Upload
jonas-stokes
View
215
Download
1
Tags:
Embed Size (px)
Citation preview
CI R2 Demonstration, February 6, 2013
Ocean Observatories Initiative
Cyber InfrastructureIntegrated Observatory Network (ION) Release 2 (R2) Instrument Integration06 February 2013
Bringing remotely collected ocean data to researchers —wherever they may be.
CI R2 Demonstration, February 6, 2013
Introduction
•This presentation is an illustration of the process
of how an instrument is introduced to and
managed by ION today.
•Objectives:
•Provide evidence of instrument integration
•Begin discussions for the working patterns of
how ION will be used
CI R2 Demonstration, February 6, 2013
Agenda• We will discuss marine integration plans and activities, and will demonstrate integration of and access to two live
instruments (SBE37, PRESF) that will remain available to Beta Testers.
• Demonstration
• Activated agents and instrument introduced to ION recently
• Can view from ION remotely (ion-alpha.oceanobservatories.org – SBE37SMP, PRESF)
• Prerequisites
• Instrument
• Instrument Agent (IA) and Port Agent (PA)
• Instrument Preload
• Integration
• Prerequisites
• IA lifecycle
• Data access
• Visualization
• Persistence
• Download
CI R2 Demonstration, February 6, 2013
Caveat Emptor
•While functionality of the ION System to support
the command & control of an instrument and
persist data is complete the user facing access of
some of this functionality is not currently
implemented necessitating the use of interim
measures such as the ION preload.
CI R2 Demonstration, February 6, 2013
Demonstration
CI R2 Demonstration, February 6, 2013
Prerequisites
• Port Agent
• One for each instrument port
• Instrument Agent
• One template for each instrument class and series (at a minimum)
• Once verified (refer to previous process), the IA is published into ION
• Once activated, the first article device associated with the IA is available in ION
• 2 currently: SBE37SMP & PRESF
• Registration / Instrument preload (in lieu of a UI for now)
• Instrument identification
• Associated Instrument Agent and Port Agent
• Instrument data dictionary
• Stream definitions
• Data processes
CI R2 Demonstration, February 6, 2013
Integration
• Prerequisites satisfied
• Verify IA is completed and published
• Verify Instrument preload is completed
• Agents lifecycle
• Agents will be running and awaiting connection
• Integrate instrument
• Connect and power instrument
• Browse to instrument face page
• Verify status by status icons in header
CI R2 Demonstration, February 6, 2013
Data Access
•Visualization
• Instrument face page -> Data products page
•Persisted
•Related data products page L0, L1, L2, etc.
•Download
•Data products page -> action menu
CI R2 Demonstration, February 6, 2013
Marine Integration Plans and Activities
• Continued IA development and refinement with MIO participation (please submit helpdesk request if
issues found)
• 9 instrument agents coded:
• Available 13 February 2013
• SBE-37SMP
• PRESF
• PREST
• Available 27 February 2013
• CTDBP w/o DOSTA
• PARAD-SA
• VELPT
• Available 06 March 2013
• VEL3D
• TRHPH
• NUTNR-B
• IAs will be activated in ION as verified
CI R2 Demonstration, February 6, 2013
Questions and Comments