57
To remove your name from our mailing list, please click here . Questions or comments? E-mail us at [email protected] . CIS can be set-up to monitor the supplier/subcontractor’s performance on a weekly or monthly basis. However, in order for this work properly, we must make some adjustments to how we use the inspection codes in the Inspection module. By looking at how the in- spection criteria is graphed and reported, we can make a sound judgment on how to set-up the inspection criteria so that it will graph the im- portant supplier perform- ance. First, the criteria must include all applicable options that result from an inspection in order to see the good and the bad. For example, we can not just include criteria for failure such as damaged, missing paperwork or other such specific criteria. The criteria should be set-up to account for the result of each inspection, both positive and negative. This will then translate into a positive ver- sus negative report and graph. Additionally, we should do the same for in process and final inspection. This is how I like to set- up the criteria for Inspection and I find that it provides an excellent report for both suppliers and also for in process and final inspection results: Receiving/Accepted Receiving/RejectedReturned to supplier Receiving/RejectedReworked In-House Receiving/RejectedScrap In-Process/Accepted In-Process/RejectedReworked In-House In-Process/RejectedScrap Final/Accepted Final/RejectedReworked In-House Final/RejectedScrap After reviewing the above inspection criteria, there may be a need for additional criteria to fill in the gaps. For example, if your receiving inspection often rejects items and puts them on hold because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate before the product/material is released, then you could add another criteria such as: Receiving/RejectCOC Required. Once the inspection criteria is completed as above, you then must enter all inspections in CIS in order to capture the true picture. The payback is that you can give your supplier access to the Reports and Graphs and they can log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of each reject. Supplier monitoring and review could then be simplified within your procedure to require a review of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en- try in the Vendor section to record these reviews. Furthermore, the suppliers will know your aiming at them before you load your gun! Settings in CIS that allow suppliers to monitor themselves Supplier Report as seen by supplier in CIS The customization of the reporting templates in CIS is often overlooked by most CIS users. Unfortunately, this is a big mistake that could be avoided at the very set-up of CIS. By modifying the templates, you can target the informa- tion to managers in a sim- ple (easy-to-read) manner that is best suited to achieve your objectives. At the end of this article, we have in- serted some examples of modified templates to meet the needs of various objec- tives. Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the job easy and quick. We will discuss these here. If however, you are experience difficulties, you may always contact your Master Distributor or Consultant for some additional assistance. First, lets have a look at the template editor and the basic tools at our disposal: Customizing Reports in CIS to better serve the organization and simplify the use of CIS Sample of a Modified NCR Report (See complete samples at the end of this article). NCR Form to be used when a MRB Committee or group of managers wants to sit down and review NCRs and all agree on the disposition. This may be required for aerospace and automotive industries , especially when Inspection Stamps are re- This is a Training Certificate that was modified from the original Training Report. This allows the HR or managers to complete training on hundreds of employees and with a click of a mouse; Issue Training Certificates to all the employees. This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice how the E-mail template includes only the useful information so that the manager re- ceiving the Corrective Action Notice can act immediately without the clutter of all the other empty fields. To have CIS place information from the database record into your report, you must use the appli- cable field names. When editing the template (E-mail or Report) the available field names and how they should be entered is always listed on top in a scrolling box (see above). The field name must be placed into the template where you want to see the information and must be exactly as shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ). Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and then the field name that will display the meeting title as follows: Meeting Title: [MEETINGTITLE] We could also change the font color, size, alignment and type as shown below: ================================================================ Meeting Title: [MEETINGTITLE] Meeting Title: [MEETINGTITLE] Meeting Title: [MEETINGTITLE] Meeting Title: [MEETINGTITLE] ================================================================ Perhaps the most challenging task is to create a table so that it resembles a form that we are already familiar with and use. The following steps will show us some guidelines on creating ta- bles: Step 1: Click the Insert table icon (see diagram above) and choose your table’s options such as the quantity of rows, cells and the boarder type. In this example, I deleted every- thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2 columns and a boarder 2 times the line thickness. Click Insert. Step 2: The table is inserted into my template. However, when I start typing “Meeting Title” the column expands to the right side leaving virtually no room for the actual field name. Therefore, I have to take the next step to define the cells. So I place my cursor in the first cell then click the table icon again and I will be presented with the option to edit cells. When I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result below. Result after inserting table and adjusting cell Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where I want them. I included only the necessary information so that the E-Mail will be clear and to the point. To verify if all is well and the way we intended the form to be, we can preview the form by clicking preview at the bottom. In summary there are a few additional commands that you may need to get your form to look “just right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom to use do not work. For example, right clicking, copy and paste do not work. You must use the copy and paste icon in the template editor. The other function is the Enter (return) key on your keyboard that usually will create a new line below the point where you click “enter”. We often use this to add a line space between two lines. However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de- sired result of pushing the line down. Now that you are armed with this new information on Form editing, you can modify all of your forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report” if that is the terms used in your organization. Change Customer to Client or Part Number to SKU Number. The sky is the limit! Does ISO 9001:2000 require us to have numbers on forms? In CIS, forms may be loaded into the procedures and forms section under the Forms Section. CIS actually con- trols the forms and the revision. However, additionally, we are expected to enter the retention period and the final filing location of the “Quality Record” when entering the form for the first time. There is a difference between a “FORM” and a “Quality Record”. In ISO 9001:2000, we are expected to control quality records which are generally forms that are completed with information. A form is not a procedure, not a quality record, not a work instruction and is only a piece of paper or an input area in a database. In fact, ISO 9001:2000 does not require numbers or revi- sions on anything! The standard requires us to ensure that all procedures are current and applicable to the task at hand. We had asked this question to a group of auditors that were in the middle of a Lead Auditor Course and we received this answer: “A form is only a tool to capture and record information. If an organization chooses to record information on a dinner napkin, a scratch paper, or the back of an envelope, should these tools have form numbers and revision letters on them? Most of the time the only reason an organization would need to put form numbers or rev. levels on forms is if there is a procedural, regulatory or contract requirement. If this organizations forms are on an electronic system and they print them as needed this is control. The stan- dard itself does not prescribe the need to put form numbers or rev levels on anything. If the auditor stated that the form is an instruction on how to complete a task, the auditor needs additional training on the difference between a procedure or work instruction and a form.” SAMPLE FORMS THAT WERE MODIFIED CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports (Modifying Templates) 3. Does ISO 9001 Require us to Number Forms? Do you have a trick or have found a unique way to use CIS? Submit it to [email protected] to be included in our next “Hints and News”. Continuous Improvement Software Issue 1April 12th, 2008 A completed Form is a Quality Record...

CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 2: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 3: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 4: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 5: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 6: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 7: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 8: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 9: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 10: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 11: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 12: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 13: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 14: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 15: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 16: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 17: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 18: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 19: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 20: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 21: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 22: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 23: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 24: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 25: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 26: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 27: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 28: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 29: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 30: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 31: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 32: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 33: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 34: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 35: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 36: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 37: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 38: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 39: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 40: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 41: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 42: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 43: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 44: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 45: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 46: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 47: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 48: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 49: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 50: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 51: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 52: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 53: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 54: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 55: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 56: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...

Page 57: CIS User’s Hints & News - Continuous Improvement Online · 2009. 11. 26. · CIS User’s Hints & News Contents 1. Allow Suppliers to Monitor Themselves 2. Creating Useful Reports

To remove your name from our mailing list, please click here.

Questions or comments? E-mail us at [email protected].

CIS can be set-up to monitor

the supplier/subcontractor’s

performance on a weekly or

monthly basis.

However, in order for this

work properly, we must

make some adjustments to

how we use the inspection

codes in the Inspection

module.

By looking at how the in-

spection criteria is graphed

and reported, we can make

a sound judgment on how to

set-up the inspection criteria

so that it will graph the im-

portant supplier perform-

ance.

First, the criteria must include all applicable options that result from an inspection in order to see

the good and the bad. For example, we can not just include criteria for failure such as damaged,

missing paperwork or other such specific criteria. The criteria should be set-up to account for the

result of each inspection, both positive and negative. This will then translate into a positive ver-

sus negative report and graph.

Additionally, we should do the same for in process and final inspection. This is how I like to set-

up the criteria for Inspection and I find that it provides an excellent report for both suppliers and

also for in process and final inspection results:

Receiving/Accepted

Receiving/Rejected—Returned to supplier

Receiving/Rejected—Reworked In-House

Receiving/Rejected—Scrap

In-Process/Accepted

In-Process/Rejected—Reworked In-House

In-Process/Rejected—Scrap

Final/Accepted

Final/Rejected—Reworked In-House

Final/Rejected—Scrap

After reviewing the above inspection criteria, there may be a need for additional criteria to fill in

the gaps. For example, if your receiving inspection often rejects items and puts them on hold

because a Certificate of Compliance is missing and the supplier must e-mail or fax the certificate

before the product/material is released, then you could add another criteria such as:

Receiving/Reject—COC Required.

Once the inspection criteria is completed as above, you then must enter all inspections in CIS in

order to capture the true picture.

The payback is that you can give your supplier access to the Reports and Graphs and they can

log in anytime and see exactly the quantity of jobs accepted versus rejected and the result of

each reject.

Supplier monitoring and review could then be simplified within your procedure to require a review

of any supplier who has less than 80 % accepted receiving inspections. CIS allows for a log en-

try in the Vendor section to record these reviews.

Furthermore, the suppliers will know your aiming at them before you load your gun!

Settings in CIS that allow suppliers to monitor themselves

Supplier Report as seen by supplier in CIS

The customization of the

reporting templates in CIS is

often overlooked by most

CIS users. Unfortunately,

this is a big mistake that

could be avoided at the very

set-up of CIS.

By modifying the templates,

you can target the informa-

tion to managers in a sim-

ple (easy-to-read) manner

that is best suited to achieve

your objectives. At the end

of this article, we have in-

serted some examples of

modified templates to meet

the needs of various objec-

tives.

Do not be intimidated by the CIS on-line editor. There are a few simple steps that will make the

job easy and quick. We will discuss these here. If however, you are experience difficulties, you

may always contact your Master Distributor or Consultant for some additional assistance.

First, lets have a look at the template editor and the basic tools at our disposal:

Customizing Reports in CIS to better serve the organization and simplify the use of CIS

Sample of a Modified NCR Report (See complete samples at the end of this article).

NCR Form to be used when a MRB Committee or group of managers wants to sit

down and review NCRs and all agree on the disposition. This may be required for

aerospace and automotive industries , especially when Inspection Stamps are re-

This is a Training Certificate that was modified from the original Training Report. This

allows the HR or managers to complete training on hundreds of employees and with a

click of a mouse; Issue Training Certificates to all the employees.

This is a Corrective Action E-mail Notice “As Received in Microsoft Outlook”. Notice

how the E-mail template includes only the useful information so that the manager re-

ceiving the Corrective Action Notice can act immediately without the clutter of all the

other empty fields.

To have CIS place information from the database record into your report, you must use the appli-

cable field names. When editing the template (E-mail or Report) the available field names and

how they should be entered is always listed on top in a scrolling box (see above). The field name

must be placed into the template where you want to see the information and must be exactly as

shown, including the square brackets and capital letters ( EXAMPLE: [MEETINGTITLE] ).

Therefore, if in our form we want to report the Meeting Title we could write “Meeting Title:” and

then the field name that will display the meeting title as follows:

Meeting Title: [MEETINGTITLE]

We could also change the font color, size, alignment and type as shown below:

================================================================

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

Meeting Title: [MEETINGTITLE]

================================================================

Perhaps the most challenging task is to create a table so that it resembles a form that we are

already familiar with and use. The following steps will show us some guidelines on creating ta-

bles:

Step 1: Click the Insert table icon (see diagram above) and choose your table’s options

such as the quantity of rows, cells and the boarder type. In this example, I deleted every-

thing in the Action Meeting E-mail and then I have inserted a table and chosen 5 rows with 2

columns and a boarder 2 times the line thickness. Click Insert.

Step 2: The table is inserted into my template. However, when I start typing “Meeting Title”

the column expands to the right side leaving virtually no room for the actual field name.

Therefore, I have to take the next step to define the cells. So I place my cursor in the first

cell then click the table icon again and I will be presented with the option to edit cells. When

I click the edit cells, I select fixed cell width at 50 % (half the page) and apply (see result

below.

Result after inserting table and adjusting cell

Step 3: To finalize the Action Item E-Mail Form, I will put in the titles and field names where

I want them. I included only the necessary information so that the E-Mail will be clear and to

the point. To verify if all is well and the way we intended the form to be, we can preview the

form by clicking preview at the bottom.

In summary there are a few additional commands that you may need to get your form to look “just

right”. Since the template editor is an HTML on-line editor, certain functions that we are accustom

to use do not work. For example, right clicking, copy and paste do not work. You must use the

copy and paste icon in the template editor.

The other function is the Enter (return) key on your keyboard that usually will create a new line

below the point where you click “enter”. We often use this to add a line space between two lines.

However, with the on-line HTML editor, you MUST press “SHIFT” + “ENTER” to achieve the de-

sired result of pushing the line down.

Now that you are armed with this new information on Form editing, you can modify all of your

forms to meet your needs. Remember, you can title the NCR Report to read “Discrepancy Report”

if that is the terms used in your organization. Change Customer to Client or Part Number to SKU

Number. The sky is the limit!

Does ISO 9001:2000 require us to have numbers on forms?

In CIS, forms may be loaded into the procedures and

forms section under the Forms Section. CIS actually con-

trols the forms and the revision. However, additionally, we

are expected to enter the retention period and the final

filing location of the “Quality Record” when entering the

form for the first time. There is a difference between a

“FORM” and a “Quality Record”. In ISO 9001:2000, we are

expected to control quality records which are generally

forms that are completed with information. A form is not a

procedure, not a quality record, not a work instruction and

is only a piece of paper or an input area in a database.

In fact, ISO 9001:2000 does not require numbers or revi-

sions on anything! The standard requires us to ensure that

all procedures are current and applicable to the task at

hand. We had asked this question to a group of auditors

that were in the middle of a Lead Auditor Course and we

received this answer:

“A form is only a tool to capture and record information. If an organization chooses to

record information on a dinner napkin, a scratch paper, or the back of an envelope,

should these tools have form numbers and revision letters on them? Most of the time

the only reason an organization would need to put form numbers or rev. levels on forms

is if there is a procedural, regulatory or contract requirement. If this organizations forms

are on an electronic system and they print them as needed this is control. The stan-

dard itself does not prescribe the need to put form numbers or rev levels on anything. If

the auditor stated that the form is an instruction on how to complete a task, the auditor

needs additional training on the difference between a procedure or work instruction and

a form.”

SAMPLE FORMS THAT WERE MODIFIED

CIS User’s Hints & News Contents

1. Allow Suppliers to Monitor Themselves

2. Creating Useful Reports (Modifying Templates)

3. Does ISO 9001 Require us to Number Forms?

Do you have a trick or have found a

unique way to use CIS? Submit it to

[email protected] to be included

in our next “Hints and News”.

Continuous Improvement Software Issue 1—April 12th, 2008

A completed Form is a Quality

Record...