Document NumberRedis Construction Afrika (Pty) Ltd.
QMS-SMP-FOR-013
Revision Number / DateQuality Management Systems
00 / 02 DEC 2013
Page NumberPUNCH LIST
Page 2 of 3
ClientDRAContract NoC8396
ProjectAsanko Gold ProjectDate 02-10-2015
Contractors Job No233Drawing NoMP6206 SHT.1 - REV. 1
Equipment NoCIL TANK 4 -0620-TK-0672Prepared BySamuel Yeko
Itemno.Butt - ItemCategory1,2 & 3Who toactionDate CompletedActioner SignatureRedis QC VerifyRedis QC Signature
1Install cleaning hatch cover with gasket1E. Dodou
2Install oxygen lance support.1E. Dodou
3Tighten all loosen Bolts on tanks1E. Dodou
4Install deep chute.1E. Dodou
5Install oxygen lance support.1E. Dodou
6Install sparger nozzle.1E. Dodou
7Complete touching outside of tank.1E. Dodou
8Corrosion protection of internal and external welds1E. Dodou
9Install manway cover with gasket1E. Dodou
Copyright Redis Construction Afrika (Pty) Ltd. All Rights Reserved - This documentation is considered the intellectual property of Redis Construction Afrika (Pty) Ltd. Unauthorised reproduction or distribution of this documentation or any portion of it may result in severe civil and criminal penalties, and violators will be prosecuted.