods as directed or required by the Alberta Occupational Health and Safety Act, Regulation, Code thereunder, or because conditions of imminent danger exist that would likely result in injury to any person, the Contractor shall comply with the order immediately as per Section 9, 10, 11 of the Alberta Occupational Health and Safety Act.

Should the Contractor not be available or capable of removing the danger to life or equipment resultant from the Contractor’s operations, then the Engineer may issue the removal of a danger and the Contractor shall be liable for the cost of such arrangements and such an act by the Engineer shall not relieve the Contractor of responsibility for injury, loss of life, or damage which may occur in that situation.

In the event that the Contractor refuses or fails to comply with an order under the Alberta Occupational Health and Safety Act, Regulation, Code or regulations thereunder and the performance of the work is stopped, the Owner may, upon written notice, hold the Contractor in default.

50. ENGINEER SAFETY PROGRAM

.1 The Engineering firm managing this contract is committed to protecting its employees, its property, the public, the client, and the environment from incident and accident through the implementation of a strong safety program.

.2 The Engineering firm strictly adheres to the Occupational Health and Safety regulations as well will adhere to the Client’s safety policies at all times.

Page 56: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

NOTICE

These Contract Documents include special provisions which take document precedence over

the standard specifications. Tenderers should refer to the special provisions (pink pages) first to

determine any changes or modifications to the standard specifications. Refer to Article 4 of the

General Conditions for the order of document precedence.

Page 57: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01000 City of Cold Lake SPECIAL PROVISIONS Standard Construction Specifications Page 1 of 7

1.0 STATUS OF SPECIAL PROVISIONS

.1 As indicated in the General Conditions, Article 4, Special Provisions have document precedence over all but the Contract Agreement and Addenda issued during tendering period.

2.0 GOODS AND SERVICE TAX

.1 Include the Federal Goods and Service Tax amount in space provided on Tender Summary Form.

.2 Payment of the Goods and Service Tax will be made to the Contractor

on the basis of 5% being added to the amount of each progress certificate.

3.0 COMPLETION DATE

.1 The Project shall be fully completed as indicated on the Contract

Tender form

4.0 LUMP SUM PAYMENTS

.1 Where lump sum payments are indicated in the Tender Form this shall be full compensation for all items of work other than those that are expressly covered by the unit prices.

.2 Where lump sum payments are broken into individual items, such a

breakdown is solely for the purpose of estimating progress payments and comparing tenders.

.3 The fact that all individual items may not appear in the lump sum

breakdown does not relive the Contractor from any responsibility to provide a complete facility as outlined at the total lump sum price tendered.

5.0 TENDER SECURITY

.1 Tender security in the form of a bid bond, or a certified cheque or a letter of credit is required with the tender submission.

.2 The amount of tender security shall be 10% of the tender amount.

.3 The tender security shall be made payable to the City of Cold Lake.

Page 58: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01000 City of Cold Lake SPECIAL PROVISIONS Standard Construction Specifications Page 2 of 7

6.0 PROJECT SECURITY

.1 Upon entering into a contract with the City of Cold Lake, the Contractor will be required to provide the following security: .1 Labour and Material Bond and Performance Bond each

in the amount of 50% of the tender amount. A guarantee fund as defined by Special Provision Clause 9.0 will also be required to cover defects and deficiencies remaining at time of completion.

.2 The project security shall remain in effect to the end of the one-year Guarantee Period.

.1 Upon recommendation from the Engineer, due to non-performance on the part of the Contractor, the Owner will be entitled to make withdrawals from the project security.

7.0 GUARANTEE FUND WHEN PROJECT SECURITY IS CERTIFIED CHEQUE

.1 Further to Article 28 of the General Conditions, the project security,

when supplied in the form of a certified cheque will be used as a guarantee fund. No amount will be withheld from the final payment.

8.0 GUARANTEE FUND WHEN PROJECT SECURITY IS PERFORMANCE BOND

.1 If the project security is provided in the form of a performance bond, then a separate guarantee fund as described in Article 28 of the General Conditions will be required to cover defects and deficiencies remaining at time of completion.

.4 The guarantee fund shall be in effect until which time defects and

deficiencies are corrected to satisfaction of the Owner during the Guarantee Period.

.5 All other provisions of Article 28 shall apply.

9.0 FAILURE TO COMPLETE WORK ON TIME

.1 Further to Article 37 of the General Conditions, any work which

remains incomplete after the specified Contract completion date, there will be deducted from money due the contractor, the cost to the owner of any work and material reasonably expended by the Owner which has been made necessary by reason of the Contractor’s failure to

Page 59: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01000 City of Cold Lake SPECIAL PROVISIONS Standard Construction Specifications Page 3 of 7

complete the Work by the date specified in the contract and without in any way limiting the generality of the foregoing, shall include:

(i) Liquidated Damages

.1 Further to Article 37 of the General Conditions, in the event that the Contractor shall fail to complete the work within the time fixed for such completion set forth in the Contract Documents, the Contractor shall pay to the Owner as damages for each calendar day of delay in completing the work the sum of $500.00, per day per day to a maximum of $ 25,000.00. In view of the difficulty of accurately determining the loss which the Owner will suffer by delay in completion of the work, said sum is hereby fixed and agreed as liquidated damages and not as a penalty.

.2 The Engineer and owner reserves the right to extend the completion date without penalty, for extenuating circumstances. (ii) Actual Loss or Damages In addition to the daily stipulated sum for Liquidated Damages, as set out in (i), above, the Contractor agrees to provide to the Owner, the actual loss or damages suffered by the Owner for each and every day beyond the specified completion date the Work remains uncompleted for the following items: (a) The additional cost of maintenance and repair necessary; and (b) The cost of accommodating traffic over, through or around portions of Work. The Owner will deduct assessed amounts from payments due on this contract. If there are insufficient funds to cover the assed amounts, the Owner will invoice the Contractor. The Contractor shall promptly pay the amounts invoiced. Should any amount remain unpaid after 60 days from the date of invoice, the Owner may recover such unpaid sum from any money due to the Contractor from the Owner on any Contract or account, rendering an accounting to the Contractor for any sums so recovered.

.2 The City of Cold Lake reserves the right to extend the

completion date without penalty, for extenuating circumstances.

Page 60: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01000 City of Cold Lake SPECIAL PROVISIONS Standard Construction Specifications Page 4 of 7

10.0 REVISIONS TO TENDERS

.1 Revisions to the tender by FAX 780-594-3480 will be accepted if received prior to the specified closing time to the office of the City of Cold Lake on the date the tenders close.

.2 Faxed tenders will be accepted only if the original of the tender security

is delivered to the office of the City of Cold Lake prior to the specified closing time on the date the tenders close.

11.0 TRUCK WEIGHT SCALES

.1 The Contractor shall at his own expense provide platform scales and a scale house

.2 The platform scales shall be of sufficient length and capacity to

accommodate any truck, including pups or trailers, used on the contract in a single weighing.

.3 The Contractor’s weight scales shall be tested and certified by Weights

and Measures Inspection Services of the Federal Department of Consumer and Corporate Affairs.

.4 The scales shall be tested prior to their use on this contract and as

frequently as Engineer may deem necessary in order to ensure their accuracy.

.5 Except for the first certification of the season, weigh scales may be

tested by the Contractor’s project personnel provided that the Contractor uses the proper weights and testing.

.6 The Contractor may also verify the weigh scales by comparing the

weight of a loaded vehicle over an operating provincial weigh scale provided that the tare weight remains unchanged for both weightings.

.7 The scale house shall be weatherproof, heated and large enough to

provide reasonable working accommodation for the scale operator and required furnishings.

.8 The inspection certificate issued for the current year shall be provided to the Engineer.

.9 The Contractor will provide at his expense a scale person at the

Contractor weigh scales for the purposes of weighing materials. .10 The weights so determined shall be the basis for measurement for

payment.

Page 61: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01000 City of Cold Lake SPECIAL PROVISIONS Standard Construction Specifications Page 5 of 7

12.0 TRAFFIC

.1 The Contractor shall perform the construction operations such that traffic disruptions are minimized. Contractor to submit traffic accommodation plan to the Engineer for approval prior to start of construction.

.2 All effort should be made to detour the traffic using existing roads where practical. This must be reflected on the traffic accommodation plan.

.3 If a detour road must be constructed, the contractor will be responsible for the construction of this detour road at his own cost and he will be responsible for the maintenance of that detour road for as long as the detour road is required. Contractor will be responsible to remove this detour road and restore the ground to it’s original state prior to completion of the project. Contractor to account for this cost on the line item: Traffic Accommodation on the schedule of quantities.

.4 The Contractor will be responsible to provide adequate signage to

detour traffic from the construction zones. The Contractor may refer to Alberta Transportations standards for traffic accommodation in urban work zones for details of construction signage. Those signage must be identified on the traffic accommodation plan.

.5 The Contractor may request the Engineer to restrict traffic access to

local traffic only. .6 The Contractor will be required to maintain access for local traffic and

emergency traffic at all times. .7 Provide 48 hours notice to affected residents who may temporarily lose

vehicular access to their properties. .8 The Contractor may request to the Engineer to detour local traffic

through lanes. .9 Provide any necessary flagmen to control traffic flow during the

construction operations.

13.0 QUALITY CONTROL TESTING

.1 The Contractor will be responsible for providing and paying for standard quality control testing.

Page 62: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01000 City of Cold Lake SPECIAL PROVISIONS Standard Construction Specifications Page 6 of 7

.2 The quality control testing firm shall be approved by the Engineer. .3 Copies of results for any quality control testing carried out by the

contractor shall be forwarded directly to the Engineer. .4 Quality assurance testing will be done by a designated testing firm for

the City of Cold Lake, at their expense. .5 Where tests or inspections by the designated testing firm reveal work

not in accordance with contract requirements, Contractor shall pay costs for additional tests or inspections as Engineer may require to verify acceptability of corrected work.

.6 Contractor’s Responsibilities .1 Provide access to work to be inspected and tested. .2 Cooperate to provide reasonable facilities for such access. .3 Facilitate inspections and tests. .4 Make good work disturbed by inspection and tests.

.5 Notify the appropriate agency and Engineer in advance of the requirement for tests, in order that attendance arrangements can be made.

.6 Submit samples and / or materials required for testing, as

specifically requested in specifications. Submit with reasonable promptness and in an orderly sequence so as not to cause delay in the work.

.7 Provide labour and facilities to obtain and handle samples and

materials on site. Provide sufficient space to store and cure test samples.

14.0 LINE PAINTING – ON SITE MEETING MANDATORY

.1 On-Site meeting between the General Contractor, Painting sub-

contractor and the Engineer is mandatory prior to any work being done. If painting contractor proceed to do the work prior to the mandatory site meeting he/she may take the risk of the work not get accepted by the Engineer.

Page 63: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01000 City of Cold Lake SPECIAL PROVISIONS Standard Construction Specifications Page 7 of 7

END OF SECTION

Page 64: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01005 City of Cold Lake GENERAL INSTRUCTIONS Standard Construction Specifications Page 1 of 4

1.0 DOCUMENTS REQUIRED

.1 Maintain at job site, one copy of each of the following: .1 Contract drawings .2 Specifications .3 Addenda .4 Reviewed shop drawings .5 Change orders .6 Other modifications to Contract .7 Field test reports .8 Copy of approved work schedule .9 Copy of any Environmental Approvals .10 Manufacturers' installation and application instructions .11 Standards listed in Part 1 of Specification Section under

Reference Standards

2.0 PRODUCTS SUPPLIED BY OWNER

.1 No products will be supplied by Owner.

3.0 WORK SCHEDULE

.1 Provide within 7 calendar days after Contract award, schedule showing anticipated progress stages and final completion of work within time period required by Contract documents.

.2 Interim reviews of work progress based on work schedule will be

conducted as decided by Engineer and schedule updated by Contractor in conjunction with and to approval of Engineer.

4.0 COST BREAKDOWN

.1 Before submitting first progress claim submit breakdown of Contract price in detail as directed by Engineer and aggregating contract price. After approval by Engineer cost breakdown will be used as basis for progress payment.

5.0 MEASUREMENT OF PAYMENT

.1 Notify Engineer sufficiently in advance of operations to permit required measurement for payment.

6.0 CONTRACTOR'S USE OF SITE

.1 Use of site: limited to working areas and public land as shown on the drawings for work and storage.

Page 65: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01005 City of Cold Lake GENERAL INSTRUCTIONS Standard Construction Specifications Page 2 of 4

.2 Do not unreasonably encumber site with materials or equipment. .3 Move stored products or equipment which interfere with operations of

Engineer or other contractors.

7.0 CODES AND STANDARDS

.1 Perform work in accordance with any applicable federal, provincial or local codes provided that in any case of conflict or discrepancy, more stringent requirements shall apply.

.2 Meet or exceed requirements of specified standards, codes and

referenced documents.

8.0 PROJECT MEETINGS

.1 Engineer will arrange project meetings and assume responsibility for setting times and recording and distributing minutes.

9.0 CLIENT / CONTRACTOR / ENGINEER COMMUNICATION

1. Contractor is under no circumstances authorized to communicate directly with the Client. All communications and/or questions are to be directed to the Engineer.

2. The Engineer is the only contractual authority that can communicate

with the Client.

3. Contractor is to be notified that if he/she makes a contractual arrangement with the client without the presence of the Engineer who is the contractual authority, the contractor may not be financially compensated for his/her effort.

4. If the Contractor requires access to private land to conduct his/her

activity, (for example using land as laydown area, or spill pile dirt from excavation), contractor is to make sure the terms are made clear in writing and signed by the land owner and the contractor. Terms of the agreement must indicate what is agreed upon between both parties and restauration that is required after work is completed. A copy of this agreement must be provided to the Engineer. Contractor to note that the Owner will be absolved of any responsibility towards potential claim that may occur between the land owner and the contractor. Contractor to refer to sample land use agreement in Appendix.

Page 66: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01005 City of Cold Lake GENERAL INSTRUCTIONS Standard Construction Specifications Page 3 of 4

10.0 LOCATION OF EQUIPMENT AND FIXTURES

.1 Location of equipment, fixtures and outlets indicated or specified are to be considered as approximate.

.2 Locate equipment, fixtures and distribution systems to provide

minimum interference and maximum usable space and in accordance with manufacturer's recommendations for safety, access and maintenance.

.3 Inform Engineer of impending installation and obtain his approval for

actual location. .4 Submit field drawing to indicate relative position of various services

and equipment when required by Engineer.

11.0 CONCEALMENT

.1 Conceal pipes, ducts and wiring in floor, wall and ceiling construction of finished areas except where indicated otherwise.

12.0 CUTTING, FITTING AND PATCHING

.1 Execute cutting (including excavation), fitting and patching required to make work fit properly together.

.2 Where new work connects with existing and where existing work is

altered, cut, patch and make good to match existing work. .3 Obtain Engineer's approval before cutting, boring or sleeving load-

bearing members. .4 Make cuts with clean, true, smooth edges. Make patches

inconspicuous in final assembly. .5 Fit work airtight to pipes, sleeves, ducts and conduits.

13.0 EXISTING SERVICES

.1 Where work involves breaking into or connecting to existing services, carry out work at times directed by governing authorities, with minimum of disturbance to the public.

.2 Before commencing work, establish location and extent of service lines

in area of work and notify Engineer of findings.

Page 67: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01005 City of Cold Lake GENERAL INSTRUCTIONS Standard Construction Specifications Page 4 of 4

END OF SECTION

Page 68: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01501 City of Cold Lake GENERAL PROJECT REQUIREMENTS Standard Construction Specifications Page 1 of 12

1.0 GENERAL

1.1 Scope .1 This Section describes the general requirements of the Contractor in

the execution of this contract. .2 General Project Requirements refers to the provision of items

incidental to completion of the work for which unit or lump sum prices are not applicable including, bonding, insurance, mobilization, demobilization, maintenance costs, and provision of a site office for the Engineer complete with temporary utilities, as defined within either the General Conditions, the Special Conditions or the detailed specifications within Division 1 – General Requirements.

1.2 Drawings

.1 The current Drawings are indicated in the Table of Contents and these, along with other Drawings that may be prepared during the course of construction form part of the Contract Documents.

.2 The Drawings show the approximate dimensions and general

requirements of the principal features of the work. Where necessary, as determined by the Engineer, additional Drawings showing further details or alterations will be furnished to the Contractor during the progress of the work.

.3 Any discrepancies found between the Drawings and the specifications

and site conditions or any error or omissions in the Drawings or Specifications shall be immediately reported to the Engineer, who shall promptly correct such error or omission in writing. Any work done by the Contractor after discovery of such discrepancies, errors or omissions shall be done at the Contractor's own expense should changes in the Drawings and/or Specifications be required.

.4 The Contractor shall verify all dimensions, quantities and details shown

on the Drawings, Supplementary Drawings, Schedules or other data received from the Engineer, and shall notify the Engineer of any errors, omissions, conflicts and discrepancies found therein.

.5 Failures to discover and correct errors, conflicts or discrepancies shall

not relieve the Contractor of full responsibility for unsatisfactory work, faulty construction or improper operation resulting therefrom, nor from rectifying such conditions at the Contractor’s own expense.

1.3 Historical Resources

.1 Historical resources, as defined by the Historical Resources Act, or other objects of historical significance found on site will remain the property of the Owner, Province or Federal authority.

.2 The Contractor shall protect such articles and request directions from

the Engineer.

Page 69: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01501 City of Cold Lake GENERAL PROJECT REQUIREMENTS Standard Construction Specifications Page 2 of 12

1.4 Fair Wages

.1 The Contractor shall, in carrying out this Contract, pay fair wages and

comply with and fix working conditions, with respect to each employee or class of employment, not less favorable than the wages and working conditions established in the area of the General Contractor's Association and/or the Association of the Industry.

1.5 Health and Safety

.1 The Contractor shall designated the “Prime Contractor” as defined in the Occupational Health and Safety Act and shall be responsible for all duties prescribed thereunder.

1.6 Environmental Protection

.1 The Contractor must conduct himself in accordance with all federal, provincial or municipal environmental legislation.

.2 The Contractor shall perform the work in accordance with all approvals

received from any federal, provincial or municipal authorities. .3 All work shall be performed in accordance with the Development and

Reclamation Application as approved by Alberta Environment. 1.7 Holidays

.1 The Contractor shall not work on any Sunday or on any other day normally observed as a holiday without the Engineer’s approval.

1.8 Night Work

.1 Night work will only be allowed if the Engineer gives written permission, in accordance with the municipal authorities' Bylaws. When work is carried out at night, the Contractor must supply all equipment necessary for the illumination and the safe and satisfactory working in the area designated for the night work.

2.0 PRODUCTS 2.1 General Instructions

.1 Prior to commencing actual construction, the Contractor shall check field conditions to obtain actual dimensions required to ensure correct fabrication and execution of the work, and notify the Engineer in writing, of all matters, which could prejudice proper execution of the work. Commencement of construction shall constitute acceptance of existing conditions, and verification of dimensions.

.2 Where work of this Contract involves breaking into or connecting to

existing services or utilities, the Contractor shall carry out work as directed by governing authorities, with a minimum of disturbance to the public.

Page 70: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01501 City of Cold Lake GENERAL PROJECT REQUIREMENTS Standard Construction Specifications Page 3 of 12

2.2 Alternates

.1 Quality - In order to establish standards of quality, the Engineer may have, in the Specifications and/or Drawings, referred to the products by name. This procedure is not to be construed as eliminating other products of equal or better quality. The Engineer will be the sole judge as to the acceptability of substitute materials.

2.3 Materials Supplied by the Contractor

.1 All materials used in the work shall meet the requirements of the respective Specifications. The Contractor shall supply all materials not otherwise specifically indicated.

3.0 EXECUTION

3.1 Co-ordination of Work

.1 The Contractor shall be responsible for the co-ordination of all aspects of the completed work.

.2 The Contractor shall confine his plant and equipment, the storage of

materials and the operations of his workmen to limits indicated by law, ordinances, permits or directions of the Engineer and shall not unreasonably encumber the work areas with his materials.

.3 The Contractor shall permit full use, without charge therefore, by the

Owner and/or other Contractors of any facilities usable jointly. .4 The Owner and/or other Contractors may perform work at or in the

vicinity of the site during the period covered by the Contract. The Contractor shall co-operate with and co-ordinate his activities with other Contractors in the working area so that the work of all Contractors concerned will proceed unhindered.

.5 No claims for additional payment will be considered on account of

delays, changes in construction schedules or any other reason whatsoever due to the fact that other Contractors are operating in the work areas.

3.2 Project Meetings

.1 Immediately following the Award of Contract, all parties to the Contract shall meet to discuss and resolve administrative procedures and responsibilities. Senior representatives of the Owner, the Engineer, the General Contractor, major Sub-Contractors, Utility Company representatives, provincial officials (as required), all Field Inspectors and Supervisors will be invited to attend.

.2 After award of Contract, the Engineer shall arrange progress meetings

at regular intervals. The Engineer shall prepare minutes of these meetings and circulate to all in attendance and other relevant individuals.

Page 71: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01501 City of Cold Lake GENERAL PROJECT REQUIREMENTS Standard Construction Specifications Page 4 of 12

3.3 Construction Program

.1 The Contractor's construction operations shall be subject to the review of the Engineer. The sequence of operations and methods of operation shall be such as to ensure the completion of the work in a timely manner with minimal inconvenience to the public and impact on the environment.

.2 Within seven (7) calendar days after the Contractor has been advised

in writing of the acceptance of his tender, he shall furnish the Engineer with his proposed program of operation and the Contractor shall immediately advise the Engineer of any proposed changes to his construction program. Should the Contractor's work fail to progress according to the applicable progress schedules, the Contractor shall explain the slippage in construction schedule and develop measures to regain the original approved schedule.

3.4 Surveys

.1 The Contractor shall provide the Engineer with all stakes and other materials with the exception of technical instruments, required by the Engineer to establish all horizontal and vertical control for the work. The Contractor shall also supply the Engineer with reasonable assistance and with assistants as required for establishing or checking line and grade as well as measuring quantities.

.2 The Engineer is responsible to establish the baseline with 3m offset at

50m intervals at the start of the project. If manpower is available, the Engineer may provide at the contractor’s expense service above and beyond the baseline. If during construction, the contractor destruct the baseline stakes and want them to be replaced, the Engineer may do so if manpower is available and at the contractor’s expense.

.2 The Contractor shall have the responsibility to carefully preserve

bench marks, reference lines, stakes, grade marks, monuments, legal survey pins and all data pertaining to horizontal and vertical control and in the case of destruction thereof by the Contractor or resulting from his negligence, the Contractor shall be charged with the expense and damage resulting from and shall be responsible for any mistakes that may be caused by the unnecessary loss or disturbance of any horizontal and vertical control.

.4 Legal survey markers, disturbed or removed by the construction

operation, that existed at a horizontal distance of two (2) metres or more from the centreline of pipe being installed or one (1) metre or more of any roadway, sidewalk or curb and gutter shall be replaced at the Contractor's expense by a Registered Land Surveyor. If it is necessary to remove or disturb existing legal survey markers that are within two (2) metres of the pipe centre line or within one (1) metre of any roadway, sidewalk or curb and gutter, the Engineer shall be so notified before such removal and replacement will be at the Owner's

Page 72: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01501 City of Cold Lake GENERAL PROJECT REQUIREMENTS Standard Construction Specifications Page 5 of 12

expense. 3.5 Public Safety and Convenience

.1 The Contractor shall at all times conduct the work to ensure the least possible obstruction to traffic, inconvenience to the general public and disturbance of the residents in the vicinity of the work and shall ensure the protection of persons and property.

.2 No road or street shall be closed to the public except with the

permission of the Engineer and proper governmental authority.

.3 Fire hydrants on or adjacent to the work shall be kept accessible to fire-fighting equipment at all times.

.4 Temporary provisions shall be made by the Contractor to ensure the

use of sidewalks and the proper functioning of all gutters, sewer inlets, drainage ditches and irrigation ditches, which shall not be obstructed except as approved by the Engineer.

.5 Control all work site access points and work site activities. Delineate and isolate the work site from adjacent and surrounding areas by use of appropriate means to maintain control of all work site access points. Provide all necessary lighting, fencing, boarding, signage and security personnel to adequately protect the work and the public.

.6 Make provisions for granting permission to access onto work site to all persons who require access. Procedures for granting permission to access are to be in accordance with the Alberta Occupational Health and Safety Act, and the Regulations made pursuant to the Act and the Contractor’s Health and Safety Program.

.7 Ensure persons granted access to the work site are in possession of and wear the minimum personal protective equipment (PPE) designated by the Contractor’s Health and Safety Program and the governing OH & S Legislation. Ensure persons granted access to the work site are provided with, trained in the use of, and wear, appropriate PPE that are required above and beyond the designated minimums previously noted and as specifically related to the work site activity that they are involved in. Be responsible for the efficacy of the PPE that is provided above and beyond the designated minimums.

.8 Install safety fence around active construction site, open excavation that may endanger the public, and as directed by Engineer. Contractor to follow Alberta Health and Safety Regulations and the governing OH&S legislation.

Page 73: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01501 City of Cold Lake GENERAL PROJECT REQUIREMENTS Standard Construction Specifications Page 6 of 12

.9 Safety fence shall be a minimum 1.9 m high wire construction fence. Snow fencing around open excavation will not be approved by the Engineer.

3.6 Quality Control .1 An independent inspection firm, appointed by the Engineer and paid

for by the Owner, shall carry out testing. The Contractor shall pay for extra tests required because of non-compliance of the works with the minimum requirements for materials and workmanship.

3.7 Warning Signs and Barricades

.1 The Contractor shall provide adequate signs, barricades, red lights, and watchmen and take all necessary precautions for the protection of the work and the safety of the public. All barricades and obstructions shall be protected at night by signal lights or flares which shall be kept burning from sunset to sunrise. Barricades shall be readily visible at night. Suitable warning signs shall be placed and illuminated at night to show in advance where construction, barricades or detours exist.

.2 Prior to leaving the site for extended periods of time (in excess of 24

hours) the Contractor shall ensure all excavations are backfilled. Alternatively, the Engineer may approve the use of temporary fencing to protect the public from entering open excavations.

3.8 Access Roads

.1 Temporary roads shall be constructed as required for access to the working areas. Adequate drainage facilities in the form of ditches, culverts or other conduits shall be installed, when required for these roads.

.2 In the construction of access roads, existing drainage facilities, natural

or otherwise, shall not be disturbed to the detriment of properties outside the working area and such facilities shall, unless otherwise provided elsewhere in the specifications, be restored to their original condition upon completion of the work.

3.9 Haul Routes

.1 Haul routes used by the Contractor shall be subject to approval by the Owner and Engineer. The Contractor shall be responsible for damage and/or spillage on the roads used for hauling materials and equipment to and from the site, subject to the Engineer being satisfied such damage or spillage was a direct result of the actions of the Contractor or any of the Contractor's agents in the performance of the work required under this Contract. If remedial work is necessary, the Contractor shall immediately clean and/or restore the affected area.

Page 74: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01501 City of Cold Lake GENERAL PROJECT REQUIREMENTS Standard Construction Specifications Page 7 of 12

3.10 Water Consumption .1 Water for construction purposes will be obtained from sources

approved by the Engineer. Contractor is responsible to find his/her own water source.

3.11 Business Licence

.1 The Contractor will require a municipal business licence. 3.12 Detours

.1 Where construction requires the blocking or closing of existing roads, a suitable detour with adequate signing and lighting shall be provided. The Contractor shall obtain the approval of the local authority for the proposed closing and the detour route.

.2 The police, ambulance and fire departments shall be advised by the

contractor a minimum of 48 hours in advance of the road closure and the location of the proposed detour.

.3 The contractor shall provide all detour signs according to Alberta

transportation standards. All signs must meet Alberta Transportation Standard, no contractor made signs will be accepted. Owner will not be responsible for the cost or the supply of the traffic detour signs or the replacement of the signs if they go missing.

3.13 Traffic Control

.1 All traffic signs/devices, traffic channeling, detours, closures, etc. shall be in accordance with the Manual of Uniform Traffic Control Devices as published by the Transportation Association of Canada (TAC) .

.2 All traffic control shall be carried out in accordance with Specification

01502. 3.14 Road Closures

.1 A minimum of one-lane must be open to traffic at all times unless otherwise approved by the Engineer.

.2 The use of parallel roads to accommodate traffic is subject to the

approval of the Engineer. 3.15 Salvaged Utilities

.1 The owner reserves the right and/or dispose of all existing utility material such as hydrants, valves, pipes, etc., that is removed from the site during construction. If the owner wishes to retain some or all existing utility material, they shall remain the property of the Owner and shall be stockpiled and/or disposed of as directed by the Engineer. If the owner does not wish to retain the existing utility material, they shall be disposed by the contractor off the Owner’s property.

Page 75: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01501 City of Cold Lake GENERAL PROJECT REQUIREMENTS Standard Construction Specifications Page 8 of 12

3.16 Protection of Existing Surface and Underground Structures

.1 The Contractor shall take all necessary measures to protect any existing structures from injury and damage and shall substantially and sufficiently support all structures that may be endangered by work or other operations carried out as part of the contract.

.2 The existence and location of underground utilities shown on the

Drawings is not guaranteed, and notwithstanding any other provision in the Contract and without limiting the generality of the foregoing, sewer, water and gas mains or lines, electric light, power, or telephone conduits, or other such structures of utilities must be located by the Contractor, and failure to locate same does not negate the Contractor's responsibility thereto. The Contractor shall pay any charges to the Utility Companies in this regard. The Contractor shall make arrangements with the Owner of any underground structure to be present to supervise the work adjacent to the structure. Should any structures be injured by the aforementioned operation, they shall be restored at the expense of the Contractor to an operable state, or as specified by the Engineer, within the same working day as such disruption occurred.

.3 Permanent repair must be completed during the next working day, to

the satisfaction of the Engineer. 3.17 Blasting

.1 Blasting will be permitted only after securing the approval of the Owner and/or local authority. The Contractor at his expense shall repair damage caused by blasting. The method and procedure employed for blasting shall be in accordance with federal, provincial, and municipal laws and regulations. The Contractor shall not do any blasting without first verifying that his insurance covers any loss of life or damage that may result from this work. The Owner, in granting approval for blasting, does not in any way assume responsibility for injury, loss of life, or damage that may result therefrom, and such approval shall not be construed as approval of the methods employed by the Contractor in blasting, the sole responsibility therefor being that of the Contractor.

3.18 Special Controls

.1 The Contractor shall perform the work in conformity with all municipal by-laws with respect to noise, hours of work, night work and holiday work. Night work and holiday work requires the written permission of the Owner.

.2 The Contractor shall perform the work in a manner that will not

produce an objectionable amount of dust. Dust control shall be performed to the satisfaction of the Engineer and there will be no separate or additional payment for this work but it shall be considered incidental to the remaining work under the Contract.

Page 76: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01501 City of Cold Lake GENERAL PROJECT REQUIREMENTS Standard Construction Specifications Page 9 of 12

.3 The Contractor shall perform all work in conformity with the

Environmental Protection and Enhancement Act and all existing municipal bylaws.

3.19 Construction Affecting Residential Areas

.1 The Contractor shall provide suitable traffic control for pedestrians, cyclists and motorists, which will protect the public and maintain access to local traffic with as little disruption as possible.

.2 All proposed routes for hauling equipment must be approved by the

Engineer prior to commencement of the work. Rubber tired motor scrapers shall not be used to haul over improved streets or gas lines. When any travelled roadway is being entered or crossed by hauling equipment, traffic must be controlled by qualified flag persons and sufficient warning signs to ensure the safety of the public.

.3 Trucks must be loaded in such a manner that no spillage occurs during

haul. Care must be taken to prevent the deposition of soil onto existing streets and roads. The clean-up of soil deposition must be performed prior to the end of each day’s haul or as directed by the Engineer.

.4 All public relations elements inclusive of open houses, advertisements,

notices, other information requirements, emergency contract personnel, emergency response personnel, public relations telecommunications equipment, emergency telecommunications equipment whether on-site or off-site shall be the responsibility of the Contractor. The Contractor shall submit to the Owner, in writing, his proposed public relations strategy and personnel for Owner approval prior to proceeding with construction.

.5 Notify, in writing, every business or resident whose property is fronting,

backing or immediately adjacent to the construction site, at least seven (7) days in advance for construction in the affected area. Notices shall be printed on the Contractor's letterhead and submitted to the Engineer for his approval prior to delivery to businesses or residents.

.6 Contractor notices shall give approximate date of construction in

affected areas and clearly indicate the Contractor's name, address and telephone number, as well as a telephone number which residents can call for 24-hour emergency service. The notice shall also include a contact person's name for reporting damage to personal property, alternative parking, access, and garbage disposal and temporary water or sewer systems. The Contractor shall also provide notice, warning parents of the dangers that exist on construction site and shall deliver this to every household in the vicinity of construction.

.7 In the event that it should become necessary to disrupt water or

sanitary services to any residences during the course of construction,

Page 77: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01501 City of Cold Lake GENERAL PROJECT REQUIREMENTS Standard Construction Specifications Page 10 of 12

the Contractor shall give 48-hour written notice of the intended disruption to all affected residences or businesses. The notice shall be delivered to an adult member of the residence or business.

.8 If the date of garbage collection falls within the lane/street closure

period, the Contractor shall make arrangements for removing the garbage to a location where sanitation trucks can pick up the garbage without driving on the closed road or excavated area. The Contractor shall co-ordinate this activity with the Owner and shall have Owner approval of proposed strategy for garbage collection.

.9 The Contractor shall be responsible for providing, maintaining,

protecting and repairing temporary utility (water, sewer, gas, power, telephone and other utility) services.

.10 During construction and warranty periods, if the Contractor fails to

respond to customer's (property owner's) requests for remedial works regarding maintaining (or repairing) temporary utility services or correcting faulty works (or products), within a reasonable time (i.e. one to two hours), the Owner shall have the right to carry out the necessary remedial works (by Owner forces or other Contractors) in this regard and shall charge the costs of the remedial works done to the Contractor or deduct the costs of the remedial works from the contract value or holdback monies due to the Contractor.

.11 The Contractor shall be responsible for providing temporary parking

spaces for property owners and customers whose access to their normal parking spaces (i.e. garages, parking lots, etc.) are affected by construction on site.

.12 The Contractor shall be responsible for providing temporary accesses

to private/public properties in which accesses to the property (i.e. sidewalks, driveways, para-ramps, etc.) are affected by construction on site.

.13 During construction periods, if the Contractor fails to respond to

customer's (property owner's) requests for providing temporary access to his or her property(s) within a reasonable time (i.e. one to two hours), the Owner shall have the right to carry out the necessary remedial works (by Owner forces or other Contractors) in this regard and shall charge the costs of the remedial works done to the Contractor or deduct the costs of the remedial works from the contract value or holdback monies due to the Contractor.

.14 This section shall apply to all areas of this project.

3.20 Site Maintenance and Cleanup

.1 The working area shall be maintained in an orderly manner and shall not be encumbered with equipment, materials or debris.

Page 78: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01501 City of Cold Lake GENERAL PROJECT REQUIREMENTS Standard Construction Specifications Page 11 of 12

.2 Clean up shall be a continuing process from the start of the work to the

final acceptance of the project. .3 The Contractor shall at all times, and without further order, keep

property on which work is in progress free from accumulations of waste materials or rubbish caused by employees or by the work. Accumulations of waste materials, which might constitute a fire hazard, will not be permitted. Spillage from the Contractor's hauling vehicles on travelled public or private roads shall be promptly cleaned up. On completion of construction, the Contractor shall remove all temporary structures, rubbish, and waste materials resulting from his operations.

3.21 Access to Private Property

.1 The Contractor shall provide and maintain reasonable access to all private property and places of business. When actual construction operations prohibit provisions of such access the Contractor shall notify, well in advance, any residents and businesses affected by the closure.

3.22 Project Closeout

.1 The Contractor and his Sub-contractors shall conduct an inspection of the Work and correct all deficiencies. The Contractor shall notify the Engineer in writing of satisfactory completion of the "Contractor's Inspection" and request an Engineer Inspection. The Engineer's inspection shall consist of the Engineering team and the Contractor. During the "Engineer's Inspection" a list of all deficiencies shall be drawn up and signed by the Engineer. The Contractor shall correct all deficiencies in a satisfactory manner. When the Contractor is satisfied that all deficiencies have been corrected, the Contractor shall request, in writing, a "Final Inspection". The Final Inspection Team shall consist of the Owner, Engineer and the Contractor.

.2 When the Final Inspection team mutually agrees that the work is

completed, the Contractor shall issue a written declaration to the Owner as follows:

All work in respect to the Contract for the (Name of Project) and

identified as Engineer's Job No. (Job No.), has been completed as of (Day, Month, Year) and no further work is required except for repairs or replacements as set out in the General Conditions.

.3 The Engineer will state in writing, upon agreement with the above

declaration, his approval of the inspected work, and issue a Construction Completion Certificate. The Engineer may at any time before issuance of a Construction Completion Certificate, describe the portions of the Work not completed to his satisfaction and all things which must be done by the Contractor before a Construction Completion Certificate will be issued.

Page 79: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01501 City of Cold Lake GENERAL PROJECT REQUIREMENTS Standard Construction Specifications Page 12 of 12

.4 Immediately prior to expiration of the relevant maintenance period, the

Contractor shall request in writing, a joint inspection of the work, by the Final Inspection Team. The Engineer will thereafter, on being satisfied that all necessary maintenance has been completed, issue a Certificate of Total Performance.

4.0 PAYMENT 4.1 General

.1 Unless otherwise provided in the Tender Form there shall be no separate or additional payment for work required under this Section but it shall be considered incidental to the remaining work under this Contract.

.2 Where indicated in the Tender Form, payment for General Project

Requirements shall be made in accordance with the following schedule:

(a) Fifty percent (50%) of the lump sum tender price shall be included

in the first progress report payment certificate for the schedule.

(b) The remaining fifty percent (50%) shall be paid out upon substantial completion of the project.

END OF SECTION

Page 80: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01502 City of Cold Lake TRAFFIC ACCOMODATION Standard Construction Specifications Page 1 of 4

1.0 GENERAL 1.1 Traffic Accomodation

.1 Make suitable provisions, including the use of detours, to accommodate all vehicular and pedestrian traffic safely and with a minimum of inconvenience through and around the work.

.2 Provide, install, maintain and protect traffic control devices such as

signs, barriers, fences and lights as required to perform the work safely.

.3 Provide the required number of flagpersons, during all periods of active

equipment operations which may affect normal traffic operations. .4 Control operations to ensure normal school bus operations are not

interfered with. .5 Ensure uninterrupted access to developments along the project. .6 Obtain prior approval of the Engineer before changing or disrupting

existing accesses and road crossings. .7 Carry out construction operations in one continuous operation at road

crossings, intersections and entrances for each phase of the work. .8 Provide and use such other methods or equipment necessary to

accommodate traffic safely through the work site. .9 The Engineer has the right to require the Contractor to modify

operations if, in the opinion of the Engineer, traffic is being unduly hindered or public safety is being compromised.

.10 The Contractor shall promptly make any modifications to the traffic

accommodation operations deemed necessary by the Engineer. .11 The Engineer may suspend work, where in the Engineer’s opinion, the

Contractor fails to adequately provide for the safety of the public, for re-occurring safety issues or when the Contractor fails to comply with orders issued by the Engineer regarding traffic accommodation operations.

.12 The Contractor shall remove or cover all traffic control devices when

not essential for the safe accommodation of traffic, in order to eliminate unnecessary inconvenience to the traffic.

Page 81: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01502 City of Cold Lake TRAFFIC ACCOMODATION Standard Construction Specifications Page 2 of 4

.13 The Contractor shall coordinate his traffic accommodation measures

with those of other forces at or adjacent to the work, as required, to accommodate traffic safely and conveniently. This shall not relieve the Contractor of the responsibility for the safe accommodation of traffic over the whole of the work.

.14 Prior to any prolonged shut down of construction, the Contractor shall

ensure that any disturbed roadway surface is restored to a condition suitable for traffic operations approved by the Engineer.

15. The contractor shall provide all detour signs according to Alberta

transportation standards. All signs must meet Alberta Transportation Standard, contractor made signs will not be accepted. Owner will not be responsible for the cost or the supply of the traffic detour signs.

.16 The Contractor shall provide adequate signs, barricades, red lights,

and watchmen and take all necessary precautions for the protection of the work and the safety of the public. All barricades and obstructions shall be protected at night by signal lights or flares which shall be kept burning from sunset to sunrise. Barricades shall be readily visible at night. Suitable warning signs shall be placed and illuminated at night to show in advance where construction, barricades or detours exist.

1.2 Flagpersons

.1 When construction operations or work zone conditions cause interruption, delay or hazard to the traveling public or anyone on the worksite, that requires the use of flagpersons, responsible flagpersons shall be continuously maintained for the direction and control of traffic.

.2 The Contractor shall ensure that flagpersons are instructed in and use

proper traffic control procedures appropriate for the prevailing conditions.

.3 Flagpersons shall have proof of certification from a recognized training

program on traffic control procedures through construction zones. .4 Flagpersons shall be dressed in clean uniforms or coveralls, orange

hardhats and fluorescent red-orange overvests for maximum visibility and shall be equipped with proper traffic control paddles.

.5 During hours of darkness, flagpersons shall be additionally equipped

with a red signal hand-light with sufficient brightness to be clearly visible to approaching traffic and flagging stations shall be illuminated by overhead lighting.

.6 During hours of darkness, signs indicating hazardous conditions and

signs requiring increased attention shall be marked with flashers.

Page 82: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01502 City of Cold Lake TRAFFIC ACCOMODATION Standard Construction Specifications Page 3 of 4

1.3. Removal, Salvage and Replacement

of Existing Signs and Guideposts

.1 All existing signs and guideposts which must be removed in the prosecution of the work shall be carefully salvaged by the Contractor.

.2 Critical signs necessary for the protection of traffic such as stop signs

shall be maintained. .3 All signs shall be replaced as soon as possible after the completion of

the work. 1.4. Detour Road and Roadway Maintenance

.1 Subject to the approval of the Engineer, detours may be used to carry traffic around the worksite.

.2 Construction of the detour road is part of the contract and is covered

under line item – Traffic Accommodation on the schedule of quantities. As well maintenance of the detour road during construction is the contractor’s responsibility and is part of the Traffic Accommodation line item on the schedule of quantities.

.3 When the work required disturbance of an existing roadway carrying

public traffic, the Contractor shall keep the disturbed areas of the travel lanes well graded, free of potholes and of sufficient width for the required number of travel lanes.

.4 Prior to any prolonged shut down of construction, the Contractor shall

ensure that any disturbed roadway surface is restored to a condition suitable for traffic operations as approved by the Engineer.

.5 When traffic is diverted entirely off the right-of-way, the Contractor

shall establish and maintain a detour which shall be complete with signs at every intersection.

.6 When in the opinion of the Engineer surfacing gravel is required for

traffic accommodation on areas disturbed by the Contractor prior to the completion of the work on those areas, the Contractor shall promptly provide and place crushed surfacing gravel to the satisfaction of the Engineer.

.7 When a secondary or local road is used as a detour, the Contractor

shall maintain and leave it in a condition as good as it was, in the opinion of the Engineer, prior to its use as a detour, including resurfacing if required.

.8 If the Contractor fails to promptly maintain the road and apply gravel,

the Engineer may make other arrangements to have the work done

Page 83: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01502 City of Cold Lake TRAFFIC ACCOMODATION Standard Construction Specifications Page 4 of 4

and deduct the cost thereof from any money owing to the Contractor. 1.5. Dust Abatement

.1 The Contractor shall keep detours and roadways within the project limits free of excessive dust.

.2 The Contractor shall supply and apply all dust abatement material. .3 If the Contractor fails to promptly undertake dust abatement measures,

the Engineer may make other arrangements to have the work done and deduct the cost thereof from any money owing to the Contractor.

END OF SECTION

Page 84: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01503 City of Cold Lake SAFEGUARDING UTILITY INSTALLATIONS Standard Construction Specifications Page 1 of 5

1.0 GENERAL

1.1 Contractor’s Responsibility .1 The Contractor shall assume full responsibility for safeguarding all

existing and relocated utility installations during the progress of the work.

.2 “Utility installations” shall mean: Utilities and facilities which are located on, in or near the right-of-way

and which may be affected by the construction and shall include but not be limited to pipelines, drainage works, irrigation works, water works, sewage works, power facilities, telephone facilities, cable facilities and related appurtenances.

.3 While the Engineer has made every effort to collect and present

complete details concerning utility installations, no responsibility will be assumed by the Engineer for the correctness and completeness of its information and the Contractor shall have no claim on that account.

1.2 Liaison and Location

.1 The Contractor shall be responsible to ensure that all utility installations are located and clearly marked on the ground before commencing construction operations.

.2 The Engineer may provide information respecting known utilities but

the Contractor shall be responsible for contacting all affected utility owners or operators to determine the existence and location of all utility installations, maintaining liaison with the utility owners or operators concerning adjustment of the utilities and coordinate construction accordingly.

1.3 Precautionary Measures

.1 The Contractor shall take all precautionary measures as may be necessary when working over or adjacent to utility installations whether above or below ground and shall control equipment and method of construction to prevent damage to any utility and its appurtenances.

.2 Under no circumstances shall the Contractor carry out any

construction operations over or adjacent to any utility until the required adjustments and protection as required for the proposed construction have been completed.

.3 The Contractor shall provide a minimum of 48 hours (excluding

weekends and holidays) notice to the utility owner or operator in advance of commencing construction operations that may affect their installations.

.4 After completion of utility work by the owner or operator the Contractor

shall continue to work in close liaison with the utility owner or operator

Page 85: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01503 City of Cold Lake SAFEGUARDING UTILITY INSTALLATIONS Standard Construction Specifications Page 2 of 5

and, if the utility owner or operator so requires, ensure that a representative of the affected utility owner or operator is present at all times during active equipment operations at that location.

.5 The Contractor shall ensure that no equipment crosses or operates

over or under any utility installations at locations other than where required protection has specifically been provided and shall work in close cooperation with the utility owner or operator in the execution of the work.

.6 When construction is undertaken in the vicinity of any unprotected

utility installation, the Contractor shall exercise extreme caution to ensure that the utility installation is not damaged by construction equipment or applied loads.

.7 When haul roads or equipment crossings are required it shall be the

Contractor’s responsibility to determine, provide and install any protective works necessary and to observe any other precautions which may be required

1.4 Telephone Facilities

.1 When there are telephone facilities which are affected by the work, the applicable telephone company may carry out the required relocation of their facilities concurrently with the Contractor’s operations.

.2 In those areas where it is not immediately feasible to relocate buried

cable to the final location, the telephone company may temporarily place cable on the surface and bury it upon completion of construction operations.

1.5 Power Facilities

.1 When there are power facilities within the limits of this project, alterations will be carried out by the applicable power company concurrently with construction operations.

.2 The Contractor, in undertaking any work near existing power facilities

shall comply with the requirements under the Electrical Protection Act and associated regulations.

.3 Prior to the commencement of power facility relocation the Contractor

shall first carry out necessary clearing and grubbing. .4 The Contractor may be required to undertake additional clearing and

grubbing to accommodate the relocated power facilities, payment for which will be made at the applicable unit prices.

.5 When the Contract does not contain bid items for clearing or clearing

and grubbing, any required clearing or clearing and grubbing will be considered incidental to the work.

Page 86: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01503 City of Cold Lake SAFEGUARDING UTILITY INSTALLATIONS Standard Construction Specifications Page 3 of 5

.6 It shall be the Contractor’s responsibility to maintain liaison with the power company to ensure that the necessary land clearances have been arranged.

1.6 Pipelines

.1 The companies named within the Special Provisions have pipelines located within the limits of the project and any required adjustments will be carried out by the owner or operator concurrently with construction operations.

.2 When the magnitude and degree of complexity of any required

adjustments prevents the Contractor from working in the vicinity of the pipeline, the Contractor shall arrange operations clear of the those pipelines until the required adjustments are completed and permission to construct in their vicinity is received.

.3 The Contractor shall not have any claim for compensation or damages

for any stoppage, delays, inconvenience or damage sustained due to any interference for the pipelines or the operation of relocating them.

.4 Prior to the commencement of construction operations, the Contractor

shall review the project with representatives of each pipeline company and the Engineer to determine the location and specifics of each pipeline.

.5 The Contractor, being fully aware of the location of all pipelines, shall

mark the location of the same so their positions are readily identifiable to all work forces.

.6 Under no circumstances shall work be commenced within 30 metres of

any pipeline until the required adjustments (if any) have been completed and a written crossing agreement has been received from the affected company.

.7 The Contractor shall contact the company representative 72 hours

(excluding weekends and holidays) prior to commencing construction operations within 30 metres of a pipeline so arrangements may be made to have a company representative or delegate present during the period machinery is being employed within 30 metres of a pipeline.

.8 Absolutely no work shall be undertaken within 30 metres of a pipeline

until a company representative is present at the site and has authorized the work.

.9 No operations involving the use of machinery shall be commenced

within 5 metres of a pipeline/underground utilities (gas, power, sanitary, water and storm) until the line has been exposed (by hand or hydrovac), its location accurately referenced and any required protection is put in place and/or adjustment to the pipeline is complete.

Page 87: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01503 City of Cold Lake SAFEGUARDING UTILITY INSTALLATIONS Standard Construction Specifications Page 4 of 5

.10 The exposure and backfilling of the pipelines shall be undertaken by the Contractor under the direct supervision of the Engineer and the pipeline company’s representative.

.11 The exposure and backfilling of pipelines will not be paid for separately

but shall be included in the lump sum price bid for “Locating Utility Installations”.

.12 If the Contractor proposes to move any equipment across the pipeline

right-of-way prior to the commencement of construction operations, the Contractor shall use timbers or a pad of earth if the pipeline company so requires or the Engineer so directs.

.13 All labour, equipment, materials and incidentals as may be required for

the protection of a pipeline and the safe execution of work will not be paid for separately but shall be considered incidental to the work.

.14 Clearing required within 30 metres of a pipeline shall be carried out

using suitable hand operated tools and burning or burial of debris within 30 metres of a pipeline is strictly prohibited.

.15 This work will be paid at the applicable unit prices. .16 When the Contract does not contain bid items for clearing or clearing

and grubbing, any required clearing or clearing and grubbing will be considered incidental to the work.

.17 The Contractor shall not store, park or drive any equipment, materials

and/or vehicles over or along any pipeline right-of-way except as reasonably necessary in the actual construction.

.18 Notwithstanding the foregoing, the Contractor shall conduct operations

in the vicinity of all pipelines in accordance with the Pipeline Act of Alberta, the National Energy Board Regulations and other related legislation.

.19 The Contractor is advised that in the event of a pipeline accident, all

work is to cease immediately and the Contractor is to contact the pipeline company involved as well as the local area office of the Energy and Utilities Board (EUB).

1.7 Railway Right-of-Way

.1 When work is undertaken within the limits of a railway right-of-way the Contractor shall coordinate his operations with the railway company.

.2 Prior to commencing operations within the railway right-of-way, the

Contractor shall provide 3 weeks notice to the Track Supervisor of the applicable railway company as listed in the Special Provisions.

Page 88: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01503 City of Cold Lake SAFEGUARDING UTILITY INSTALLATIONS Standard Construction Specifications Page 5 of 5

.3 The Contractor shall determine from the railway company possible

additional measures which may be required for the protection of their personnel and facilities, including any supplemental insurance coverage.

.4 At the discretion of the Track Supervisor, a flagperson will be

employed to protect the trains and operating equipment. .5 A temporary mat shall be placed over the rails to facilitate the

movement of tracked equipment. .6 The railway shall be maintained free of dirt, debris and obstruction at

all times. .7 The Contractor shall determine the exact location and depth of any

underground railway signal or telecommunication cables prior to commencing construction operations, which shall be located by means of hand digging by the Contractor’s forces under the direct supervision of a representative of the railway company.

.8 The Contractor shall be fully responsible for his work operations

adjacent to the rail line when working within the railway right-of-way and indemnify and hold harmless Lakeland County and the Engineer.

END OF SECTION

Page 89: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01545 City of Cold Lake SAFETY REQUIREMENTS Standard Construction Specifications Page 1 of 3

1.0 CONSTRUCTION SAFETY MEASURES

.1 Comply with the latest edition of the Alberta Occupational Health and

Safety Act, and the Regulations made pursuant to the Act. .2 Contractor is required to fully comply with all Provincial Safety Acts,

Codes and Regulations. For this reason the Contractor will be acting as the “Prime (Principal) Contractor for this contract.

.3 Observe and enforce construction safety measures required by: .1 National Building Code of Canada (latest edition) .2 Provincial Worker’s Compensation Board .3 Municipal Statutes and Ordinances .4 Contractors Health and Safety Program .4 In event of conflict between any provisions of above authorities the

most stringent provision shall apply. .5 Provide and maintain Worker’s Compensation Board coverage for all

employees for the duration of the contract. Prior to commencement of the work, and prior to final payment, provide to the Engineer a letter/certificate of Clearance from the Worker’s Compensation Board indicating that the Contractor’s account is in good standing.

.1 Should the Contractor be a sole proprietor, provide documented proof in a form acceptable to the Engineer, of an alternative means of personal coverage that meets or exceeds the requirements set out above for Worker’s Compensation Board coverage. .6 The Contractor is responsible for safety of persons and property both

on and adjacent to the work site to the extent that they may be affected by conduct of work.

.7 Should an unforeseen or peculiar safety related hazard or condition

become evident during performance of work, immediately take measures to rectify the situation and prevent damage or harm. Advise the Engineer verbally and in writing of the hazard or condition.

.8 Install safety fence around active construction site, open excavation that may endanger the public, and as directed by Engineer. Contractor to follow Alberta Health and Safety Regulations and the governing OH&S legislation.

Page 90: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01545 City of Cold Lake SAFETY REQUIREMENTS Standard Construction Specifications Page 2 of 3

.9 Safety fence shall be a minimum 1.9 m high wire construction fence. Snow fencing around open excavation will not be approved by the Engineer.

2.0 PRIME CONTRACTOR

The “Contractor” is required to fully comply with all Alberta Occupational Health and Safety Act, Regulation and Code. For this reason, this letter is to certify that the “Contractor” referenced above will be acting as the “Prime Contractor” for this contract. The Contractor is the “Prime Contractor” as defined by Alberta Occupational Health and Safety Act , Regulation, Code as per: Section 3 (2) The Prime Contractor for a work site is: (a) the contractor, employer or other person who enters into an agreement with the owner of the work site to be the prime contractor, or (3) If a work site is required to have a prime contractor under subsection (1), the prime contractor shall ensure, as far as it is reasonably practicable to do so, that this Act and the regulations are complied with in respect of the work site. (4) One of the ways in which a prime contractor of a work site may meet the obligation under subsection (3) is for the prime contractor to do everything that is reasonably practicable to establish and maintain a system or process that will ensure compliance with this Act and the regulations in respect of the work site.” The Contractor shall be the “Prime Contractor” for the full duration from the issuance of “Notice to Proceed” through to the issuance of “Final Completion Certificate”. He shall also be the Prime Contractor whenever the Contractor’s personnel, equipment or subcontractors are on site between the period of issuance of the “Certificate of Construction Completion” and “Final Acceptance Certificate”.

In any case where, pursuant to the provisions of the Alberta Occupational Health and Safety Act, Regulation, Code, an order is given to the Contractor or any of his Subcontractors in respect to their operations under this Contract to cease operations because of failure to install or adopt safety devices or appliance or methods as directed or required by the Alberta Occupational Health and Safety Act, Regulation, Code thereunder, or because conditions of imminent danger exist that would likely result in injury to any person, the Contractor shall comply with the order immediately as per Section 9, 10, 11 of the Alberta Occupational Health and Safety Act.

Should the Contractor not be available or capable of removing the danger to life or equipment resultant from the Contractor’s operations, then the Engineer may issue the removal of a danger and the Contractor shall be liable for the cost of such arrangements

Page 91: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01545 City of Cold Lake SAFETY REQUIREMENTS Standard Construction Specifications Page 3 of 3

and such an act by the Engineer shall not relieve the Contractor of responsibility for injury, loss of life, or damage which may occur in that situation.

In the event that the Contractor refuses or fails to comply with an order under the Alberta Occupational Health and Safety Act, Regulation, Code or regulations thereunder and the performance of the work is stopped, the Owner may, upon written notice, hold the Contractor in default.

3.0. ENGINEER SAFETY PROGRAM

.1 The Engineering firm managing this contract is committed to protecting its employees, its property, the public, the client, and the environment from incident and accident through the implementation of a strong safety program.

.2 The Engineering firm strictly adheres to the Occupational Health and Safety regulations as well will adhere to the Client’s safety policies at all times.

END OF SECTION

Page 92: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01560 City of Cold Lake ENVIRONMENTAL PROTECTION Standard Construction Specifications Page 1 of 2

1.0 GENERAL

.1 All work on this project shall be carried out in accordance with the approval received from Alberta Environment, DFO and/or other approving agency.

.2 All work on this project shall be governed by the Development

and Reclamation Application as approved by Alberta Environment. .3 The approved application shall have precedence over and

supersede all other Clauses, Standard Specifications, Special Provisions, etc. contained within the Contract.

1.1 Fires

.1 Fires and burning of rubbish on site permitted only when approved by Engineer.

.2 Where fires or burning permitted, prevent staining or smoke damage to

structures, materials or vegetation which is to be preserved. Restore, clean and return to new condition stained or damaged work.

.3 Provide supervision, attendance and fire protection measures as

directed.

1.2 Disposal of Wastes .1 Do not bury rubbish and waste materials on site unless approved by

Engineer. .2 Do not dispose of waste or volatile materials, such as mineral spirits,

oil or paint thinner into waterways, storm or sanitary sewers.

1.3 Drainage .1 Provide temporary drainage and pumping as necessary to keep

excavations and site free from water.

1.4 Site Clearing and Plant Protection .1 Protect trees and plants on site and adjacent properties where

indicated. .2 Wrap in burlap, trees and shrubs adjacent to construction work,

storage areas and trucking lanes, and encase with protective wood framework from grade level to height of 2 m.

.3 Protect roots of designated trees to dripline during excavation and site

grading to prevent disturbance or damage. Avoid unnecessary traffic, dumping and storage of materials over root zones.

Page 93: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 01560 City of Cold Lake ENVIRONMENTAL PROTECTION Standard Construction Specifications Page 2 of 2

.4 Minimize stripping of topsoil and vegetation. .5 Restrict tree removal to areas indicated or designated by Engineer.

1.5 Work Adjacent to Waterways .1 Do not operate construction equipment in waterways. .2 Do not use waterway beds for borrow material without Engineer's

approval. .3 Do not dump excavated fill, waste material or debris in waterways. .4 Design and construct temporary crossings to minimize erosion to

waterways. .5 Do not skid logs or construction materials across waterways. .6 Avoid indicated spawning beds when constructing temporary crossings

of waterways. .7 Do not blast under water or within 100 m of indicated spawning beds.

1.6 Pollution Control .1 Maintain temporary erosion and pollution control features installed

under this contract. .2 Control emissions from equipment and plant to local authority’s

emission requirements. .3 Prevent sandblasting and other extraneous materials from

contaminating air beyond application area, by providing temporary enclosures.

.4 Cover or wet down dry materials and rubbish to prevent blowing dust

and debris. Provide dust control for temporary roads. END OF SECTION

Page 94: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02000 City of Cold Lake SPECIAL PROVISIONS Standard Construction Specifications Page 1 of 5

1.0 UTILITY LOCATIONS

.1 The Contractor shall ascertain the locations of all existing utilities. .2 The Contractor shall be responsible for any damages to existing

utilities as a result of his construction operations. .3 Any utilities that require relocation to facilitate construction shall be

relocated by the appropriate utility company. The Owner will assume the direct costs of the utility company. The Contractor shall have no claims related to interruption of work as a result of utility relocations.

2.0 ASPHALT AND CONCRETE SAWCUTTING

.1 Sawcut existing asphalt and concrete surfaces at removal and tie locations where directed by the Engineer.

.2 No extra payment will be made for asphalt or concrete saw cutting as it will be considered incidental to the work.

3.0 CONCRETE AND ASPHALT REMOVALS

.1 Existing concrete and asphalt surfaces will be removed to the limits as directed by the Engineer.

.2 Removal of curb and gutter or monolithic curb, gutter and walk will be

measured as indicated on the tender form along the face of curb. .3 Removal of slab concrete and asphalt will be measured as indicated

on the tender form. .4 Removal of storm manhole will be measured by unit. .5 Disposal of concrete and asphalt waste will be the responsibility of the

Contractor.

4.0 COMMON EXCAVATION

1. Excavate, separate materials; load; haul the freehaul distance; dump and spread; scarify, trim, cut and fill slopes; place and grade fill material on berm, boulevard, road, or slope.

2. Over excavation due to the Contractor’s own fault will not be paid for.

Page 95: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02000 City of Cold Lake SPECIAL PROVISIONS Standard Construction Specifications Page 2 of 5

5.0 WASTE and SUBCUT EXCAVATION

1. Excavate, break and separate materials, load, haul and dispose off site, pay dumping fees if any; drainage protection; dust control; protect, maintain and clean-up haul route.

2. Haul waste material to the location indicated on the plans or an onsite location as specified by the Engineer.

6.0 BORROW EXCAVATION/SUPPLY

.1 Borrow excavation/supply will include excavating, loading, and hauling material from a borrow site designated by the Contractor, placing on site, leveling, aerating, conditioning (either drying or watering), compacting and finishing to final grades.

.2 The contractor will be responsible for access and maintenance of the

haul road for the borrow site during construction operations. .3 Stockpile sufficient material on site for use in backfilling curb

installations and grading. .4 Measurement of borrow excavation will be based as indicated on the

tender form calculated from cross-section survey taken in the areas of excavation.

.5 Volumes for borrow excavation will determined by a comparison of

initial original ground elevations and the cross-sections taken for the excavation.

7.0 TRAFFIC SIGN REMOVAL, REPLACEMENT AND CONSTRUCTION SIGNING

.1 Remove and replace all signs necessary to complete the work. .2 Provide temporary construction signage and flagmen as required. .3 No extra payment will be made for traffic sign removal, replacement

and construction signing as it will be considered incidental to the work.

8.0 SUBGRADE PREPARATION

.1 Subgrade preparation will be measured as per the tender form of subgrade prepared to the depth indicated in the tender form.

.2 Shape and compact subgrade to 100% of Standard Proctor Density

(S.P.D) .3 Where indicated in the Tender Form, subgrade prepared with cement

modification shall utilize application rates indicated or as determined by the engineer.

Page 96: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02000 City of Cold Lake SPECIAL PROVISIONS Standard Construction Specifications Page 3 of 5

.4 Payment for subgrade preparation will be full compensation for

scarifying, shaping, and compacting the subgrade to design grades. Payment will be based on square meters of subgrade prepared.

.5 Payment for increasing or decreasing the cement content utilized in

cement stabilization procedures will be based on increments of 5 kg per square meter over the cement stabilized area.

9.0 20 MM CRUSHED GRANULAR BASE

.1 Payment for 20 mm crushed granular base shall be based on the complete supply and placement of the compacted thickness specified in the Tender Form.

10.0 CONCRETE WORKS

.1 Keep excavation for concrete works to minimum depth and width required for construction.

.2 Supply and install 2 - 10M reinforcing bars for the full length of the

reduced face curb and gutter for commercial and lane crossings.. .3 Supply and install 10M reinforcing bars for the full length of separate

sidewalk installations as detailed in the plans. .4 No extra payment will be made for reinforcing of concrete works. .5 Payment for the supply, place and finish of separate walk and slab

concrete will be full compensation for compacting the subgrade, supply and compacting 100mm depth minus 20mm gravel base, concrete construction and all incidentals.

.6 Pararamps will be measured in units. Note that pararamps will also be

included in the linear measurement of curb, gutter and/or sidewalk.

11.0 MANHOLE FRAME AND COVER REPLACEMENT

.1 Existing manhole frames and covers are to be removed and replaced with F-80 frames and covers.

.2 The old frames and covers are to be disposed of by the Contractor. .3 Payment for manhole frame and cover replacement shall be made in

units. .4 Adjustment of the manhole frame and covers will be made separately.

Page 97: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02000 City of Cold Lake SPECIAL PROVISIONS Standard Construction Specifications Page 4 of 5

12.0 TOPSOILING AND SEEDING OF DISTURBED LANDSCAPED AREAS

.1 If possible Utilize 100mm depth topsoil from the borrow location stockpile for use in landscape restoration.

.2 If quantity required for topsoil is not available from borrow location,

contractor to supply topsoil. .3 Topsoil and seeding will include supply and install of topsoil, finish

grading, harrowing and seeding. .4 Payment for top soil and seeding will be as indicated on the tender

form.

13.0 Filter Fabric (Geotextile)

.1 The synthetic filter fabric shall consist of a durable, permeable, woven,

polypropylene fabric composed of continuous synthetic filaments with typical properties as follows:

Tensile Grab Strength — ASTM D4632 890 N Trapezoid Tear Strength — ASTM D4533 330 N Mullen Burst Strength — ASTM D3786 2,750 kPa Puncture—ASTM 400 N Filter fabric shall be woven Propex 2002, Layfield LP200 or approved

equal. 14.0 SILT FENCE BARRIERS .1 The supply and installation of Silt Fence Barriers will be measured as

indicated on the tender form. .2 Silt Fences are suitable for controlling sedimentation from sheet and rill

erosion on relatively short slopes and should not be used where the flow exceeds 0.03 m3/s.

.3 Single run of silt fence should not exceed 100m. Pool depth should not

exceed 600mm. Secure silt fences according to manufacturer instructions.

.4 Follow slope grade/length guidelines:

Slope Grade (%) Maximum Length (m)

<2 30 2 – 5 23

5 – 10 15 10 – 20 7.5

>20 4.5

Page 98: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02000 City of Cold Lake SPECIAL PROVISIONS Standard Construction Specifications Page 5 of 5

END OF SECTION

Page 99: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02070 City of Cold Lake PROTECTION AND REMOVALS Standard Construction Specifications Page 1 of 1

1.0 GENERAL

1.1 Protection

.1 Protect existing items designated to remain and materials designated for salvage. In event of damage, immediately replace such items or make repairs to approval of Engineer and at no additional cost to Engineer.

2.0 EXECUTION

2.1 Preparation

.1 Inspect site and verify with Engineer items designated for removal and items to be preserved.

.2 Locate and protect utility lines. Preserve in operating condition active

utilities traversing site. .3 Notify utility companies before starting demolition.

2.2 Removal

.1 Remove items indicated. .2 Do not disturb adjacent items designated to remain in place.

2.3 Salvage

.1 Carefully dismantle items containing materials directed or indicated for salvage. Stockpile salvaged materials at locations directed or indicated by the Engineer.

2.4 Disposal of Material

.1 Dispose of materials not designated for salvage or re-use in work, off-site.

END OF SECTION

Page 100: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02225 City of Cold Lake AGGREGATES - GENERAL Standard Construction Specifications Page 1 of 4

1.0 GENERAL

1.1 Source Approval

.1 Source of materials to be incorporated into work or stockpiled requires

approval. .2 Inform Engineer of proposed source of aggregates and provide access

for sampling at least 4 weeks prior to commencing production. .3 If, in opinion of Engineer, materials from the proposed source do not

meet, or cannot reasonably be processed to meet specified requirements, procure an alternative source or demonstrate that material from source in question can be processed to meet specified requirements.

.4 Should a change of material source be proposed during work, advise

Engineer 4 weeks in advance of proposed change to allow sampling and testing.

.5 Acceptance of a material at source does not preclude future rejection if

it is subsequently found to lack uniformity, or if it fails to conform to requirements specified, or if its field performance is found to be unsatisfactory.

1.2 Production Sampling

.1 Aggregate will be subject to continual sampling during production. .2 Provide Engineering with ready access to source and processed

material for purpose of sampling and testing. .3 Bear the cost of sampling and testing of aggregates which fail to meet

specified requirements.

2.0 PRODUCTS

2.1 Materials

.1 Aggregate quality: sound, hard, durable material free from soft, thin,

elongated or laminated particles, organic material or other deleterious substances.

.2 Flat and elongated particles are those whose greatest dimensions

exceeds five times their least dimension.

Page 101: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02225 City of Cold Lake AGGREGATES - GENERAL Standard Construction Specifications Page 2 of 4

.3 Fine aggregates satisfying requirements of applicable section shall be one, or a blend of following:

.1 Natural Sand .2 Manufactured Sand .3 Screenings produced in crushing of quarried rock, boulders, gravel or slag.

.4 Coarse aggregates satisfying requirements of applicable section shall be one of following:

.1 Crushed rock or slag .2 Gravel composed of naturally formed particles of stone. .5 Class B Bedding:

.1 The granular material shall be hand placed and compacted to a density of 95% Standard Proctor in 150 mm layers for the full width of the trench up to 300 above the crown of the pipe.

3.0 EXECUTION

3.1 Development of Aggregate Source .1 Prior to excavating materials for aggregate production, clear and

grub area to be worked, and strip unsuitable surface materials. Dispose of cleared, grubbed and unsuitable materials as directed.

.2 Where clearing is required, lease a screen of trees between

area and roadways as directed. .3 Clear, grub and strip an area ahead of quarrying or excavating

operation sufficient to prevent contamination of aggregate by deleterious materials.

.4 When operating in stratified deposits use excavation equipment

and methods that will produce a uniform, homogeneous aggregate.

.5 When excavation is completed dress sides of excavation to a

nominal 1.5:1 slope, and provide drains or ditches as required to prevent surface standing water.

Page 102: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02225 City of Cold Lake AGGREGATES - GENERAL Standard Construction Specifications Page 3 of 4

3.2 Processing .1 Process aggregate uniformly using methods that prevent

contamination, segregation and degradation. .2 Blend aggregates if required to obtain gradation requirements

specified. Use approved methods and equipment. .3 Blending to increase percentage of crushed particles or

decrease of flat and elongated particles is permitted. .4 Wash aggregates, if required to meet specifications. Use only

equipment approved by Engineer. 3.3 Handling .1 Handle and transport aggregates to avoid segregation,

contamination and degradation. 3.4 Stockpiling .1 Stockpile aggregates on site in locations indicated or

designated. Do not stockpile on completed pavement surfaces where damage to pavement may result.

.2 Stockpile aggregates in sufficient quantities to meet project

schedules. .3 Stockpiling sites shall be level, well drained, and of adequate

bearing capacity and stability to support stockpiled materials. .4 Except where stockpiled on acceptable stabilized areas, provide

a compacted sand base not less than 300 m in depth to prevent contamination of the aggregate or, if permitted, stockpile aggregates on ground but do not incorporate bottom 300 mm of pile into work.

.5 Separate aggregates by substantial dividers or stockpile far

enough apart to prevent intermixing. .6 Reject intermixed or contaminated materials. Remove and

dispose of rejected materials as directed with 48 hrs of rejection.

Page 103: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02225 City of Cold Lake AGGREGATES - GENERAL Standard Construction Specifications Page 4 of 4

.7 Stockpile materials in uniform layers of thickness as follows: .1 Max 1 m for coarse aggregate and base course materials. .2 Max 2 m for fine aggregate and sub-base materials. .3 Max 1.5 m for other materials. .8 Complete each layer over entire stockpile area before beginning next layer. .9 Uniformly spot-dump aggregates delivered to stockpile in trucks and build up stockpile as specified. .10 Coning of piles or spilling or material over edges of pile will not be permitted. .11 During winter operations, prevent ice and snow from becoming mixed into stockpile or in material being removed from stockpile.

3.5 Stockpile Cleanup .1 Leave stockpile site in a tidy, well drained condition, free of standing surface water. .2 Leave any unused aggregates in neat compact stockpiles as directed. 3.6 Fill types and compaction .1 Compact Native Backfill: .1 98% Standard Proctor Density in paved or gravelled areas.

.2 Pipe Zone material: 95% Standard Proctor Density.

.3 Gravel Base: 100% Standard Proctor Density.

.4 Class B Bedding:

.1 The granular material shall be hand placed and compacted to a density of 95% Standard Proctor in 150 mm layers for the full width of the trench up to 300 above the crown of the pipe.

END OF SECTION

Page 104: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02230 City of Cold Lake ROADWAY EXCAVATION, EMBANKMENT AND COMPACTION Standard Construction Specifications Page 1 of 4

1.0 GENERAL

1.1 Definitions

.1 Unclassified excavation: excavation of deposits of whatever character encountered in work.

.2 Topsoil: material capable of supporting good vegetative growth and

suitable for use in top dressing, landscaping and seeding. .3 Free haul: distance that excavated material is to be hauled without

compensation. .4. Overhaul: authorized hauling in excess of free haul distance that

excavated material is moved. .5 Embankment: material derived from usable excavation and placed

above original ground or stripped surface up to subgrade elevation. .6 Pavement structure: combination of layers of unbound or stabilized

granular sub-base, base, and asphalt or concrete surfacing. .7 Subgrade elevation: elevation immediately below pavement structure

or roadway gravelling.

1.2 Measurement for Payment

.1 Common Excavation:

.1 Will be measured as indicated on the tender form calculated from cross-sections taken in areas of excavation.

.2 In areas of excavation, initial cross-sections will be taken after

clearing and grubbing and prior to stripping of topsoil. .4 If double handling of material is directed (stockpiling and later

placing), then quantities will be measured twice; on excavation from original location and on excavation from stockpile.

.2 Subgrade compaction will be measured as indicated on the tender

form. .3 Overhaul will not be measured separately unless otherwise indicated. .4 No measurements will be made for:

.1 Unnecessary excavation beyond lines established. .2 Extra handling of windrowed materials blended on embankment

slopes.

Page 105: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02230 City of Cold Lake ROADWAY EXCAVATION, EMBANKMENT AND COMPACTION Standard Construction Specifications Page 2 of 4

.3 Stockpiling of borrow material for use in embankment.

1.3 Requirements of Regulatory Agencies .1 Adhere to regulations of authority having jurisdiction if blasting is

required. .2 Adhere to Provincial and National Environmental requirements if

potentially toxic materials are involved.

1.4 Traffic Provisions .1 Provide and maintain roadways, walkways and detours, for vehicular

and pedestrian traffic and access to fire hydrants.

1.5 Buried Services .1 Check with utility companies to locate or advise regarding buried

pipes, cables, ducts or services.

2.0 PRODUCTS

2.1 Materials .1 Embankment materials require approval by Engineer. .2 Material used for embankment not to contain organic matter, frozen

lumps, weeds, sod, roots, logs, stumps or any other objectionable matter.

3.0 EXECUTION

3.1 Compaction Equipment

.1 Compaction equipment must be capable of obtaining required densities in materials on project.

3.2 Water Distributors

.1 Apply water with equipment capable of uniform distribution.

3.3 Stockpiling .1 General:

.1 Advise Engineer sufficiently in advance of excavation operations for initial cross-sections to be taken.

.2 Maintain crowns and cross slopes to provide good surface

drainage. .3 Notify Engineer whenever unsuitable materials are encountered

in cut sections and remove unsuitable materials to depth and extent directed.

Page 106: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02230 City of Cold Lake ROADWAY EXCAVATION, EMBANKMENT AND COMPACTION Standard Construction Specifications Page 3 of 4

.4 Where subgrade is on transition from excavation to embankment treat ground slopes at grade points as directed by Engineer.

.5 Dispose of waste material as directed by Engineer.

.2 Stripping:

.1 Strip topsoil from areas and to depths indicated or directed by Engineer prior to beginning of excavation and embankment work. Avoid contamination of topsoil and underlying soil.

.2 Remove materials unsuitable for embankments to lateral limits

and depths directed. .3 As indicated or directed by Engineer, topsoil and unsuitable

materials excavated under 3.3.2.1 and 3.3.2.2 to be stockpiled, placed in windrows outside toe of embankment or disposed of.

.3 Side Ditches:

.1 Construct side ditches to depths and widths indicated or directed by Engineer, to permit ready flow of surface water.

.2 Maintain and keep ditches open and free from debris until final

acceptance of work.

3.4 Embankments .1 Where indicated or directed by Engineer, scarify or bench existing

slopes in side hill or sloping sections to ensure a proper bond between new materials and existing surfaces. Obtain prior approval of method to be used.

.2 Do not place material which is frozen or place material on frozen

surfaces. .3 Maintain a crowned surface during construction to ensure ready run-off

of surface water. .4 With material containing less than 25% by volume of stone.

.1 Place and compact to full width in uniform layers not exceeding 200 mm loose thickness. Engineer may authorize thicker lifts if specified compaction can be achieved.

.2 Compact to a density of not less than 95% of maximum

Standard Proctor Density, except last 500 mm up to subgrade elevation. Compact last 500 mm to 98% of maximum Standard Proctor Dry Density. Areas designated to have subgrade preparation will have compaction to 100% Standard Proctor

Page 107: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02230 City of Cold Lake ROADWAY EXCAVATION, EMBANKMENT AND COMPACTION Standard Construction Specifications Page 4 of 4

Density to a depth as indicated in drawings and schedule of quantities.

.5 Refer to Section 02911 for topsoil requirements and seeding.

3.5 Finishing .1 Remove soft or other unstable material that will not compact properly

and fill resulting depressions with approved material. .2 Shape and compact entire roadbed to within 50 mm of design

elevations but not uniformly high or low. .3 Do scarifying, blading, compacting or other methods of work as

necessary to provide a thoroughly compacted roadbed shaped to grades and cross sections indicated or directed.

.4 Finish back and side slopes of common material to a neat condition,

suitable for topsoil and seeding, true to line and grade.

.1 Remove boulders encountered in cut slopes and fill resulting cavities.

.2 Hand finish slopes that cannot be finished satisfactorily by

machine.

3.6 Maintenance .1 Maintain finished surfaces in a condition conforming to this section

until acceptance. END OF SECTION

Page 108: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02232 Municipal District of Bonnyville CEMENT MODIFIED SUBGRADE Standard Construction Specifications Page 1 of 2

1.0 GENERAL

1.1 Measurement for Payment

.1 Cement modified subgrade to the specified depth will be measured as indicated on the tender form.

.2 No measurements will be made for:

.1 Unnecessary excavation beyond lines established. .2 Extra handling of windrowed materials blended on embankment

slopes. .3 Stockpiling of borrow material for use in embankment.

2.0 PRODUCTS

2.1 Materials

.1 In situ material or approved imported material .2 Cement conforming to ASTM 150 or CSA A5 (latest edition). .3 Water obtained from domestic supply or other sources subject to the

Engineer’s approval.

3.0 EXECUTION

3.1 Compaction Equipment

.1 Compaction equipment must be capable of obtaining required densities in materials on project.

3.2 Water Distributors

.1 Apply water with equipment capable of uniform distribution.

3.3 Cement Distributors

.1 Apply cement with equipment capable of uniform distribution at the required rate.

Page 109: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02232 Municipal District of Bonnyville CEMENT MODIFIED SUBGRADE Standard Construction Specifications Page 2 of 2

3.4 Preparation

.1 Shape subgrade to proper grade and cross-section prior to applying cement.

.2 Remove and repair unsuitable subgrade areas as directed by the

Engineer. .3 Loosen soil for full depth to be processed and work with cultivating or

mixing equipment until all large lumps are broken down.

3.5 Placing and Compaction

.1 Apply cement at a uniform rate as specified over the area surface. .2 Apply water to bring material to a moisture content adequate to

achieve required compaction and density. .3 Mix with equipment of sufficient size to undertake full depth mixing with

one pass to obtain a homogenous mixture with 100% passing a 25mm sieve.

.4 Commence final compaction within one hour. .5 Compact to 100% of Standard Proctor Density. .6 Shape to within 30mm of design grades with reasonable smoothness

and uniformity. .7 Complete the entire operation in a particular section within one day. .8 Apply a curing seal coat of liquid asphalt primer as per Section 2745.

3.6 Cement Dust Containment

.1 Cement shall not be spread when wind speeds exceed 20 kilometres per hour.

.2 The Contractor is responsible for ensuring that cement dust is

contained within the work area and does not contaminate adjacent areas.

3.7 Maintenance

.1 Maintain finished surfaces in a condition conforming to this section until acceptance.

END OF SECTION

Page 110: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02311 City of Cold Lake SITE GRADING Standard Construction Specifications Page 1 of 4

1.0 GENERAL 1.1 Definitions

.1 Common Excavation:

.1 Refer to Special Provision 2000, para 4.0.

.2 Rock Excavation:

.1 The excavation of rock, concrete or masonry exceeding 1.0 m3

in volume; and solid ledge rock, concrete or masonry which requires for its removal drilling, blasting, wedging, sledging, barring or breaking with a power operated hand tool shall be classified as rock excavation. Soft or disintegrated rock, concrete or masonry which can be removed with a hand pick, power operated excavator or shovel; and loose, shaken or previously blasted rock will not be classified as rock excavation.

1.2 Protection

.1 The Contractor shall be responsible for locating and protecting all existing underground and surface structures, utility pipelines, overhead lines and poles, fences, water and sewer mains, building services, cables, culverts, sidewalks and other works. All damage incurred shall be repaired by the Contractor at his expense.

1.3 Measurement for Payment

.1 Common excavation will be measured as indicated on the tender form in its original place. Payment shall cover compaction of excavated material in fills to 95% Standard Proctor Density, any dewatering required before or during construction, leveling, grading, trimming or similar work, watering for compaction, and construction of ditches in designated locations. Over-excavation will not be paid for. There will be no provision of overhaul payment.

.2 Rock excavation will be measured as indicated on the tender form in

its original place. Payment shall cover complete excavation, loading, hauling and disposal.

.3 Disposal of waste material will be as indicated on the tender form

measured in its original place. Payment shall cover complete excavation, loading, hauling, disposal and leveling or stockpiling at dump locations or other areas as directed.

Page 111: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02311 City of Cold Lake SITE GRADING Standard Construction Specifications Page 2 of 4

.4 Topsoil stripping and replacement of disposal sites will be paid under their respective paid items. There will be no provision of overhaul payment.

.5 Borrow excavation will be the volume measured as indicated on the

tender form compacted in-place. The in-place volume shall be determined by cross-sections taken before and after imported fill placement over the fill area and computer by the average End Area Method. Payment shall cover borrow pit location, clearing, grubbing, stripping, excavation, loading, hauling, placing, compacting, leveling and borrow pit restoration.

2.0 PRODUCTS

.1 Supply all labour, materials and equipment required for site grading. 3.0 EXECUTION 3.1 Grading

.1 Grading shall include the removal and/or satisfactory placement of all materials necessary for the construction and preparation of embankment, slopes, drainage works, alignment, grade and cross-section shown on the Drawings or as required.

.2 Conditions requisite for the completion of grading work will be a

roadway or other works which are smooth and compact over the entire width, firm side slopes with regular shoulder lines, clean side ditches, satisfactory approaches, intersections and entrances, and smooth back slopes. All soft and yielding material in the roadway, if so directed shall be removed and replaced with acceptable material, and all loose stones, clods, weeds, trash, etc. shall be removed from the roadway, side slopes, ditches and back slopes. All improperly compacted material shall be excavated, brought to optimum moisture content if required, and re-compacted at the Contractor’s own expense. On the side slopes and back slopes, and in the bottom of ditches, all projecting boulders must be removed or broken off at least flush with the lines and grades, and the resultant cavities, if any, backfilled.

3.2 Embankment

.1 Embankment shall be constructed by depositing, shaping and compacting acceptable excavated materials. The embankments shall be constructed above the natural ground or other level as required, in conformity with the lines, grades and cross sections shown on the Drawings.

.2 All suitable material from excavations shall be used in forming

embankments or shall be otherwise disposed of.

Page 112: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02311 City of Cold Lake SITE GRADING Standard Construction Specifications Page 3 of 4

.3 Embankment shall be formed of suitable unfrozen material. Stumps, trees, rubbish, sod, topsoil or other unsuitable material shall not be placed in the embankment.

.4 Embankment material shall not be placed on frozen earth, snow or ice,

nor shall frozen soils, ice or snow be placed in any embankment. However, on approval, embankment material may be placed on the existing ground surface if frost penetration is 0.10 m or less. Any frozen material in the embankment shall be removed and disposed of at the Contractor’s expense before proceeding with further embankment construction.

.5 Embankment shall be constructed so that after settlement is complete

the required grade and cross-section is attained at all points. If at anytime before final acceptance of the work the embankment settles below the required grade, it shall be brought back to the required grade by the Contractor.

3.3 Solid Rock Excavation

.1 All rock cuts shall be excavated to 0.15 m below the design subgrade

surface and then backfilled to grade with suitable material. .2 All rock is to be used in the construction of embankments. Where rock

is being used in the embankment, such rock shall be carefully distributed and the cavities filled with approved finer material or earth to form a dense compact mass. Any large rocks encountered during the construction of the embankment in the final finishing operations which constitute a hazard to traffic, due to size or protrusion from the finished embankment surface, shall be removed and disposed of as required.

3.4 Compaction

.1 All material placed shall be spread and bladed smooth in successive

layers, not to exceed 0.15 m in depth when compacted and to the full width of the cross-section Each layer shall be compacted by approved means to a minimum of 98/% Standard Proctor Density. Materials placed in the upper 0.3 m of embankments shall not contain rock which has a diameter larger than 0.15m. The material in each layer shall be compacted at the optimum moisture content plus or minus 2%, unless otherwise required. In case of controversy, the degree of compaction and/or moisture content will be determined by in situ density testing before the succeeding layer is placed.

.2 Compaction over the entire surface area of each layer shall be

obtained by equipment to meet the specified density requirements. Hauling equipment will not be accepted in lieu of compaction equipment. Compaction to the specified density shall be obtained uniformly throughout each layer.

Page 113: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02311 City of Cold Lake SITE GRADING Standard Construction Specifications Page 4 of 4

.3 Where the embankment to be placed traverses muskeg or yielding

ground and it is not possible to place the initial embankment lift in a 0.15 m compacted depth, the Contractor may, upon approval, construct the first embankment lift to a depth sufficient to support the construction equipment. All embankment to be constructed above this support will be constructed in 0.15 m compacted depths, as herein before specified.

.4 Where moisture content tests indicate that material being used for

embankment is above optimum moisture content, the material shall be thoroughly worked until its optimum moisture content is reached.

.5 Where moisture content tests indicate the material for embankment is

below optimum moisture, water shall be added. The material shall be thoroughly dissected and broken down, water added in amounts as required, and the material thoroughly worked to mix the water uniformly throughout the soil prior to commencing compaction operations.

3.6 Surplus Material

.1 Surplus material in excavation which is not required in the adjacent

embankments, test fills, entrances or subsidiary road connections, shall be otherwise utilized or disposed of in the area indicated on the Drawings or as directed by the Engineer. No material shall be wasted, unless approved. In no case shall material be deposited above the established grade without approval.

END OF SECTION

Page 114: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02315 City of Cold Lake TRENCHING AND BACKFILLING Standard Construction Specifications Page 1 of 11

1.0 GENERAL

1.1 Definitions

.1 Common Excavation:

.1 Refer to special provision 2000, par 4.0. .2 Rock Excavation:

.1 The excavation of rock, concrete or masonry exceeding 1.0m3 in volume; and solid ledge rock, concrete or masonry which requires for its removal drilling, blasting, wedging, sledging, barring or breaking with a power operated hand tool shall be classified as rock excavation. Soft or disintegrated rock, concrete or masonry which can be removed with a hand pick, power operated excavator or shovel; and loose, shaken or previously blasted rock will not be classified as rock excavation.

.3 Class 1 Backfill:

.1 Class I backfilling shall consist of backfilling the trench with sand or gravel compacted in even layers not exceeding 300mm in depth so that there is no subsequent subsidence in the trench. Backfill shall be compacted to a minimum of 100% Standard Proctor Density. Fillcrete may be used in lieu of Class 1 backfill.

.4 Class 2 Backfill:

.1 Class 2 backfilling shall consist of replacing the excavated material in even layers not exceeding 300 mm in depth, and compacting each layer by mechanical means to 95% Standard Proctor Density in landscaped areas and 98% Standard Proctor Density within the road carriage way.

.5 Topsoil:

.1 The top layer of soil containing organic material capable of supporting good vegetative growth and suitable for use in top dressing, landscaping and seeding.

Page 115: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02315 City of Cold Lake TRENCHING AND BACKFILLING Standard Construction Specifications Page 2 of 11

1.2 Protection of Existing Features

.1 Existing buried utilities and structures:

.1 Prior to commencing any excavation work, notify applicable owner or authorities; establish location and state of use of buried utilities and structures. Clearly mark such locations to prevent disturbance during work.

.2 Maintain and protect from damage, water, sewer, gas, electric,

telephone and other utilities and structures encountered. All damage incurred shall be repaired by the contractor at his expense.

.2 Existing buildings and surface features:

.1 Maintain and protect from damage existing buildings, trees and

other plants, lawns, fencing, service poles, wires, rail tracks, paving, survey bench marks and monuments which may be affected by work. All damage incurred shall be repaired by the Contractor at his expense.

1.3 Safety Requirements

.1 The Contractor shall be required to observe all applicable sections of

the Alberta Regulations 271176 made under the Occupational Health and Safety Act covering worker safety in trenches and excavations.

.2 Open cut trenches shall be sheeted and braced as required by the

Accident Prevention Regulations of the Occupational Health and Safety Division of the Department of Labour and Municipal Ordinances, and as may be necessary to protect life, property and the work.

.3 Prefabricated cages or shields, provided they conform with all

applicable safety requirements, may be used to supplement or replace conventional shoring.

1.4 Samples

.1 At least 2 weeks prior to commencing work, inform of proposed source

of granular materials. .2 The Contractor shall provide a sieve analysis of the material for

approval.

Page 116: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02315 City of Cold Lake TRENCHING AND BACKFILLING Standard Construction Specifications Page 3 of 11

.3 Sand and gravel shall be approved before being used.

1.5 Measurement for Payment

.1 Except as provided elsewhere, trenching, backfilling and compaction

will be measured as indicated on the tender form for each depth category and type of backfill used on the following basis:

.1 Horizontal measurement shall be measured along the

centerline of the trench between manhole centres, fittings to fittings for watermain and from main to the property line for the house service trenches.

.2 Measurement between any two manholes or structures for

gravity sewers shall be included in one depth category. .3 The depth category between any two manholes or structures

for gravity sewers will be calculated by taking the sum of the depths of the pipe at each manhole or structure and dividing by two.

.4 The depth of the pipe shall be the depth from the top of the

frame to the invert of the pipe in the trench being measured. .2 Rock excavation will be measured as indicated on the tender form in

its original place. Boulders exceeding 1.0m3 in volume shall be measured complete, as removed from the trench. Ledge rock shall be measured by actual length and actual width of the trench. A greater width than the approved width will not be paid for. Depth shall be measured by the distance from the surface of the rock to the level to which the Engineer orders the rock to be excavated. Any over excavation will not be paid for. Payment for rock excavation shall include hauling and disposing of the material excavated at a location approved, and replacement with suitable material.

.3 Imported granular material used for stabilizing trench bases and

replacement of unsuitable material will be measured as indicated on the tender form. The volume of the material used shall be computed from the length and depth specified, and the width which shall be the trench width as specified. Payment shall be compensation in full for supplying and hauling the material to the site, placing and compacting, the cost of any extra excavation involved and the disposal of any extra excavated material.

Page 117: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02315 City of Cold Lake TRENCHING AND BACKFILLING Standard Construction Specifications Page 4 of 11

.4 Filter fabric used for wrapping trench stabilizing gravel will be

measured as indicated on the tender form installed. Payment shall be compensation in full for supply and hauling the material to the site, placing, sewing, welding, cutting and all other incidentals necessary to complete the work prescribed.

.5 The cost of supplying, placing, maintaining and removal of shoring,

bracing, cofferdams, underpinning and dewatering equipment will be incidental to the price paid for pipe installation. No extra payment will be made.

2.0 PRODUCTS

2.1 Stabilizing Base Gravel

.1 Stabilizing base gravel shall be well graded gravel consisting of hard

durable particles free from clay lumps, cementation, organic material, frozen material and other deleterious materials.

.2 The material shall meet one of the following gradations depending on

the native foundation material encountered:

Screened Rock-Washed (Not Crushed)

Crushed Gravel

Sieve Size (10-6 m)

Percent Passing (by weight)

Sieve Size (10-6 m)

Percent Passing (by weight)

25,000 100 25,000 100

10,000 30-55 20,000 35-60

2,000 5-25 5,000 15-40

400 0-5 400 5-15

63 0-5

.3 The liquid limit shall not exceed 25 and the plasticity index shall not exceed 6.

Page 118: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02315 City of Cold Lake TRENCHING AND BACKFILLING Standard Construction Specifications Page 5 of 11

2.2 Filter Fabric

.1 The synthetic filter fabric shall consist of a durable, permeable, woven,

polypropylene fabric composed of continuous synthetic filaments with typical properties as follows:

Tensile Grab Strength — ASTM D4632 890 N Trapezoid Tear Strength — ASTM D4533 330 N Mullen Burst Strength — ASTM D3786 2,750 kPa Puncture—ASTM 400 N Filter fabric shall be woven Propex 2002, Layfield LP200 or approved

equal.

2.3 Class I Backfill Material

.1 Material for Class 1 backfill shall consist of sound, hard, durable, uniformly graded crushed gravel and shall not contain organic or soft materials, materials that break up when alternately frozen and thawed or wetted and dried, or other deleterious materials. When compacted near the optimum moisture content to not less than 95% of the maximum dry density corrected for the stone content as determined by ASTM D698, the material shall have a minimum bearing ratio as defined ASTM D1 883, of fifteen percent (15%).

.2 Class 1 backfill shall meet the following gradation when tested to

ASTM C1 36:

Sieve Size (10-6 m)

Percent Passing (by weight)

60,000 100

16,000 32-85

5,000 20-65

315 6-30

80 2-10

2.4 Fillcrete

.1 Non-shrinking fill made up of a mixture of portland cement, sand, water

and admixtures conforming to the following:

.1 Minimum 28 day compressive strength 1.00 to 2.00 MPa .2 Slump 100 mm ±25 mm .3Portland Cement Type 10 .4 Air entrainment 5% ±1%

Page 119: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02315 City of Cold Lake TRENCHING AND BACKFILLING Standard Construction Specifications Page 6 of 11

3.0 EXECUTION

3.1 Site Preparation

.1 Strip organic material, clear and grub, remove weeds and grasses as

specified or as required prior to excavation. Avoid intermixing of subsoil fill materials with organic material and from other forms of contamination.

3.2 Trenching

.1 Trench width:

.1 The minimum trench width below the crown of the pipe shall be not less than the nominal diameter of the pipe plus 400mm. The maximum width of the trench below the crown of the pipe including shoring shall not be more than the nominal diameter of the pipe plus 600mm or not more than a total width of 900mm, whichever is larger. Where the maximum trench width is exceeded, the Contractor shall, at his own expense, provide special bedding or take other precautions as directed by the Engineer. Where more than one pipe is laid in the same trench, the minimum and maximum widths shall be as directed by the Engineer.

.2 The contractor shall confine his activities to the immediate area

of the trench. All activities outside the trench boundaries shall be performed so as not to damage other existing features. The Contractor shall generally have the option of using either vertical shored trenches or Vee trenches. Every effort shall be made to restrict the trench widths to minimize the area disturbed.

.2 All excavated material shall be piled at least 1.0m clear of the trench

top to prevent material from falling back into the excavation. The material shall be piled in such a manner that it will not endanger the work, or obstruct other work or rights-of-way. Sufficient clear space must be left on one side of the trench to accommodate the surveyor’s stakes.

.3 The trench shall be excavated so that the pipe can be laid to the

alignment, grade and depth required.

Page 120: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02315 City of Cold Lake TRENCHING AND BACKFILLING Standard Construction Specifications Page 7 of 11

.4 Trench Rock Excavation:

.1 Where excavation is made in rock or where excavation is made

in a material which cannot provide an even, uniform and smooth surface; or where large stones are encountered in the trench, such material shall be removed to provide a clear distance between any part or projection of such material and the surface of all pipe and fittings of not less than 150mm for 600mm outside diameter pipe or less, and 200mm for pipe having an outside diameter greater than 600mm. The subgrade shall then be made by backfilling with an approved sand compacted in 75mm layers at the Contractors expense. Excavated rock shall not be used for backfill. The finished subgrade surface shall be shaped by hand tools to provide a uniform and continuous support for the pipe.

.2 Blasting for excavation will be permitted only with the approval

of the City of Cold Lake and only when proper precautions are taken for the protection of persons or property. The Contractor’s method of procedure in blasting shall conform to provincial statutes and municipal ordinances.

.5 The subgrade shall provide an uniform and continuous support for the

pipe and fittings on solid undisturbed ground. Any over excavation by the Contractor below the required grade shall be backfllled at his expense with an approved compacted sand.

3.3 Unstable Subgrade

.1 Where the subgrade of the trench is unstable or will not properly

support the pipe, or where it contains materials harmful to the pipe such as ashes, cinders, refuse, vegetable or organic material, the Contractor shall excavate such material to the width, depth and length as directed and dispose of the material. The subgrade shall then be made by backfilling with an approved stabilizing gravel compacted in 75mm layers. The finished subgrade surface shall be shaped by hand tools to provide an uniform and continuous support for the pipe.

.2 The stabilization gravel may be completely wrapped in the filter fabric

as specified. The fabric shall be overlapped a minimum of 500 mm at all joints to provide a full, continuous wrap and shall be smooth and free of tension, stress, folds, wrinkles or creases.

Page 121: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02315 City of Cold Lake TRENCHING AND BACKFILLING Standard Construction Specifications Page 8 of 11

.3 Where the subgrade cannot be made to properly support the pipe by

replacing unsound material with stabilizing gravel, the Contractor shall construct a foundation for the pipe in accordance with a drawing prepared at the time. Payment for this work shall be made in accordance with the provisions for extra work unless specified otherwise.

3.4 Shoring

.1 When close sheeting is required, it shall be so driven as to prevent adjacent soil from entering the trench either below or through such sheeting. When directed, the sheeting shall be driven to the full depth of the trench or to such additional depths as may be required for the protection of the work.

.2 Trench bracing may be removed when the backfilling has reached the

respective level of such bracing. Sheeting shall be removed as the backfilling proceeds. Backfilling of holes left by sheeting below the trench bottom shall be carefully compacted, and thereafter backfilling and withdrawal of sheeting shall proceed together. No voids shall be left in the backfill by the withdrawal of the sheeting.

.3 When a cage or shield is used in the trench instead of shoring, special

care shall be taken to ensure that there is no lateral or longitudinal movement of the pipe when the cage is moved. The cage shall be raised vertically so that the bottom member is clear of the crown of the pipe before the cage is pulled forward in the trench.

3.5 Trench Drainage and Stormwater Management

.1 Gutters and natural drainage channels shall not be obstructed.

Satisfactory provisions shall be made for alternate drainage where this is impractical.

.2 The trench shall be so drained that the workmen may work safely and

effectively. All water encountered in trenches whether caused by high water table, rain or surface runoff shall be pumped or bailed out, and in no case shall the pipe be used as a drain for such water. It is essential that the discharge of the trench dewatering pumps be conducted away from the site of the work and into natural drainage channels, drains or storm sewers.

Page 122: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02315 City of Cold Lake TRENCHING AND BACKFILLING Standard Construction Specifications Page 9 of 11

.3 Keep excavations free of water while work is in progress.

.4 Protect open excavations against flooding and damage due to surface run-off.

.5 Manage flows in active storm sewer during construction.

.6 Dispose of water in a manner not detrimental to public and private property, or any portion of work completed or under construction.

.7 Submit details of proposed surface and stormwater management methods to Engineer for approval prior to start of work.

.8 All surface run-off, trench drainage and Stormwater Management

activities are the responsibility of the contractor. Contractor is to familiarize himself with the geotechnical report and determine the amount of dewatering effort that will be required to do the work in a safe and efficient manner. No separate payment will be made for dewatering.

3.6 Backfillinq

.1 Bedding and initial backfilling shall be as specified for the particular pipe installed.

.2 General backfilling:

.1 Class 1 backfill as defined in Section 1.1 - Definitions shall be used underneath all existing asphalt road or concrete areas. Class 2 backfill as defined in Section 1.1 - Definitions shall be used in all other areas including future roads, boulevards and open areas

.2 No boulders, rock, ice, snow, organic material or debris shall be

permitted in the trench. These unsuitable materials shall be hauled away.

.3 All surplus excavated material shall also be hauled away, or

disposed of as directed. In the event of deficiency of backfill material, suitable material shall be supplied by the Contractor at his expense.

.4 All trenches shall be backfilled as the work proceeds and no

more than 30 m shall be left open at the end of a days work.

Page 123: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02315 City of Cold Lake TRENCHING AND BACKFILLING Standard Construction Specifications Page 10 of 11

3.7 Backfill Compaction

.1 The Contractor shall be responsible for adequate compaction of the

trenches and for the correction of settlement during the maintenance period of the Contract. Mechanical compaction equipment shall not be used until there is sufficient cover to prevent damage to the pipe.

.2 The type of compaction equipment shall be chosen with regard to

minimizing the vibration effect on nearby buildings and utilities. The Contractor shall inspect the condition of buildings prior to construction. The Contractor is responsible for any damage caused to buildings due to construction.

3.8 Testing Backfill Compaction

.1 Compaction results shall be based on a minimum of one density test

per 100 metres of trench for each 1.0 meter of compacted vertical backfill. Additional tests may be called for by the City of Cold Lake as deemed necessary.

.2 If a density test indicates insufficient compaction at any depth, then

two more densities, where are proportionally representative of trench length, shall be taken at that depth. If the average of these tests is below the required density, the trench shall be re-excavated and re-compacted to meet the specified density.

.3 This testing in no way relieves the Contractor of his maintenance

responsibilities with respect to settlements as specified. The Contractor shall repair any settlement and damaged surface improvements due to the settlement which occurs during the maintenance period.

.4 The cost of all initial testing will be borne by the Contractor. Non-

conformity with the specified density or moisture content shall constitute sufficient grounds for rejection of the work.

3.9 Augered/Bored Crossings

.1 The augering/boring machine shall be aligned and set to the required

grade. If the hole deflects from desired course, another hole shall be bored in a location specified. Minimum allowable grades and maximum allowable bends shall be as specified by water mains laid in an open trench.

.2 The bored hole shall be of sufficient size to allow the carrier pipe or

casing pipe, as specified, to pass through unrestricted. After installation of the pipe, the bored hole void shall be backfilled with

Page 124: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02315 City of Cold Lake TRENCHING AND BACKFILLING Standard Construction Specifications Page 11 of 11

pneumatically blown free running sand or sealed with 5 MPa pressure grouting.

.3 Highway crossings shall be cased as shown on the drawings. Casing

pipe joints shall be welded. Each joint shall be coated and wrapped with primer and tape.

.4 Anodes and warning signs shall be installed as specified.

3.10 Fences and Gates

.1 Maintain gates and fences along and crossing the right-of-way and on

access roads. .2 Do not open fences crossing the construction right-of-way unless

installing the pipe underneath the fence is not feasible. .3 Notify landowners and tenants if a fence must be opened. Install

temporary gates in accordance with the wishes of the landowners and tenants.

.4 Return fences to original condition as soon as fence openings or

alterations are no longer required for construction.

END OF SECTION

Page 125: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02340 City of Cold Lake SUBGRADE CONSTRUCTION Standard Construction Specifications Page 1 of 4

1.0 GENERAL

1.1 Measurement for Payment

.1 Subgrade preparation will be measured for payment as indicated on

the tender form. Payment shall be compensation for shaping, scarifying, watering, aerating and compaction to 100% Standard Proctor Density with a moisture content between +3% and -3% of optimum.

.2 Imported granular material will be measured as indicated on the tender

form material in place after compaction. Payment shall be compensation for supply, hauling, placing and compacting the material to 98% Standard Proctor Density.

.3 Road filter fabric will be measured as indicated on the tender form in

place. Payment shall be compensation for supply, placing, overlapping or sewing.

2.0 PRODUCTS

2.1 Imported Granular Material

.1 Material for the imported granular material shall consist of sound, hard,

durable, uniformly graded crushed gravel and shall not contain organic or soft materials, materials that break up when alternately frozen and thawed or wetted and dried, or other deleterious materials.

.2 Imported granular Material shall meet the following gradation when

tested to ASTM C136

Sieve Size (10-6 m)

Percent Passing (by weight)

60,000 100

16,000 32-85 5,000 20-65 315 6-30 80 2-10

.3 At least 30 percent by weight of material retained on the 25,000 sieve

shall have two or more fractured faces.

Page 126: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02340 City of Cold Lake SUBGRADE CONSTRUCTION Standard Construction Specifications Page 2 of 4

2.2 Filter Fabric (Geotextile)

.1 The synthetic filter fabric shall consist of a durable, permeable, woven,

polypropylene fabric composed of continuous synthetic filaments with typical properties as follows:

Tensile Grab Strength — ASTM D4632 890 N Trapezoid Tear Strength — ASTM D4533 330 N Mullen Burst Strength — ASTM D3786 2,750 kPa Puncture—ASTM 400 N

Filter fabric shall be woven Propex 2002, Layfield LP200 or approved equal.

3.0 EXECUTION

3.1 Unstable Subgrade

.1 Where the subgrade is unstable, or where it contains materials such as

ashes, cinders, refuse, vegetable or organic material, the Contractor shall excavate such material to the width, depth and length as directed and dispose of the material as required. The subgrade shall then be made by backfilling with approved native material or imported granular material as required. Material shall be placed in successive layers not exceeding 150 mm in depth and compacted to a minimum of 98% Standard Proctor Density.

3.2 Subgrade Preparation

.1 The subgrade shall be scarified and compacted to a minimum of 100%

Standard Proctor Density at optimum moisture content, over the full width of the cross-section. The material shall be worked to ensure as much uniformity as possible in material.

.2 Water shall be added or the material shall be aerated to bring the

moisture content to optimum value. The supply of water shall be the responsibility of the Contractor.

3.4 Testing Compaction and Quaility Control

.1 The Contractor shall be responsible for quality control. .2 Compaction results shall be based on a minimum of one density test

per 2,000 square metres of road. Additional tests may be called for by The City of Cold Lake as deemed necessary to ensure the quality of the work.

Page 127: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02340 City of Cold Lake SUBGRADE CONSTRUCTION Standard Construction Specifications Page 3 of 4

.3 Copies of results for any quality control testing carried out by the contractor shall be forwarded directly to the Engineer.

.4 Field density tests shall conform to ASTM D1 556, ASTM D21 67, or ASTM D2922 for comparison with a maximum density determined according to ASTM D698 Method A.

.5 Areas which are not satisfactory to the Engineer shall be reworked and

retested at the Contractors expense. .6 The Contractor shall supply a Loaded Tandem Axle Water truck for the

subgrade proof roll test. This test will be undertaken when the compaction of the subgrade has been completed, and shall be under the direction and in the presence of the Engineer.

.7 Under no circumstances shall the Contractor cover the subgrade with

sub-base, base-course, asphalt base-course, curb and gutter, or monolithic curb, gutter and sidewalk until all density test results and the Subgrade proof roll test performed in the presence of the Engineer are approved by the Engineer.

.8 Areas which are not satisfactory to the Engineer shall be reworked and

retested at the Contractors expense. .9 Compaction density testing may be waived by the Engineer upon

satisfaction of the construction operations and results of the proof roll test.

3.5 Proof Roll Test .1 For proof rolling use a loaded Tandem Axle Water truck. The Engineer may authorize use of other acceptable proof rolling equipment. .2 Proof roll top of subgrade upon completion of fine grading and compaction as directed by the Engineer .3 Make sufficient passes with proof roller to subject every point on surface to three (3) separate passes of loaded tire or as directed by the Engineer. .4 Where permanent rutting in excess of 1 inch (25mm) will be

considered failure. In addition, (rebound) movement or rutting in excess of 1 inch (25mm) with substantial cracking or substantial lateral movement will be considered failure. The Engineer and/or Owner the proof rolling reveals areas of defective sub-grade:

.1 Remove base, and sub-grade material to depth and extent as directed by the Engineer.

Page 128: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02340 City of Cold Lake SUBGRADE CONSTRUCTION Standard Construction Specifications Page 4 of 4

.2 Backfill excavated sub-grade with suitable common material and compact in accordance with Section 02230 - Roadway Excavation, Embankment and Compaction.

3.6 Tolerances

.1 The finished surface of the subgrade shall conform to approved grades

and shall show no depression more than 30 mm under a straightedge 3.0 m long when placed parallel to the centreline. Subgrade higher than the approved grades shall be cut to the required grades.

.2 The tolerance for ditches, boulevards, etc., shall be ±50 mm.

3.7 Inspection .1 Before acceptance, the subgrade surface shall be true to cross-section and grade, and shall conform to the density and bearing ratio requirements specified. .2 Field density and moisture content tests may be made by the Owner Or his representative to ensure that the material is satisfactory. Material not meeting the specifications will not be approved. 3.8 Maintenance .1 Maintain finished base in a condition conforming to this Section until Succeeding material is applied or until acceptance by the Engineer.

END OF SECTION

Page 129: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 1 of 14

1.0 GENERAL

1.1 Definitions

.1 Class B Bedding:

.1 The pipe shall be bedded in compacted granular material which shall have a thickness as specified on the standard drawing.

.2 The granular material shall be hand placed and compacted

to a density of 95% Standard Proctor in 150 mm layers for the full width of the trench up to

300 above the crown of the pipe.

1.2 Samples

.1 At least 2 weeks prior to commencing work, inform of proposed

source of bedding materials. .2 Provide a sieve analysis of the bedding materials for review. .3 Bedding material samples shall be submitted before being used.

1.3 Scheduling of Work

.1 Schedule work to minimize interruptions to existing sewers. .2 Maintain existing sewer flows during construction. .3 Submit schedule of expected interruptions for approval and adhere

to approved schedule.

Page 130: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 2 of 14

1.4 Measurement for Payment

.1 Sewer main installed in open trench will be measured centre to

centre between manholes or from the centre of a manhole to a required termination where applicable. Measurement shall be based on depth classification. The applicable depth shall be determined at the time the grade stakes are set by measuring the depth from existing ground to the invert of the pipe at 20 m stations between every pair of manholes. The depth classification shall be obtained by averaging these measured depths between each pair of manholes. Payment shall be compensation in full for supply of materials including, bedding, laying and jointing of the pipe, disposal of surplus excavation, dewatering, backfill, compaction as specified and provision of a sieve analysis for bedding material.

.2 Manholes will be measured in metres from the top of cover to the

lowest invert. Payment shall be compensation in full for excavation, supply of materials, installation of the manhole complete with benching, frame and cover, backfill and compaction.

.3 Drop manhole will be paid for at the price bid for manholes except

that the drop section of the manhole shall be paid for separately. The drop section of the manhole shall be measured in metres between the low and high invert of the drop piping. Payment shall be compensation in full for excavation, supply and installation of all material exclusive of the manhole, breaking into the manhole, benching the manhole floor, backfill and compaction.

.4 Connections to existing manholes will be measured in units

acceptably completed. Payment shall be compensation in full for excavation; breaking into the manhole or catch basin; supply and installation of all concrete, pipe, adaptors, connections and bedding; grouting the junction area; benching and rechannelling the manhole floor; sealing off connections to be abandoned, backfill and compaction.

.5 Connection to existing sewer stub will be measured in units

acceptably completed. Payment shall be compensation for all necessary locating, excavation, cutting and removal of existing pipe; supply and installation of coupler or fittings; disposal of water; reconnection of pipe, backfill and compaction.

.6 Sewer main and catch basin lead in auger holes will be measured

in metres from shaft face to shaft face. Payment shall be compensation in full for excavation of shafts, boring, supply and installation of the pipe, testing, backfill, compaction and disposal of surplus excavated material.

Page 131: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 3 of 14

.7 Catch basins will be measured in units. Payments shall be compensation in full for excavation, supply of materials, installation of the catch basin complete with frame and cover, backfill and compaction.

.8 Catch basin leads installed in open trench will be measured in

metres along the top of the pipe from the centre of the catch basin to the centre of the sewer or manhole at the point to connection. Payment shall be compensation in full for excavation; supply of materials; bedding, laying and jointing of the pipe: connection to catch basins, manholes or sewers; backfill and compaction as specified.

.9 CCTV sewer inspection will be measured in meters of sewer main

inspected. Payment shall be full compensation for CCTV inspection requirements as indicated in section 3.7 Testing

2.0 PRODUCTS

2.1 Sanitary Sewers

.1 Sanitary sewers shall be Polyvinyl Chloride (PVC) pipe, DR35,

conforming to CAN B182.2 and ASTM D3034. The pipe shall be manufactured from PVC compounds conforming to ASTM D1 784. Joints shall be rubber rings conforming to ASTM D1 869 preset in the bell groove. Prefabricated PVC Tee branches shall be installed at all service connection locations (no saddles). Pipe age not to exceed two years at time of installation.

2.2 Storm Sewers

.1 Storm sewers shall be reinforced concrete pipe conforming to CAN A257.2 and ASTM C655 using flexible rubber gaskets meeting CAN A257.3 and ASTM C443 Sulphate resistant Portland cement to CAN A5.

OR .2 PVC gravity pipe with exterior reinforcing ribs conforming to ASTM

F794, GSA B182.4 and UNI-B-9. The pipe is to have a minimum pipe stiffness of not less than 320 kPa at 5% deflection when tested in accordance with ASTM D2412.

Page 132: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 4 of 14

2.3 Catch Basin Leads

.1 Catch basin leads shall be Polyvinyl Chloride (PVC) pipe, DR35,

conforming to CAN B182.2 and ASTM D3034. The pipe shall be manufactured from PVC compounds conforming to ASTM D1 784. Joints shall be rubber rings conforming to ASTM D1869 preset in the bell groove.

2.4 Manhole and Catch Basin Sections

.1 Manhole and catch basins sections shall be precast reinforced

concrete conforming to ASTM C478. All sanitary and storm manhole sections shall have confined rubber gasket joints meeting requirements of ASTM C443. Both the inside and outside of each joint shall be finished smooth with cement mortar. Manholes shall be 1,200 mm diameter barrels complete with 20 mm galvanized ladder rungs set at 400 mm on centre. All manhole bases shall be pre-benched bases with all incoming and outgoing pipes factory installed. Catch basins shall be 900 mm diameter barrels with Tee-Top slab and shall conform to ASTM C478.

2.5 Frame and Covers

.1 Manhole frames and covers shall be Norwood Foundry No. F39 or

approved equal in boulevard and landscaped areas. Manhole frames and covers shall be Norwood Foundry No. NF80 or approved equal in asphalt road areas. Frames and covers shall conform to ASTM A48 for Grey Iron Castings.

.2 Catch basin frames and grates shall be Norwood Foundry No. K7

for rolled faced curbs and Norwood Foundry F51 w/o side inlet for straight faced curbs or approved equal. Frames and grates shall conform to ASTM A48 for Grey Iron Castings.

2.6 Concrete

.1 Concrete for bedding, manholes, catch basins, concrete pipe and

other appurtenances shall be Sulphate Resistant ASTM Type 50. Cast-in-place concrete shall develop a compressive strength of not less than 25 MPa in 28 days.

Page 133: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 5 of 14

2.7 Bedding Material

.1 Well graded sand consisting of hard durable particles free from clay

lumps, cementation, organic material, frozen material and other deleterious materials.

.2 The material shall meet the following gradation:

Sieve Size (106 m)

Percent Passing (by weight)

12,500 100

5,000 95

80 2-10

.3 The liquid limit shall not exceed 25 and the plasticity index shall not

exceed 6. The Contractor shall provide a sieve analysis of the sand for the Engineer’s approval.

2.8 Insulation

.1 Any insulation that is used must be manufactured using a process that

does not utilize ozone-depleting chemicals in any way.

.2 For insulating pipes, use DOW HI-40 Styrofoam or similar approved board.

3.0 EXECUTION

3.1 Preparation

.1 Clean pipes and fittings of debris and water before installation.

Carefully inspect materials for defects before installing. Remove defective materials from site.

3.2 Trenching and Backfill

.1 Do trenching and backfill work in accordance with Section 02315-

Trenching and Backfilling. .2 Do not allow contents of any sewer or sewer connection to flow into

trench. .3 Trench line and depth require approval prior to placing bedding

material and pipe.

Page 134: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 6 of 14

.4 Do not backfill trenches until pipe grade and alignment have been checked and accepted, and infiltration and exfiltration test results are within limits specified.

3.3 Pipe Bedding

.1 Pipe bedding shall be Class B as defined in Section 1.1 - Bedding material shall be as specified in Section 2.0 -Products. .2 Granular Bedding:

.1 Place granular bedding material in uniform layers not

exceeding 150 mm compacted thickness for the full width of the trench up to a level of 300 mm above the crown of the pipe to at least 95% Standard Proctor Density.

.2 Shape bed true to grade and to provide continuous, uniform

bearing surface for barrel of pipe. Do not use blocks when bedding pipe.

.3 Shape transverse depressions as required to receive bell if

bell and spigot pipe is used.

3.4 Pipe Installation

.1 The horizontal alignment of the centreline of the pipe shall not be

more than 75 mm off the given line. .2 The vertical grade of the sewer main shall not deviate from the

given grade by an amount greater than 20 mm. .3 Handle pipe with approved methods. Do not use chains or cables

passed through pipe bore so that weight of pipe bears upon pipe ends. Do not exceed maximum joint deflection recommended by pipe manufacturer. Install PVC pipe and fittings in accordance with CSA B181.12. Install concrete pipe as recommended in the “Concrete Pipe Installation Manual” as published by the American Concrete Pipe Association.

.4 Lay and join pipes in accordance with manufacturer’s

recommendations. Lay pipes on prepared bed, true to line and grade, with pipe invert smooth and free of sags or high points. Ensure barrel of each pipe is in contact with shaped bed throughout its full length. Commence laying at the lowest point of the length being laid and proceed in upstream direction with bell socket ends of pipe facing upgrade.

.5 Do not allow water to flow through pipe during construction, except

Page 135: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 7 of 14

as may be permitted by the City of Cold Lake. .6 Whenever work is suspended, install a removable watertight

bulkhead at open end of last pipe laid to prevent entry of foreign materials.

.7 Position and join pipes by approved methods. Do not use

excavating equipment to force pipe sections together. .8 Pipe Jointing:

.1 Install gaskets in accordance with manufacturer’s

recommendations. .2 Support pipes with hand slings or crane as required to

minimize lateral pressure on gasket and maintain concentricity until gasket is properly positioned.

.3 Align pipes carefully before joining. Maintain pipe joints free

from mud, silt, gravel and other foreign material. .4 Avoid displacing gasket or contaminating with dirt or other

foreign material. Gaskets so disturbed shall be removed, cleaned and lubricated and replaced before joining is attempted. Only the lubricant recommended by the rubbing ring manufacturer shall be applied to the rubber ring or ends of the pipe.

.5 Complete each joint before laying next length of pipe.

Minimize joint deflection after joint has been made to avoid joint damage. Apply sufficient pressure in making joints to ensure that joint is complete as outlined in manufacturer’s recommendations.

.6 At rigid structures, install pipe joints not more than 1.2 m

from side of structure. .7 Mortared concrete pipe joints: .8 Pipe Jointing: .1 Install gaskets in accordance with manufacturer’s

recommendations. .2 Support pipes with hard slings or crane as required to

minimize lateral Pressure on gasket and maintain concentricity until gasket is properly positioned.

.3 Align pipes carefully before joining. Maintain pipe

joints free from mud, silt, gravel and other foreign material.

Page 136: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 8 of 14

.4 Avoid displacing gasket or contaminating with dirt or other foreign material. Gaskets so disturbed shall be removed, cleaned and lubricated and replaced before joining is attempted. Only the lubricant recommended by the rubbing ring manufacturer shall be applied to the rubber ring or ends of the pipe.

.5 Complete each joint before laying next length of pipe.

Minimize joint deflection after joint has been made to avoid joint damage. Apply sufficient pressure in making joints to ensure that joint is complete as outlined in manufacturer’s recommendations.

.6 At rigid structures, install pipe joints not more than 1.2m

from side of structure. .7 Mortared concrete pipe joints:

.1 Pipe interior: circular pipes 700mm diameter

and larger, and arch or elliptical pipe equivalent to 900mm diameter or larger shall have interior gap between end of adjacent pipes filled with motar. Apply motar minimum 7 days after backfilling has been completed to allow pipe settlement to occur. Finish interior surface of joint smooth.

.2 Pipe exterior: for bell and spigot pipe, use motar to seal outside of joints. Press and bed motar into place. Allow motar to set minimum of one hour before backfilling.

.9 Plug lifting holes with approved prefabricated plugs set in non-

shrink grout. .10 Cut pipes as required for special inserts, fittings or closure pieces in

a neat manner, as recommended by pipe manufacturer, without damaging pipe or its coating and to leave a smooth end at right angles to axis of pipe.

.11 Make watertight connections to manholes. Use non-shrink grout

when suitable gaskets are not available.

3.5 Service Connections

.1 Junctions and risers shall be installed in the sewer mains using

prefabricated tee branches or wye branches. .2 Use prefabricated saddles or approved field connections for

connecting pipes to existing sewer pipes. Joint of saddle to pipe shall be structurally sound and watertight.

Page 137: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 9 of 14

.3 Service connection pipe shall not extent into interior of main sewer.

3.6 Appurtenances

.1 Install all manholes, drop inlets, junctions, risers, catch basins and other appurtenances at the locations shown on the construction drawings and/or as directed. Installation shall be in accordance with the standard or special drawing for each appurtenance.

.2 Maximum allowable tolerances for installed manhole and catch

basins are: .1 Horizontal: 10 mm horizontal in 1.5 m vertical. .2 Vertical: ± 10 mm for any elevation shown.

.3 A minimum of 3 courses of grade rings are required immediately

beneath the manhole cover to allow for a minimum adjustment of 400 mm and maximum adjustment of 800 mm.

.4 Confined rubber gasket joints conforming to ASTM C443 shall be

used between barrels and all joints between barrels and grade rings. At joints shall be finished smoothly with cement mortar.

.5 The channeled floor of the manholes shall be smooth and true to

line and grade and shall be constructed of concrete shaped to provide a smooth, unobstructed flow. The benching shall be trowelled to a smooth finish. Branch lines entering the manhole shall be channeled to join the main line at an acute angle.

.6 Sewer pipe into existing manholes must be grouted in. Since

concrete wilt not bond to PVC pipes, it will be necessary to coat the PVC pipe with an approved cementing agent to which sand has been added to form a suitable surface to which the concrete will bond. All PVC pipe shall be connected in accordance with the ASTM Standard.

.7 Break into existing manholes, catch basins or sewers as shown on

the construction drawings. This work shall be performed in a workmanlike manner according to the dictates of good practice. Existing manhole floors shall be rechanneled and properly benched, the junction area shall be grouted to form a smooth joint, all debris including concrete and excavated material shall be removed and the vicinity of the connection shall be left in a tidy acceptable condition.

Page 138: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 10 of 14

3.7 Testing

1. Sewer inspection by televising:

.1 Contractor operating the CCTV must be PAC (Pipeline

Assessment Certified) and he/she must present their certification to the Engineer prior to start of CCTV.

.2 All sewers shall be inspected by camera after backfilling of

the trench to finished grade. .3 The inspection shall be made by employing television

scanning equipment which shall be provided by the Contractor. The Contractor shall employ a qualified PAC closed circuit television Contractor acceptable to the City of Cold Lake to carry out the inspection.

.4 All television inspection shall be carried out in the presence

of the City of Cold Lake and/or the Engineer who shall be given at least 48 hours advance notice of any testing to be carried out. Television inspection shall be performed by the Contractor on all sewers unless otherwise directed.

.5 The closed circuit television Contractor shall provide all

equipment and materials necessary to conduct the inspection as specified herein.

.6 During the television inspection, contractor will ensure

the sanitary and storm pipe have been flushed out prior to performing the camera inspection.

.7 Contractor shall ensure that there is a constant flow of

water during the camera inspection. This is critical to indicate the location of the sags. If the camera inspection is carried out without the water running and/or the Engineer present, the work may be rejected by the Engineer.

.8 The television equipment shall be a self-contained camera

and monitoring unit connected by cable. It must be waterproof and be capable of lighting the entire pipe. Picture capabilities must be of quality to show the entire pipe periphery. There must be capability of providing measurement within the line to any accuracy of one third of a metre per kilometre. Picture quality must be such to produce a continuous 600 line resolution picture showing the entire periphery of the pipe.

Page 139: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 11 of 14

.9 The following capabilities and items must be available.

.1 A direct voice communication.

.2 A camera towing service.

.3 Self-contained electrical power.

.4 Proper safety equipment to protect employees and the general public.

.10 The cameras rate of progress shall be uniform during

inspection and shall not exceed 6 rn/mm.

.1 A television log shall be maintained during the inspection showing location of leak, fault, open joint, break, crack, collapse, settlement, obstruction, infiltration, or any other defect affecting the overall performance of the sewer line. The location of the defect shall be referenced from the manhole.

.2 A separate log shall be kept of service connections

with comments of condition. .3 Photographs shall be taken as directed or at the

discretion of the television scanning operator. A minimum of one photo per manhole reach is required plus one of every deficiency.

.4 Manhole identity shall be noted clearly as indicated on

the drawings.

.11 A final typewritten report with corresponding photograph secured properly and referenced to the text along with a copy of the video tape shall be submitted to the Engineer within two weeks after completion of inspection.

.12 The Contractor shall be responsible for all works performed

by the subcontractor, for traffic control and any other related work incidental to the completion of television inspection.

.2 Exfiltration test:

.1 If required by the Engineer, the Contractor shall conduct an exfiltration test.

.2 Fill test section with water in such a manner as to allow

displacement of air in line. Maintain under nominal head for 24 hours to ensure absorption in pipe wall is complete before test measurements are commenced.

Page 140: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 12 of 14

.3 Immediately prior to test period add water to pipeline until

there is a head of 1.0 m over interior crown of pipe measured at highest point of test section or water in manhole is 1.0 m above static groundwater level, whichever is greater.

.4 Duration of exfiltration test shall be two hours. .5 Water loss at end of test period shall not exceed maximum

allowable exfiltration over any section of pipe between manholes.

.3 Infiltration test:

.1 If required by the Engineer, the Contractor shall conduct an infiltration test.

.2 Conduct infiltration test in lieu of exfiltration test where static

groundwater level is 750 mm or more above top of pipe measured at highest point in line to be used.

.3 Do not interpolate a head greater than 750 mm to obtain an

increase in allowable infiltration rate. .4 Install a watertight plug at upstream end of pipeline test

section. .5 Discontinue pumping operations for at least 72 hours before

test measurements are to commence, and during this time keep thoroughly wet at least one third of pipe invert perimeter.

.6 Prevent damage to pipe and bedding material due to

flotation and erosion. .7 Place a 900 V-notch weir, or other approved measuring

device in invert of sewer at each manhole. .8 Measure rate of flow over a minimum of 1 hour, with

recorded flow for each 5 minute interval.

.4 Infiltration and exfiltration shall not exceed following limits in litres per hour per 100 metres of pipe, including service connections:

Page 141: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 13 of 14

Nominal Pipe Diameter in mm PVC Pipe

PVC Pipe Concrete Pipe

10 3.88 25.5

12 4.62 30.0

15 5.51 34.0

20 7.45 41.5

250 9.39 49.5

30 11.33 56.5

35 13.27 63.5

40 14.91 70.0

45 16.84 76.0

50 18.78 81.5

550 20.72 87.0

600 22.80 92.5

700 26.53 102.0

800 30.11 110.5

900 33.69 118.0

1,000 37.56 124.5

1,100 41.29 130.0

1,200 45.01 135.0

3.8 Acceptance

.1 The location of all deficient work will be recorded and the

Contractor will be required to repair, relay, restore or otherwise make good, to the satisfaction of the Engineer and City of Cold Lake any deficient work including the repair of alignment problems, cracked or broken pipe, deformed pipe, leaks or any other faults not conforming with these specifications or the pipe manufacturers which the television inspection revealed.

.2 Tolerance of Sags in PVC Sanitary/Storm Pipe:

Pipe Diameter (mm)

Maximum Allowable Depth (D) of Sag

(mm)

Maximum Allowable Length (L) of Sag

(m)

Minimum Allowable Distance (X)

Between Sags (m)

100 10 1.5 5

150 10 1.5 5

200 20 2.0 10

250 20 2.5 20

300 and Larger 30 3.0 25

Page 142: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02630 City of Cold Lake SEWER MAINS Standard Construction Specifications Page 14 of 14

Any sags or ponding of water along the pipe will be repaired by excavation of the pipe, realigning and compacting the subgrade or relaying the non-conforming section of pipe if necessary. Any defects in the pipe or construction method revealed shall be corrected and CCTV for Engineers review, approval, and acceptance. All costs associated with the retesting and the correction of defects shall be the responsibility of the contractor.

.3 After the deficiencies are repaired and corrected and before final

acceptance, the City of Cold Lake reserves the right to have the faulty areas re-inspected at the Contractor’s expense.

END OF SECTION

Page 143: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02721 City of Cold Lake GRANULAR BASE COURSE Standard Construction Specifications Page 1 of 3

1.0 GENERAL

1.1 Aggregate Supply

.1 To ensure product consistency, all aggregate material to be provided from the same source unless otherwise approved by the Engineer.

1.1 Samples

.1 At least 2 weeks prior to commencing work, inform of proposed source of granular materials.

.2 The Contractor shall provide a sieve analysis of the material for review.

1.2 Submissions

.1 Granular base course shall be submitted before being used.

.2 Preliminary review of the material as represented in the test results shall not constitute general acceptance of all material in the deposit or source of supply. Materials may be considered unsuitable even though particle sizes are within the limits of the gradation sizes required, if particle shapes are thin or elongated or any other characteristic precludes satisfactory compaction or if the material fails to provide a roadway suitable for traffic. Rejected material will not be paid for. The Engineer has the right to request additional testing if there are any concerns with the proposed aggregate.

1.3 Measurement for Payment

.1 Granular base course will be measured for payment as indicated on the tender form. Payment shall be compensation for supplying, loading, hauling, placing, remixing if segregation has occurred, compacting, moisture conditioning, shaping the material and provision of a sieve analysis.

2.0 PRODUCTS

2.1 Granular Base Course

.1 Material for the granular base course shall consist of sound, hard, durable crushed rock or crushed gravel and shall not contain organic or soft, thin, elongated, or laminated materials, materials that break up when alternately frozen and thawed or wetted and dried, or other deleterious materials. When compacted near the optimum moisture content to not less than 100% of the maximum dry density corrected for the stone content as determined by ASTM D698, the material shall have a minimum bearing ratio as defined by ASTM D1 883 of fifty-five percent (55%).

Page 144: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02721 City of Cold Lake GRANULAR BASE COURSE Standard Construction Specifications Page 2 of 3

.2 Granular base course shall meet the following gradation when tested

to ASTM Cl 36 and ASTM C11 7, and give a smooth curve without sharp breaks when plotted on a semi-log grading chart

Level Size (10-6 m)

Percent Passing (by weight)

25,000 100

20,000 82-97

16,000 70-94

10,000 52-79

5,000 35-64

1,250 18-43

630 12-34

315 8-26

160 5-18

80 2-10

.3 At least 60 percent by weight of material retained on the 5,000 sieve shall have two or more fractured faces.

.4 The liquid limit shall not exceed 25 and the plasticity index shall not

exceed 6 for the portion of material passing the 400 sieve.

3.0 EXECUTION

3.1 Placing

.1 The base material shall not be placed until the underlying course has been accepted. The granular material shall be placed in uniform layers not exceeding 150 mm in thickness before compaction. The material shall be placed by mechanical spreaders or deposited in windrows and leveled with suitable equipment.

3.2 Compaction

.1 Each layer of granular base course shall be compacted near the optimum moisture content to not less than 100% of the maximum dry density corrected for the stone content as determined by ASTM D698 Method A for the material used.

.2 During compaction, the moisture content shall be maintained at the

optimum moisture content as determined by ASTM D698. If the moisture content exceeds the optimum moisture content the material shall be aerated by mechanical means until the material has dried sufficiently to reach the optimum moisture content. Water shall be added if the moisture content is below optimum.

Page 145: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02721 City of Cold Lake GRANULAR BASE COURSE Standard Construction Specifications Page 3 of 3

3.3 Testing Compaction and Quality Control

.1 Compaction results shall be based on a minimum of one density test per 1,500 square metres of road. Additional tests may be called for by the Engineer as deemed necessary.

.2 Field density tests shall conform to ASTM D1556, ASTM D2167, or

ASTM D2922 for comparison with a maximum density determined according to ASTM D698 Method A.

.3 Areas which are not satisfactory to the Engineer shall be reworked and

retested at the Contractors expense. .4 The Contractor shall supply a Loaded Water Truck for the granular

base proof roll test. This test will be undertaken when the compaction of the granular base has been completed, and shall be under the direction and in the presence of the Engineer.

.5 Under no circumstances shall the Contractor cover the granular base

with asphalt base course, curb and gutter, or monolithic curb, gutter and sidewalk until all density test results and the granular base proof roll test performed in the presence of the Engineer are approved by the Engineer.

.6 Compaction density testing may be waived by the Engineer upon

satisfaction of the construction operations and results of the proof roll test.

3.4 Shaping and Finishing

.1 The finished surface of the granular base course shall conform to approved grades and shall show no depression more than 15 mm under a straight edge 3.0 m long placed parallel to the road centreline. Granular base course higher than the approved grades shall be cut to the required grades.

3.5 Inspection

.1 Before acceptance, the granular base course surface shall be true to cross-section and grade, and shall conform to the density and bearing ratio requirements specified.

.2 Field density and moisture content tests will be made by the Engineer

to ensure that the material is satisfactory. Material not meeting the specification requirements will not be approved and shall be removed and replaced at the contractor’s expense.

END OF SECTION

Page 146: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 1 of 14

1.0 GENERAL

1.1 Samples

.1 At least 2 weeks prior to commencing work, inform of proposed source

of aggregate materials. .2 The Contractor shall submit asphalt concrete mix design based on the

Marshall Method and trial mix test results for review at least 2 weeks prior to commencing work. The Contractor shall provide a sieve analysis of the aggregate material for review.

1.2 Submissions

.1 Asphalt concrete mix design and aggregate material shall be submitted

before being used. Aggregate shall be tested for detrimental matter in coarse aggregate.

.2 Preliminary review of the aggregate as represented by the samples

shall not constitute general acceptance of all material in the deposit or source of supply. Materials may be considered unsuitable even though particle sizes are within the limits of the gradation sizes required, if particle shapes are thin or elongated or any other characteristic precludes satisfactory compaction or if the material fails to provide a pavement suitable for traffic. Rejected material will not be paid for. The Engineer has the right to request additional testing if there are any concerns with the proposed aggregate mix design.

1.3 Measurement for Payment

.1 Hot mix asphalt pavement will be measured as indicated on the tender

form for the full length and width as constructed at the specified depth indicated. Payment shall be compensation in full for furnishing, mixing, transporting, placing and rolling, provision of a sieve analysis and asphalt concrete mix design, and for all other labor and materials required to complete the work. Payment for asphalt pavement shall be subject to the penalties outlined in Section 3.12 for deficient pavement. Asphalt concrete required as a leveling course in addition to the specified depth will be measured as indicated on the tender form for the full length and width as constructed at the specified depth indicated.

Page 147: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 2 of 14

1.4 Definitions

.1 Overlay: Paving over an existing pavement for rehabilitation purposes and not as part of staged paving.

.2 Staged Paving: Paving where a lift or lifts that form part of the total

pavement structure are deferred to a future date

.3 Mix Types: Mixes are designated according to use as follows:

.1 Surfaces (ACS): Surface course for freeways, arterials and industrial! commercial streets.

.2 Base (ACB): Base course for freeways, arterials, industrial/

commercial and collectors. .3 Residential (ACR): Residential and collector streets. .4 Overlay (ACO): Thin overlay on arterial and collector streets.

2.0 PRODUCTS

2.1 Mix Type

.1 Mix type and required minimum Marshall Density shall be as specified

herein.

2.2 Aggregate

.1 Aggregate shall consist of hard, durable, uniformly graded crushed

gravel and shall not contain organic or soft materials that break up when alternately frozen and thawed or wetted and dried, nor other deleterious materials.

.2 Aggregate shall meet the following gradation when tested to ASTM C1

36 and ASTM C117, and give a smooth curve without sharp breaks when plotted on semi-log grading chart:

Page 148: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 3 of 14

Sieve Size

(10-6 m) Percent Passing

(by weight)

ACR/ACO ACS ACB

25,000 -- -- 100

20,000 -- 100 80-95

12,500 100 85-95 --

10,000 87-95 -- --

5,000 65-80 45-65 40-60

2,000 42-64 -- --

800 27-47 -- --

400 19-37 -- --

160 9-20 7-12 9-14

80 4-8 3-7 4-8

a) The Liquid Limit shall not exceed 25 and the Plasticity Index shall not exceed 6 for the portion of material passing the 400 sieve.

b) Los Angeles Abrasion Maximum % loss by weight: 40% c) Crushed Fragments: For each mix type, the minimum

percentage, by mass retained down to the 4.75 mm sieve of fragments having at least 2 freshly fractured faces shall be as follows:

Mix Type ACS ACB ACR ACO Crushed Face Count (%):

75 min. 70 min. 75 min. 75 min.

d) Maximum of 3.0% total deleterious matter by total mass of

combined aggregate.

.3 Should the grading of the mineral aggregates supplied to the plant not meet the gradation above, mineral filler shall be added in the weight hopper of the asphalt plant in such quantities as will be required to meet the specifications.

Page 149: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 4 of 14

2.3 Mineral Filler

.1 Mineral filler shall consist of Portland Cement, Pozzolan, commercially

ground stone dust or other mineral dust approved by the Engineer. Mineral filler shall have a Plasticity Index of Zero and when tested by means of laboratory sieves, it shall meet the following gradation:

Sieve Size (10-6 m)

Percent Passing (by weight)

400 100

160 not less than 90

80 not less than 70

45 not less than 62

.2 Mineral filler to be dry and free flowing when added to aggregate.

2.4 Asphaltic Binder

The asphaltic binder shall be uniform in character, shall not foam when heated to 175°C and shall meet the following requirements:

.1 Designation A/C 150/200 .2 Penetration (ASTM D5) under 100 g for 5 sec. at 25°C……150 to 200 .3 Flash Point (ASTM D92) filled or unfilled greater than……………190°C .4 Ductility (ASTM 0113) strain rate of 5 cm.sec. at 25°C greater

than…..1 00(+) cm

.5 Solubility in CC1 4 [unfilled] 99.0[+]%

.6 Kinematic Viscosity in Centistokes at 135°C…………………….150(+) .7 Thin Film Oven Test Penetration under 100 g for 5 sec. at 25°C

.45(+)%

Page 150: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 5 of 14

2.5 Mix Design

.1 From the aggregate and asphalt cement samples, the testing laboratory shall prepare a design mix to produce the following criteria:

Mix Type ACS ACB ACR ACO Max. Aggregate Size, mm

20 25 12.5 12.5

No. of Blows 75 75 50 75 Minimum Stability, N 6,700 6,700 4,500 6,700 Minimum Retained Stability,_% 75 75 75 75

FlowValue,0.254mm Unit

6-12 6-12 8-16 6-12

.2 The Marshall Stability Value and the Flow Index shall be tested in

accordance with the current issue of ASTM D1559 for Resistance to Plastic Flows of Bituminous Mixtures.

.3 The Percentage Voids and Percentage Aggregate Voids Filled with

Asphalt shall be determined according to the Marshall Method of Mix Design for Hot Mix Asphalt Paving, as set out in the latest edition of the Asphalt Institute Manual Series.

3.0 EXECUTION

3.1 Preparation

.1 Patch and correct depressions and other irregularities before beginning paving operations. Prior to laying mix, clean surfaces of loose and foreign material and apply primer coat or tack coat in accordance with Section 02745.

.2 Where the asphaltic surface course is placed in two lifts, the surface of the first lift shall first be thoroughly cleaned of dirt or other deleterious material by sweeping with a power broom supplemented by hand brooming and scraping where necessary. A tack coat shall then be applied, where required, by means of an approved pressure distributor. No levelling course or surface course mixtures shall be placed until the tack coat is thoroughly set.

.3 If levelling is required prior to placement of 2nd lift, it will be at contractor’s expense.

.4 Where the asphaltic surface course is to be placed in 2 lifts, the first lift shall be placed , finished and compacted for the full width as shown on the drawings, prior to commencing on the second lift.

.5 In placing the second lift, the individual mixture spreads shall be aligned in a manner such that the longitudinal joints in each layer will not coincide.

Page 151: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 6 of 14

.6 Contractor to note on the schedule of quantities if the second lift is to be installed during the following year (2nd year). If the year of installation for the second lift is not indicated on the tender form, then the second lift is to be installed during the first year of construction.

3.2 Mix Tolerances .1 All mixture furnished shall conform to the job mix formula within the range of

tolerance specified:

.1 Aggregate Material Passing Percent by Weight 5,000 um Sieve ±6 800 um Sieve ±4 80 um Sieve ±1.5 .2 The amount of bituminous material designated for the job mix

shall be maintained within the tolerance of 0.3 percentage points.

.3 The temperature of mixing asphaltic mixtures shall not vary

from those specified in the job mix formula by more than 9°C.

.4 Air voids in mix:

Mix Type ACS ACB ACR ACO

Air Voids, %: 4.0 +- 1 4.0 +- 1 3.0+- 4.0 +- 1

.5Film thickness in mix:

Mix Type ACS ACB ACR ACO

Min.Film Thickness:

7.0um 6.0um 7.0um 7.0um

.6 Voids filled in mix:

Mix Type ACS ACB ACR ACO

Limits, % 65-78 67-78 73-85 68-80

3.3 Mixing Plant

.1 The mixing plant and auxiliary equipment shall be such as to combine, dry

and heat the mineral aggregate, heat the asphalt and accurately proportion the asphalt and aggregate to produce a uniform mixture in accordance with these specifications.

Page 152: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 7 of 14

3.4 Transportation of Mix

.1 The mixture shall be transported from the mixing plant to the work in vehicles with tight metal bottoms previously cleaned of all foreign materials. The vehicle shall be suitably insulated and each load shall be covered with canvas or other suitable material of sufficient size to protect it from weather conditions. The inside surface of all vehicles may be lightly lubricated with a thin oil or soap solution prior to loading but excess lubricating will not be permitted.

.2 Any accumulation of asphaltic material which was collected in the box shall

be thoroughly cleaned before loading with hot mix. .3 Trucks shall be maintained perfectly clean of mud or any substance which

could contaminate the working area.

3.5 Equipment

.1 Payers:

.1 Mechanical grade controlled self-powered payers capable of spreading mix within specified tolerances, true to line, grade and crown indicated.

.2 Roller:

.1 The rollers used for compaction shall be self-propelled steel-

wheeled or rubber-tired rollers, providing at least 35 Newtons per millimetre width of tread. The roller shall be in good condition without backlash when reversed and shall be operated by competent rollermen. The wheels shall be kept properly moistened, but excess water or oil will not be permitted.

.3 Hand Tools:

.1 Lutes or rakes with covered teeth for spreading and finishing operations.

3.6 Placing

.1 Obtain approval of base and existing surface and tack coat and prime coat prior to placing asphalt. Asphaltic concrete shall be constructed in layers to obtain the following minimum and maximum compacted thickness:

Page 153: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 8 of 14

Mix Type Minimum (mm) Maximum (mm)

ACO 40 75

ACR 25 75

ACS 50 125

.2 Place asphalt concrete to thicknesses, grades and lines indicated or directed. .3 Placing Conditions:

.1 Place asphalt mixtures only when air temperature is above

2°C. .2 When temperature of surface on which material is to be placed

falls below 10°C, provide extra rollers as necessary to obtain required compaction before cooling.

.3 Do not place hot mix asphalt when pools of standing water

exist on surface to be paved, during rain, or when surface is damp.

.4 Mixtures shall be spread at temperatures which, when

measured in the hopper of the spreader, are not lower than 125°C or higher than 150°C.

.5 In small areas where the use of mechanical finishing equipment is not

practical, the mix may be spread and finished by hand, if so directed. The material shall be distributed uniformly to avoid segregation of the coarse and fine aggregates. Broadcasting of material shall not be permitted. During the spreading operation, all material shall be thoroughly loosened and uniformly distributed by lutes or rakes. Material that has formed into lumps and does not break down readily shall be rejected.

3.7 Rolling and Compaction

.1 Before rolling is started, the surface shall be checked, inequalities in depth

adjusted and fat spots or sandy accumulations replaced and irregularities in alignment or grade along the outside edge shall be corrected.

.2 The rollers must be kept in continuous operation as nearly as practicable and

all parts of the pavement shall receive substantially the same compaction. Rolling shall be done at a maximum speed of 5 km per hour.

.3 At least one roller shall be used for every 40 tonnes of asphaltic concrete laid

per hour. Rolling shall start as soon as the pavement will bear the roller without checking or undue displacement, working from the low part or edge to the high part or edge continuously until no roller marks are left in the finished surface and no further compaction is possible. Where width permits the pavement shall be rolled diagonally in two directions. At all curbs, manholes

Page 154: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 9 of 14

and other appurtenances, and at all locations not accessible to the rollers, hand tampers shall be used to produce the same density as provided by the roller. Where the asphaltic concrete is laid in more than one lift, each lift shall be so compacted.

.4 Required Density: Each mat of hot mix placed shall be compacted to the

following minimum density (% of Marshall density) for the type of paving.

Minimum Density Type of Paving

98% New paving and all stages in staged paving except 2nd stage residential < 40 mm.

96% Second stage residential mat 40 mm thick or less.

97% Lane paving. 97% Overlay more than 40 mm thick. 96% Overlay 40 mm thick or less.

3.8 Joints

.1 The mixture shall be laid so that all longitudinal joints are made while the first

mat of the two being laid is still hot. .2 A narrow strip along the edge of a mat which is joined with another asphalt

mat shall be left without rolling until the adjoining mat has been placed against it. The joint which is formed shall be rolled immediately after the adjacent mat has been placed to ensure a bonding of the material while the asphalt is still hot.

.3 Transverse joints shall be carefully constructed and thoroughly compacted to

provide a smooth-riding surface. Joints shall be straight-edged to assure smoothness and true alignment and shall be offset at least one metre from joints of adjacent mats. The vertical face shall be treated with freshly laid mixture raked against it, tamped with hot tampers and rolled. Heat shall be used as necessary to ensure a proper bond.

.4 All concrete or metal structures such as gutters, manholes, etc. shall be

painted with an approved bituminous material prior to placing the plant mix.

3.9 Butt Joints

.1 Butt joint, a vertical face is constructed by hand across the width being paved. This operation consists of raking, shoveling, and then removing the mix that is located downstream of the selected joint location.

.2 It is necessary for the rollers to compact the mix immediately adjacent to the

joint. For this to be done properly, runoff boards must be placed next to the

Page 155: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 10 of 14

joint. The thickness of the boards should be approximately equal to the compacted thickness of the layer being placed. In addition, the boards must be wide and long enough to support the full size of a roller. The compaction equipment passes over the mix at the joint and onto the boards before the rolling direction is reversed. This practice ensures that the transverse joint receives the same degree of compaction as the rest of the mix in the pavement layer.

.3 After materials have been removed and discarded, the area adjacent to the

joint should be cleaned of all dust and other loose particles. The exposed edge should be lightly tacked with an acceptable tack coat.

3.10 Finish

.1 The finished pavement shall be true to the required profile and cross-section.

Tests of pavement profile and thickness shall be made after the first layer of asphalt has been placed, and depressions or bumps in excess of 5 mm shall be corrected. The allowable tolerance for finished pavement shall be ±5 mm, and the surface shall show no depressions or bumps exceeding 3 mm under a straight-edge 3 m long placed parallel to the road centreline.

.2 Finished surface shall have a tightly knit texture free of visible signs of poor

workmanship such as, but not limited to:

.1 Segregation; .2 Areas exhibiting excess or insufficient asphalt; .3 Improper matching of longitudinal and transverse joints; .4 Roller marks, cracking, or tearing;

If surface and grade tolerances are exceeded, or if surface texture is not met,

grind down and resurface defective areas as required.

3.11 Defective Work

.1 Correct irregularities which develop before completion of rolling by loosening

surface mix and removing or adding material as required. If irregularities or defects remain after final compaction, remove surface course promptly and lay new material to form a true and even surface and compact immediately to specified density.

.2 Repair areas showing checking or hairline cracking.

Page 156: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 11 of 14

3.12 Testinq and Inspection

.1 The Contractor or his representative shall retain core samples from the

completed pavement, from which depth of pavement and density tests shall be made.

.2 One core shall be taken for approximately every 1,000 m2 of asphalt or at

least once each day during placing operations. The following tests shall be carried out:

.1 Marshall stability (test for resistance of plastic flow of

bituminous mixtures) using Marshall Apparatus as per ASTM 01559.

.2 Sieve analysis of extracted aggregates in accordance with

ASTM C136 and entire washed sample in accordance with ASTM C1 17.

.3 Bulk specific gravity of compacted mixtures in accordance with

ASTM D2726. .4 Bitumen content of paving mixtures in accordance with ASTM

D2172. .5 Percent voids in the mineral aggregates (VMA) is to be

calculated on the basis of ASTM D2726 Bulk Specific Gravity of the aggregate.

.6 Air voids in compacted mix in accordance with ASTM 03203.

.3 The Contractor shall repair all test holes with fresh, hot mix asphaltic concrete

mixture, and thoroughly compact it to the required density with no additional compensation.

Page 157: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 12 of 14

3.13 Penalties

.1 Thickness:

.1 If the average core thickness is deficient, that area of asphalt

pavement will be assessed a pay factor according to the following table and be applied to the price of the quantity of hot-mix asphalt in that mat area.

Thickness Deficiency (%) Pay factor (%) 10.0 100 11.0 97.0 12.0 93.7 13.0 90.0 14.0 85.5 15.0 80.5 16.0 75 17.0 68 18.0 60 19.0 50 19.0 and Over Mill and resurface

.2 Density:

.1 The cores will also be used to determine density. If any test fails to meet the density specified, two more cores shall be taken in the area, and the average density of the three cores shall represent the area. If the densities are less than specified, the Contract Unit Price shall be adjusted as follows:

Page 158: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 13 of 14

ASPHALT DENSITY PAY FACTORS

98% Required 97% Required 96% Required

Actual Density %

Pay Factor %

Actual Density %

Pay Factor %

Actual Density %

Pay Factor %

98.0 100.0 97.0 100.0 96.0 100.0

97,9 99.9 96.9 99.9 95.9 99.7

97.8 99.8 96.8 99.7 95.8 99.3

97.7 99.6 96.7 99.4 95.7 98.9

97.6 99.4 96.6 99.1 95.6 98.4

97.5 99.1 96.5 98.7 95.5 97.8

97.4 98.7 96.4 98.2 95.4 97.1

97.3 98.3 96.3 97.7 95.3 96.4

97.2 97.8 96.2 97.1 95.2 95.6

97.1 97.2 96.1 96.3 95.1 94.6

97.0 96.5 96.0 95.5 95.0 93.4

96.9 95.8 95.9 94.6 94.9 92.2

96.8 95.0 95.8 93.6 94.8 90.7

96.7 94.2 95.7 92.5 94.7 89.1

96.6 93.3 95.6 91.3 94.6 87.3

96.5 92.3 95.5 89.9 94.5 85.1

96.4 91.1 95.4 88.4 94.4 82.6

96.3 89.8 95.3 86.7 94.3 79.5

96.2 88.5 95.2 84.8 94.2 75.5

96.1 87.1 95.1 82.7 94.1 69.7

96.0 85.5 95.0 80.3 94.0 60.0

95.9 83.8 94.9 77.6 Under 94.0 Reject

95.8 82.0 94.8 74.3

95.7 80.0 94.7 70.6

95.6 77.7 94.6 66.0

95.5 75.4 94.5 60.0

95.4 73.0 Under 94.5 Reject

95.3 70.3

95.2 67.2

95.1 63.7

95.0 60.0

Under 95.0 Reject Actual Density = % of Marshall density. Pay Factor = % of contract price. 3.14 Acceptance

.1 Locations shall be cleared of all excess material resulting from the paving operation and any damage caused by the Contractor shall be

Page 159: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02741 City of Cold Lake HOT MIX ASPHALT PAVEMENT Standard Construction Specifications Page 14 of 14

repaired to the City of Cold Lake’s satisfaction within 3 days of the date of completion of the street or lane. Failure to cleanup or repair damage may result in other crews undertaking this work without notice to the Contractor and deducting the costs from money due to the Contractor.

.2 No traffic shall be allowed on the finished surface until it has cooled to

atmospheric temperature.

END OF SECTION

Page 160: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02745

City of Cold Lake PRIME AND TACK COATS

Standard Construction Specifications Page 1 of 4

1.0 GENERAL

1.1 Definitions

.1 Prime Coat:

.1 Prime coat shall be the application of bituminous material to previously prepared subgrade or granular base course, preparatory to placing bituminous surfacing materials or asphaltic concrete base course.

.2 Tack Coat:

.1 Tack coat shall be the application of bituminous material to a previously constructed paving surface of any type in preparation of placing bituminous surfacing materials.

1.2 Measurement for Payment

.1 Measurement for prime and tack coats will be as indicated on the

tender form at the rate of application specified in each case. Payment shall include the supply of materials, preparation of the surface, brooming or sweeping the surface, application, sand blotting, including supply of sand, maintaining the treated surface and the supply of all tools and incidentals to complete the work.

2.0 PRODUCTS

2.1 Prime Coat

.1 The bituminous material for priming the base course shall be liquid

asphalt. The asphalt types may vary from medium curing (MC) type MC-30 to MC-250; from slow setting (SS) type SS-1 to SS-1H or a special emulsified asphalt primer S.E.P. 1 or S.E.P. 2, depending on conditions to suit the base and time of season.

Page 161: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02745

City of Cold Lake PRIME AND TACK COATS

Standard Construction Specifications Page 2 of 4

2.2 Tack Coat

.1 The bituminous material for tacking the existing asphalt surface shall be liquid asphalt. The asphalt types may vary from rapid curing (RC) type RC-30 to RC-250; from slow setting (SS)type SS-1 to SS-1 H, depending on conditions to suit the base and time of season.

2.3 Sand Blotter

.1 The materials for sand cover shall consist of clean granular mineral

material all of which shall pass a 5,000 sieve.

3.0 EXECUTION

3.1 Equipment

.1 Cleaning equipment shall consist of power brooms, flushers, and

whatever hand scrapers may be necessary to remove all foreign material.

.2 The pressure distributor used for applying asphaltic material shall

distribute the asphaltic material at an even temperature, uniformly on variable widths of surface up to 5 metres. Uniform spray without atomization shall be determined and controlled from 0.2 to 5.4 litres per minute (Urn) with uniform pressure, and with an allowable variation from any specified rate not exceeding 0.1 L/m.

.3 Suitable means for accurately indicating the temperature of the

asphaltic material shall be provided at all times. The thermometer well shall be placed so as not to be in contact with a heating tube.

.4 If provided with heating attachments the distributor shall be so

equipped and operated that the asphaltic material shall be circulated or agitated throughout the entire heating process.

Page 162: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02745

City of Cold Lake PRIME AND TACK COATS

Standard Construction Specifications Page 3 of 4 3.2 Preparation

.1 Immediately prior to applying the asphalt primer or tack coat, the surface shall be brought to uniform cross-section by patching all depressions and defective areas using an approved patching material and by removing all bumps and irregularities.

.2 All loose and foreign material shall be removed by light sweeping.

3.3 Application

.1 Obtain approval of existing surface before applying asphalt prime or

tack coats. Clean surface as required. .2 Upon the prepared surface the asphalt shall be applied uniformly at a

rate of from 0.50 to 1.50 litres/square metre (l/m2) for asphalt primer, and at a rate of from 0.25 to 0.90 L/m2 for tack coat. The asphalt primer or tack coat shall be applied only when the surface is dry or slightly damp, or only when the air temperature in the shade is above 10°C.

.3 The application temperature of the asphalt primer or tack coat shall be

as follows:

.1 Rapid Curing Asphalt: RC-30 51 -68°C RC-70 74 - 88°C RC-250 100-110°C .2 Medium Curing Asphalt: MC-30 51 - 68°C MC-70 74 - 88°C MC-250

100-110°C .3 Emulsified Asphalt: SS-1 24-54°C SS-1H 24-54°C .4 Emulsified Asphalt Primer: 15- 50°C

.4 Coat contact surfaces of curbs, gutters, headers, manholes and like

structures with a thin uniform coat of asphalt material. Do not prime or tack surfaces that will be visible when paving is complete. Work adjacent to the roadway shall be completely protected from the application operation by a suitable covering. Any unnecessary splashing of the concrete shall be cleaned.

Page 163: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02745

City of Cold Lake PRIME AND TACK COATS

Standard Construction Specifications Page 4 of 4

.5 Do not apply asphalt coat when air temperature is less than 5°C or when rain is forecast within 2 hours.

.6 The Contractor shall maintain the primed surface until the surface course has been placed. Maintenance shall include spreading any additional sand and patching any breaks in the primed surface with additional asphaltic material.

.7 The asphalt primer should preferably be entirely absorbed by the base

course and therefore require no sand cover. If, however, the asphalt has not been completely absorbed 24 hours after application, just sufficient sand shall be spread over the surface to blot up excess asphalt and prevent it from being picked up by any traffic.

.8 Traffic shall not be permitted to travel on the tack coat until cured. The

Contractor shall use flagmen, if required, and signage to control traffic until the tack coat has cured.

.9 Traffic shall not be permitted to travel on the prime coat until 6 hours

after application or until it has cured. After this period of time, excess asphalt material remaining on the surface shall be blotted by sand before traffic is permitted to travel on the surface.

END OF SECTION

Page 164: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02760 City of Cold Lake PAVEMENT MARKING - GENERAL Standard Construction Specifications Page 1 of 8

1.0 GENERAL

1.1 Description

.1 This section specifies the general requirements for pavement

markings regardless of the type of pavement marking used. Deviations from these general requirements will be covered in the specific requirements for each material.

.2 The work shall consist of furnishing all materials, equipment and labour

necessary for the required pavement preparation and application of uniformly retro reflective pavement marking materials in accordance with the plans or as described herein. All pavement markings shall conform with the Manual of Uniform Traffic Control Devices for Canada (Current Edition).

1.2 Related Work

.1 PAINTED TRAFFIC LINES AND MARKINGS SECTION 02761 .2 THERMOPLASTIC PAVEMENT MARKINGS SECTION 02762 .3 PAVEMENT SURFACE CLEANING SECTION 02966

1.3 References

.1 ASTMD4060: Test Method for Abrasion Resistance of Organic Coating by Taber Abrasion

.2 ASTM D256: Test Method for Impact resistance of Plastics and

Electrical Insulating Materials .3 ASTM D570: Test Method for Water Absorption of Plastics .4 ASTM E28: Test Method for Softening Point by Ring and Ball

Apparatus .5 ASTM E1347: Test Method for Directional Reflectance, 45˚ 0˚, of

Opaque Specimens by Broadband filter Reflectometry.

Page 165: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02760 City of Cold Lake PAVEMENT MARKING - GENERAL Standard Construction Specifications Page 2 of 8

1.4 Definitions

.1 Plastic pavement marking material: means any type of paving marking material, excluding paint, consisting of various materials that harden and retain their shape after being applied to the pavement or concrete surface, includes Thermoplastic Hot Inlaid, and Spray Plastic.

1.5 Samples .1 If requested by Engineer, submit the following material sample Quantities at least four 4 weeks prior to commencing work. .1 Two 1L samples of each type of paint .2 One kg. of sample of glass beads .3 Sampling to CGSB 1 - GP-71. .2 Mark samples with name of product and its location, paint

manufacturer’s name and address, name of paint, CGSB specification number, formulation number and batch number.

2.0 PRODUCTS

2.1 Materials .1 When Thermo plastic pavement marking are to be installed, the

Contractor and Subcontractor (applicator) shall provide written evidence that he has a minimum of three years successful experience supplying and installing Thermo plastic pavement markings under similar climatic conditions.

.2 Pavement marking materials shall conform to the following:

PAINTED TRAFFIC LINES AND MARKINGS SECTION 02761 THERMOPLASTIC PAVEMENT MARKINGS SECTION 02762

A material safety data sheet for each material, including resin, catalyst, activator, glass beads and cleaning solvent to be used on the project shall be furnished by the Contractor to the Engineer prior to the star of the work. The applicator shall maintain current material safety data sheets for all materials present with this work in an immediately accessible location.

Page 166: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02760 City of Cold Lake PAVEMENT MARKING - GENERAL Standard Construction Specifications Page 3 of 8

.3 Glass beads: Overlay type: to CGSB1-GP-74M as follows:

.1 Imperfections: surface of spheres shall be smooth and free from film, scratches and pits. At last 90% shall be of true spherical shape and free from milkiness, dark or air inclusions and other defects.

.2 Index of Refraction: liquid immersion method at 25˚C may be

used to determine refraction index of glass spheres. A reflective index of 1.50 to 1.60 is required.

.3 Beads shall show resistance to corrosion after exposure to a 1%

solution (by weight) of sulfuric acid.

3.0 EXECUTION

3.1 Drawing Confirmation .1 Arrange a meeting with the Engineer to review the pavement

marking drawings prior to the commencement of premarking for the installation of the permanent pavement marking materials.

3.2 General .1 Lines shall be applied as solid, dashed or dotted stripes, either

singly or in combination, as shown on the Drawings. The Contractor shall use an accurate dashing mechanism, which is capable of being easily adjusted to retrace existing dashed markings or to apply new materials at the correct spacing. Dashed lines that are to be applied over plainly visible existing dashed lines shall begin within 150mm of the beginning of the existing dash, unless otherwise directed by the Engineer.

.2 Gaps not marked as a result of template use for symbols and

words shall be filled with marking material after template removal.

.3 Pavement markings shall be free of uneven edges, overspray or

other readily visible defect that detract from the appearance or function of the pavement markings.

.4 Methods and equipment used for pavement preparation,

marking and marking removal shall be subject to the approval of the Engineer. Glass beads shall be kept dry during storage and prior to use.

Page 167: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02760 City of Cold Lake PAVEMENT MARKING - GENERAL Standard Construction Specifications Page 4 of 8

.5 The Contractor shall furnish to the Engineer copies of current manufacturer’s instructions and recommendations for application of any marking material, including primer, activator, catalyst and/or adhesive, called for in the plans.

.6 Other construction work such as shoulder paving, seeding

and/or mulching shall be scheduled and performed in a manner to avoid damage to applied pavement marking.

3.3 Storage .1 Store pavement marking materials as per manufacturer’s

instructions. 3.4 Site Preparation .1 On-Site meeting between the General Contractor, Painting

sub-contractor and the Engineer is mandatory prior to any work being done. Purpose of the meeting is to confirm with the painting contractor the Engineer markings on the road. If painting contractor proceed to do the work prior to the mandatory site meeting and the painting does not meet the design, the painting contractor will have to redo the work at his own cost.

.2 Maintain vehicular and pedestrian traffic as directed by the

Engineer. Provide flagmen, barricades, flares and signing to protect workers and public.

.3 Sweep or air blow pavement surface clean and dry. To Section 02966 .4 If required, remove existing markings and repair pavement

surface. .5 Pre-mark intended lines at a minimum of offset of 150mm. Pre-

mark outline of symbols. Engineer to inspect and approve pre-marking. Any correction to pre-marking shall be at the Contractor’s expense. All marking shall be within 12mm+_ of that specified on drawings, unless the Engineer approves variances.

.6 The Engineer is responsible to establish the baseline with 3m

offset at 50m intervals at the start of the project. Contractor is responsible to layout all the paint lines (shoulders and center lines) according to Alberta Transportation standards using the baseline stakes as a guide. If during construction, the contractor destruct the baseline stakes and want them to be replaced, the Engineer may do so if manpower is available and at the contractor’s expense. If the contractor requires the Engineer to

Page 168: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02760 City of Cold Lake PAVEMENT MARKING - GENERAL Standard Construction Specifications Page 5 of 8

layout the paint lines, If manpower is available, the Engineer may layout the paint lines at the contractor’s expense.

3.5 Line Types .1 Lines shall be sharp, well defined and uniformly retroflective.

The width of line applied shall be the width specified. Fuzzy lines, excessive overspray or non-uniform application are unacceptable. Lines shall provide proper visibility. Pavement markings that are improperly applied, located or reflectorized shall be corrected. Lines applied with insufficient material quantities shall be properly reapplied. Improperly located lines shall be removed in; new lines shall then be applied in the correct locations at the Contractor’s expense, including furnishing of approved materials.

3.6 Line Dimensions and Acceptable Pavement Marking Materials .1 Line dimensions shall be as follows:

Line Type Color Size Pattern

Center Line Yellow 100mm Continuous line; break at

intersections

Lane Line White 100mm 3.0m line, 6.0m skip

Edge Line White or Yellow 100mm or

200mm

Continuous line, white on the

right, yellow on the left.

Intersection Guide

Lines

White or Yellow 100mm 0.5m line, 0.5m skip; color as

specified on Drawings

Continuity Lines White 200mm 3.0m line, 3.0m skip

Stop Bars White 300mm 1.0m separation from

crosswalk; otherwise4.5m back

off F.O.C. extension

STOP AHEAD White ---------- Alberta Transportation Highway

Pavement Marking guide,

Page 169: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02760 City of Cold Lake PAVEMENT MARKING - GENERAL Standard Construction Specifications Page 6 of 8

Figure TCS-C-425

Crosswalk White 100mm 2 parallel lines; 4.0m apart

Crosswalk Bars White 600mm 4.0m long

Arrow Symbols White -------- Arrow style and size to conform

to Alberta Transportation

Highway Pavement Marking

guide, C-4.

Other Symbols White -------- Symbol dimensions to conform

to Alberta Transportation

Highway Pavement Marking

guide

Barrier Free

Parking

Refer to template on Page 8

Loading Zone Refer to template on Page 8

3.7 Protection and Cleanup

.1 Do not permit traffic over applied markings until directed by the Engineer. .2 Protect surrounding areas and structures from disfiguration and damage. Repair damage as directed by the Engineer. .3 On completion of the work, clean up and leave site free of debris and waste matter. 3.8 Workmanship .1 Faulty markings such as non-straight lines, non-uniform, excessive

overflow, overspray, etc. shall redone within five working days at no cost to the Owner.

Page 170: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02760 City of Cold Lake PAVEMENT MARKING - GENERAL Standard Construction Specifications Page 7 of 8

.2 Removal of pavement markings due to incorrect installation, incorrect

location or obsolete marking due to the new roadway geometrics, must be submitted for approval by the Engineer. Removal processes that are not approved include: painting or blacking out the marking and/or leaving the marking to wear out over time.

3.9 Performance Life/Acceptance .1 General .1 A warranty period is not applicable for Painted Pavement Markings. .2 Plastic pavement markings shall be warranted against failure due to: .1 Poor adhesion .2 Defective materials .3 Improper installation

.2 Contractor shall also guarantee that in all instances there shall be

sufficient material remaining at end of the designated warranty period so that premarking is not necessary.

4.0 Measurement and Payment .1 Lines shall be measured in lineal metres of material installed for each type of line installed. Gaps between line segments are not measured. .2 Pavement marking including reflective glass beads shall be measured in

lineal metres of material installed. .3 No additional payment will be made for the supply of pavement marking

material and reflective glass beads. .4 Symbols and letters will be measured in specified units. .5 Removal of pavement markings will be in specified units. Pavement markings will be measured complete in place in the units designated. Line quantities will be the length of completed marking, excluding the gaps. All work performed and measured as prescribed above will be paid for as provided

Page 171: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02760 City of Cold Lake PAVEMENT MARKING - GENERAL Standard Construction Specifications Page 8 of 8

in the respective items for each type of pavement marking material supplied and installed. Payment shall include all labour, equipment, materials, traffic safety control and premarking necessary to complete the work. Barrier Free template Loading Zone Template

END OF SECTION

Page 172: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02761 City of Cold Lake PAINTED TRAFFIC LINES AND MARKINGS Standard Construction Specifications Page 1 of 3

1.0 GENERAL

1.1 Description

.1 This section specifies the requirements for painted pavement

markings.

1.2 Related Work

.1 PAVEMENT MARKING - GENERAL SECTION 02760

.2 PAVEMENT SURFACE CLEANING SECTION 02966

2.0 PRODUCTS

2.1 Materials

.1 Paint .1 Alkyd traffic paint to CGSB 1-GP-74M .2 Alkyd reflectorized traffic paint to CGSB 1-GP-149M .3 Colour to CGSB 1-GP-12C .4 White 513-301 .5 Yellow 505-308 .6 Thinner to CAN/CGSB-1.5 .7 Glass beads to Section 02760

3.0 PRODUCTS

3.1 Equipment Requirements

.1 Paint applicator to be an approved pressure type mobile distributor

capable of applying paint in single, double and dashed lines. Applicator to be capable of applying marking components uniformly, at rates specified, and to dimensions as indicated, and to have positive shut off.

.2 Distributor to be capable of applying reflective glass beads as an overlay on freshly applied paint.

Page 173: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02761 City of Cold Lake PAINTED TRAFFIC LINES AND MARKINGS Standard Construction Specifications Page 2 of 3

.3 Thoroughly clean distributor tank before refilling with paint of different

colour.

3.2 Site Preparation

.1 Sweep or airblow pavement surface clean and dry, to section 02966 .2 If required, remove existing markings and repair pavement surface.

3.3 Application

.1 Pavement markings to be laid out by Contractor and layout approved by Engineer prior to application of paint. .2 The Engineer is responsible to establish the baseline with 3m offset at

50m intervals at the start of the project. Contractor is responsible to layout all the paint lines (shoulders and center lines) according to Alberta Transportation standards using the baseline stakes as a guide. If during construction, the contractor destruct the baseline stakes and want them to be replaced, the Engineer may do so if manpower is available and at the contractor’s expense. If the contractor requires the Engineer to layout the paint lines, If manpower is available, the Engineer may layout the paint lines at the contractor’s expense.

.3 Unless otherwise approved by the Engineer, apply paint only when air temperature is above 10˚ and no rain is forecast. .4 Apply traffic paint evenly at a rate of 0.33l/m². The first application of paint to new asphalt pavement surfaces shall be increased by 25% over the specified rate. .5 Do not thin paint unless approved by the Engineer. .6 Symbols and letters to conform to dimensions indicated on the drawings or in the Manual of Uniform Traffic Control Devices. .7 Paint lines must be of uniform colour and density with sharp edges. .8 If specified, apply glass beads at a rate of 100 gm/m² of painted area. The glass beads shall be applied to the wet paint so that the beads are embedded and retained in the paint and uniformly cover the painted surface.

Page 174: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02761 City of Cold Lake PAINTED TRAFFIC LINES AND MARKINGS Standard Construction Specifications Page 3 of 3

3.4 Tolerance

.1 Paint markings to be within ± 12mm of dimensions specified.

3.5 Traffic Control

.1 Provide adequate warning signs and traffic channelization devices to prevent tracking by vehicles.

3.6 Protection of Completed Work

.1 Protect pavement markings until dry.

3.7 Measurement and Payment

.1 As specified in Section 02760, PAVEMENT MARKING – GENERAL.

END OF SECTION

Page 175: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02770 City of Cold Lake CONCRETE SIDEWALKS CURBS AND GUTTERS Standard Construction Specification Page 1 of 10

1.0 GENERAL 1.1 Measurement for Payment

.1 Payment for curbs, gutters and sidewalks shall be full compensation forming, supplying and placing concrete and reinforcing steel, jointing, jointing materials, finishing, curing, stripping forms, backfilling, boulevard restoration with topsoil and seeding where required to match existing, and removal and replacement of existing street and traffic signs. Measurement for concrete curbs, gutters and sidewalks shall be as follows:

.1 Sidewalks not poured monolithically with curbs will be

measured by the square meter. .2 Sidewalks poured monolithically with curbs or curbs and

gutters will be measured by the lineal meter measured along the line of the lip of gutter.

.3 Curbs or curbs and gutters not poured monolithically will be

measured by the lineal meter. .4 Concrete surfaced pararamps will be measured as units

constructed and includes the ramp section, gutter, drop curb and tapered curb sections.

.2 Payment for concrete curbs, gutters and sidewalks shall be subject

to the penalties outlined in Section 3.12 for deficient concrete. All basis of payment shall be on cylinder strength.

2.0 PRODUCTS 2.1 Cement

.1 All cement used shall be Portland Cement and shall conform to CSA standard CAN3A5 Type 50 sulphate resistant cement.

2.2 Aggregates

.1 Aggregates shall conform to CSA standard CAN3-A.23.1.

Page 176: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02770 City of Cold Lake CONCRETE SIDEWALKS CURBS AND GUTTERS Standard Construction Specification Page 2 of 10

2.3 Water

.1 Water shall conform to CSA standard CAN3-A.23. 1. Water shall be clear, free from injurious amounts of oil, acid, alkali, organic matter, sediment, or other substances harmful to mixing and curing of concrete.

2.4 Air Entraining Mixture

.1 Air entraining mixture shall conform to CSA standard CAN3-A.266.1-M.

2.5 Reinforcing Steel

.1 Reinforcing steel shall conform to the following requirements:

.1 Welded steel wire fabric shall conform to CSA standard G30.5.

.2 Billet steel bars shall conform to CSA standard G30.12-M. 2.6 Expansion Joint Filler

.1 Expansion joint filler shall be a non-extruding bituminous type and shall conform to ASTM D1751 for preformed expansion joint fillers.

2.7 Expansion Joint Sealer

.1 Joint sealer shall conform to CGSB standard specification for polyurethane sealing compound 1 9-GP-1 5 or ASTM standard specification for hot poured joint sealer D1190.

2.8 Membrane Curing Compound

.1 Curing compound shall be impervious resin based, liquid membrane—forming compound conforming to ASTM standard specification C309, Type 2, Class B with white pigmentation.

Page 177: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02770 City of Cold Lake CONCRETE SIDEWALKS CURBS AND GUTTERS Standard Construction Specification Page 3 of 10

2.9 Concrete

.1 The concrete mix shall be designed as follows:

.1 Minimum 28 day compressive strength 30 MPa

.2 Slump not exceeding 150 mm

.3 Maximum aggregate size 20 mm

.4 Air entrainment 5.0% to 8.0% .2 Ready mixed concrete shall be mixed and transported in

accordance with ASTM C-94 for Ready Mixed Concrete. 2.10 Levelling Course

.1 Leveling course shall be medium to coarse graded sand meeting the following gradation when tested to ASTM C136 and ASTM C117, and give a smooth curve without sharp breaks when plotted on semi-log grading chart:

Sieve Size (10-6 m)

Percent Passing (by weight)

25,000 100

5,000 95-100

1,250 53-85

200 10-30

63 0-10 .2 The liquid limit shall not exceed 25 and the plasticity index shall not

exceed 6 for the portion of material passing the 400 sieve. 3.0 EXECUTION 3.1 Grade Preparation

.1 The bed for the sidewalks, curbs and driveways shall be excavated and prepared to the lines, grades and cross-sections on the plans or directed. Unsuitable material shall be removed and disposed of. The subgrade shall be uniformly compacted to eliminate all soft and spongy areas to provide a firm base for all concrete work.

Page 178: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02770 City of Cold Lake CONCRETE SIDEWALKS CURBS AND GUTTERS Standard Construction Specification Page 4 of 10

.2 A layer of compacted clean leveling course shall be used as a

foundation material under concrete sidewalks, curbs and driveway crossings. The base on which the concrete will rest shall be thoroughly wetted immediately prior to placing the concrete and must not be frozen, muddy or have areas of water pondage.

.3 The subgrade elevation -shall be finished to tolerances requiring 50

mm of leveling course materials on the subgrade. This material shall be compacted to 100% Standard Proctor Density.

3.2 Forms

.1 Forms shall be of steel or wood of sufficient strength to resist the pressure of wet concrete, and the supply shall be sufficient to permit their remaining in place not less than 12 hours after concrete has been placed. The use of bent, twisted, battered or worn-out forms will not be permitted. Forms shall be held securely by approved methods to prevent movement and bulging when the concrete is placed. Forms must be checked for alignment and elevation before concrete is poured, and shall be cleaned and oiled before each use.

3.3 Reinforcement

.1 Where required, reinforcement shall be secured in the location shown on the drawings and shall be free from mill scale, grease and rust immediately prior to placing concrete. Reinforcement shall be drilled and dowelled into existing concrete at all joints.

3.4 Placement

.1 The concrete shall be placed as soon as possible after mixing, but not later than one hour after mixing has begun. Retempered concrete shall not be used. The concrete shall be transported by methods which will prevent segregation and deposited on the subgrade to that as little handling as possible is required.

.2 Concrete shall be placed continuously until a complete section

between expansion joints has been poured. .3 The concrete shall be thoroughly consolidated against and along

the faces of the forms. Hand spreading shall be done with shovels, not with rakes, in order that the concrete will not be segregated. Precautions should be taken to prevent overworking of the concrete.

Page 179: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02770 City of Cold Lake CONCRETE SIDEWALKS CURBS AND GUTTERS Standard Construction Specification Page 5 of 10

.4 Mechanical Extruding Machines:

.1 If an extruding machine is used in constructing curbs, curb

and gutter, sidewalk or combined curb and sidewalk, the material excavated to accommodate the machine shall be either stockpiled at a specified location or windrowed to the centre of the street with a minimal disruption to traffic. After the installation of the concrete works the excavated material shall be replaced to the original street grade or the elevations directed and compacted to not less than 95% Standard Proctor Density. Granular material which may have existed shall be replaced on the street. Backfill material required behind curbs or sidewalks shall be hauled in from surplus stockpiles or a location designated.

3.5 Appurtenances

.1 Appurtenances shall be located, examined for deficiencies and staked by the Contractor prior to work beginning on a particular section and any deficiencies noted must be reported immediately. Upon completion of a block of work, the Contractor shall relocate these structures and inspect them. Any damage which may have occurred during the concreting operations and deficiencies not previously reported, shall be repaired at the Contractor’s expense.

3.6 Finishing

.1 Surfaces shall be struck off and screeded to the slope, cross-section and elevation shown on the drawings and as staked. The surface shall be consolidated and smoothed using a wood float. Light street trowelling shall be used followed by a uniform brush finish. After brushing and before the concrete has taken its initial set, surfaces shall be edged at all joints to prevent chipping of the concrete. No patching will be allowed.

3.7 Expansion and Contraction Joints

.1 Contraction joints shall be constructed at 3 metre intervals, and shall not be less than 50 mm deep. In the case of monolithic or separate sidewalks, an additional midway surface joint, 13 mm deep, shall be constructed in sidewalks and shall not extend through the curb and gutter.

Page 180: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02770 City of Cold Lake CONCRETE SIDEWALKS CURBS AND GUTTERS Standard Construction Specification Page 6 of 10

3.8 Curing

.1 All concrete shall receive two applications of membrane curing compound. The first application is to be applied after the disappearance of the water sheen and the final finishing of the concrete. During hot, dry, windy days, the first application shall be applied immediately after final finishing and before all free water on the surface has evaporated. The second applications hall be made immediately at right angles to the first so that complete coverage on the surface is attained. Immediately after removal of the forms all exposed surfaces shall be thoroughly wetted with water and then sprayed with membrane curing compound. The membrane curing compound shall be applied in accordance with the manufacturer’s instructions.

3.9 Cold Weather Requirements

.1 When the temperature of the surrounding atmosphere is at, or below 4°C, the aggregate and the mixing water shall be heated. The aggregate and mixing water shall have a temperature of not less than 4°C and be entirely free of frozen materials. The aggregate shall not be heated to more than 60°C, and the concrete when deposited in the forms shall have a temperature of not less than 10°C nor more than 38°C. The concrete shall be maintained at a temperature of 10°C for not less than four days after placing.

3.10 Tolerances

.1 The finished surfaces of all concrete work shall be true to the required cross-section with a tolerance of plus or minus 6 mm from the required elevation and dimensions. Surface of curbs, gutters or sidewalks shall not show any depressions or bumps exceeding 3 mm under a straight edge 3 m long placed parallel to the curb or sidewalk. Concrete not meeting the requirements specified shall be removed to the nearest joint and replaced at the Contractor’s expense.

Page 181: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02770 City of Cold Lake CONCRETE SIDEWALKS CURBS AND GUTTERS Standard Construction Specification Page 7 of 10

3.11 Field Tests

.1 Tests shall be made of the concrete to ensure that it meets these specifications. Testing shall be done to conform to the following standard specifications:

Test Current Issue of ASTM

Sampling of Fresh Concrete C172 Test for Slump of Concrete C143 Compression and Flexure Test C31 Compressive Strength of Molded Concrete Cylinders

C39

Measurement of Air Content C1 73 or C231

.2 Three concrete cylinders shall constitute one test and shall be

made from the same batch or load. They shall be stored undisturbed on site for 24 hours, covered with a plastic sheet to prevent loss of moisture. They shall then be delivered to an approved testing laboratory, and laboratory cured with one cylinder tested at seven days and the other two at twenty-eight days. A set of three cylinders shall be taken for every 100 m3 of concrete poured, or as directed.

.3 When construction begins, the City of Cold Lake reserves the right

to request additional cylinders to be made in order to establish a concrete strength pattern as quickly as possible.

.4 The Contractor or his representative shall make the cylinders and

slump tests.

Page 182: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02770 City of Cold Lake CONCRETE SIDEWALKS CURBS AND GUTTERS Standard Construction Specification Page 8 of 10

3.12 Penalties for Insufficient Strength

.1 Where there are variations from specified design strength, the following adjustments will be made based on the 28 day, laboratory cured cylinders.

.1 When concrete strength of any set exceeds 95% of design

strength, full payment for the work shall be made at the contract unit prices.

.2 When concrete strength of any set is greater than 80% but less than 95% of design strength, the price paid to the Contractor for the work represented by that set of cylinders shall be determined by the following formula:

2P(A-B)1 P- [ A ] Where: P = unit price A = specified strength B = average 28 day cylinder strength.

.3 If concrete strength of any set is less than 80% of design

strength, the work represented by that set of cylinders will be rejected.

.4 Where the average strength of all tests for the total work falls below design strength, but above 95% of design strength, that work not already having a price adjustment under the preceding clauses shall be subject to the following adjustment. The price paid by the Contractor shall be determined by the following formula:

2P (A - B)

P- [ A ]

Where: P = unit price A = specified strength B = average 28 day cylinder strength.

3.13 Protection

.1 Keep all animals and pedestrians off the newly constructed sidewalks or curb until completely set. The Contractor shall also be responsible for keeping all vehicles off the work for a period of 5 days after the concrete has been finished.

Page 183: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02770 City of Cold Lake CONCRETE SIDEWALKS CURBS AND GUTTERS Standard Construction Specification Page 9 of 10

3.14 Backfilling

.1 Backfill along the backs of walks or curbs, to the top of the concrete, within seven days of the placing of the concrete. The backfill shall be mechanically tamped in maximum lifts of 150 mm to a minimum density of 95% Standard Proctor Density, to a distance 1.0 m from the back of the walk or curb.

3.15 Pin On Curb .1 Minimum embedment for surface conditions suitable for driven

anchor pins shall be 24”. Where curb is to be installed in a location impractical to accommodate driven anchor pins, alternate methods of placement may be considered as follows:

.1 An epoxy resin glue of a type and manufacture approved by the

Engineer may be used. The glue shall be prepared according to the manufacturer’s directions and applied to the portion of the curb to be in contact with the pavement face. Surfaces to come in contact with glue shall be prepared as directed by the Engineer, and placement of glued surfaces shall be done as directed by the Engineer.

.2 A minimum of 2 holes (3 holes on units measuring more than 5

feet long) shall be drilled in the pavement surface a minimum of 6 inches deep to accommodate anchor pins. The holes shall be at least the diameter of the anchor pins plus 1 inch. The anchor pin shall be embedded with non-shrink mortar grout in the drilled hole.

.3 Any other method may be submitted to the Engineer for

consideration approval of any alternate method must be received before installation is begun. The completed installation shall be subject to the approval of the Engineer.

3.16 Final Cleanup

.1 As the work progresses, clean up the site and all areas in which

work has been done shall be left in a neat and presentable condition. All gutters and street drainage ditches which have been blocked as a result of the Contractor’s trenching operation shall be restored or repaired at the Contractor’s expense.

.2 The Contractor shall, at his own expense, dispose of all surplus

excavated material, organic soil, rock, boulders and pieces of concrete and masonry, including those less than 0.1 m3 in volume at a location designated.

Page 184: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02770 City of Cold Lake CONCRETE SIDEWALKS CURBS AND GUTTERS Standard Construction Specification Page 10 of 10

3.17 Concrete Deterioration

.1 Concrete that shows surface scaling, deterioration or loss of cement or aggregate during the maintenance period will be rejected and require removal and replacement by the Contractor at no cost to the City of Cold Lake.

END OF SECTION

Page 185: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Section 02821 City of Cold Lake Chain Link Fence Standard Construction Specifications Page 1 of 5

1 General

1.1 SCOPE

.1 Supply only or supply and installation of chain link fence.

2 Products

2.1 CHAIN LINK FABRIC

.1 Conforming to CAN/CGSB-138.1-96

.1 Manufactured from the highest quality zinc coated wire in accordance with CAN/CGSB-138.1-96, Type 1, Class B, medium style, Grade 1 or Grade 2.

.2 Nominal wire diameter: 3.5 mm (9 gauge)

.3 Mesh Size: 50 mm (2 inch)

.4 Fabric height: 0.9 m – 3.65 m (3’ – 12’)

.5 Coating: Zinc – Grade 1 366 g/m2 (1/2 oz/ft2)

Zinc – Grade 2 490 g/m2 (1/6 oz ft2)

.2 Salvage: twisted or knuckled top and knuckled bottom.

2.2 FENCE FRAMEWORK

.1 Conforming to CAN/CGSB-138.2-96:

.1 Posts and rails: hot-dip galvanized cold rolled welded steel pipe (ASTM A53, Grade A, Schedule 40), zinc coated at minimum 550 g/m2, and with the following minimum dimensions:

Top Rail:

Outside Diameter (OD) 42.2 mm (1 5/8”) – 3.56 mm (.140”) wall

Line Post:

Outside Diameter (OD)

- Fabric height under 1.8 m (6”) 48.3 mm (1 7/8) – 3.68 mm (.145”) wall

- Fabric height between 1.8 m (6’) and 2.4 m (8’)

60.3 mm (2 3/8”) – 3.91 mm (.154”) wall

- Fabric height over 2.4 m (8’) 73.0 mm (2 7/8”) = 5.16 mm (.203”) wall

Length 762 mm (30”) longer than height of fabric

Page 186: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Section 02821 City of Cold Lake Chain Link Fence Standard Construction Specifications Page 2 of 5

Terminal Post – End and Corners:

Outside diameter (OD)

- Fabric height under 1.8 m (6’) 73.0 mm (2 7.8”) – 3.68 mm (.145”) wall

- Fabric height between 1.8 m (6’) and 2.4 m (8’)

88.9 mm (3 ½”) – 5.49 mm (.216”) wall

- Fabric height over 2.4 m (8’) 114.3 mm (4 ½”) – 6.02 mm (.237”) wall

Length

- Fence without barbed wire and corner posts for fence with barbed wire

1.066 m (42”) longer than height of fabric

- Fence with barbed wire 1.372 m (54”) longer than height of fabric

Terminal Post – Gates:

Outside Diameter (OD)

- Gate with panel length* under 3.0 m (10’)

88.9 mm (3 ½”) – 5.489 mm (.216”) wall

- Gate with panel length* between 3.0 m (10’) and 4.5 m (15’)

114.3 mm (4 ½”) – 6.902 mm (.237”) wall

- Gate and panel length* between 4.5 m (15’) and 7.5 m (25’)

168.3 mm (6 5/8 - 7.11 mm (.280’) wall

Length

- Fence without barbed wire 1.066 m (42”) longer than height of fabric

- Fence with barbed wire 1.372 m (54”) longer than height of fabric

*Panel length is opening size for single swinging gates and one half of opening size for double swinging gates.

.2 Bottom Tension wire: 3.5 mm (9-gauge) galvanized steel wire, zinc-coated to match chain link fabric, attached at 600 mm (2’) intervals.

2.3 BARBED WIRE OVERHANG

.1 May be specified in the work item only for fences 1.8 m (6’) or higher:

.1 End, Corner and Gate Posts: End and gate posts to be 1.372 m (54’) longer than fabric height when barbed wire overhang is specified. Corner

Page 187: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Section 02821 City of Cold Lake Chain Link Fence Standard Construction Specifications Page 3 of 5

posts to be 1.066 m (42”) longer than fabric height with corner barber wire arms when barbed wire overhand is specified.

.2 Barb Arms: with eyes to hold top rail; to hold 3 strands of barbed wire, top strand to be 300 mm (12”) above fabric; vertical or at 45° overhang, as specified.

.3 Barbed Wire: conforming to ASTM A121, with 3 strands, 2 wire each strand, each wire 2.5 mm diameter (12.5-gauge), zinc-coated at minimum 245 g/m2 (Class 3). Barbs to have 4 points at 150 mm (6”) maximum spacing.

2.4 GATE

.1 Gate Fabric: to match fence fabric in 2.1.1

.2 Gate Frame: 42.2 mm (1 5/8”) OD for panels up to 3.0 m (10’) in length, 48.3 mm (1 7/8”) OD for panels over 3.0 m (10’) in length’ electrically welded at all points.

.3 Gate Fittings: galvanized steel industrial hinges allowing an opening of at least 90°, drop pin latch with provision for padlock. Both latch and padlock accessible from both sides.

.4 Double Gate: complete with one foot bolt.

.5 Gate Barbed Wire: if required, to match fence barbed wire.

2.5 FITTINGS

.1 Conforming to ASTM F626 as follows:

Minimum Dimensions (mm)

Minimum Zinc coating

Material

Post Cap and Rail End

N/A 366 g/m2 (1.2 oz/ft2) Pressed steel, cast iron or die cast aluminium

Top rail sleeve 150 long 366 g/m2 (1.2 oz/ ft2)

Round steel tubing

Tie wire 3.5 diameter (9-gauge)

N/A Aluminium

Tension & brace bands

2.0 thick x 19.0 wide

366 g/m2 (1.2 oz/ ft2)

Pressed steel

Tension bar 4.75 x 19.0 366 g/m2 (1.2 oz/ ft2)

Steel strip

Barb arm 2.0 thick (14-gauge) 366 g/m2 (1.2 oz/ Pressed steel

Page 188: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Section 02821 City of Cold Lake Chain Link Fence Standard Construction Specifications Page 4 of 5

ft2)

2.6 CONCRETE FOR POST FOOTING

.1 20.0 mpa at 28 days.

3 Execution

3.1 SITE PREPARATION

.1 Not necessarily site clearing and grading will be done by other unless specified.

3.2 POST LOCATION

.1 Line Posts: set not more than 3.05 m (10’) apart, measured parallel to the ground surface.

.2 Corner Posts: set where change in alignment is greater than 10°.

.3 Gate Posts: set on both sides of gate opening.

.4 End Posts: set at end of fence.

3.3 POST SETTING

.1 Post Hole: drilled to the following minimum diameters and depths.

Pipe Diameter Hole Diameter Depth of Hole

60.3 mm (2 3/8”) 250 mm (10’) 914 mm (36”)

73.0 mm (2 7/8”) 300 mm (12”) 1,143 mm (45”)

88.9 mm (3 1/2”) 350 mm (14”) 1,371 mm (54”)

114.3 mm (4 1/2)”) 450 mm (18”) 1,524 mm (60”)

.2 Concrete Footing: Concrete is placed in post hole and post is embedded.

3.4 TOP RAIL

.1 Top rail is supported at each line post with a line post cap so that a continuous brace is formed between terminal posts. Rails are joined with sleeves to allow for expansion and contraction.

.2 Top rail is securely fastened to terminal posts using rail ends and brace bands.

Page 189: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Section 02821 City of Cold Lake Chain Link Fence Standard Construction Specifications Page 5 of 5

3.5 TERMINAL POST BRACING

.1 Bracing installed from end and gate posts to nearest line post at midpanel and parallel to top rail. Note: Bracing not required for fences 1.83 m (6;) or under.

.2 Braces installed on both sides of corner posts in a similar manner.

3.6 BOTTOM TENSION WIRE

.1 Installed within the bottom 150 mm (6”) of fabric. Wire is stretch taut and free of sag, fastened securely to end, corner, gate and straining posts. Hog rings are used to fasten wire to the fabric at 600 mm (24”) spacing.

3.7 CHAIN LINK FABRIC

.1 Fabric is placed outside of area to be enclosed.

.2 Fabric is stretched to recommended tension and fastened to end, corner and gate posts using a tension bar and tension bands at 300 mm (12”) spacing.

.3 Fabric is secured with tie wire to line posts at 300 mm (12”) spacing and top rail at 450 mm (18”) spacing.

.4 Installed fabric shall have a smooth, uniform appearance free of sag, dent and bulge.

3.8 BARBED WIRE OVERHAND

.1 If barbed wire is specified, barb arms are installed in lieu of caps on top of line posts. Overhang is positioned towards area enclosed, unless otherwise directed.

.2 Each barbed wire strand is stretch taut and free of sag, firmly attached into slots of barb arms and secure to end and gate posts.

3.9 WORKMANSHIP

.1 The installed chain link fence shall be free of any defect or imperfection that can affect its serviceability and appearance. The fence shall follow the ground contours smoothly without sharp changes in grade.

END OF SECTION

Page 190: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02911 City of Cold Lake TOPSOIL REPLACEMENT Standard Construction Specifications Page 1 of 1

1.0 GENERAL

1.1 Definitions

.1 Topsoil:

.1 The top layer of soil containing organic material capable of supporting good vegetative growth and suitable for use in top dressing, landscaping and seeding.

1.2 Measurement for Payment

.1 Topsoil replacement will be measured as indicated on the tender form acceptably placed within the dimensions indicated on the drawings or as directed for the specified depth indicated. Payment for topsoil replacement shall be full compensation for everything required to place the topsoil in accordance with the requirements of the specifications and drawings.

2.0 PRODUCTS 2.1 Topsoil

.1 Topsoil must be free of subsoil, clay lumps, stones, live plants, roots, sticks or other extraneous matter.

3.0 EXECUTION 3.1 Topsoil

.1 A 100mm layer of topsoil shall be placed on all areas as shown on the drawings, or as directed. After placement, disc and harrow topsoil thoroughly.

.2 Do not perform work under adverse field conditions such as

frozen soil, excessively wet or dry soil or soil covered with snow, ice or standing water.

.3 Fine grade surface free of humps and hollows to smooth even

grades. Cultivate final grade immediately prior to seeding.

3.3 Acceptance .1 Topsoil areas will be accepted by the Engineer provided that all

areas are uniformly spread and free of weeds and rocks, branches etc..

END OF SECTION

Page 191: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02911 City of Cold Lake HYDROSEEDING Standard Construction Specifications Page 1 of 3

1 General

1.1 PRODUCT DATA

.1 Submit product data, prior to start of construction for:

.1 Seed.

.2 Fertilizer.

1.2 SCHEDULING

.1 Schedule to complete work in one area before proceeding to next area.

2 Products

2.1 GRASS SEED

.1 Composition of Seed Mixture will be:.

40% Creeping Red Fescue 20% Tall Fescue 20% Intrigue Chewing Fescue 20% IQ Perennial Ryegrass

2.2 WATER

.1 Free of impurities that would inhibit germination and growth.

.2 Supplied as per Section 01500 - Temporary Facilities. Contractor to supply all related hoses, trucks, sprinklers as required.

2.3 FERTILIZER

.1 To Canada "Fertilizers Act" and Fertilizers Regulations".

.2 Starter fertilizer (8-38-15) shall be applied, prior to seeding.

3 Execution

3.1 WORKMANSHIP

.1 Hydroseed as directed by the Engineer.

.2 Remove and dispose of weeds; debris; stones 50 mm in diameter and larger; soil contaminated by oil, gasoline and other deleterious materials; off site.

Page 192: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02911 City of Cold Lake HYDROSEEDING Standard Construction Specifications Page 2 of 3

3.2 SEED BED PREPARATION

.1 Verify that grades are correct. If discrepancies occur, notify Engineer and do not commence work until instructed by Engineer.

.2 Fine grade surface free of humps and hollows to smooth, even grade, elevations indicated to tolerance of plus or minus 10 mm, surface draining naturally.

.3 Cultivate fine grade approved by 25 mm depth immediately prior to seeding.

.4 Apply fertilizer at a rate of 2.5 kg/100 m2.

3.3 HYDRO SEEDING

.1 Hydroseed all areas as directed by the Engineer.

.2 Mix seed with water, mulch and fertilizer in the following suggested quantities to cover 4,000 m2.

.1 Grass Seed: 80 kgs

.2 Water: 6,400 litres

.3 Mulch: 640 kgs

.4 Fertilizer: 100 kgs

.3 Hydro seeding should not be carried out in wind velocities which cause seed mix to be blow. The Engineer to determine if conditions are appropriate for application.

.4 Measure quantities of materials to be fed into the seeder, either by weight or by using another approved system.

.5 Application rates:

.1 Grass seeds: 2.0 kg per 100 m2 or as specified for the seed type

.2 Water: 106 L/100 m2

.3 Mulch: 16 kg/100 m2 or sufficient to apply the specified

amount of seed and fertilizer per 100 m2

.4 Fertilizer: 2.5 kg/100 m2.

.6 Thoroughly mix seed, fertilizer, mulch, binder and water in a slurry and uniformly apply in one operation of apply seed and fertilizer mixture then cover with an approved mulch.

.7 Protect seeded areas against damage. Remove this protection after areas have been accepted by Engineer.

Page 193: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02911 City of Cold Lake HYDROSEEDING Standard Construction Specifications Page 3 of 3

3.4 MAINTENANCE DURING ESTABLISHMENT PERIOD

.1 Perform following operations from time of seed application until acceptance by Engineer.

.1 Water seeded area to maintain optimum soil moisture level for germination and continued growth of grass. Control watering to prevent washouts.

.2 Repair and reseed dead or bare spots to allow establishment of seed prior to acceptance.

.3 Fertilize seeded areas after first cutting or approximately 6 weeks with an appropriate organic supplementary fertilizer (i.e. 27-14-0) at rate of 2.5 kg/100m2. Spread half of required amount of fertilizer in one direction and remainder at right angels and water in well.

.4 Eliminate weeds by mechanical means. Contractor is responsible for cutting lawn until all areas have been accepted by the Engineer.

3.5 ACCEPTANCE

.1 Seeded areas will be accepted by Engineer provided that:

.1 Areas are uniformly established and turf is free of rutted, eroded, bare or dead spots and free of weeds.

.2 Areas have been fertilized.

.3 Areas have been cut a minimum of once.

.2 Areas seeded in fall will be accepted in following spring, one month after start of growing season provided acceptance conditions are fulfilled.

3.6 MAINTENANCE DURING WARRANTY PERIOD

.1 Perform following operations from time to time of acceptance until end of warranty period:

.1 Water seeded area to maintain optimum solid moisture level for continued growth of grass. Control watering to prevent washouts.

.2 Repair and reseed dead or bare spots to satisfaction of Engineer.

END OF SECTION

Page 194: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02966 City of Cold Lake PAVEMENT SURFACE CLEANING Standard Construction Specifications Page 1 of 1

1.0 GENERAL

1.1 Cleaning pavement surfaces prior to overlay or pavement marking

.1 Related Work:

.1 Hot Mix Asphaltic Concrete Paving Section 02741.

2.0 PRODUCTS

2.1 Materials

.1 Abrasives and solvents used for removal of paint, oil, grease, rubber

deposits, etc. to be products specially designed for pavement cleaning subject to approval of Engineer.

3.0 EXECUTION

3.1 Pavement Surface Cleaning

.1 Removal to existing pavement level, any material which has protruded

excessively and dispose of removed materials as directed. .2 Remove by approved methods, dust, contaminants, loose and foreign

materials, oil and grease, ponded water, frost and ice. Deposit in areas designated by Engineer.

.3 Use rotary power brooms or street sweeper supplemented by hand

brooming as required. .4 Protect storm drainage system from dust, loose and waste materials. .5 Pavement surface prior to application must be dry, clean and above 4

degrees C.

END OF SECTION

Page 195: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02 22 05 City of Cold Lake Site Work Demolition Removal and Abandonment 1 Standard Construction Specifications

1 General

1.1 PROTECTION OF EXISTING FEATURES

.1 Existing underground utilities: There are existing underground utilities in area of work. Establish the location of all underground utilities and have their location adequately marked. Obtain direction of Engineer before disturbing the utility lines.

.2 Protect existing items designated to remain and materials designated for salvage. In event of damage to such items, immediately replace or make repairs to approval of Engineer and at no cost to the OWNER.

.3 Prevent movement, settlement or damage of adjacent surfaces and structures. Provide bracing and shoring required. Make good damage and be liable for injury caused by demolition.

2 Products

.1 Not used.

3 Execution

3.1 PREPARATION

.1 Inspect site and verify with Engineer items designated for removal and items to be preserved.

.2 Locate and protect utility lines. Preserve in operating condition active utilities traversing site.

.3 Notify Engineer sufficiently in advance of operations to allow for assignment of personnel and scheduling for removal and or relocation of equipment and the like.

3.2 REMOVAL

.1 Remove existing asphalt pavement as required to facilitate excavation.

.2 Remove existing fence and dispose of post, wires and all fence accessories off site. Do not bury or burn.

.3 Remove and dispose of existing CSP identified on the drawings and/or specifications off site. Do not bury.

.4 Do not disturb adjacent items designated to remain in place.

Page 196: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 02 22 05 City of Cold Lake Site Work Demolition Removal and Abandonment 1 Standard Construction Specifications

.5 Square up adjacent surfaces to remain in place by saw cutting or other approved method.

.6 Protect adjacent joints and load transfer devices.

.7 Prevent contamination of removed asphalt pavement by topsoil, underlying gravel or other material.

3.3 DISPOSAL OF MATERIALS

.1 Dispose of materials not designated for salvage or reuse in work, off the OWNER property, at contractor’s expense.

3.4 RESTORATION

.1 Upon completion of work, remove debris, trim surfaces and leave work site clean.

.2 Reinstate areas and existing works outside areas of demolition to match condition of adjacent, undisturbed areas.

END OF SECTION

Page 197: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 26 05 34 City of Cold Lake UNDERGROUND CONDUITS Standard Construction Specifications Page 1 of 2

1.0 GENERAL

1.1 Scope

.1 This section specifies the requirements for the installation of underground conduits.

2.0 PRODUCTS

2.1 CONDUITS

.1 Rigid pvc conduit: to CSA C22.2 No. 211.2

.2 Flexible pvc conduit: to CAN/CSA-C22.2 No 227.3

2.2 CONDUIT FITTINGS

.1 Fittings: manufactured for use with conduit specified. Coating: same as

conduit. .2 Factory “ells” where 90 degree bends are required for NPS 1 25mm

and larger conduits. .3 Watertight connectors and couplings for EMT. Set-screws are not

acceptable. 2.3 EXPANSION FITTINGS FOR RIGID CONDUIT

.1 Weatherproof expansion fittings with internal bonding assembly suitable for 100 200mm linear expansion. .2 Watertight expansion fittings with integral bonding jumper suitable for linear expansion and 19mm deflection in all directions. .3 Weatherproof expansion fittings for linear expansion at entry to panel

2.4 FISH CORD .1 Polypropylene 3.0 EXECUTION 3.1 INSTALLATION

.1 Use epoxy coated conduit underground in corrosive areas

Page 198: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 26 05 34 City of Cold Lake UNDERGROUND CONDUITS Standard Construction Specifications Page 2 of 2

.2 Use rigid pvc conduit underground in corrosive areas.

.3 Minimum conduit size for lighting and power circuits: NPS ¾ 19mm

.4 Install fish cord in empty conduits

3.2 CONDUITS IN CAST-IN-PLACE CONCRETE

.1 Locate to suit reinforcing steel. Install in centre of concrete post.

.2 Protect conduits from damage where they stub out of concrete.

.3 Install sleeves where conduits pass through concrete post.

3.3 CONDUITS UNDERGROUND .1 Slope conduits to provide drainage .2 Waterproof joints (pvc excepted) with heavy coat of bituminous paint

END OF SECTION

Page 199: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 03 30 00 City of Cold Lake Cast-in-place-Concrete Standard Construction Specifications Page 1 of 7

PART 1 - GENERAL

1.1 MEASUREMENT

PROCEDURES

.1 Payment for all work specified as

indicated on the tender form.

1.2 REFERENCES

.1 Canadian Standards Association (CSA).

.1 CAN/CSA-A23.1, Concrete Materials and

Methods of Concrete Construction.

.2 CAN/CSA-A23.2, Methods of Test for

Concrete.

1.3 SAMPLES

.1 At least 4 weeks prior to commencing work,

inform Engineer of proposed source of

aggregates and provide access for

sampling.

1.4 CERTIFICATES

.1 Provide certification that mix proportions

selected will produce concrete of quality,

yield and strength as specified in

concrete mixes, and will comply with

CAN/CSA-A23.1.

.2 Provide certification that plant,

equipment, and materials to be used in

concrete comply with requirements of

CAN/CSA-A23.1.

1.5 WASTE

MANAGEMENT AND

DISPOSAL

.1 Use trigger operated spray nozzles for

water hoses.

Page 200: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 03 30 00 City of Cold Lake Cast-in-place-Concrete Standard Construction Specifications Page 2 of 7

.2 Designate a cleaning area for tools to

limit water use and runoff.

.3 Carefully coordinate the specified

concrete work with weather conditions.

.4 Ensure emptied containers are sealed and

stored safely for disposal away from

children.

.5 Prevent plasticizers, water-reducing

agents and air-entraining agents from

entering drinking water supplies or

streams. Using appropriate safety

precautions, collect liquid or solidify

liquid with an inert, noncombustible

material and remove for disposal. Dispose

of all waste in accordance with applicable

local, provincial and national

regulations.

.6 Choose least harmful, appropriate cleaning

method which will perform adequately.

1.6 SUBMITTALS

.1 At least 4 weeks prior to commencing work,

inform Engineer of proposed source of

aggregates and provide access for

sampling.

1.7 QUALITY

ASSURANCE

.1 Submit to Engineer, minimum four weeks

prior to starting concrete work, valid and

recognized certificate from plant

delivering concrete.

.1 When plant does not hold valid

certification, provide test data and

certification by qualified independent

inspection and testing laboratory that

materials used in concrete mixture will

meet specified requirements.

Page 201: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 03 30 00 City of Cold Lake Cast-in-place-Concrete Standard Construction Specifications Page 3 of 7

1.8 DELIVERY,

STORAGE AND

HANDLING

.1 Concrete hauling time: maximum allowable

time for concrete to be delivered to site

of Work and discharged not to exceed 120

minutes after batching.

.1 Modifications to maximum time limit

must be agreed to Engineer and concrete

producer as described in CSA A23.1/A23.2.

.2 Deviations to be submitted for review

by Engineer.

.2 Concrete delivery: ensure continuous

concrete delivery from plant meets CSA

A23.1/A23.2.

PART 2 - PRODUCTS

2.1 MATERIALS

.1 Portland cement: to CAN/CSA-A5, type 50

normal.

.2 Supplementary cementing materials: to

CAN/CSA-A23.5.

.3 Water: to CAN/CSA-A23.1.

.4 Aggregates: to CAN/CSA-A23.1. Coarse

aggregates to be normal density.

.5 Air entraining admixture: to CAN3-A266.1.

.6 Shrinkage compensating grout: premixed

compound consisting of non-metallic

aggregate, Portland cement, water reducing

and plasticizing agents.

.1 Compressive strength: 45 MPa at 28

days.

.2 Consistency:

.1 Fluid: to ASTM C 827. Time of

efflux through flow cone (ASTM C

939), under 30s.

.2 Flowable: to ASTM C 827. Flow

Page 202: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 03 30 00 City of Cold Lake Cast-in-place-Concrete Standard Construction Specifications Page 4 of 7

table, 5 drops in 3s, (ASTM C 109/C

109M, applicable portion) 125 to

145%.

.3 Plastic: to ASTM C 827. Flow

table, 5 drops in 3s, (ASTM C 109/C

109M, applicable portions) 100 to

125%.

.4 Dry pack to manufacturer's

requirements.

2.2 MIXES

.1 Proportion normal density concrete in

accordance with CAN/CSA-A23.1.

.1 Cement:

.1 Type 50 Portland cement for

underground works.

.2 Minimum compressive strength at 28

days: 20 Mpa.

.3 Maximum water cementing material

ratio: 0.45.

.4 Nominal size of coarse aggregate: 20

mm.

.5 Slump at time and point of discharge:

80 to 120 mm.

.6 Air content: 5.5 to 8%.

.2 Do not change concrete mix without prior

approval of Engineer. Should change in

material source be proposed, new mix

design to be approved by Engineer.

PART 3 - EXECUTION

3.1 PREPARATION

.1 Obtain Engineer’s approval before placing

concrete. Provide 24 hours notice prior to

placing of concrete.

.2 Pumping of concrete is permitted only

after approval of equipment and mix.

Page 203: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 03 30 00 City of Cold Lake Cast-in-place-Concrete Standard Construction Specifications Page 5 of 7

.3 Prior to placing of concrete obtain

Engineer's approval of proposed method for

protection of concrete during placing and

curing in adverse weather.

.4 Maintain accurate records of poured

concrete items to indicate date, location

of pour, quality, air temperature and test

samples taken.

.5 Do not place load upon new concrete until

authorized by Engineer.

.6 Ensure that reinforcement and formwork are

thoroughly clean before placing.

.7 Place concrete in the dry.

3.2 CONSTRUCTION

.1 Concrete to be placed in post holes

.2 Do cast-in-place concrete work in

accordance with CAN/CSA-A23.1.

.3 Concrete shall not be placed on or against

any surface (including rebar) that is at a

temperature below 5°C.

.4 Concrete at time of deposit shall be

between 10°C and 30°C.

.5 Consolidate concrete during pour using

approved vibratory equipment to ensure the

concrete is correctly consolidated

including undercut and cavity areas.

.6 Carry out winter concreting in strict

accordance with CAN/CSA-A23.1.

3.3 FIELD QUALITY

CONTROL

.1 Inspection and testing of concrete and

concrete materials will be carried out by

a Testing Laboratory designated and paid

Page 204: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 03 30 00 City of Cold Lake Cast-in-place-Concrete Standard Construction Specifications Page 6 of 7

by Engineer in accordance with CAN/CSA-

A23.1.

3.4 FINISHING

.1 Not required.

3.5 CURING

.1 Cure concrete in accordance with CAN/CSA-

23.1.

.2 Ensure that freshly placed concrete is

protected from freezing, dehydration,

mechanical shock and contact with

injurious substances.

.3 The concrete shall be protected from

premature drying and extremes of

temperature, and shall be cured at a

temperature of at least 10°C for a minimum

period of 3 days.

3.6 DEFECTIVE WORK

.1 Repairs and classification of unacceptable

concrete to be in accordance with CAN/CSA-

A23.1.

.2 Remove defective concrete and embedded

debris and repair as directed by Engineer.

.3 Excessive honeycomb or embedded debris in

any concrete shall deem it defective.

Remove and replace defective concrete.

.4 Remove to bare concrete curing compounds

detrimental to application of specified

finishes.

.5 Concrete to be supplied at the minimum

strength requirement at 28 days. Tests

indicating strengths lower than specified

will necessitate further testing as

Page 205: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

SE Design and Consulting Inc. Section 03 30 00 City of Cold Lake Cast-in-place-Concrete Standard Construction Specifications Page 7 of 7

required by the Engineer. Cost for such

testing to be at the Contractor's expense.

Should further tests confirm low values,

the Engineer has the right to require

strengthening of the affected area or

removal and replacing of the weak concrete

all to the Contractor's expense.

.6 Repair all shrinkage cracks in the

completed slabs-on-grade employing a

suitable epoxy injection technique

acceptable to Engineer to completely seal

all such cracks.

3.7 TOLERANCES

.1 Concrete tolerance in accordance with

CAN/CSA-A23.1.

END OF SECTION

Page 206: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

APPENDIX

Page 207: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

Permission for Land Use

Agreement made in triplicate this _____ day of ___________ A.D. 2015.

Between:

________________________________ (Name of Contractor)

_______________________________

(Company name)

AND

______________________________

(Name of Land Owner)

______________________________

(County)

I, _____________________________ give permission to, ______________________________________

(land Owner name) (Contractor Company name)

to use my property located on _____________ acres in the _____________________________________

(number) (1/4 section description)

to ___________________________________________________________________________________

(purpose of land occupation, ie: lay down area etc).

The aforesaid rights are granted upon the following terms, namely (list in details what has been agreed upon between the contractor and the land owner):

1.

2.

3.

4.

5.

Note: Terms of the agreement must indicate what is agreed upon between both parties and restauration that is required after work

is completed. A copy of this agreement must be provided to the Engineer. Contractor to note that the MD Bonnyville will be

absolved of any responsibility towards potential claim that may occur between the land owner and the contractor.

______________________________________________ __________________

(Land Owner name and signature) Date

______________________________________________ __________________

(Contractor name and signature) Date

Page 208: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

S E D E S I G N A N D C O N S U L T I N G I N C .

S E D E S I G N A N D C O N S U L T I N G I N C .

713 Lakeshore Drive

COLD LAKE, ALBERTA

T9M 0C4

Phone: 780-594-5380

Fax: 780-594-4486

Email: [email protected]

Prime Contractor Agreement Date: Contract Description: Cold Lake City Hall Parking Lot Project No.: CL-0021 Award Date: Completion Date: Contractors Name: Alberta Occupational Health & Safety Act, Section 3-“Prime Contractor” The “Contractor” is required to fully comply with all Alberta Occupational Health and Safety Act, Regulation and Code. For this reason, this letter is to certify that the “Contractor” referenced above will be acting as the “Prime Contractor” for this contract. The Contractor is the “Prime Contractor” as defined by Alberta Occupational Health and Safety Act , Regulation, Code as per: Section 3 (2) The Prime Contractor for a work site is: (a) the contractor, employer or other person who enters into an agreement with the owner of the work site to be the prime contractor, or (3) If a work site is required to have a prime contractor under subsection (1), the prime contractor shall ensure, as far as it is reasonably practicable to do so, that this Act and the regulations are complied with in respect of the work site. (4) One of the ways in which a prime contractor of a work site may meet the obligation under subsection (3) is for the prime contractor to do everything that is reasonably practicable to establish and maintain a system or process that will ensure compliance with this Act and the regulations in respect of the work site.” The Contractor shall be the “Prime Contractor” for the full duration from the issuance of “Notice to Proceed” through to the issuance of “Final Completion Certificate”. He shall also be the Prime Contractor whenever the Contractor’s personnel, equipment or subcontractors are on site

Page 209: CITY HALL PARKING LOT CITY OF COLD LAKE ...sedesign.ca/wp-content/uploads/2015/07/City-Hall-Parking...CITY OF COLD LAKE, ALBERTA CONTRACT DOCUMENTS City of Cold Lake SE DE S I GN A

between the period of issuance of the “Certificate of Construction Completion” and “Final Acceptance Certificate”.

In any case where, pursuant to the provisions of the Alberta Occupational Health and Safety Act, Regulation, Code, an order is given to the Contractor or any of his Subcontractors in respect to their operations under this Contract to cease operations because of failure to install or adopt safety devices or appliance or methods as directed or required by the Alberta Occupational Health and Safety Act, Regulation, Code thereunder, or because conditions of imminent danger exist that would likely result in injury to any person, the Contractor shall comply with the order immediately as per Section 9, 10, 11 of the Alberta Occupational Health and Safety Act.

Should the Contractor not be available or capable of removing the danger to life or equipment resultant from the Contractor’s operations, then the Engineer may issue the removal of a danger and the Contractor shall be liable for the cost of such arrangements and such an act by the Engineer shall not relieve the Contractor of responsibility for injury, loss of life, or damage which may occur in that situation.

In the event that the Contractor refuses or fails to comply with an order under the Alberta Occupational Health and Safety Act, Regulation, Code or regulations thereunder and the performance of the work is stopped, the Owner may, upon written notice, hold the Contractor in

default.

____________________________________________________________________________ (Contractors Representative: Print Name and Title)

________________________________________ ___________________________________ (Signature) (Date)

________________________________________ ___________________________________ (Witness Signature) (Date)