C A I R O I N S P E C T I O N C O M P A N Y
C a i r o I n s p e c t i o n C o m p a n y ( C I C )
Is an inspection company established to provide 3rd party inspection services, ASME inspection services, ASME consultation, NDT services and Technical Training Services.
Our objective is to enrich the Oil and Gas field with a high level of qualified personnel either by doing the job by ourselves or by supplying our clients with the qualified and certified staff or through our Technical Training Programs.
I N T R O D U C T I O N
C A I R O I N S P E C T I O N C O M P A N Y
Third Party Inspection
ASME Code Inspection
ASME Code Consultation
Non Destructive Testing
(NDT)
Welding Inspection &
Painting Inspection
Engineering Technical
Assistance & Design
Review
Technical Training
CE MARKING
LEVEL III ACTIVITIES
T H I R D P A R T Y I N S P E C T I O N
Third party inspection for raw materials (ferrosilicon-
calcium-silicon-pig iron - magnesium pure-calcium carbide -
carburizer - quartezite - zinc wire,, etc).
Third party inspection for new equipments.
Third party inspection of Oil & Gas plants, pipeline, Petrochemicals, Power Plants, Refineries and LNG plant.
A S M E C O D E I N S P E C T I O N
We do the rule of ASME Inspector for new
constructions. CIC has its ASME Authorized
Inspector who can inspect newly constructed or in
service boilers, pressure vessels, Heat exchanger,
Separators…etc for continued services in
accordance with ASME code.
We do the in-service inspection in accordance to NBIC and
API through our qualified and certified National Board
Commissioned Inspector and API Authorized Inspector.
A S M E C O D E C O N S U L T A T I O N
Through Our Experienced and Qualified team we can
prepare Client’s work shop to get the ASME
Certifications Of Authorization and ASME Stamps
( U,U2,S,PP,A ) and Also the ( R ) certificates and
stamps in accordance to National Board
Inspection Code NBIC. We Also Train the company
team to understand ASME Code philosophy and
to perform in accordance to its rules.
S E R V I C E S
C A I R O I N S P E C T I O N C O M P A N Y
Third Party Inspection
ASME Code Inspection
ASME Code Consultation
Non Destructive Testing
(NDT)
Welding Inspection &
Painting Inspection
Engineering Technical
Assistance & Design
Review
Technical Training
CE MARKING
LEVEL III ACTIVITIES
C E M a r k i n g a c c o r d i n g t o
( P E D )
Through Our Experienced and Qualified team we can prepare
Client’s work shop to give the CE Marking to pressure
equipment.
N O N D E S T R U C T I V E T E S T I N G
We can perform all the required NDT such as Ultrasonic
Testing, Dye Penetrant and Magnetic Testing (UT,PT,MT)
through a highly qualified and certified team, we issue the
reports of NDT in accordance with the applicable Codes and
standards. We also perform Hardness testing and Positive
material identification PMI
W E L D I N G I N S P E C T I O N &
P A I N T I N G I N S P E C T I O N
Review the Welding Procedure Qualification WPS and PQR as per applicable Codes and Standards, Monitor the application of the WPS.
Witness the Procedures Qualification Records (PQR).
Witness Welders Performance Qualification (WPQ).
Perform the Welding Inspection as Third Party and/or Client Representative.
Review Painting Procedures.
Determine the required Painting system.
Perform the inspection and witness the required tests
Issue an independent report of the performed inspection.
S E R V I C E S
C A I R O I N S P E C T I O N C O M P A N Y
Third Party Inspection
ASME Code Inspection
ASME Code Consultation
Non Destructive Testing
(NDT)
Welding Inspection &
Painting Inspection
Engineering Technical
Assistance & Design
Review
Technical Training
CE MARKING
LEVEL III ACTIVITIES
E N G I N E E R I N G T E C H N I C A L
A S S I S T A N C E & D E S I G N
R E V I E W
We have a qualified team of design engineers to handle design
reviews for all engineering disciplines (Pressure Vessels,
Boilers, Heat Exchangers, Piping System, Steel Structure, and
Tanks) for new & in-service constructions
T E C H N I C A L T R A I N I N G
Through our training center we do our best to enrich the
country with a highly qualified and certified personnel in all
industrial aspects, our courses cover the NDT methods (VT, RT,
UT, PT and MT) we also conduct the preparation course for
CWI Examination, the training courses for preparation of API
510, API 570, API 653 examinations and ASME code awareness
courses covering ASME VIII, V, IX, II, I and B31.1 and B31.3 and
AWS D1.1.
L E V E L III A C T I V I T I E S
Through Our certified ASNT NDT level III, we can perform the
following level III activities ;
Prepare, Review and Approve NDE procedures ( RT,UT,MT,PT(
Prepare, Review and Approve Written Practice .
Qualify and certify NDE Personnel.
Witness, record and certification of NDE demonstrated procedures.
S E R V I C E S
C A I R O I N S P E C T I O N C O M P A N Y
AFTER MORE THAN 3000 hrs of training
courses having developing our services
and have acquired an extensive expertise.
Having based ourselves on the featured
demands by large companies.
We are pleased to offer our Training
services, from our belief that we can
provide the best services
C A I R O I N S P E C T I O N C O M P A N Y
VISUAL INSPECTION
RADIOGRAPHIC TESTING
ULTRASONIC TESTING
DYE PENETRANT TESTING
MAGNETIC PARTICLE TESTING
CERTIFIED WELDING INSPECTOR
(CWI)
AWS D1.1
API 510
API 653
API 570
ASME CODE
CSWIP 3.1.
CSWIP 3.2.
BGAS-CSWIP
NACE Coating Inspector Level I
NACE Coating Inspector Level II
T R A I N I N G C O U R S E S
C A I R O I N S P E C T I O N C O M P A N Y
VISUAL INSPECTION
RADIOGRAPHIC TESTING
ULTRASONIC TESTING
DYE PENETRANT TESTING
MAGNETIC PARTICLE
TESTING
CERTIFIED WELDING
INSPECTOR (CWI)
AWS D1.1
API 510
API 653
API 570
ASME CODE
CSWIP 3.1.
CSWIP 3.2.
BGAS-CSWIP
NACE Coating Inspector
Level I
NACE Coating Inspector
Level II
V I S U A L I N S P E C T I O N
Most basic and common inspection method, used to inspect
material, fabrication, Monitor welding activities before,
during and after welding, perform material receiving
inspection and final visual and dimensional checks.
R A D I O G R A P H I C T E S T I N G
Radiography (RT) uses X or gamma-rays to produce an
image of an object on film. The image is
usually natural-size. X and gamma-rays
are short wavelength electromagnetic
radiation which passes through solid
material, being partly absorbed during
transmission. Thus, if an X-ray source is placed on one side
of a specimen and a photographic film on the other side, an
image is obtained on the film.
U L T R A S O N I C T E S T I N G
Ultrasonic Inspection (UT) is used to detect internal
anomalies in a part, which may contain
welding, or stress defects that can be
detrimental to the integrity of the
component. It is also a commonly
accepted method of checking the wall
thickness of pipelines and vessels, which are suspected of
being eroded internally, when access is limited to one side
of the material.
T R A I N I N G
C A I R O I N S P E C T I O N C O M P A N Y
VISUAL INSPECTION
RADIOGRAPHIC TESTING
ULTRASONIC TESTING
DYE PENETRANT TESTING
MAGNETIC PARTICLE
TESTING
CERTIFIED WELDING
INSPECTOR (CWI)
AWS D1.1
API 510
API 653
API 570
ASME CODE
CSWIP 3.1.
CSWIP 3.2.
BGAS-CSWIP
NACE Coating Inspector
Level I
NACE Coating Inspector
Level II
.
D Y E P E N E T R A N T T E S T I N G
Liquid Penetrant Inspection (PT) is another common
method of NDT, and is solely used to detect
surface breaking discontinuities, which are
free from debris that can limit the entrance
of the dye (oil, grease and paint). This
method of Inspection can be applied to
Ferromagnetic and non-ferromagnetic materials.
M A G N E T I C P A R T I C L E
T E S T I N G
Magnetic particle inspection (MPI) is a nondestructive
testing method used for defect detection.
MPI is fast and relatively easy to apply, and
part surface preparation is not as critical as
it is for some other NDT methods. These
characteristics make MPI one of the most
widely utilized nondestructive testing methods.
C E R T I F I E D W E L D I N G
I N S P E C T O R ( C W I )
P R E P A R A T I O N C O U R S E
The Certified Welding Inspector (CWI) certification is the
widest internationally recognized, in the
welding industry. Successful companies
have come to rely on this AWS
certification when ensuring the highest
level of quality workmanship.
T R A I N I N G
C A I R O I N S P E C T I O N C O M P A N Y
VISUAL INSPECTION
RADIOGRAPHIC TESTING
ULTRASONIC TESTING
DYE PENETRANT TESTING
MAGNETIC PARTICLE
TESTING
CERTIFIED WELDING
INSPECTOR (CWI)
AWS D1.1
API 510
API 653
API 570
ASME CODE
CSWIP 3.1.
CSWIP 3.2.
BGAS-CSWIP
NACE Coating Inspector
Level I
NACE Coating Inspector
Level II
A S M E C O D E
ASME Code is the most used Code Worldwide for the
fabrication of Boilers and Pressure vessels, it includes the
Requirements for Design, material, fabrication, welding,
inspection, Testing, PWHT and certification of the
equipment.
A P I 5 1 0
This inspection code covers the in-service inspection,
repair, alteration, and rerating activities for pressure
vessels and the pressure-relieving devices protecting these
vessels. This inspection code applies to all refining and
chemical process vessels that have been constructed in
accordance with an applicable construction code or non-
code.
A P I 6 5 3
This standard is providing guidance in the inspection,
repair, alteration, and reconstruction of steel storage tanks
used in the petroleum and chemical industries.
A P I 5 7 0
API 570 covers inspection, repair, alteration, and rerating
procedures for metallic piping systems that have been in-
service. Developed for the petroleum refining and
chemical process industries but may be used, where
practical, for any piping system.
T R A I N I N G
C A I R O I N S P E C T I O N C O M P A N Y
VISUAL INSPECTION
RADIOGRAPHIC TESTING
ULTRASONIC TESTING
DYE PENETRANT TESTING
MAGNETIC PARTICLE
TESTING
CERTIFIED WELDING
INSPECTOR (CWI)
AWS D1.1
API 510
API 653
API 570
ASME CODE
CSWIP 3.1.
CSWIP 3.2.
BGAS-CSWIP
NACE Coating Inspector
Level I
NACE Coating Inspector
Level II
C S W I P 3 . 1 .
the duties and responsibilities of a welding inspector;
fusion welding processes; typical weld defects; types of
steel; carbon-manganese, low alloy and stainless steels;
hardening of steels; weldability; heat treatment; parent
metal defects; visual inspection; testing parent metals and
welds; destructive tests; NDT techniques; welder and
procedure approval; codes and standards; outline of safe
working practices.
C S W I P 3 . 2 .
Function and responsibilities of a senior welding inspector; defects in
welds; weld symbol interpretation; interpretation of NDT reports;
documentation of welding; approval and certification procedures;
general principles of supervision; case studies; planning; organisation;
interpretation of fractured surfaces; auditing; practice in typical
examination questions; course assessments
B G A S - C S W I P
Corrosion theory; surface preparation; paint formulation;
paint systems; curing and drying; paint manufacture;
application methods; paint/paint film testing; paint
identification; inspection methods; specification
requirements; health and safety; working practices.
T R A I N I N G
C A I R O I N S P E C T I O N C O M P A N Y
VISUAL INSPECTION
RADIOGRAPHIC TESTING
ULTRASONIC TESTING
DYE PENETRANT TESTING
MAGNETIC PARTICLE
TESTING
CERTIFIED WELDING
INSPECTOR (CWI)
AWS D1.1
API 510
API 653
API 570
ASME CODE
CSWIP 3.1.
CSWIP 3.2.
BGAS-CSWIP
NACE Coating Inspector
Level I
NACE Coating Inspector
Level II
COATNG INSPECTOR PROGRAM LEVEL 1(NACE)
The CIP Level 1 Course is an intensive presentation of the
basic technology of coating application and inspection over a
full 60 hours of personal instruction and practice. This course
provides both the technical and practical fundamentals for
coating inspection work on structural steel projects.
COATNG INSPECTOR PROGRAM LEVEL 2(NACE)
CIP Level 2 focuses on advanced inspection techniques and
specialized application for both steel and non-steel
substrates. The course explains in-depth coverage of surface
preparation, coating types, inspection criteria, and failure
modes for various coatings including specialized coatings
and linings. The course concludes with both written and
practical exams.
T R A I N I N G
C A I R O I N S P E C T I O N C O M P A N Y
A- ASME Authorized Inspection
1- In the following projects I participated as the ASME AI for the preparation of the
company to get ASME certification of qualification and my scope of work was as follow:
1. Review of company Quality Control Manual.
2. Check the quality control system.
3. Review of the Design calculations and Drawings of Demo. Item.
4. Review of NDE procedures and personnel qualifications and records and written practice.
5. Review of welding book (WPS, PQR, and WPQ) and continuity records for welders.
6. Review of Hydro test, PWHT procedures.
7. Review of purchase order and verify against code ordering information.
8. Review calibration procedures and verify calibration to calibrated equipments and gages.
9. Review material receiving and material traceability procedure.
10. Review welding consumables handling procedure.
11. Review and verify records retention.
12. Participate in the ASME review team to evaluate the company.
The above have been carried out for the following companies:
S/N Company Name ASME certificates Remarks
1. ARABI ENERTECH KSC in Kuwait (U, PP, R) the fabrication and repair of pressure vessels and Power piping
The certificates have been awarded
2. ARESCO”ASEC” Manufacturing& Industrial Projects
Fabrication and repair of Pressure vessels and Power Boilers (U, S, PP, R stamps)
The certificates have been awarded
3. ARCONS contracting Office Fabrication and repair of Pressure vessels and Power Boilers (U, S, R stamps)
The certificates have been awarded
KEY PERSONNEL
CIC personnel are very experienced personnel in oil & gas industries.
They are committed to provide the highest quality & most creative
solutions with the lowest cost. Herein a short hint about the project
they have executed.
C A I R O I N S P E C T I O N C O M P A N Y
4. AL-BASMALAH for Trading and contracting
Site Assembly and fabrication of Power Piping and the repair of pressure Vessels and Boilers ( A, PP,R stamps)
The certificates have been awarded
5. Power System Projects Fabrication and repair of Pressure vessels and Power Boilers (U, S, R, pp stamps)
The certificates have been awarded
2- Carrying out the Inspection activities (explained before) as ASME AI for the following projects:
S/N Project No of items Fabrication workshop
1. AL – AMAL FILED DEVELOPMENT 5 Pressure vessels To ASME VIII Div. 1
PETROJET SUEZ CENTRAL WORKSHOP
2. DIMENERALIZATION PLANT FOR EL-TEBBIN POWER STATION for
MITITO Co.
15 pressure vessels To ASME VIII Div. 1
Arab Steel Fabrication
3. 11-3090 EAgrium/UHDE Separators and Drums
38 pressure vessels To ASME VIII Div.1
PETROJET CENTRAL WORKSHOP
4. EMETHANEX DAMIETTA 1
PROJECT 2 pressure vessels To ASME VIII Div.1
Arab Steel Fabrication
5. Salam Gas Trains (SGT3&4)
project for Khalda Petroleum Co.(KPC)
75 Pressure Vessels To ASME VIII Div. 1
PETROJET CENTRAL WORKSHOP
B-Third Party Inspection
S.No Project No of items Client
1. Yemen LNG Project 1 Spherical Tank to PD 5500 YLNG at Yemen
2. Arab Potash Company (Jordan) 16 Tanks to API 650 APC Fabricated at
PETROJET SUEZ CENTRAL WORKSHOP
3. EXPANSION OF HOUT CRUDE ONSHORE
PRODUCTION FACILITIES (Chemical Tanks)
4 Tanks to API 650 KJO and ENPPI Fabricated
at PETROJET SUEZ CENTRAL WORKSHOP
4. EXPANSION OF HOUT CRUDE ONSHORE
PRODUCTION FACILITIES 1 Vent gas scrubber to ASME VIII Div.1
KJO and ENPPI Fabricated at PETROJET SUEZ CENTRAL WORKSHOP
5. KHAFJI FDP PHASE 1 OFFSHORE OIL AND
GAS 25 Pressure vessels to ASME VIII Div.1
KJO and ENPPI Fabricated at PETROJET
CENTRAL WORKSHOP
6. TRIPOLI Plant
2 Furnaces,2 flue gas ducts to Client
Spec’s Degremont (France)
7. Ammonia Plant (EPIC) 4 Water Tanks, 2 Ammonia Tanks to
API 650 KBR,DSD Ferrometalco
8. Khursaniyah Gas Plant (KGP) Project –
Saudi Arabia Eastern Province The biggest gas plant world wide Saudi Aramco
C A I R O I N S P E C T I O N C O M P A N Y
C- OTHER PROJECTS
1. Eltina-Abosoltan Pipe line (AUT
supervisor) 80Km Gasco
2. EPIC Ammonia gas plant 7 Tanks KBR
3. Water desalination unit ( Ayoun
Mousa ) 1
BABCOK HITACHI
4. Western desert gas development
Pressure vessels 28
Samsung- Khalda
5. Vapor Recovery Unit
Heat Exchangers 12
Naser Petroleum Company
6. Three phase separator 1 Khalda
7. Debutaniser Stabilization Column 1 Naser
Petroleum Company
8. Pressure vessels 8 ENPPI
9. Western desert gas complex
Pressure vessels Heat exchangers
6 7
ENPPI
10. Pressure vessels(sour service) 8 MIDOR
11. skid & vessels 4 ZAFCO
12. Scraper trap 4 Khalda
13. HA'PY DEVELOPMENT PROJECT
Headers Skids
3 2
GUPCO
14.
TEMSAH DEVELOPMENT (ELGAMIL)
Headers Skids
3 2
PETROBEL
15. ROSETTA FIELD DEVELOPMENT
PROJECT Skids
7 RASHPETCO
16. QANTARA WELL 1 DEVELOPMENT
Heat Exchanger + Tower 1+1 QPC
17. LIQUID CHLORINE STORAGE
TANKS 2 NCIC
18. SCARAB SAFRON DEVELOPMENT
PROJECT SKIDS
4
14000 INCH SiiRTEC NIGI
19.
ASORC NEW C.D.U. PROJECT Pressure Vessels +Tanks
Towers Heat exchangers
5+5
4 34
ASORC
20. Fabrication Of ( 8 ) Oil Tanks 8 Qarun
Petroleum Company
21. WEST AKHEN PLATFORM
PRODUCTION SEPARATOR 1 GUPCO
22. Steel Structure , Pipes Factory ,
Port said
1000 TON
PTJ-E. PR. / IPEC
C A I R O I N S P E C T I O N C O M P A N Y
23. FURAT TANAK / OMAR VRU &
TANAK WATER INJECTION Pressure Vessels
7 ENPPI
24. MORGAN - 8 LAUNCHER &
RECEIVER TRAPS 18" 2 GUPCO
25. Amerya dewaxing plant
Pressure Vessel
8 APRCO
26. ENERGY CONSERVATION PLANT
Heat Exchnger Pressure Vessel
20 6
N.P.C.
27. ASPHALT PLANT
Columns Heat exchanger
3 6
N.P.C.
28. GAS OIL CONDENSER 3 N.P.C.
29. HP / LP HEATERS FOR POWER
PLANT 24 HANJUNG
30. SUMP TANK 1 PETROPEL
31. STAINLESS STEEL CHEMICAL
TANKS ( TOTE VESSELS ) 12 GUPCO
32. L.P.G. STORAGE TANKS [ REPAIR ] 12 PETROGAS
33. CHEMICAL VERTICAL DRUM 1 ABB
34. L.P.G. SIGAR TANKS 2 GASCO
35. L.P.G. TANS GULF GAS PLANT
Air Coolers 14 E.G.P.C.
36. RAS GHARIB SEA WATER
DESALINATION PLANT Evaporators
5 GUPCO
37. CRUDE OIL FIRED HEATER 3 N.P.C.
38. NAPHTA FIRED HEATER 1 N.P.C.
39. EL FARAS GAS OIL SEPARATOR /
SCRUBBER PACKAGE 2 AGIBA / ATI
40. 3-PHASE PORTABLE SEPARATION
PACKAGE 1
Khalda Petroleum Company
41. DARFILL GAS PIPELINE LAUNCHER
/ RECEIVER SKIDS 36"/10" 2
Petrobel Petroleum Company
42. SINAA T/G GAS COMPRESSION
PLANT (UTILITIES) 4 GUPCO
43. OIL PRODUCTION & TEST
MANIFOLD SKIDS 2 MARATHON
44. OFFSHORE SEPARATION &
METERING PACKAGE 2 FANPETCO
45.
EAST ZAIT FIELD DEVELOPMENT SUMP TANK
CHEMICAL INJECTION SKID MANIFOOLD & PIG TRAPS SKID
1 1 1
ZEITCO
46. REPAIR OF LPG TRUCK MOUNTED
TANKS 6 PETROGAS
47. EGYPT LNG PROJECT ( DAMIETTA
, EGYPT ) BULLETS [ C.S , S.S]
2
SEGAS
C A I R O I N S P E C T I O N C O M P A N Y
Power Systems Projects (PSP)
YEAR 2009
OWNER POWER SYSTEMS PROJECTS
CONTACTS Dr Eng. /Mustafa Madkor
PROGRESS ASME Certification awarded
CIC SCOPE Qualifying to get ASME (U,R,S) Certificates and Stamps
SCOPE OF WORK
Review of company Quality Control Manual
Check the quality control system
Prepare & Review of the Design calculations and Drawings of Demo. Item
Prepare & Review of NDE procedures and personnel qualifications and records and written practice
Prepare & Review of welding book (WPS, PQR, WPQ) and continuity records for welders
Prepare & Review of Hydro test, PWHT procedures
Prepare & Review of purchase order and verify against code ordering information
Prepare & Review calibration procedures and verify calibration to calibrated equipments and gages
Prepare & Review material receiving and material traceability procedure
Review welding consumables handling procedure
Prepare & Review and verify records retention
Participate in the ASME review team to evaluate the company
C A I R O I N S P E C T I O N C O M P A N Y
Al-Basmalah For Trading and contracting
YEAR 2008
OWNER Al-Basmalah For Trading and contracting
progress ASME Certification awarded
CIC scope Qualifying to get ASME (A,R,PP) Stamps
SCOPE OF WORK
Review of company Quality Control Manual
Check the quality control system
Prepare & Review of the Design calculations and Drawings of Demo. Item
Prepare & Review of NDE procedures and personnel qualifications and records and written practice
Prepare & Review of welding book (WPS, PQR, WPQ) and continuity records for welders
Prepare & Review of Hydro test, PWHT procedures
Prepare & Review of purchase order and verify against code ordering information
Prepare & Review calibration procedures and verify calibration to calibrated equipments and gages
Prepare & Review material receiving and material traceability procedure
Review welding consumables handling procedure
Prepare & Review and verify records retention
C A I R O I N S P E C T I O N C O M P A N Y
ARESCO ”ASEC” Manufacturing& Industrial Projects
OWNER ARESCO ”ASEC” Manufacturing& Industrial Projects
progress ASME Certification awarded
CIC scope Qualifying to get ASME (U,R,S,PP) Stamps
SCOPE OF WORK
Review of company Quality Control Manual
Check the quality control system
Prepare & Review of the Design calculations and Drawings of Demo. Item
Prepare & Review of NDE procedures and personnel qualifications and records and written practice
Prepare & Review of welding book (WPS, PQR, WPQ) and continuity records for welders
Prepare & Review of Hydro test, PWHT procedures
Prepare & Review of purchase order and verify against code ordering information
Prepare & Review calibration procedures and verify calibration to calibrated equipments and gages
Prepare & Review material receiving and material traceability procedure
Review welding consumables handling procedure
Prepare & Review and verify records retention
Participate in the ASME review team to evaluate the company
C A I R O I N S P E C T I O N C O M P A N Y
ARCONS contracting Office
OWNER ARCONS contracting Office
progress ASME Certification awarded
CIC scope Qualifying to get ASME (U,R,S) Stamps
SCOPE OF WORK
Review of company Quality Control Manual
Check the quality control system
Prepare & Review of the Design calculations and Drawings of Demo. Item
Prepare & Review of NDE procedures and personnel qualifications and records and written practice
Prepare & Review of welding book (WPS, PQR, WPQ) and continuity records for welders
Prepare & Review of Hydro test, PWHT procedures
Prepare & Review of purchase order and verify against code ordering information
Prepare & Review calibration procedures and verify calibration to calibrated equipments and gages
Prepare & Review material receiving and material traceability procedure
Review welding consumables handling procedure
Prepare & Review and verify records retention
Participate in the ASME review team to evaluate the company
C A I R O I N S P E C T I O N C O M P A N Y
Arabi Enertech KSC in Kuwait
OWNER Arabi Enertech KSC in Kuwait
progress ASME Certification awarded
CIC scope Qualifying to get ASME (U,R, PP) Stamps
SCOPE OF WORK
Review of company Quality Control Manual
Check the quality control system
Prepare & Review of the Design calculations and Drawings of Demo. Item
Prepare & Review of NDE procedures and personnel qualifications and records and written practice
Prepare & Review of welding book (WPS, PQR, WPQ) and continuity records for welders
Prepare & Review of Hydro test, PWHT procedures
Prepare & Review of purchase order and verify against code ordering information
Prepare & Review calibration procedures and verify calibration to calibrated equipments and gages
Prepare & Review material receiving and material traceability procedure
Review welding consumables handling procedure
Prepare & Review and verify records retention
Participate in the ASME review team to evaluate the company
C A I R O I N S P E C T I O N C O M P A N Y
ARAB STEEL FABRICATION (ASF)
YEAR 2009
OWNER IBERDROLA
CONTRACTOR ASF
CIC scope ASME INSPECTION (AI)
Project description
Atmospheric drain Tank. NAT GAS Drain Collection Tank. Service Compressed Air Receiver. Instrument Compressed Air Receiver. Closed Cooling Surge tank.
SCOPE OF WORK
1. Review ITP
2. Review All procedures (NDE, Hydro test,…..).
3. Verify Drawings, Design and calculations
4. Review Welding Book (WPS , PQR, WPQ).
5. Review Material test Certificates.
6. Check Condition of material.
7. Check Type of edge preparation, method and finish.
8. Check Consumables, i.e. type of electrodes, filler wires, fluxes,
shielding and backing gases (composition) and special drying
requirements for electrodes.
9. Check Welding processes.
10. Check clearance dimensions, tolerances, type of backing (if any).
11. Check Alignment, tack welds, assembly
12. Check Alignment & Fit Up.
13. Check Joint Preparation.
14. Review NDE personnel qualification and certifications.
15. Check Conformity to Drawings and Standard Requirements.
16. Check Acceptability of Welds Regarding Appearance
C A I R O I N S P E C T I O N C O M P A N Y
WNCC (WADI El NILE CEMENT COMPANY)
YEAR 2009
OWNER WNCC
CONSULTANTS RHI (Reliance Heavy Industry)
CONTRACTOR ENERGYA
CIC scope Third Party Inspection (painting inspectors)
Project description 7500 ton Steel Structure 7500 ton Steel plate
SCOPE OF WORK
Review of equipment certificates.
Review of calibration certificates.
Final visual painting inspection & measuring (DFT) Dry Film Thickness.
C A I R O I N S P E C T I O N C O M P A N Y
ECC (EGYPTIAN CEMENT COMPANY)
YEAR 2009
OWNER ECC
CONSULTANT RHI (Reliance Heavy Industry)
CONTRACTOR ASF (Arab Steel Fabrication)
CIC scope Third Party Inspection (painting inspectors)
Project description 4500 ton Steel Structure
SCOPE OF WORK
Review of equipment certificates.
Review of calibration certificates.
Final visual painting inspection & measuring (DFT) Dry Film Thickness.
C A I R O I N S P E C T I O N C O M P A N Y
SINAI CEMENT MILL Dept. 4
YEAR 2009
OWNER SINAI CEMENT
CONSULTANT RHI (Reliance Heavy Industry)
CONTRACTOR ARESCO-ASEC
CIC scope Third Party Inspection (Welding Inspector)
Project description 900 ton Steel Structure
SCOPE OF WORK
Final visual inspection for steel structures.
Check dimensions and visual inspection
Supervising NDT activates performed by the contractor.
Review ITP & drawings
C A I R O I N S P E C T I O N C O M P A N Y
ARMED FORCE CEMENT
YEAR 2009
OWNER ARMED FORCE
CONSULTANT RHI (Reliance Heavy Industry)
CONTRACTOR NSF (National Steel Fabrication)
CIC scope Third Party Inspection (Welding Inspector)
Project description 1500 ton Steel Structure
SCOPE OF WORK
Final visual inspection for steel structures.
Check dimensions and visual inspection
Supervising NDT activates performed by the contractor.
Review ITP & drawings
C A I R O I N S P E C T I O N C O M P A N Y
ARABIAN CEMENT COMPANY
YEAR 2009
OWNER ARABIAN CEMENT Co.
CONSULTANT RHI (Reliance Heavy Industry)
CONTRACTOR ARESCO-ASEC
CIC scope Third Party Inspection (Welding Inspector)
Project description 500 ton Steel Structure
SCOPE OF WORK
Final visual inspection for steel structures.
Check dimensions and visual inspection
Supervising NDT activates performed by the contractor.
Review ITP & drawings
C A I R O I N S P E C T I O N C O M P A N Y
GEOKINETICS EGYPT LLC
YEAR 2009
OWNER GEOKINETICS EGYPT LLC
CONTRACTOR CIC
CIC scope THIRD PARTY INSPECTION
Project description FIVE PRESSURE VESSELS (AIR RECIECVERS)
SCOPE OF WORK
FINAL VISUAL INSPECTION
WITNESS HYDRO TEST
ISSUE HYDRO TEST CERTIFICATES
C A I R O I N S P E C T I O N C O M P A N Y
ECCO
YEAR 2009
OWNER ECCO
CONTRACTOR CIC
CIC scope THIRD PARTY INSPECTION
Project description INSPECTION FOR 4 PRESSURE VESSELS
SCOPE OF WORK
REVIEW ITP (INSPECTION & TEST PLAN)
REVIEW DRAWING AND DESIGN CALCULATION
FINAL VISUAL INSPECTION
WITNESS HYDRO TEST
ISSUE HYDRO TEST CERTIFICATES.
C A I R O I N S P E C T I O N C O M P A N Y
ARABIAN CEMENT COMPANY
YEAR 2009
OWNER ARABIAN CEMENT Co.
CONSULTANT RHI (Reliance Heavy Industry)
CONTRACTOR RIGA
CIC scope Consultant Representative (Welding Inspector)
Project description Construction of cement factory
SCOPE OF WORK
Review WPS for cement mill shell welding.
Witness the welding process & Check welding parameters.
Perform Dye Penetrant Testing.
Witness ultra sonic testing calibration & testing.
Perform Final visual inspection.
C A I R O I N S P E C T I O N C O M P A N Y
CONSTRUCTION OF FOUR SPHERICAL VESSELS
YEAR 2010
OWNER NEVRSEL
CONTRACTOR CAIRO INSPECTION COMPANY (CIC)
CIC Scope All QC ACTIVITIES & LEVEL III ACTIVITIES & AUTOMATIC ULTRASONIC WITNESS
Project Description
CONSTRUCTION OF FOUR (4) SPHERICAL VESSELS IN PETROCHEMICALS PLANT SOUTH PORTSAID CITY (In Progress)
SCOPE OF WORK
LEVEL III Activities.
Technical Support for all the QC problems
Manage all the QC activities in the site.
Perform the required tasks as per the project spec’s.
Review ITP.
Review All procedures (NDE, Hydro test,…..).
Review Welding Book (WPS , PQR, WPQ).
Review Material test Certificates.
Check Condition of material.
Check Type of edge preparation, method and finish.
Check Consumables, i.e. type of electrodes, filler wires, fluxes, shielding
and backing gases (composition) and special drying requirements for
electrodes.
Check Welding processes.
Check clearance dimensions, tolerances, type of backing (if any).
Check Alignment, tack welds, assembly.
Check Alignment & Fit Up.
Check Joint Preparation.
Review NDE personnel qualification and certifications.
Check Conformity to Drawings and Standard Requirements.
Check Acceptability of Welds Regarding Appearance.
C A I R O I N S P E C T I O N C O M P A N Y
3rd Party inspection for PETROJET CENTRAL WORKSHOP
YEAR 2010
OWNER ABU QIR NA/Q PII Platform
Client PETROJET-Marin Department
CIC Scope 3rd Part Inspection
Project Description
Helidec drain recovery tanks. Drain recovery tanks.
SCOPE OF WORK
Review drawing and design calculations.
Review ITP.
Review All procedures (NDE, Hydro test,…..).
Review Welding Book (WPS , PQR, WPQ).
Review Material test Certificates.
Check Condition of material.
Check Type of edge preparation, method and finish.
Check Consumables, i.e. type of electrodes, filler wires, fluxes, shielding
and backing gases (composition) and special drying requirements for
electrodes.
Check Welding processes.
Check clearance dimensions, tolerances, type of backing (if any).
Check Alignment, tack welds, assembly.
Check Alignment & Fit Up.
Check Joint Preparation.
Review NDE personnel qualification and certifications.
Check Acceptability of Welds Regarding Appearance.
C A I R O I N S P E C T I O N C O M P A N Y
3rd Party inspection for VOLCANICAENERGY
YEAR 2010
OWNER SHELL
Client VOLCANICAENERGY
CIC Scope Hydro test & NDT
Project Description
Injection & Suction pipes for triplex pump. Pressure vessel.
SCOPE OF WORK
1- Perform Visual inspection.
2- Thickness survey by ultrasonic for corrosion.
3- Ultrasonic Inspection for welds.
4- Issue test certificates for the two tanks;
5- Perform MT on welds by percent (20 %)..
6-Check Acceptability of Welds Regarding Appearance.
C A I R O I N S P E C T I O N C O M P A N Y
Worldwide inspection for ELNASR CASTING COMPANY
YEAR 2010
OWNER EL NASR CASTING COMPANY
MANUFACTURER FORTUS
CIC Scope 3rd party inspection
Item Description Pipe moulds & mechanical equipments
location ROMANIA
SCOPE OF WORK
Check Chemical Composition
Check heat treatment furnaces and procedures
General evaluation for the factory capabilities
Review ITP.
Review Welding Book (WPS , PQR, WPQ).
Review Material test Certificates.
Check Condition of material.
Check Type of edge preparation, method and finish.
Check Welding processes.
Check clearance dimensions, tolerances, type of backing (if any).
Check Alignment, tack welds, assembly.
Review NDE personnel qualification and certifications.
Check Acceptability of Welds Regarding Appearance
C A I R O I N S P E C T I O N C O M P A N Y
3rd Party Inspection for EGYPTIAN AIR FORCE
YEAR 2010
OWNER EGYPTIAN AIR FORCE
CONTRACTOR US EMBASSY
CIC Scope 3rd party inspection
Item Description NOT FOR DECLARATION
location EGYPT
SCOPE OF WORK
C A I R O I N S P E C T I O N C O M P A N Y
…………………………………………………………………………………………………………… 68/3 Abd Allah Ibn-Taher St. from Hassan el mammon St., Nasr City, Cairo, Egypt Tel: +2-012-276-0862 +2-019-836-0968 Fax: +2-02-270-1794 E-mail : [email protected] web site: www.cic-egypt.com