1300 East 8th AveTampa, FL 33605
CHURCH OF SCIENTOLOGY
CLASS V ORG - TAMPA
DEMOLITION PACKAGE - 06.11.10
GENSLER
Architect101 Marietta Street NWSuite 3000Atlanta GA 30303Contact: Colin O'Brien, Project ManagerJuli Abbott, Project ArchitectTelephone: 404.507.1000
M-ENGINEERING
Structural, Mechanical, Electrical, Plumbing Engineer750 Brooksedge Blvd.Westerville, OH 43081Contact: Shige MoroiTelephone: 614.839.4639
CHURCH OF SCIENTOLOGY
Client319 South Garden AvenueClearwater FL 33756Contact: Uli HuberTelephone: 727.467.6955
CB Richard Ellis
Project Manager189 S. Orange Ave, Suite 1900Orlando, FL 32801Contact: Steve BallTelephone: 407.404.5044
AACCES ACCESSORYACOUS ACOUSTIC(ALAFF ABOVE FINISHED FLOORAL ALUMINUMALT ALTERNATEANNUNC ANNUNCIATORANOD ANODIZEDAPPL APPLIANCEARCH ARCHITECT(URAL)AUTO AUTOMATICAVG AVERAGE & AND
B BLDG BUILDINGBOLLD BOLLARDBD BOARDBLKG BLOCKINGBRDLM BROADLOOMBU BUILT UP
CCAB CABINETCPT CARPETCEM CEMENT(ITIOUS)CER CERAMICCLG CEILINGCOATG COATINGCOILG COILINGCONC CONCRETECONSTR CONSTRUCTIONCONT CONTINUOUS(ATION)CONTR CONTRACT(OR)COV COVERCMU CONCRETE MASONRY UNIT
D DBL DOUBLEDEPT DEPARTMENTDES DESIGN(ED)DET DETAILDF DRINKING FOUNTAINDIA DIAMETERDIFF DIFFUSERDIM DIMENSIONDISP DISPENSERDIV DIVISIONDN DOWN$ DOLLAR (US CURRENCY)DR DOORDSCON DISCONNECTDWR DRAWER
E ELAST ELASTOMERICELEC ELECTRICALEMBED EMBEDD(ED)(ING)ENGR ENGINEER(ED)ENTR ENTRANCEEQ EQUALEQUIP EQUIPMENTEXIST EXISTINGEXP EXPANSIONEXPS EXPOSE(D)EXT EXTERIOR
F FAB FABRICATIONFD FLOOR DRAINFE FIRE EXTINGUISHERFE&C FIRE EXTINGUISHER & CABINETFHC FIRE HOSE CABINETFIN FINISHFLDG FOLDINGFPLC FIREPLACEFR FIREPLACEFRMG FRAMINGFXD FIXEDFXTR FIXTUREFLR FLOOR(ING)FURN FURNITUREFWC FABRIC WALL COVERING
G GA GAUGEGFRC GLASS FIBER REINFORCED CONCRETEGFRG GLASS FIBER REINFORCED GYPSUMGFRP GLASS FIBER REINFORCED PLASTERGL GLASSGR GRAD(E)(ING)GYP GYPSUM
H HD HEADHDWD HARDWOODHDWE HARDWAREHM HOLLOW METALHORIZ HORIZONTALHVAC HEATING, VENTILATING, AND AIRCONDITIONING
I INFO INFORMATIONINSTRUM INSTRUMENT(ATION)INSUL INSULATIONINTLK INTERLOCK(ING)INT INTERIORINFILTR INFILTRATION
J JAN JANITORJT JOINT
KKIT KITCHEN
L LAV LAVATORYLB POUND£ BRITISH POUND (CURRENCY)LT LIGHTLVLG LEVELINGLVR LOUVER
M MAX MAXIMUMMFD MANUFACTUREDMFR MANUFACTURERMECH MECHANICALMET METALMEMB MEMBRANEMEZZ MEZZANINEMIN MINIMUMMISC MISCELLANEOUSMLWK MILLWORKMOIST MOISTUREMOT MOTOR(IZED)MTD MOUNTED
N NIC NOT IN CONTRACTNO NUMBERNTS NOT TO SCALE
O OFCI OWNER FURNISHED, CONTRACTOR
INSTALLEDCFCI CONTRACTOR FURNISHED,
CONTRACTOR INSTALLEDORNA ORNAMENTALOVFL OVERFLOWOVHD OVERHEADOPNG OPENING(S)OPR OPERABLE
P PTN PARTITIONPEDTR PEDESTRIANPBD PARTICLE BOARDPNL PANELPOLYST POLYSTYRENEPORT PORTABLEPREFIN PREFINISHEDPREFAB PREFABRICATEDPLAM PLASTIC LAMINATEPLAS PLASTERPLSTC PLASTICPLYWD PLYWOODPRTECN PROTECTION
R RDR READERRECES RECESSEDRECPT RECEPTACLEREF REFER(ENCE)REFL REFLECTEDREFR REFRIGERATORREQD REQUIREDRESIS RESIST(ANT)(IVE)REINF REINFORCE(D)(ING)(MENT)RESIL RESILIENTRFG ROOFINGRM ROOMRO ROUGH
S SCR SCRIBESECUR SECURITYSF SQUARE FEETSGL SINGLESHORG SHORINGSIM SIMILARSST STAINLESS STEELSTD STANDARDSTL STEELSTRFR STOREFRONTSTRUCT STRUCTURALSURF SURFACESYS SYSTEM(S)SUSP SUSPENDED T THK THICKTLT TOILETTRAF TRAFFICTRANS TRANSPARENTTRTD TREATEDT&G TONGUE & GROOVETYP TYPICAL
U UNDRLAY UNDERLAYMENTUTIL UTILITYUNO UNLESS NOTED OTHERWISE
V VEH VEHICLEVERT VERTICALVIF VERIFY IN FIELD
W W/ WITHWC WATER CLOSET WD WOODWDW WINDOWW/O WITHOUTWT WEIGHTWTRPRF WATERPROOFING
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
1 : 1
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:40 PM
D00.01
PROJECT INFORMATION, DRAWING INDEX, ABBREVIATIONS
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
APPLICABLE CODES
DRAWING INDEX
D00.00 COVER
D00.01 PROJECT INFORMATION, DRAWING INDEX, ABBREVIATIONS
D01.00.1 REFERENCE DEMOLITION PLAN - FACTORY
D01.00.2 REFERENCE DEMOLITION PLAN - STEMMERY
D01.10.A DEMOLITION PLAN - FACTORY LEVEL 00 WEST
D01.10.B DEMOLITION PLAN - FACTORY LEVEL 00 EAST, LEVEL 01 SOUTH
D01.11.A DEMOLITION PLAN - FACTORY LEVEL 01 WEST
D01.11.B DEMOLITION PLAN - FACTORY LEVEL 01 EAST
D01.12.A DEMOLITION PLAN - FACTORY LEVEL 02 WEST
D01.12.B DEMOLITION PLAN - FACTORY LEVEL 02 EAST
D01.13.A DEMOLITION PLAN - FACTORY LEVEL 03 WEST
D01.13.B DEMOLITION PLAN - FACTORY LEVEL 03 EAST
D01.21.A DEMOLITION PLAN - STEMMERY LEVEL 01 WEST
D01.21.B DEMOLITION PLAN - STEMMERY LEVEL 01 EAST
D01.22.A DEMOLITION PLAN - STEMMERY LEVEL 02 WEST
D01.22.B DEMOLITION PLAN - STEMMERY LEVEL 02 EAST
D01.23.A DEMOLITION PLAN - STEMMERY LEVEL 03 WEST
D01.23.B DEMOLITION PLAN - STEMMERY LEVEL 03 EAST
GENERAL NOTES
2007 FLORIDA BUILDING CODE:BUILDINGEXISTING BUILDINGPLUMBINGMECHANICALENERGY
2007 FLORIDA FIRE PREVENTION CODE
CITY OF TAMPA MUNICIPAL CODE
1. COMPLY WITH APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONSPERTAINING TO SAFETY OF PERSONS, PROPERTY AND ENVIRONMENTAL PROTECTION.
2. PROVIDE AND MAINTAIN BARRICADES, LIGHTING, AND GUARDRAILS AS REQUIRED BYAPPLICABLE CODES AND REGULATIONS TO PROTECTOCCUPANTS OF BUILDING AND WORKERS.
3. ERECT AND MAINTAIN DUSTPROOF PARTITIONS AS REQUIRED TO PREVENT SPREAD OF DUST,FUMES, AND SMOKE, ETC. TO OTHER PARTS OF THE BUIDLING. ON COMPLETION, REMOVEPARTITIONS AND REPAIR DAMAGED SURFACES TO MATCH ADJACENT SURFACES.
4. IF DEMOLITION IS PERFORMED IN EXCESS OF THAT REQUIRED, RESTORE EFFECTED AREAS ATNO COST TO THE OWNER.
5. REMOVE FROM SITE DAILY AND LEGALLY DISPOSE OF REFUSE, DEBRIS, RUBBISH, AND OTHERMATERIALS RESULTING FROM DEMOLITION OPERATIONS IN ACCORDANCE WITH ALL LOCAL,STATE AND FEDERAL LAWS.
6. CONTRACTOR IS RESPONSIBLE FOR PROTECTING THE ADJACENT BUILDINGS, STREET,SIDEWALK, UTILITIES, TREES, ETC...FROM DAMAGE OR HARM AS PART OF THIS SCOPE OFWORK, AS OUTLINED IN THESE DOCUMENTS AND PROJECT MANUAL, AS WELL AS COMPLYINGWITH APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND REGULATIONS.
7. CLEAN ALL DEBRIS FROM FLOORS, WALLS AND CEILING TO REMAIN AFTER MAJORCOMPONENTS ARE DEMOLISHED.
8. VACUUM WALLS, FLOORS, COLUMNS AND CEILING TO RID EACH FLOOR OF DEMOLITION DUST.
9. DEMOLISH ALL MISCELANEOUS WOOD FROM CEILING STRUCTURE (ITEMS TO REMAIN: WOODBEAMS, BEAM CONNECTIONS, FLOOR JOISTS, JOIST BRACING & FLOOR SUBSTRATE & WOODFLOOR) ALL OTHER WOOD ITEMS TO BE REMOVED.
10. IN THE EVENT OF ASBESTOS OR OTHER TOXIC SUBSTANCE EXPOSURE OR THE SUBSTANTIALRISK THEROF, CLIENT WILL HAVE THE DUTY TO INFORM ARCHITECT OFSUCH RISKS KNOWN ORREASONABLY KNOWABLE TO CLIENT. IF ASBESTOS OR ANY OTHER TOXIC SUBSTANCE, OR RISKSTO EXPOSURE THEROF IS DISCOVERED BY ARCHITECT DURING WORK ON THE PROJECT,ARCHITECT SHALL, IN ITS SOLE DISCRETION, HAVE THE RIGHT TO SUSPEND WORK ON THEPROJECT. CLIENT SHALL HAVE THE DUTY PROMPTLY TO RETAIN A QUALIFIED EXPERT SAFELY TORENDER OR SUPERVISE THE REMOVAL OF SUCH ASBESTOS OR OTHER TOXIC SUBSTANCES.CLIENT SHALL INDEMNIFY AND HOLD ARCHITECTS, ITS AFFILIATES AND SUB- CONTRACTORS,AND THEIR OFFICERS, AGENTS AND EMPLOYEES HARMLESS FROM ANY AND ALL LIABILITY ONPART OF OR DAMAGE TO SUCH ENTITIES OR PERSONS, INCLUDING THE COST OF LEGAL FEESAND EXPENSES, AS SUCH FEES AND EXPENSES ARE INCURRED, WHICH MAY RESULT FROMASBESTOS OR OTHER TOXIC SUBSTANCE EXPOSURE ON THE PROJECT.
11. DIVERT CONSTRUCTION WASTE FROM LANDFILL AND RECYCLE REMOVED MATERIALSTO THE GREATEST EXTENT POSSIBLE.
12. VERIFY STRUCTURAL GRID DIMENSIONS IN FIELD.
ARCHITECTURAL DEMOLITION NOTES:
1. ALL EXTERIOR WALLS, EXTERIOR DOORS, AND EXTERIOR WINDOWS ARE HISTORIC AND ARETO REMAIN.
2. ALL COLUMNS TO REMAIN.
3. ALL STAIRS, GUARDRAILS AND HANDRAILS TO REMAIN.
4. REMOVE ALL FLOOR FINISHES AND WALL BASE UNLESS OTHERWISE NOTED
5. WHERE PARTITIONS ABUT MASONRY WALLS AND SUCH PARTITIONS ARE INDICATED TO BEREMOVED, CLEAN MASONRY OF ANY RESIDUE LEFT BY PARTITION INSTALLATION.
6. REMOVE ALL CEILING SYSTEMS UNLESS OTHERWISE NOTED.
7. IF FIRE EXTINGUISHERS AND CABINETS ARE IN PARTITIONS INDICATED TO BE REMOVED,SALVAGE FIRE EXTINGUISHERS AND CABINETS.
HVAC DEMOLITION NOTES:
1. PRIOR TO REMOVAL OF WALLS, THE HVAC CONTRACTOR SHALL IDENTIFY ALL TEMPERATURECONTROL SENSORS AND ASSOCIATE WIRING, TO PREVENT THE REMOVAL OF THESE DEVICESAND ASSOCIATED WIRING.
2. WHERE DUCTWORK IS PASSING THROUGH WALLS BEING REMOVED, THE HVAC CONTRACTORSHALL VERIFY THAT THERE ARE NO DUCTWORK SUPPORTS BEING REMOVED, OR SHALLRE- SUPPORT THE DUCTWORK ACCORDINGLY.
FIRE PROTECTION DEMOLITION NOTES:
1. AFTER REMOVAL OF WALL(S), FIRE PROTECTION CONTRACTOR TO REVIEW SPRINKLER HEADCOVERAGES TO INSURE THAT THERE SHALL BE NO SHORT CIRCUITING OF HEADS DUE TO WA(S)REMOVAL. IF SHORT CIRCUITING OF SPRINKLER HEADS EXISTS, THEN ADJUST HEADSACCORDINGLY.
2. WHERE FIRE PROTECTION LINES ARE PASSING THROUGH WALLS BEING REMOVED, FIREPROTECTION CONTRACTOR SHALL VERIFY THAT THERE ARE NO PIPING SUPPORTS BEINGREMOVED OR SHALL RE-SUPPORT THE FIRE PROTECTIONS LINES ACCORDINGLY.
PLUMBING DEMOLITION NOTES:
1. AFTER REMOVAL OF WALL(S), THE PLUMBING CONTRACTOR SHALL RE-SUPPORT EXISTINGSANITARY AND VENT, DOMESTIC WATER, AND/OR DOMESTIC HOT WATER PIPING AS REQUIRED.
2. ALL PLUMBING FIXTURES, INCLUDING DRINKING FOUNTAINS, AND PLUMBING LINES TO REMAINUNLESS OTHERWISE NOTED.
3. IF ANY PLUMBING FIXTURES ARE IDENTIFIED TO BE REMOVED, THEN ALL ASSOCIATEDSANITARY WASTE, SANITARY VENT, DOMESTIC HOT AND COLD WATER PIPING SHALL BEREMOVED. PLUMBING LINES SHALL BE REMOVED BACK TO THE MAINS AND CAPPED.
4. WHERE PLUMBING LINES ARE PASSING THROUGH WALLS BEING REMOVED, PLUMBINGCONTRACTOR SHALL VERIFY THAT THERE ARE NO PIPING SUPPORTS BEING REMOVED, OR SHALLRE-SUPPORT THE PLUMBING LINES ACCORDINGLY.
ELECTRICAL DEMOLITION NOTES:
1. PRIOR TO REMOVAL OF WALLS, THE ELECTRICAL CONTRACTOR SHALL IDENTIFY ALLRECEPTACLES, LIGHTING FIXTURES, SWITCHES, LIFE SAFETY DEVICES AND ASSOCIATEDWIRING AND CONDUIT, TO PREVENT THE REMOVAL OF THESE DEVICES AND THEIR ASSOCIATEDWIRING AND CONDUIT.
2. REMOVE ALL LIGHT FIXTURES UNLESS OTHERWISE NOTED. LIGHT FIXTURES CONTAININGHAZARDOUS BALLASTS SHALL BE DISPOSED OF PER APPROPRIATE ENVIRONMENTALREQUIREMENTS.
3. WHERE ELECTRICAL DEVICES ARE IDENTIFIED TO BE REMOVED, THEN ALL ASSOCIATEDWIRING AND CONDUIT SHALL BE REMOVED. ELECTRICAL WIRING AND CONDUIT SHALL BEREMOVED BACK TO THE MAIN PANELS.
4. WHERE CONDUIT AND/OR CABLE TRAY IS PASSING THROUGH WALLS BEING REMOVED, THEELECTRICAL CONTRACTOR SHALL VERIFY THAT THERE ARE NO CONDUITS OR CABLE TRAYSUPPORTS BEING REMOVED, OR SHALL RE-SUPPORT THE CONDUITS AND CABLE TRAYSACCORDINGLY.
5. IF A BRANCH DEVICE IS BEING REMOVED, THEN MAINTAIN THE EXISTING CIRCUITING TOMAINTAIN THE EXISTING DEVICES TO REMAIN.
TECHNOLOGY DEMOLITION NOTES:
1. PRIOR TO REMOVAL OF WALLS, THE ELECTRICAL CONTRACTOR OR TECHNOLOGYCONTRACTOR SHALL IDENTIFY ALL VOICE, VIDEO OR DATA DEVICES AND ASSOCIATED WIRINGAND CONDUIT, TO PREVENT THE REMOVAL OF THESE DEVICES AND THEIR ASSOCIATED WIRINGAND CONDUIT.
2. IF ANY TECHNOLOGY DEVICES ARE IDENTIFIED TO BE REMOVED, THEN ALL ASSOCIATEDWIRING AND CONDUIT SHALL BE REMOVED. WIRING AND CONDUIT SHALL BE REMOVED BACK TOTHE MAIN DISTRIBUTION BOARDS.
3. WHERE CONDUIT AND/OR CABLE TRAY IS PASSING THROUGH WALLS BEING REMOVED, THEELECTRICAL CONTRACTOR OR TECHNOLOGY CONTRACTOR SHALL VERIFY THAT THERE ARE NOCONDUITS OR CABLE TRAY SUPPORTS BEING REMOVED, OR SHALL RE-SUPPORT THE CONDUITSAND CABLE TRAYS ACCORDINGLY.
ABBREVIATIONS
PROJECT LOCATION
VICINITY MAP
LOCATION MAP
PROJECT LOCATION
PROJECT INFORMATION
Project Address:1300 East 8th AvenueTampa, Florida 33605
Building Construction:Type III B Sprinklered
Primary Building Occupancy:Group B Business
Gross Building Area:Factory Stemmery
Level 0 5,790 S.F.Level 0 Tunnel 970 S.F.Level 1 15,063 S.F. 12,820 S.F.Level 2 8,228 S.F. 12,854 S.F.Level 3 8,228 S.F. 12,843 S.F.Grand Total 38,279 S.F. 38,517 S.F.
PROJECT DESCRIPTION:THE PROJECT CONSISTS OF TWO BUILDINGS, THE FACTORY AND THE STEMMERY. THEBUILDINGS ARE CONNECTED BY AN UNDERGROUND CORRIDOR. THE BUILDINGS ARE INTHE YBOR CITY AREA WHICH IS DESIGNATED AS A LOCAL HISTORIC DISTRICT. INADDITION, THE TWO BUILDINGS PLUS THE NEIGHBORING WAREHOUSE BUILDING AREALL ON THE NATIONAL HISTORIC REGISTER. THE BUILDING SHELLS ARE CONSIDEREDHISTORIC ELEMENTS. IN THE FACTORY BUILDING, THERE IS A HISTORIC METAL CEILINGAND A HISTORIC STAIR AND GUARDRAIL. IN THE STEMMERY BUILDING, THERE IS AHISTORIC “READER’S PERCH.”
THE BUILDINGS’ STRUCTURE IS EXTERIOR MASONRY BEARING WALLS AND INTERIORWOOD POST-AND-BEAM CONSTRUCTION. THE INTERIORS ARE CURRENTLYCONFIGURED AS OFFICE SPACE WITH NON-BEARING PARTITIONS. THE GENERAL SCOPEOF THIS SELECTIVE DEMOLITION WORK IS TO REMOVE SELECT PARTITIONS, DOORS,CEILING SYSTEMS, FLOOR FINISHES, MILLWORK, PLUMBING FIXTURES AND LIGHTFIXTURES.
DNUP
DN
DN
UPDN
DN
DN
DN
DN
UP
UP
DNUP
DN
DN
DN
D01.10.A
D01.10.B
D01.10.A
D01.10.B
D01.11.A
D01.11.A
D01.11.B
D01.11.B
D01.11.BD01.11.B
D01.10.BD01.10.B
D01.12.A
D01.12.A
D01.12.B
D01.12.B
D01.12.A
D01.12.A
D01.12.B
D01.12.B
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
1/16" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:41 PM
D01.00.1
REFERENCE DEMOLITION PLAN - FACTORY
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
SCALE: 1/16" = 1'-0"
DEMOLITION PLAN - FACTORY LEVEL 00 OVERALL 1
SCALE: 1/16" = 1'-0"
DEMOLITION PLAN - FACTORY LEVEL 01 OVERALL 2
SCALE: 1/16" = 1'-0"
DEMOLITION PLAN - FACTORY LEVEL 02 OVERALL 3
SCALE: 1/16" = 1'-0"
DEMOLITION PLAN - FACTORY LEVEL 03 OVERALL 4
UP
UP
UP
UP
UP
UP
DN
DN
DNDN
D01.21.A
D01.21.B
D01.21.A
D01.21.B
D01.22.A
D01.22.B
D01.22.A
D01.22.B
D01.23.A
D01.23.B
D01.23.A
D01.23.B
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
1/16" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:43 PM
D01.00.2
REFERENCE DEMOLITION PLAN - STEMMERY
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
SCALE: 1/16" = 1'-0"
DEMOLITION PLAN - STEMMERY LEVEL 01 OVERALL 1
SCALE: 1/16" = 1'-0"
DEMOLITION PLAN - STEMMERY LEVEL 02 OVERALL 2SCALE: 1/16" = 1'-0"
DEMOLITION PLAN - STEMMERY LEVEL 03 OVERALL 3
DN
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
CF
DF
BF
AF
21F 23F 24F 25F 26F 27F 28F
/1
D01.10.B
/1
D01.10.B
22F
MECHANICAL
ELEVATOR MACHINEROOM
ELEVATOR 1
CORRIDOR
UP STAIR 3
10' - 7 1/2" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0"
1' - 4"
17' - 1"
17' - 3"
25' - 6"
25' - 0 1/2"
0"- 12"
38"
26A01
29A01
TYP
31A01
31A01
TYP
TYP
23A01
TYP
32A01
28A01
32A01
25A01
07A01
07A01
07A01
39A01
MATCHLINE
MATCHLINE
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:44 PM
D01.10.A
DEMOLITION PLAN - FACTORY LEVEL 00 WEST
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
C
BA
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN
UP
DN
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
CF
DF
BF
28F 29F 30F 31F 32F 33F 34F 35F
/1
D01.10.A
/1
D01.10.A
10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 11' - 6 1/2"
17' - 3"
17' - 1"
1' - 4"
38"
- 12" 0"
ELECTRICAL ROOM
CHILLED WATERPUMP ROOM
ELEVATOR MACHINEROOM ELECTRICAL ROOM
TELEPHONE ROOM
STAIR 2
23A01
TYP
29A01
TYP
32A01
28A01
26A01
32A01
30A01
TYP
31A01
TYP
07A01
24A01
07A01
07A01
07A01
07A01
MATCHLINE
MATCHLINE
/1 D01.11.B /1 D01.11.B
STAIR 8
09A01
A D J A C E N T B U I L D I N G - N. I. C.
P L A N T E RN. I. C.
MATCHLINEMATCHLINE
45' - 5"
22' - 0 1/2"
9' - 9" 9' - 9" 10' - 11"
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:46 PM
D01.10.B
DEMOLITION PLAN - FACTORY LEVEL 00 EAST, LEVEL 01 SOUTH
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
C
BA
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN
SCALE: 1/4" = 1'-0"
DEMOLITION PLAN - FACTORY LEVEL 00 EAST 1
SCALE: 1/4" = 1'-0"
DEMOLITION PLAN - FACTORY LEVEL 01 SOUTH 2
DN
DN
UP
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
CF
DF
BF
AF
1F
21F 23F
2F 3F
24F 25F 26F
6F
27F
7F
28F
8F
/1
D01.11.B
/1
D01.11.B
22F
5F4F
10' - 7 1/2" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0"
1' - 4"
17' - 1"
17' - 3"
25' - 6"
24' - 11 1/2"
STAIR 1
MEN'S RESTROOM
WOMEN'SRESTROOM
JANITOR CLOSET
ELEVATOR 1
STAIR 6
STAIR 5
DN STAIR 3
33A01
38A01
11A01
33A01
12A01
27A01
27A01
03A01
10A01
05A01
05A01
07A01
06A01
04A01
04A01
27A01
11A01
14A01
MAX
9' - 6"
P L A N T E RN. I. C.
MATCHLINE
MATCHLINE
P O R C HN. I. C.
12' - 4" 9' - 3" 10' - 2 1/2" 11' - 2 1/2" 10' - 11" 9' - 6" 9' - 11" 9' - 9"
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:48 PM
D01.11.A
DEMOLITION PLAN - FACTORY LEVEL 01 WEST
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
C
BA
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN
DN
DN
UP
DN
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
CF
DF
BF
AF
28F
8F
29F
9F
30F
10F
31F
11F
32F
12F
33F
13F
34F
14F
35F
15F
/1
D01.11.A
/1
D01.11.A
/2 D01.10.B /2 D01.10.B
10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 11' - 6 1/2"
1' - 4"
17' - 1"
17' - 3"
25' - 6"
24' - 11 1/2"
MECHANICAL
ELECTRICAL
STAIR 2
STAIR 9
STAIR 4
STAIR 10
STAIR 7
33A01
14A01
27A01
33A01
33A01
TYP
23A01
38A01
07A01
07A01
04A01
04A01
06A01
16A01
P L A N T E RN. I. C.
P L A N T E RN. I. C.
MATCHLINE
MATCHLINE
MATCHLINEMATCHLINE
9' - 8" 9' - 9" 9' - 9" 9' - 9" 9' - 9" 9' - 9" 9' - 9" 10' - 11"
32A01
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:49 PM
D01.11.B
DEMOLITION PLAN - FACTORY LEVEL 01 EAST
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
C
BA
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN
DN
AF
1F 2F 3F 6F 7F 8F
/1
D01.12.B
/1
D01.12.B
5F4F
12' - 4" 9' - 3" 10' - 2 1/2" 11' - 2 1/2" 10' - 11" 9' - 6" 9' - 11" 9' - 9"
24' - 11 1/2"
25' - 2"
STAIR 1
WOMEN'SRESTROOM
MEN'S RESTROOM
ELEVATOR 1
27A01
27A01
33A01
17A01
12A01
05A01
R O O F B E L O WN. I. C.
R O O FB E L O WN. I. C.
UP
MATCHLINE
MATCHLINE
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:51 PM
D01.12.A
DEMOLITION PLAN - FACTORY LEVEL 02 WEST
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN
BA
DN
UP
AF
8F 9F 10F 11F 12F 13F 14F 15F
/1
D01.12.A
/1
D01.12.A
24' - 11 1/2"
25' - 2"
9' - 8" 9' - 9" 9' - 9" 9' - 9" 9' - 9" 9' - 9" 9' - 9" 10' - 11"
33A01
12A01
12A01
11A01
15A01
07A01
07A01
MECHANICAL ROOM ELECTRICAL ROOM
STAIR 2
MAX
6' - 8"
MATCHLINE
MATCHLINE
R O O F B E L O WN. I. C.
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:52 PM
D01.12.B
DEMOLITION PLAN - FACTORY LEVEL 02 EAST
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN
BA
DN
AF
1F 2F 3F 6F 7F 8F
/1
D01.13.B
/1
D01.13.B
5F4F
12' - 4" 9' - 3" 10' - 2 1/2" 11' - 2 1/2" 10' - 11" 9' - 6" 9' - 11" 9' - 9"
25' - 2"
24' - 11 1/2"
17A01
29A01
29A01
ELEVATOR 1
STAIR 1
MIN
7' - 0"
MIN
4' - 0"
MATCHLINE
MATCHLINE
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:53 PM
D01.13.A
DEMOLITION PLAN - FACTORY LEVEL 03 WEST
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN
BA
DN
AF
8F 9F 10F 11F 12F 13F 14F 15F
/1
D01.13.A
/1
D01.13.A
9' - 8" 9' - 9" 9' - 9" 9' - 9" 9' - 9" 9' - 9" 9' - 9" 10' - 11"
25' - 2"
24' - 11 1/2"
06A01
04A01
05A01
07A01
05A01
07A01
07A01
07A01
STAIR 2
JANITOR
ELECTRICAL
STAIR 11
TELEPHONE
MATCHLINE
MATCHLINE
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:54 PM
D01.13.B
DEMOLITION PLAN - FACTORY LEVEL 03 EAST
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN
BA
UP
UP
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
5S 6S 7S 8S 9S 10S4S3S2S1S
BS
AS
MATCHLINE
/1
D01.21.B
WOMEN'S MEN'S
MECHANICAL ROOM
UTILITY ROOM
A J A C E N T B U I L D I N G - N I C
E X I S T I N G O U T D O O R C O U R T Y A R D - N I C
21A01
22A01
3ELEVATOR
12STAIR
07A01
PORTICON.I.C.
38A01
33A01
34A01
TYP
TYP
MIN
4' - 0" 07A01
04A01
06A01
04A01
06A01
04A01
18A01
MATCHLINE
/1
D01.21.B
20' - 7"
19' - 0"
20' - 10"
11' - 10 1/2" 9' - 11" 9' - 10" 9' - 10" 9' - 10" 9' - 10" 9' - 10 1/2" 9' - 10" 9' - 10" 9' - 10"
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:56 PM
D01.21.A
DEMOLITION PLAN - STEMMERY LEVEL 01 WEST
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN
BA
UP
UP
UP
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
9S 10S 11S 12S 13S 14S 15S 16S 17S 18S 19S
BS
AS
/1
D01.21.A
35A01
02A01
TYP
STAIR 15
18A01
34A01
33A01
TYP
TYP
36A01
07A01
STAIR 13
ELEV 2
ELECTRICAL ROOM
07A01
24A01
36A01
37A01
02A01
02A01
40A01
01A01 24
A01
40A01
20' - 7"
19' - 0"
20' - 10"
/1
D01.21.A
MATCHLINE
MATCHLINE
9' - 10" 9' - 9" 9' - 10" 9' - 10" 9' - 10" 9' - 11 1/2" 9' - 11" 9' - 10 1/2" 9' - 10 1/2" 11' - 3"
20' - 10"
19' - 0"
20' - 7"
23' - 2"
41A01
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:57 PM
D01.21.B
DEMOLITION PLAN - STEMMERY LEVEL 01 EAST
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN
BA
5S 6S 7S 8S 9S 10S4S3S2S1S
BS
AS
/1
D01.22.B
E X I S T I N G B U I L D I N G - N I C
E X I S T I N G B R I D G E - N I C
ELECTRICALROOM
MECHANICALROOM
07A01
07A01
04A01
06A01
DN DN
ELEV 3
ROOF BELOWN.I.C.
07A01
07A01
33A01
33A01 TYP
MEN'SWOMEN'S
MIN
5' - 0"
DN
DN
STAIR 12
MATCHLINE
MATCHLINE
/1
D01.22.B
11' - 9" 9' - 11" 9' - 10" 9' - 10" 9' - 10" 9' - 10" 9' - 10 1/2" 9' - 10" 9' - 10"
20' - 7 1/2"
19' - 0"
20' - 8 1/2"
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:09:58 PM
D01.22.A
DEMOLITION PLAN - STEMMERY LEVEL 02 WEST
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN
BA
DN
DN
10S 11S 12S 13S 14S 15S 16S 17S 18S 19S
BS
AS
MATCHLINE
/1
D01.22.A
MAINTENANCEROOM
STAIR 13
ELEV 2
33A01
TYP
19A01
MIN
4' - 8"
MATCHLINE
/1
D01.22.A
20' - 7 1/2"
19' - 0"
20' - 8 1/2"
20' - 8 1/2"
19' - 0"
20' - 7 1/2"
23' - 1"
9' - 10" 9' - 9" 9' - 10" 9' - 10" 9' - 10" 9' - 11 1/2" 9' - 11" 9' - 10 1/2" 9' - 10 1/2" 11' - 4"
07A01
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:10:00 PM
D01.22.B
DEMOLITION PLAN - STEMMERY LEVEL 02 EAST
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN
BA
5S 6S 7S 8S 9S 10S4S3S2S1S
BS
AS
MATCHLINE
/1
D01.23.B
STAIR 12
DN
DN
06A01
04A01
ELECTRICALROOM
MECHANICALROOM
07A01
07A01
33A01
TYP
MATCHLINE
/1
D01.23.B
11' - 9" 9' - 11" 9' - 10" 9' - 10" 9' - 10" 9' - 10" 9' - 10 1/2" 9' - 10" 9' - 10"
20' - 8 1/2"
19' - 0"
20' - 7 1/2"
R O O F B E L O W - N I C
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:10:01 PM
D01.23.A
DEMOLITION PLAN - STEMMERY LEVEL 03 WEST
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN
BA
DN
10S 11S 12S 13S 14S 15S 16S 17S 18S 19S
BS
AS
/1
D01.23.A
33A01
TYP
STAIR 13
ELEV 2
ROOF BELOWN.I.C.
9' - 10" 9' - 9" 9' - 10" 9' - 10" 9' - 10" 9' - 11 1/2" 9' - 11" 9' - 10 1/2" 9' - 10 1/2" 11' - 4"
20' - 8 1/2"
19' - 0"
20' - 7 1/2"
MATCHLINE
/1
D01.23.A
MATCHLINE
20' - 8 1/2"
19' - 0"
20' - 7 1/2"
EXISTING WALL TO REMAIN
EXISTING WALL TO BE DEMOLISHED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVEDAND SALVAGED
Gensler
101 Marietta Street NWSuite 3000Atlanta GA 30303Tel: 404.507.1000
Ref. North
© 2010 Gensler
Scale
Description
Project Number
Project Name
Seal/Signature
Issue Date & Issue Description By Check
SHEET NOTES
PLOTTING DATE: FILE PATH AND NAME:
NOT FOR CONSTRUCTION
KEY PLAN
LEGEND
# INDICATES SHEET NOTEA00.00
1/4" = 1'-0"
S:\13.7042.430\BIM\Building Model\_User Model Files\Andrea Henderson_137042430_Tampa.rvt6/11/2010 7:10:02 PM
D01.23.B
DEMOLITION PLAN - STEMMERY LEVEL 03 EAST
13.7042.430
CLASS V ORG - TAMPA
CHURCH OFSCIENTOLOGYCLASS V ORG - TAMPA1300 East 8th AveTampa, FL 33605
01 PARTIAL-HEIGHT ARCHITECTURALPILASTERS TO BE REMOVED
02 DEMOUNTABLE PARTITION TO BE REMOVED
03 WINDOW WALL TO BE REMOVED
04 MILLWORK TO BE REMOVED
05 MILLWORK TO REMAIN
06 PLUMBING FIXTURE TO BE REMOVED
07 ALL ELECTRICAL DEVICES, FLOOR FINISHES,WALL BASE, CEILING SYSTEMS IN THISROOM/CORRIDOR TO REMAIN
08 CEILING SYSTEM IN THIS ROOM/CORRIDORTO REMAIN
09 HISTORIC METAL CEILING SYSTEM IN THISROOM TO REMAIN
10 WINDOW WALL TO REMAIN
11 SIDELITE TO BE REMOVED
12 SIDELITE TO REMAIN
13 WINDOW TO REMAIN
14 REMOVE WINDOW AND MASONRY BELOWWINDOW OPENING TO BE FLUSH WITHADJACENT SUBFLOOR
15 HISTORIC GUARDRAIL TO REMAIN
16 HISTORIC STAIR TO REMAIN
17 COUNTER AND WALL BELOW TO BEREMOVED
18 CROWN MOULDING IN THIS OFFICE SUITETO BE REMOVED
19 HISTORIC “READER’S PERCH” TO REMAIN
20 SLIDING WALL SYSTEM TO BE REMOVED
21 BRICK MASONRY PILASTERS AND METALSERVICE GATE
22 EDGE OF BRIDGE ABOVE
23 CLERESTORY WINDOW
24 STEPS
25 RAMP
26 CHANGE IN SLAB LEVEL
27 MASONRY WALL
28 PARTIAL HEIGHT BRICK FOUNDATION WALL
29 MASONRY BUTTRESS
30 MASONRY COLUMN
31 MASONRY FOUNDATION AT COLUMN
32 STEEL COLUMN
33 WOOD COLUMN
34 CONCRETE FOUNDATION AT COLUMN
35 RAISED FLOOR SYSTEM TO BE REMOVEDAND SALVAGED
36 MILLWORK TO BE SALVAGED - PLACE ONFLOOR SLAB AFTER REMOVAL OF RAISEDFLOOR SYSTEM
37 REMOVE UPPER CABINET AND PLACE ONFLOOR SLAB IN THIS ROOM
38 OUTLINE OF EXISTING ROOF ABOVE
39 CHILLED WATER LINES TO REMAIN
40 CONTRACTOR TO VERIFY IF ANY STEPSEXIST BELOW RAISED FLOORING AND TOSUBMIT DOCUMENTATION TO ARCHITECT
41 DOOR ABOVE SHOWN DASHED BUTSCHEDULED TO REMAIN