CIL TANK 4 -0620-TK-0672

Embed Size (px)

DESCRIPTION

carbon in leach

Citation preview

Document NumberRedis Construction Afrika (Pty) Ltd.

QMS-SMP-FOR-013

Revision Number / DateQuality Management Systems

00 / 02 DEC 2013

Page NumberPUNCH LIST

Page 2 of 3

ClientDRAContract NoC8396

ProjectAsanko Gold ProjectDate 02-10-2015

Contractors Job No233Drawing NoMP6206 SHT.1 - REV. 1

Equipment NoCIL TANK 4 -0620-TK-0672Prepared BySamuel Yeko

Itemno.Butt - ItemCategory1,2 & 3Who toactionDate CompletedActioner SignatureRedis QC VerifyRedis QC Signature

1Install cleaning hatch cover with gasket1E. Dodou

2Install oxygen lance support.1E. Dodou

3Tighten all loosen Bolts on tanks1E. Dodou

4Install deep chute.1E. Dodou

5Install oxygen lance support.1E. Dodou

6Install sparger nozzle.1E. Dodou

7Complete touching outside of tank.1E. Dodou

8Corrosion protection of internal and external welds1E. Dodou

9Install manway cover with gasket1E. Dodou

Copyright Redis Construction Afrika (Pty) Ltd. All Rights Reserved - This documentation is considered the intellectual property of Redis Construction Afrika (Pty) Ltd. Unauthorised reproduction or distribution of this documentation or any portion of it may result in severe civil and criminal penalties, and violators will be prosecuted.