1 William S. Pratt PE Principal Engineer - AEC Applications CIM and Project/Asset Management @ CTDOT

CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

1

WilliamS.PrattPEPrincipalEngineer- AECApplications

CIMandProject/AssetManagement@CTDOT

Page 2: CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

2

CIMCivilIntegratedManagement

WhatisCIM:“CivilIntegratedManagement(CIM)isthetechnology-enabledcollection,organization,managedaccessibility,andtheuseofaccuratedataandinformationthroughoutthelifecycleofatransportationasset.

Theconceptmaybeusedbyallaffectedpartiesforawiderangeofpurposes,includingplanning,environmentalassessment,surveying,construction,maintenance,assetmanagement,andriskassessment.”

-FHWA,AASHTO,ARTBA(2012)

Page 3: CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

3

CIMCivilIntegratedManagement

WhatisCIM:– CIMisnotjusttechnology– itencompasseschangestothetypicalworkprocessessupportingprojects.

– ApplicationofCIMcanrangefromincrementalimprovementoffunctionstoleaningoutdisruptiveworkflows

– CIMcanenablefullydigitalworkflowfromprojectinceptiontoassetmanagement

– UseofCIMisnotallornothing– agenciescanselecttoolsforspecificapplicationstoday,andincreaseuseovertime

Page 4: CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

4

CIMCivilIntegratedManagement

DrivingForcesforCIM:• TED(TransportationEnterpriseData)agrassroutesefforttoestablishdata

governanceandstewardshipinvolvingrepresentationfrom:– AECApplications– AssetManagement– Planning– Safety– OIS

• BetterandFasterAsset/SafetyDataManagementthroughIntegration• Beneficiaries

– AssetManagementGroup(TAMP)– NetworkSafetyAnalysis(RDIP)– Engineering– MaintenanceOperations

Page 5: CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

5

CIMCivilIntegratedManagement

• AuthoritativeData– AssetManagementSystems– CompositeProjectData

• ATLAS(Asset/ProjectTracking+Location)=GIS– ToolsRequired

• ProposedProject(PP)Location• RecommendedProject(RP)Location• AssetLocation• Points,Lines,Polygons&ExtractedLRSRegistration• Project/AssetDatajoinedwithLocation

• EachAssethasaSteward/SMEandanAuthoritativeManagementSystem– GeospatialMetadataGuidelinesarebeingdeveloped– CADtoGISApplicationsarebeingdeveloped

• ToIdentifyAssetsforDecommissioning• ToIdentifyNewandManageExistingAssets

Page 6: CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

EditingClients

CTDOTFirewall

CTDOTOnPremise

CTDOTBusinessSQLServer

• CompositeProjectDBSchedulesEstimatesScope

CopyorreplicateBusinessData(UsingODATAwebserviceorsimilar)

OBL CORE SiteManagerGenInfoSTIPStatusExpenditures

ConstructionInfo

ExtractTransformLoadReportingData

ProjectAuthoritativeDB’s

CTDOT/BentleyArchitectureDiagramCurrentArchitecture

AssetsandTeam

ProjectAssets

Page 7: CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

ProjectWise

SQLServer

InspectTech

SQLServer

AWALIM

Oracle

SUPERLOAD

SQLServer

BentleyProductClients

BentleyCloud

EditingClients

ExoreB

AssetWiseALIM

CTDOTFirewall

BentleyFirewall

CTDOTOnPremise

CTDOTBusinessSQLServer

• CompositeProjectDB• InspectTechBridgeDB• TrafficSignalDB

SchedulesEstimatesScope

CopyorreplicateBusinessData(UsingODATAwebserviceorsimilar)

OBL CORE SiteManagerGenInfoSTIPStatusExpenditures

ConstructionInfo

ExtractTransformLoadReportingData

ProjectAuthoritativeDB’s

CTDOT/BentleyArchitectureDiagramCurrentArchitecture

AssetsandTeam

ProjectAssets

Page 8: CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

ProjectWise

SQLServer

InspectTech

SQLServer

AWALIM

Oracle

SUPERLOAD

SQLServer

WebReportingClient

(Web-GISpages)

BentleyProductClients

BentleyCloudMapsWFS/WMSServices

WebServicejoininginfo

withSpatialLocation

ExoreB

AssetWiseALIMAssetWiseDashboardandReportingService

AssetWiseALIMPublishing

CTDOTFirewall

BentleyFirewall

CTDOTCloud

CTDOTOnPremise

CTDOTBusinessSQLServer

• CompositeProjectDB• InspectTechBridgeDB• TrafficSignalDB

SchedulesEstimatesScope

SQLServerpolygonlocations

AtlasDatabase

CopyorreplicateBusinessData(UsingODATAwebserviceorsimilar)

OBL CORE SiteManagerGenInfoSTIPStatusExpenditures

ConstructionInfo

ExtractTransformLoadReportingData

ProjectAuthoritativeDB’s

EditingClients

CTDOT/BentleyArchitectureDiagramCurrentArchitecture

SQLServer

TEDDatabaseProjectAssets

AssetsandTeam

EditingClients

Page 9: CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

9

CTDOT– TED(TransportationEnterpriseData)

• ProjectsWorkAreas• Facilities• OSTAPermits

• Assets• BridgeDeckAreas• TrafficSignalAreas

• Orthoimagery• Hydraulics• SoilBorings• ROW• Town,County,RegionalBoundaries

• RoadNetwork• Inventory• NHS,Func Class

• Projects:• Capital• MaintenanceVIP

• Assets:• Bridges• Pavements• TrafficSignals

• TrafficMonitoring:• AADT• Accidents

• PublicTransportation

SpatiallyBasedData- ATLAS/ESRI LRSBasedData- EXOR

CTDOTGISData

Page 10: CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

10

As-Built

RecordingBy InspectorAddenda

Plans/Specs

Project Timeline

Recommended ProjectMemo

Project Initiation Design Approval FDP Submittal

Construction Completed

Contract Award

04_C

ontr

act-P

roce

ssin

g

Jan-09

Jan-08 Nov-08

Jun-10 - Sep-10Jul-07 - Jan-08

Nov-08 - Jan-09Contract Processing

Jan-09 - Jun-10Construction

Order Plans/Specs

Jan-08 - Nov-08Jul-07 - Jan-08

2/2/2014

Jul-07

Sep-10

Jun-08 - Nov-08

Jan-09 - Jul-10

Jan-08 - Jun-0830% 60% 90%

Jul-07 - Dec-07PPI

Development 01_Planning 02_Pre-Design 03_Final-Design 05_Construction 06_Completed

LocatingandTrackingCapitalProjects

ContractPlansSpecsandEstimates2D/3DModels

PromotePPIConceptandMajorAssetworkitemstoProject

UpdateProjectLocation

PPI/ProjectLocation:• GeospatialPolygonsrepresentingWorkAreaLimits

BenefitsforDesigner:• UnderlyingRoadNetworkSectionsandtheir

characteristics(Route/RoadID,State/Local,MPstart/end,ADT,Interstate,FC,NHS,Towns,MPO,COG,UrbanArea,Population&CTCoreFC)

POC- QueryroadassetswithinProjectWorkArea

POC- NewandManagedAssetInventories

POC- DecommissionedAssetInventories

LocateandTrackPPIConceptincluding

MajorAssetworkitems

POC- AssetFieldValidationandAs-Builts

Page 11: CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

11

Demonstration

Page 12: CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

12

Demonstration

Page 13: CIM and Project/Asset Management @ CTDOT€¦ · Development 01_Plann ing 02_Pr e-D s gn 03_Final-Design 05_Construction 06_Completed Locating and Tracking Capital Projects Contract

13

Demonstration

• PyramidofGeo-SpatialDataConsumptionOptions– AWP(AssetWisePublisher)

• Assets- RoadNetworkandMP’s,Bridges,Signals• ActiveProjects - ProjectInformation,Project0017-0182