TRAINERS METHODOLOGY I CAT COLLEGETraining Output # 9 November 3, 2008
EVIDENCE PLAN
Qualification:COMPUTER HARDWARE SERVICING NC II
Unit of Competency Install Computer Systems and Networks
Ways in which evidence will be collected: [tick the column]
Writt
en E
xam
/Ora
l qu
estio
ning
Dem
onst
ratio
n w
ith
Que
stion
ing
Obs
erva
tion
with
ora
l qu
estio
ning
The evidence must show that the candidate… Prepares and performs installation as indicated in the plan to
ensure that safety measures, policies and procedures followed.
Consults Technical personnel to ensure that the work are coordinated effectively with others involved on the worksite
Obtains computer systems and network devices in accordance with the established procedures and to comply with requirements
Determines location where devices and systems to be installed are
based from job requirements
Determines appropriate materials to complete the work obtained in accordance with established procedures and checked against job requirements
Obtains tools, equipment and testing devices needed to carry out the installation work in accordance with established procedures and checked for correct operation and safety
Checks preparatory work to ensure that no unnecessary damage has occurred and that work complies with requirements
Follows occupational health and safety policies and procedures in
installing computer systems , network devices, and peripherals
Installs computer systems, network devices and peripherals in accordance with the established procedures and complies with requirements *
Observes appropriate procedures in installing computer systems, network devices and peripherals achieve in accordance with requirements without damage or distortion to the surrounding environment and services *
Carries out test variations to devices/systems installation in accordance with the customer/client’s requirements *
Responds to unplanned events or conditions in accordance with
established procedures
Obtains approval in accordance with established procedures from appropriate personnel before any contingencies implemented
Undertakes ongoing checks of the quality of work in accordance
with the established procedures
Checks circuits and systems as being isolated where necessary using specified testing procedures
Prepared and Submitted by: ALLAN Q. VENUS TESDA Albay Provincial Office
TRAINERS METHODOLOGY I CAT COLLEGETraining Output # 9 November 3, 2008
EVIDENCE PLAN
Removes parts or connections of the installation or service in order to conduct the test stored to protect against loss or damage and in accordance with established procedures
Terminates devices/systems and/or installation tested in accordance with the industry requirements
Undertakes final inspections to ensure that the installed
devices/systems conforms to clients requirements *
Forwards documents in relation to the test to appropriate personnel and/or authority in accordance with requirements
NOTE: *Critical Aspects of Competency
Prepared by: ALLAN Q. VENUS Date: 10/30/08
Checked by: Date:
Prepared and Submitted by: ALLAN Q. VENUS TESDA Albay Provincial Office