Final Decision and Report of the Board of Inquiry into the Christchurch Southern Motorway Proposal
Volume 2 of 2: Conditions
Produced under Section 149R of the Resource Management Act 1991
Final Report and Decisionof the Board of Inquiry into the
Christchurch Southern Motorway Proposal
Volume 2 of 2: Conditions
Published by the Board of Inquiry into the Christchurch Southern Motorway Proposal
Dated: 8 November 2013
13 September 2013 i
TABLE OF CONTENTS PAGE Designation Conditions
1. Definitions
1
2. Designation Conditions
DC.1 to DC.39 3
Regional Resource Consent Conditions
3. Guide to Reading the Conditions
19
4. Acronyms and Terms Used in Conditions
22
5. General conditions
G.1 to G.2 24
6. Conditions relating to the consent application for excavation of land and deposition of fill over an unconfined or semi-confined aquifer
E.1 to E.6 35
7. Conditions relating to the consent application for the construction of bores
B.1 to B.7 37
8. Conditions relating to the permit for the taking of groundwater
GT.1 to GT.8 38
9. Conditions relating to the permit for the temporary and permanent diversion of stockwater races
D.1 to D.8 40
10. Conditions relating to the permits for the discharge of water (including stormwater)
DP.1 to DP.29 42
11. Conditions for the discharge of dust to air during construction of the project
51
12. Consent conditions for the storage and use of hazardous substances
51
13. Consent conditions for earthworks within riparian margins and activities in the bed of a stream
51
District Resource Consents
14. Acronyms and Terms Used in Conditions
52
15. Conditions relating to the consent applications to sample and disturb soil and change the land use within land identified as contaminated or potentially contaminated
CL.1 to CL.7 53
13 September 2013 ii
22 O
ctob
er 2
013
1
1.
Desi
gn
ati
on
Co
nd
itio
ns
- D
efi
nit
ion
s
The
tabl
e be
low
pro
vide
s exp
lana
tion
to a
num
ber o
f the
acr
onym
s and
term
s use
d in
the
cond
ition
s:
Def
initi
ons
AEE
Mea
ns th
e CS
M2
and
MSR
FL (“
Proj
ect”
) Ass
essm
ent o
f Effe
cts o
n th
e En
viro
nmen
t (V
olum
e 2)
dat
ed N
ovem
ber 2
012
BPO
M
eans
the
Best
Pra
ctic
able
Opt
ion
CCC
Mea
ns th
e Ch
ristc
hurc
h Ci
ty C
ounc
il
CEM
P M
eans
the
Cons
truc
tion
Envi
ronm
enta
l Man
agem
ent P
lan
City
M
eans
the
Chris
tchu
rch
City
Com
men
cem
ent o
f W
orks
M
eans
the
time
whe
n th
e w
orks
that
are
aut
horis
ed b
y th
e de
signa
tions
com
men
ce
Coun
cil
Mea
ns th
e re
leva
nt te
rrito
rial a
utho
rity
(Sel
wyn
Dist
rict C
ounc
il or
Chr
istch
urch
City
Cou
ncil)
Coun
cil E
ngin
eerin
g Sp
ecifi
catio
n
Mea
ns th
e de
sign
engi
neer
ing
spec
ifica
tion
of th
e re
leva
nt C
ounc
il (S
elw
yn D
istric
t Cou
ncil
Engi
neer
ing
Code
of P
ract
ice
or C
hrist
chur
ch C
ity C
ounc
il Ci
vil E
ngin
eerin
g Co
nstr
uctio
n St
anda
rd S
peci
ficat
ion)
.
Coun
cil u
tiliti
es
Mea
ns w
ater
supp
ly, s
tock
wat
er ra
ces,
was
tew
ater
(inc
ludi
ng se
wer
pip
es) a
nd ro
adin
g in
fras
truc
ture
Dist
rict
Mea
ns th
e Se
lwyn
Dist
rict
Dist
rict P
lan
Mea
ns th
e re
leva
nt te
rrito
rial a
utho
rity
dist
rict p
lan
(Sel
wyn
Dist
rict P
lan
or C
hrist
chur
ch C
ity P
lan)
High
ly se
nsiti
ve a
ir po
llutio
n la
nd u
se
Mea
ns re
siden
tial p
rope
rtie
s, p
rem
ises u
sed
prim
arily
as t
empo
rary
acc
omm
odat
ion
(suc
h as
hot
els,
mot
els a
nd
cam
ping
gro
unds
), ho
spita
ls, sc
hool
s, ea
rly c
hild
hood
edu
catio
n ce
ntre
s, c
hild
care
faci
litie
s, re
st h
omes
, pub
lic o
pen
spac
e us
ed fo
r rec
reat
ion,
the
cons
erva
tion
esta
te, m
arae
and
oth
er si
mila
r cul
tura
l fac
ilitie
s
22 O
ctob
er 2
013
2
Def
initi
ons
Man
ager
M
eans
the
Regu
lato
ry M
anag
er o
f the
rele
vant
terr
itoria
l aut
horit
y (S
elw
yn D
istric
t Cou
ncil
or C
hrist
chur
ch C
ity C
ounc
il)
Noi
se C
riter
ia
Cate
gorie
s M
eans
the
grou
ps o
f pre
fere
nce
for t
ime-
aver
aged
soun
d le
vels
esta
blish
ed in
acc
orda
nce
with
NZS
680
6:20
10 w
hen
dete
rmin
ing
the
BPO
miti
gatio
n op
tion,
i.e.
Cat
egor
y A
– pr
imar
y no
ise c
riter
ion,
Cat
egor
y B
– se
cond
ary
noise
crit
erio
n an
d Ca
tego
ry C
– in
tern
al n
oise
crit
erio
n
NZS
680
6:20
10
Mea
ns N
ew Z
eala
nd S
tand
ard
NZS
680
6:20
10 A
cous
tics –
Roa
d-tr
affic
noi
se –
New
and
alte
red
road
s
PPFs
M
eans
onl
y th
e pr
emise
s and
faci
litie
s ide
ntifi
ed in
gre
en, o
rang
e or
red
in th
e As
sess
men
t of O
pera
tiona
l Noi
se E
ffect
s da
ted
Nov
embe
r 201
2, su
bmitt
ed w
ith th
e No
tice
of R
equi
rem
ent
Proj
ect
Mea
ns th
e w
iden
ing
and
upgr
adin
g of
SH1
Mai
n So
uth
Road
bet
wee
n Ro
bins
ons R
oad
and
Rolle
ston
to p
rovi
de a
four
-la
ne m
edia
n se
para
ted
expr
essw
ay (M
ain
Sout
h Ro
ad F
our L
anin
g kn
own
as M
SRFL
) and
the
cons
truc
tion,
ope
ratio
n an
d m
aint
enan
ce o
f the
Chr
istch
urch
Sou
ther
n M
otor
way
Sta
ge 2
(CSM
2) a
nd in
clud
es a
ssoc
iate
d lo
cal r
oad
wor
ks,
incl
udin
g ne
w re
ar a
cces
s roa
ds
Requ
iring
Aut
horit
y M
eans
the
New
Zea
land
Tra
nspo
rt A
genc
y
Road
Con
trol
ling
Auth
ority
M
eans
the
rele
vant
Roa
d Co
ntro
lling
Aut
horit
y (S
elw
yn D
istric
t Cou
ncil
or C
hrist
chur
ch C
ity C
ounc
il)
RMA
Mea
ns th
e Re
sour
ce M
anag
emen
t Act
199
1
SDC
Mea
ns th
e Se
lwyn
Dist
rict C
ounc
il
SEM
P M
eans
Spe
cial
ised
Envi
ronm
enta
l Man
agem
ent P
lan
Stru
ctur
al M
itiga
tion
Has t
he sa
me
mea
ning
as i
n N
ZS 6
806:
2010
Terr
itoria
l aut
horit
y M
eans
the
rele
vant
terr
itoria
l aut
horit
y (S
elw
yn D
istric
t Cou
ncil
or C
hrist
chur
ch C
ity C
ounc
il)
Wor
k M
eans
any
act
ivity
or a
ctiv
ities
und
erta
ken
in re
latio
n to
the
cons
truc
tion
and
oper
atio
n of
the
Proj
ect
22 O
ctob
er 2
013
3
2.
Desi
gn
ati
on
Co
nd
itio
ns
Ref
Cond
ition
s
G
ener
al a
nd A
dmin
istra
tion
DC.1
Exce
pt a
s mod
ified
by
the
cond
ition
s bel
ow, a
nd su
bjec
t to
final
des
ign,
the
Proj
ect s
hall
be u
nder
take
n in
gen
eral
acc
orda
nce
with
the
info
rmat
ion
prov
ided
by
the
Requ
iring
Aut
horit
y in
the
Not
ices
of R
equi
rem
ent d
ated
Nov
embe
r 201
2 an
d su
ppor
ting
docu
men
ts b
eing
: (a
) As
sess
men
t of E
nviro
nmen
tal E
ffect
s rep
ort,
date
d N
ovem
ber 2
012;
(b
) Pl
an se
ts:
i. La
yout
Pla
ns: 6
2236
-A-C
020-
C029
& 6
2236
-B-C
020-
C025
, C02
6-C0
27 re
v 1,
C02
8-C0
35, C
036
rev
1, C
037-
C038
ii.
Pl
an a
nd L
ongi
tudi
nal S
ectio
ns: 6
2236
-A-C
100-
C107
, C11
0-C1
13, C
120,
C13
1-C1
33 &
622
36-B
-C10
1-C1
12, C
115,
C12
0-C1
21,
C125
-C12
6, C
130
rev
1, C
135-
C136
, C14
0-C1
45, C
160-
C163
iii
. Ty
pica
l Cro
ss S
ectio
ns: 6
2236
-A-C
171-
C173
& 6
2236
-B-C
171-
C173
iv
. Pa
vem
ent S
urfa
ces:
622
36-A
-C25
0-C2
52, C
253
rev
1 &
622
36-B
-C25
0-C2
51, C
252-
C253
rev
1, C
254-
C255
v.
Cy
cle
Path
Pla
ns: 6
2236
-B-C
315-
C316
vi
. Dr
aina
ge L
ayou
t Pla
ns: 6
2236
-A-C
401,
C40
2-C4
03 re
v 1,
C40
4-C4
06, C
408
rev
1, C
411
rev
1, C
412
rev
2 &
622
36-B
-C40
1-C4
02 re
v 1,
C40
3-C4
04, C
405-
rev
1, C
406-
407
rev
2, C
408,
C40
9-C4
12 re
v 1,
C41
3, C
414
rev
1, C
415,
C41
6-C4
17 re
v 1,
C42
5-C4
26 re
v 1
vii.
Drai
nage
Det
ails:
622
36-A
-C45
1, C
453-
C454
, C46
1-C4
63 re
v 1
& 6
2236
-B-C
451-
C455
, C46
1-C4
66 re
v 1
viii.
Sig
nage
Pla
ns: 6
2236
-A-C
501-
C508
& 6
2236
-B-C
501-
C505
, C50
6-C5
07 re
v 1,
C50
8-C5
15, C
516
rev
1, C
517
ix.
Land
Req
uire
men
t Pla
ns: 6
2236
-A-C
1101
-C11
09, C
1110
rev
1 &
622
36-B
-C11
01-C
1105
, C11
06-C
1107
rev
1, C
1108
-C11
15, C
1116
re
v 1,
C11
17-C
1118
x.
St
ruct
ural
Pla
ns: 6
2236
-A-S
000,
S01
1-S0
12 &
622
36-B
-S00
0, S
011-
S013
, S02
1-S0
23, S
031-
S032
, S04
1-S0
43, S
051-
S053
, S06
1-S0
63, S
071-
S072
, S08
1-S0
83
xi.
Land
scap
e Pl
antin
g Pl
ans:
622
36-A
-L01
1-L0
19 re
v 1
& 6
2236
-B-L
011-
L015
rev
1, L
016-
L017
rev
2, L
018-
L024
rev
1, L
025
rev
2,
L026
-L02
8 re
v 1
xii.
Ligh
ting
Plan
s: 1
6.00
1630
, she
ets 1
-20
Advi
ce N
otes
: Fo
r the
avo
idan
ce o
f dou
bt, n
one
of th
ese
cond
ition
s pre
vent
or a
pply
to w
orks
requ
ired
for t
he o
ngoi
ng o
pera
tion
or m
aint
enan
ce o
f the
Pr
ojec
t fol
low
ing
cons
truc
tion,
such
as c
hang
es to
stre
et fu
rnitu
re o
r sig
nage
ove
r tim
e. D
epen
ding
upo
n th
e na
ture
of s
uch
wor
ks,
Out
line
Plan
s or O
utlin
e Pl
an w
aive
rs m
ay b
e re
quire
d fo
r any
such
wor
ks.
The
supp
ort d
ocum
enta
tion
as c
onfir
med
in th
e de
signa
tions
con
tain
s all
the
info
rmat
ion
that
wou
ld b
e re
quire
d to
be
prov
ided
with
an
22 O
ctob
er 2
013
4
Ref
Cond
ition
s
Out
line
Plan
und
er S
ectio
n 17
6A o
f the
RM
A, th
eref
ore
no se
para
te O
utlin
e Pl
ans f
or c
onst
ruct
ion
of th
e w
orks
show
n in
the
said
supp
ort
docu
men
tatio
n w
ill b
e su
bmitt
ed.
An O
utlin
e Pl
an m
ay b
e pr
epar
ed a
nd su
bmitt
ed fo
r any
wor
ks n
ot in
clud
ed w
ithin
Con
ditio
n DC
.1 in
acc
orda
nce
with
the
requ
irem
ents
of
Sect
ion
176A
of t
he R
MA.
DC
.2
As
soon
as p
ract
icab
le fo
llow
ing
com
plet
ion
of c
onst
ruct
ion
of th
e Pr
ojec
t, th
e Re
quiri
ng A
utho
rity
shal
l: (a
) Re
view
the
wid
th o
f the
are
a de
signa
ted
for t
he P
roje
ct;
(b)
Iden
tify
any
area
s of d
esig
nate
d la
nd th
at a
re n
o lo
nger
nec
essa
ry fo
r the
ong
oing
ope
ratio
n, o
r mai
nten
ance
of t
he P
roje
ct o
r for
on
goin
g m
itiga
tion
mea
sure
s; a
nd
(c)
Giv
e no
tice
to th
e Co
unci
l in
acco
rdan
ce w
ith S
ectio
n 18
2 of
the
RMA
for t
he re
mov
al o
f tho
se p
arts
of t
he d
esig
natio
n id
entif
ied
in
Cond
ition
DC.
2(b)
abo
ve.
DC.3
The
desig
natio
n sh
all l
apse
if n
ot g
iven
effe
ct to
with
in 1
5 ye
ars f
rom
the
date
on
whi
ch it
is in
clud
ed in
the
Dist
rict P
lan
unde
r Sec
tion
175
of th
e RM
A.
Co
mm
unic
atio
ns a
nd P
ublic
Lia
ison
- Con
stru
ctio
n DC
.4
Th
e Re
quiri
ng A
utho
rity
shal
l app
oint
a li
aiso
n pe
rson
for t
he d
urat
ion
of th
e co
nstr
uctio
n ph
ase
of th
e Pr
ojec
t to
be th
e m
ain
and
read
ily a
cces
sible
poi
nt o
f con
tact
at a
ll tim
es fo
r per
sons
affe
cted
by
the
cons
truc
tion
wor
k. T
he R
equi
ring
Auth
ority
shal
l tak
e ap
prop
riate
step
s to
advi
se a
ll af
fect
ed p
artie
s of t
he li
aiso
n pe
rson
’s n
ame
and
cont
act d
etai
ls. T
he P
roje
ct c
onta
ct p
erso
n sh
all b
e re
ason
ably
ava
ilabl
e by
tele
phon
e du
ring
the
cons
truc
tion
phas
e of
the
Proj
ect.
If th
e lia
ison
pers
on w
ill n
ot b
e av
aila
ble
for a
ny re
ason
, an
alte
rnat
ive
cont
act p
erso
n sh
all b
e no
min
ated
.
22 O
ctob
er 2
013
5
Ref
Cond
ition
s
DC.5
Prio
r to
the
com
men
cem
ent o
f wor
ks, t
he R
equi
ring
Auth
ority
shal
l pre
pare
and
impl
emen
t a C
omm
unic
atio
ns P
lan
that
sets
out
pr
oced
ures
det
ailin
g ho
w th
e pu
blic
and
stak
ehol
ders
will
be
com
mun
icat
ed w
ith th
roug
hout
the
cons
truc
tion
perio
d. A
s a m
inim
um,
the
Com
mun
icat
ions
Pla
n sh
all i
nclu
de:
i. de
tails
of a
pub
lic li
aiso
n pe
rson
ava
ilabl
e at
all
times
dur
ing
wor
ks. C
onta
ct d
etai
ls sh
all b
e pr
omin
ently
disp
laye
d at
the
site
offic
e so
th
at th
ey a
re c
lear
ly v
isibl
e to
the
publ
ic a
t all
times
; ii.
met
hods
to c
onsu
lt on
and
to c
omm
unic
ate
deta
ils o
f the
pro
pose
d co
nstr
uctio
n ac
tiviti
es to
surr
ound
ing
resid
entia
l com
mun
ities
, an
d m
etho
ds to
dea
l with
con
cern
s rai
sed;
iii
. m
etho
ds to
reco
rd fe
edba
ck ra
ised
abou
t con
stru
ctio
n ac
tiviti
es;
iv.
any
stak
ehol
der s
peci
fic c
omm
unic
atio
n pl
ans;
v.
mon
itorin
g an
d re
view
pro
cedu
res f
or th
e Co
mm
unic
atio
n Pl
an;
vi.
deta
ils o
f com
mun
icat
ions
act
iviti
es p
ropo
sed
whi
ch m
ay in
clud
e:
Pu
blic
atio
n of
a n
ewsle
tter
, or s
imila
r, an
d its
pro
pose
d de
liver
y ar
ea.
N
ewsp
aper
adv
ertis
ing.
Web
site.
Not
ifica
tion
of su
rrou
ndin
g pr
oper
ties w
ithin
200
met
res o
f con
stru
ctio
n ac
tiviti
es a
nd c
onsu
ltatio
n w
ith in
divi
dual
pro
pert
y ow
ners
and
occ
upie
rs w
ith d
wel
lings
with
in 2
0 m
etre
s of c
onst
ruct
ion
activ
ities
. Th
e Co
mm
unic
atio
ns P
lan
shal
l inc
lude
link
ages
and
cro
ss-r
efer
ence
s to
met
hods
set o
ut in
oth
er m
anag
emen
t pla
ns w
here
rele
vant
. Th
e Re
quiri
ng A
utho
rity
shal
l pro
vide
the
Com
mun
icat
ions
Pla
n to
the
Man
ager
at l
east
15
wor
king
day
s prio
r to
the
com
men
cem
ent o
f w
orks
.
22 O
ctob
er 2
013
6
Ref
Cond
ition
s
DC.6
The
Requ
iring
Aut
horit
y sh
all e
stab
lish
a Co
mm
unity
Lia
ison
Grou
p(s)
(CLG
) at l
east
30
wor
king
day
s prio
r to
the
com
men
cem
ent o
f w
orks
. Th
e pu
rpos
e of
the
CLG
shal
l be
to p
rovi
de a
regu
lar f
orum
thro
ugh
whi
ch in
form
atio
n ab
out t
he P
roje
ct c
an b
e pr
ovid
ed to
the
com
mun
ity, a
nd a
n op
port
unity
for c
once
rns a
nd is
sues
to b
e ra
ised
with
the
Requ
iring
Aut
horit
y.
The
CLG
shal
l con
sist o
f a m
axim
um o
f eig
ht p
erso
ns w
ith a
pre
fere
nce
for r
epre
sent
ativ
es fr
om th
e fo
llow
ing
grou
ps:
i. Se
lwyn
Dist
rict C
ounc
il;
ii. C
hrist
chur
ch C
ity C
ounc
il;
iii. E
duca
tiona
l fac
ilitie
s sur
roun
ding
the
Proj
ect a
rea
(sch
ools,
kin
derg
arte
ns, c
hild
care
faci
litie
s);
iv. C
omm
unity
/ env
ironm
enta
l gro
ups;
and
v.
The
Pro
ject
liai
son
pers
on, a
ppoi
nted
in a
ccor
danc
e w
ith C
ondi
tion
DC.4
. Th
e CL
G w
ill b
e of
fere
d th
e op
port
unity
of m
eetin
g at
leas
t onc
e ev
ery
thre
e m
onth
s or a
s req
uest
ed th
roug
hout
the
cons
truc
tion
perio
d, so
that
ong
oing
info
rmat
ion
can
be d
issem
inat
ed a
nd d
iscus
sed,
at t
he R
equi
ring
Auth
ority
’s e
xpen
se.
M
anag
emen
t Pla
ns -
Gen
eral
DC
.7
At
leas
t thr
ee m
onth
s prio
r to
the
com
men
cem
ent o
f wor
ks, t
he R
equi
ring
Auth
ority
shal
l sub
mit
info
rmat
ion
to th
e M
anag
er to
de
mon
stra
te th
at th
e pr
opos
ed c
ertif
ier o
f the
man
agem
ent p
lans
(req
uire
d by
Con
ditio
n DC
.8) i
s ind
epen
dent
, sui
tabl
y qu
alifi
ed a
nd
expe
rienc
ed. W
orks
shal
l not
pro
ceed
unt
il ap
prov
al fr
om th
e M
anag
er is
obt
aine
d.
If th
e M
anag
er d
oes n
ot a
ppro
ve th
e pe
rson
(s) p
ropo
sed
by th
e Re
quiri
ng A
utho
rity,
reas
ons s
houl
d be
pro
vide
d to
indi
cate
why
the
pers
on(s
) is n
ot c
onsid
ered
to b
e su
itabl
e.
With
the
prio
r agr
eem
ent o
f the
Man
ager
, the
inde
pend
ent c
ertif
ier m
ay b
e ch
ange
d at
any
stag
e in
the
Proj
ect.
22 O
ctob
er 2
013
7
Ref
Cond
ition
s
DC.8
(a)
All w
orks
shal
l be
carr
ied
out i
n ge
nera
l acc
orda
nce
with
the
Cons
truc
tion
Envi
ronm
enta
l Man
agem
ent P
lan
and
rele
vant
Sp
ecia
lised
Env
ironm
enta
l Man
agem
ent P
lans
(“SE
MPs
”) re
quire
d by
thes
e de
signa
tion
cond
ition
s. T
he d
raft
man
agem
ent p
lans
lo
dged
with
the
Not
ices
of R
equi
rem
ent t
hat a
re li
sted
bel
ow in
this
cond
ition
shal
l be
upda
ted
and
final
ised
by th
e Re
quiri
ng
Auth
ority
: i.
Cons
truc
tion
Envi
ronm
enta
l Man
agem
ent P
lan
(“CE
MP”
) ii.
SE
MP
001
Air Q
ualit
y M
anag
emen
t Pla
n
iii.
SEM
P 00
3 Co
nstr
uctio
n N
oise
and
Vib
ratio
n M
anag
emen
t Pla
n
iv.
SEM
P 00
4 Co
nstr
uctio
n Tr
affic
Man
agem
ent P
lan
v.
SE
MP
005
Land
scap
e M
anag
emen
t Pla
n
(b)
The
man
agem
ent p
lans
shal
l be
cert
ified
by
an in
depe
nden
t, su
itabl
y qu
alifi
ed a
nd e
xper
ienc
ed p
erso
n(s)
(app
rove
d by
the
Man
ager
as b
eing
com
pete
nt a
nd su
itabl
e to
pro
vide
such
cer
tific
atio
n as
per
Con
ditio
n DC
.7),
at le
ast 4
0 w
orki
ng d
ays p
rior t
o th
e co
mm
ence
men
t of c
onst
ruct
ion
of th
e re
leva
nt st
age
or st
ages
of w
ork.
If c
hang
es a
re re
ques
ted
by th
e ce
rtifi
er th
ese
chan
ges
shal
l be
mad
e be
fore
the
cert
ifica
tion
is co
nfirm
ed.
(c)
This
cert
ifica
tion
shal
l be
prov
ided
to th
e M
anag
er a
t lea
st 1
0 w
orki
ng d
ays p
rior t
o th
e co
mm
ence
men
t of c
onst
ruct
ion
of th
e re
leva
nt st
age
or st
ages
of w
ork.
(d
) W
here
a m
anag
emen
t pla
n(s)
is to
be
subm
itted
in a
stag
ed m
anne
r as a
resu
lt of
the
stag
ing
of c
onst
ruct
ion
wor
ks, i
nfor
mat
ion
abou
t the
pro
pose
d st
agin
g sh
all b
e su
bmitt
ed a
s par
t of t
he C
EMP.
Ad
vice
Not
e:
A 20
wor
king
day
turn
arou
nd ti
me
is in
tend
ed fo
r the
man
agem
ent p
lan
cert
ifica
tion
proc
ess.
DC
.9
W
orks
shal
l not
pro
ceed
unt
il th
e re
leva
nt m
anag
emen
t pla
ns a
nd c
ertif
icat
ion
desc
ribed
in C
ondi
tion
DC.8
hav
e be
en re
ceiv
ed a
nd
ackn
owle
dged
in w
ritin
g by
the
Man
ager
. If w
ritte
n ac
know
ledg
emen
t is n
ot p
rovi
ded
by th
e Co
unci
l with
in 1
0 w
orki
ng d
ays o
f the
Re
quiri
ng A
utho
rity
send
ing
the
cert
ifica
tion,
the
cert
ifica
tion
shal
l be
deem
ed to
be
conf
irmed
. DC
.10
Th
e Re
quiri
ng A
utho
rity
may
mak
e re
ason
able
am
endm
ents
to th
e m
anag
emen
t pla
ns a
t any
tim
e. A
ny c
hang
es to
the
man
agem
ent
plan
s sha
ll re
mai
n co
nsist
ent w
ith th
e ov
eral
l int
ent o
f the
rele
vant
man
agem
ent p
lan
and
shal
l be
cert
ified
by
the
agre
ed in
depe
nden
t ce
rtifi
er, a
s per
the
requ
irem
ents
out
lined
in C
ondi
tion
DC.8
. The
Req
uirin
g Au
thor
ity sh
all p
rovi
de a
cop
y of
any
such
am
endm
ent t
o th
e m
anag
emen
t pla
ns a
nd th
e ce
rtifi
catio
n to
Cou
ncil
for i
nfor
mat
ion,
prio
r to
givi
ng e
ffect
to th
e am
endm
ent.
DC.1
1
All o
pera
tiona
l per
sonn
el in
volv
ed w
ith th
e co
nstr
uctio
n of
the
Proj
ect s
hall
be m
ade
awar
e of
, and
hav
e ac
cess
to, a
ll co
nditi
ons a
nd
man
agem
ent p
lans
app
licab
le to
the
cons
truc
tion,
mai
nten
ance
and
ope
ratio
n of
the
Proj
ect.
A co
py sh
all b
e ke
pt o
n sit
e at
all
times
.
22 O
ctob
er 2
013
8
Co
nstr
uctio
n En
viro
nmen
tal M
anag
emen
t Pla
n DC
.12
Th
e Re
quiri
ng A
utho
rity
shal
l fin
alise
the
CEM
P su
bmitt
ed w
ith th
e ap
plic
atio
n an
d th
is sh
all b
e ce
rtifi
ed in
acc
orda
nce
with
Con
ditio
n DC
.8. T
he c
ertif
icat
ion
shal
l con
firm
that
the
CEM
P:
(a)
is ge
nera
lly c
onsis
tent
with
the
draf
t CEM
P su
bmitt
ed w
ith th
e ap
plic
atio
n; a
nd
(b)
addr
esse
s the
mat
ters
set o
ut in
Con
ditio
n DC
.13
belo
w.
DC.1
3
The
purp
ose
of th
e CE
MP
is to
pro
vide
an
over
arch
ing
fram
ewor
k to
ens
ure
that
the
Proj
ect r
emai
ns w
ithin
the
limits
and
stan
dard
s ap
prov
ed u
nder
this
desig
natio
n an
d th
at th
e co
nstr
uctio
n ac
tiviti
es a
void
, rem
edy
or m
itiga
te a
dver
se e
ffect
s on
the
envi
ronm
ent.
Th
e CE
MP
shal
l inc
lude
, but
nee
d no
t be
limite
d to
, the
follo
win
g:
(a)
Gen
eral
:
CEM
P pu
rpos
e;
Pr
ojec
t det
ails
incl
udin
g an
ticip
ated
con
stru
ctio
n ac
tiviti
es;
CE
MP
Obj
ectiv
es a
nd P
olic
ies;
(b
) En
viro
nmen
tal M
anag
emen
t:
Ex
istin
g en
viro
nmen
t cha
ract
erist
ics;
Envi
ronm
enta
l iss
ues a
ntic
ipat
ed d
urin
g co
nstr
uctio
n;
En
viro
nmen
tal m
anag
emen
t app
roac
h an
d m
etho
ds a
nd m
easu
res t
o av
oid
and
miti
gate
adv
erse
env
ironm
enta
l effe
cts a
risin
g fr
om c
onst
ruct
ion
wor
k;
M
itiga
tion/
cont
inge
ncy
mea
sure
s;
(c)
CEM
P Re
quire
men
ts:
Ro
les a
nd re
spon
sibili
ties;
Trai
ning
and
edu
catio
n;
M
onito
ring,
mai
nten
ance
, aud
it an
d re
port
ing;
Corr
ectiv
e ac
tion
and
emer
genc
y co
ntac
ts a
nd re
spon
se;
Fe
edba
ck m
anag
emen
t;
CEM
P re
visio
n an
d co
mpl
ianc
e iss
ue re
solu
tion
proc
esse
s;
(d)
Activ
ity S
peci
fic R
equi
rem
ents
: i)
Haza
rdou
s Sub
stan
ces
The
CEM
P sh
all d
evel
op a
nd im
plem
ent m
etho
dolo
gies
and
pro
cess
es fo
r min
imisi
ng p
oten
tial e
nviro
nmen
tal r
isks a
risin
g fr
om th
e us
e an
d st
orag
e of
haz
ardo
us su
bsta
nces
and
the
tran
spor
tatio
n, d
ispos
al a
nd tr
acki
ng o
f mat
eria
ls ta
ken
away
dur
ing
the
22 O
ctob
er 2
013
9
cons
truc
tion
of th
e Pr
ojec
t, in
acc
orda
nce
with
bes
t pra
ctic
e an
d na
tiona
l sta
ndar
ds a
nd re
gula
tions
. Thi
s sha
ll in
clud
e:
a) t
he ty
pes a
nd v
olum
es o
f haz
ardo
us su
bsta
nces
stor
ed d
urin
g th
e co
nstr
uctio
n ph
ase;
b)
the
equ
ipm
ent,
syst
ems a
nd p
roce
dure
s to
be u
sed
to m
inim
ise th
e ris
k of
spill
s or l
eaks
of h
azar
dous
subs
tanc
es;
c) t
he sp
ill m
anag
emen
t and
con
tain
men
t equ
ipm
ent t
o be
mai
ntai
ned
at a
ll tim
es o
n sit
e, a
nd it
s loc
atio
n;
d) p
roce
dure
s for
con
tain
ing,
man
agin
g, c
lean
ing
and
disp
osin
g of
any
spill
or l
eak
of c
onta
min
ated
mat
eria
l fro
m th
e sit
e (s
pill
kits
); e)
pro
cedu
res t
o no
tify
and
repo
rt to
Cou
ncil
with
in 2
4 ho
urs o
f a sp
ill o
r lea
k in
volv
ing
10 li
tres
or m
ore
occu
rrin
g, in
clud
ing
a m
aint
aine
d sc
hedu
le o
f em
erge
ncy
cont
act n
ames
and
num
bers
; and
f)
proc
edur
es to
be
follo
wed
to id
entif
y ca
uses
of s
pills
or l
eaks
and
to p
reve
nt th
eir r
ecur
renc
e.
ii) N
etw
ork
Utili
ties
The
CEM
P sh
all o
utlin
e th
e m
etho
dolo
gies
that
will
be
adop
ted
to e
nsur
e en
ablin
g w
ork,
des
ign
and
cons
truc
tion
of th
e Pr
ojec
t ad
equa
tely
take
s acc
ount
of (
and
incl
udes
mea
sure
s to
addr
ess)
the
safe
ty, i
nteg
rity,
pro
tect
ion
or w
here
nec
essa
ry th
e re
loca
tion
of e
xist
ing
netw
ork
utili
ties.
Thi
s sha
ll in
clud
e:
a) m
easu
res t
o be
use
d to
acc
urat
ely
iden
tify
the
loca
tion
of e
xist
ing
netw
ork
utili
ties;
b)
mea
sure
s for
the
prot
ectio
n, re
loca
tion
and/
or re
inst
atem
ent o
f exi
stin
g ne
twor
k ut
ilitie
s;
c) m
easu
res t
o en
sure
the
cont
inue
d op
erat
ion
and
supp
ly o
f exi
stin
g in
fras
truc
ture
serv
ices
whi
ch m
ay in
clud
e, b
ut n
ot b
e lim
ited
to, e
lect
ricity
line
s, te
leco
mm
unic
atio
ns c
able
s, se
wer
pip
es a
nd w
ater
supp
ly;
d) m
easu
res t
o pr
ovid
e fo
r the
safe
ope
ratio
n of
pla
nt a
nd e
quip
men
t, an
d th
e sa
fety
of w
orke
rs a
nd o
ther
per
sons
, in
prox
imity
to
exist
ing
live
netw
ork
utili
ties;
e)
mea
sure
s to
prov
ide
for a
cces
s to
netw
ork
utili
ties a
t rea
sona
ble
times
; f)
mea
sure
s to
man
age
pote
ntia
l ind
uctio
n ha
zard
s to
exist
ing
netw
ork
utili
ties;
g)
ear
thw
orks
man
agem
ent (
incl
udin
g de
pth
and
exte
nt o
f ear
thw
orks
) and
man
agem
ent o
f dus
t, fo
r ear
thw
orks
in c
lose
pro
xim
ity
to e
xist
ing
netw
ork
utili
ties (
in p
artic
ular
com
plia
nce
with
New
Zea
land
Ele
ctric
al C
ode
of P
ract
ice
for E
lect
rical
Saf
e Di
stan
ces
– N
ZECP
34:
2001
); h)
Vib
ratio
n m
anag
emen
t for
wor
ks in
clo
se p
roxi
mity
to e
xist
ing
netw
ork
utili
ties;
and
i)
Emer
genc
y m
anag
emen
t pro
cedu
res i
n th
e ev
ent o
f any
em
erge
ncy
invo
lvin
g ex
istin
g ne
twor
k ut
ilitie
s.
j) De
sign
and
cons
truc
tion
of C
ounc
il ut
ilitie
s sha
ll be
und
erta
ken
in a
ccor
danc
e w
ith C
ondi
tion
DC.3
9.
iii) C
onst
ruct
ion
Ligh
ting
The
CEM
P sh
all o
utlin
e th
e m
etho
dolo
gies
that
will
be
adop
ted
to a
void
, rem
edy
or m
itiga
te th
e ef
fect
s of c
onst
ruct
ion
light
ing.
Th
is sh
all i
nclu
de:
a) i
n ar
eas a
djac
ent t
o re
siden
ces,
all
secu
rity
and
cons
truc
tion
light
ing
shal
l be
inst
alle
d so
that
it c
an b
e sh
ield
ed, o
r dire
cted
to
22 O
ctob
er 2
013
10
the
requ
ired
wor
k ar
ea to
min
imise
ligh
t spi
ll, g
lare
and
upw
ard
was
te b
eyon
d th
e sit
e so
far a
s it i
s rea
sona
bly
prac
tical
and
to
achi
eve
com
plia
nce
with
rele
vant
Dist
rict P
lan
stan
dard
s; a
nd
b) c
aref
ul c
onsid
erat
ion
to th
e lo
catio
n of
site
offi
ces t
o en
sure
ther
e is
no o
btru
sive
light
ing
effe
cts t
o ne
arby
resid
ence
s;
iv) C
ultu
ral/
Arch
aeol
ogy
and
Herit
age
Man
agem
ent
The
CEM
P sh
all i
ncor
pora
te th
e Ac
cide
ntal
Disc
over
y Pr
otoc
ol c
over
ing
NZT
A N
ew Z
eala
nd R
egio
ns 1
1 (C
ante
rbur
y) a
nd 1
2 (W
est
Coas
t) an
d th
e N
gai T
ahu
Koiw
i Tan
gata
Pol
icy
1993
. Ad
vice
Not
e:
The
use
and
stor
age
of h
azar
dous
subs
tanc
es w
ill b
e co
mpl
iant
with
the
rele
vant
pro
visio
ns o
f the
Haz
ardo
us S
ubst
ance
s and
New
O
rgan
isms A
ct 1
996.
Air Q
ualit
y M
anag
emen
t Pla
n - C
onst
ruct
ion
DC.1
4
The
Requ
iring
Aut
horit
y sh
all f
inal
ise th
e Ai
r Qua
lity
Man
agem
ent P
lan
(SEM
P 00
1) su
bmitt
ed w
ith th
e ap
plic
atio
n.
The
Air Q
ualit
y M
anag
emen
t Pla
n sh
all b
e ce
rtifi
ed (a
s a re
quire
men
t of C
ondi
tion
DC.8
) to
conf
irm th
at th
e Ai
r Qua
lity
Man
agem
ent
Plan
: (a
) is
gene
rally
con
siste
nt w
ith th
e dr
aft A
ir Q
ualit
y M
anag
emen
t Pla
n su
bmitt
ed w
ith th
e ap
plic
atio
n; a
nd
(b)
addr
esse
s all
the
mat
ters
list
ed in
Con
ditio
n DC
.15
belo
w.
22 O
ctob
er 2
013
11
DC.1
5
The
Air Q
ualit
y M
anag
emen
t Pla
n (S
EMP
001)
shal
l des
crib
e th
e m
easu
res t
hat w
ill b
e ad
opte
d th
at, s
o fa
r as p
ract
icab
le, r
educ
e th
e du
st o
r fum
es a
risin
g as
a re
sult
of th
e co
nstr
uctio
n of
the
Proj
ect a
t any
poi
nt b
eyon
d th
e de
signa
tion
boun
dary
that
bor
ders
a h
ighl
y se
nsiti
ve a
ir po
llutio
n la
nd u
se.
The
Air Q
ualit
y M
anag
emen
t Pla
n sh
all
incl
ude,
but
nee
d no
t be
limite
d to
, the
follo
win
g:
i. De
scrip
tion
of th
e w
orks
, and
sour
ces o
f dus
t and
fum
es;
ii. I
dent
ifica
tion
of p
erio
ds o
f tim
e w
hen
emiss
ions
of d
ust o
r fum
es m
ight
aris
e fr
om c
onst
ruct
ion
activ
ities
; iii
. Id
entif
icat
ion
of h
ighl
y se
nsiti
ve a
ir po
llutio
n la
nd u
ses l
ikel
y to
be
adve
rsel
y af
fect
ed b
y em
issio
ns o
f dus
t or f
umes
from
co
nstr
uctio
n ac
tiviti
es;
iv.
Met
hods
for m
anag
ing
dust
em
itted
from
con
stru
ctio
n ya
rds,
hau
l roa
ds, s
tock
-pile
s and
con
stru
ctio
n sit
e ex
its u
sed
by tr
ucks
; v.
Met
hods
for m
aint
aini
ng a
nd o
pera
ting
cons
truc
tion
equi
pmen
t and
veh
icle
s in
orde
r to
min
imise
veh
icle
em
issio
ns fr
om e
xhau
st
tailp
ipes
; vi
. M
etho
ds fo
r mon
itorin
g du
st a
nd fu
mes
dur
ing
cons
truc
tion,
incl
udin
g vi
sual
insp
ectio
ns o
f dus
t sou
rces
and
dus
t gen
erat
ing
activ
ities
, visu
al in
spec
tions
of m
anag
emen
t mea
sure
s, c
heck
ing
wea
ther
fore
cast
s and
obs
ervi
ng w
eath
er c
ondi
tions
; vi
i. M
etho
ds fo
r und
erta
king
and
repo
rtin
g on
the
resu
lts o
f dai
ly in
spec
tions
of c
onst
ruct
ion
activ
ities
that
mig
ht g
ive
rise
to d
ust o
r fu
mes
; and
vi
ii. P
roce
dure
s for
mai
ntai
ning
con
tact
with
stak
ehol
ders
, not
ifyin
g of
pro
pose
d co
nstr
uctio
n ac
tiviti
es a
nd h
andl
ing
feed
back
abo
ut
dust
or f
umes
.
N
oise
and
Vib
ratio
n –
Cons
truc
tion
DC.1
6
The
Requ
iring
Aut
horit
y sh
all f
inal
ise th
e Co
nstr
uctio
n N
oise
and
Vib
ratio
n M
anag
emen
t Pla
n (S
EMP
003)
subm
itted
with
the
appl
icat
ion.
Th
e Co
nstr
uctio
n N
oise
and
Vib
ratio
n M
anag
emen
t Pla
n sh
all b
e ce
rtifi
ed (a
s a re
quire
men
t of C
ondi
tion
DC.8
), to
con
firm
that
the
Cons
truc
tion
Noi
se a
nd V
ibra
tion
Man
agem
ent P
lan:
(a
) is
gene
rally
con
siste
nt w
ith th
e dr
aft C
onst
ruct
ion
Noi
se a
nd V
ibra
tion
Man
agem
ent P
lan
subm
itted
with
the
appl
icat
ion;
and
(b
) ad
dres
ses a
ll th
e m
atte
rs li
sted
in C
ondi
tion
DC.1
7 be
low
. DC
.17
Th
e pu
rpos
e of
the
Cons
truc
tion
Noi
se a
nd V
ibra
tion
Man
agem
ent P
lan
(SEM
P 00
3) is
to id
entif
y th
e no
ise a
nd v
ibra
tion
perf
orm
ance
st
anda
rds t
hat w
ill, w
here
pra
ctic
able
, be
com
plie
d w
ith a
nd se
ts th
e fr
amew
ork
for t
he d
evel
opm
ent a
nd im
plem
enta
tion
of p
artic
ular
no
ise a
nd v
ibra
tion
man
agem
ent a
nd c
ontr
ol m
etho
dolo
gies
to m
inim
ise a
dver
se e
ffect
s on
the
heal
th a
nd sa
fety
of n
earb
y re
siden
ts.
The
Cons
truc
tion
Noi
se a
nd V
ibra
tion
Man
agem
ent P
lan
(SEM
P 00
3) s
hall
desc
ribe
the
mea
sure
s th
at w
ill b
e ad
opte
d to
, as f
ar a
s pr
actic
able
, mee
t:
22 O
ctob
er 2
013
12
(a)
The
noise
crit
eria
set o
ut in
Con
ditio
n DC
.19.
Whe
re it
is n
ot p
ract
icab
le to
ach
ieve
thos
e cr
iteria
, alte
rnat
ive
stra
tegi
es m
ust b
e de
scrib
ed in
the
site
spec
ific
man
agem
ent s
ched
ules
requ
ired
unde
r (vi
i) be
low
to a
ddre
ss th
e ef
fect
s of n
oise
on
neig
hbou
rs.
(b)
The
Cate
gory
A v
ibra
tion
crite
ria se
t out
in C
ondi
tion
DC.2
0. W
here
it is
not
pra
ctic
able
to a
chie
ve th
ose
crite
ria a
ltern
ativ
e st
rate
gies
mus
t be
desc
ribed
in th
e sit
e sp
ecifi
c m
anag
emen
t sch
edul
es re
quire
d un
der (
vii)
belo
w, a
nd a
suita
bly
qual
ified
aco
ustic
ex
pert
shal
l be
enga
ged
to a
sses
s and
man
age
cons
truc
tion
vibr
atio
n du
ring
the
activ
ities
that
exc
eed
the
Cate
gory
A c
riter
ia. I
f pr
edic
ted
cons
truc
tion
vibr
atio
n le
vels
exce
ed C
ateg
ory
B cr
iteria
, the
n co
nstr
uctio
n ac
tivity
shou
ld o
nly
proc
eed
if ap
prov
ed b
y th
e in
depe
nden
t, su
itabl
y qu
alifi
ed c
ertif
ier a
nd if
ther
e is
appr
opria
te m
onito
ring
of v
ibra
tion
leve
ls an
d ef
fect
s on
build
ings
at r
isk o
f ex
ceed
ing
the
Cate
gory
B c
riter
ia, i
n ac
cord
ance
with
a si
te sp
ecifi
c m
anag
emen
t sch
edul
e.
The
Cons
truc
tion
Noi
se a
nd V
ibra
tion
Man
agem
ent P
lan
shal
l inc
lude
, but
nee
d no
t be
limite
d to
, the
follo
win
g:
i. De
scrip
tion
of th
e w
orks
, ant
icip
ated
equ
ipm
ent/
pro
cess
es a
nd th
eir s
ched
uled
dur
atio
ns;
ii.
Hour
s of o
pera
tion,
incl
udin
g tim
es a
nd d
ays w
hen
cons
truc
tion
activ
ities
cau
sing
noise
and
/or v
ibra
tion
wou
ld o
ccur
; iii
. Th
e co
nstr
uctio
n no
ise a
nd v
ibra
tion
crite
ria fo
r the
Pro
ject
; iv
. Id
entif
icat
ion
of a
ffect
ed d
wel
lings
and
oth
er se
nsiti
ve lo
catio
ns w
here
noi
se a
nd v
ibra
tion
crite
ria a
pply
; v.
M
itiga
tion
optio
ns, i
nclu
ding
alte
rnat
ive
stra
tegi
es w
here
full
com
plia
nce
with
the
rele
vant
noi
se a
nd/o
r vib
ratio
n cr
iteria
can
not
be a
chie
ved;
vi
. De
tails
of w
hich
road
traf
fic n
oise
miti
gatio
n op
tions
as r
equi
red
by C
ondi
tion
DC.1
8 w
ill b
e im
plem
ente
d ea
rly e
noug
h to
also
m
itiga
te c
onst
ruct
ion
noise
; vi
i. Re
quire
men
t for
man
agem
ent s
ched
ules
con
tain
ing
site
spec
ific
info
rmat
ion.
Spe
cific
man
agem
ent s
ched
ules
shal
l inc
lude
: a.
Tr
ents
Vin
eyar
d w
here
, as f
ar a
s pra
ctic
al, n
oise
from
con
stru
ctio
n ac
tiviti
es sh
all b
e no
gre
ater
than
55
dBL A
eq(1
hr) a
nd 7
0 dB
L Am
ax w
hen
mea
sure
d w
ithin
50
met
res o
f the
wed
ding
ven
ue o
n w
eddi
ng d
ays,
from
2 p
m o
nwar
ds o
n Fr
iday
, Sat
urda
y an
d Su
nday
aft
erno
ons,
betw
een
mid
-Sep
tem
ber t
o m
id-M
ay;
b.
Not
ifica
tion
of p
ile d
rivin
g ac
tiviti
es w
hen
usin
g a
drop
ham
mer
, in
orde
r to
enab
le p
rote
ctio
n of
live
stoc
k.
viii.
M
etho
ds a
nd fr
eque
ncy
for m
onito
ring
and
repo
rtin
g on
con
stru
ctio
n no
ise a
nd v
ibra
tion;
ix
. Pr
oced
ures
and
met
hods
for m
aint
aini
ng c
onta
ct w
ith st
akeh
olde
rs, n
otify
ing
of p
ropo
sed
cons
truc
tion
activ
ities
and
han
dlin
g no
ise a
nd v
ibra
tion
com
plai
nts;
x.
Co
nstr
uctio
n eq
uipm
ent o
pera
tor t
rain
ing
proc
edur
es a
nd e
xpec
ted
cons
truc
tion
site
beha
viou
rs; a
nd
xi.
Cont
act n
umbe
rs fo
r key
cons
truc
tion
staf
f, st
aff r
espo
nsib
le fo
r noi
se a
nd v
ibra
tion
asse
ssm
ent a
nd C
ounc
il of
ficer
s.
DC.1
8
The
Requ
iring
Aut
horit
y sh
all,
whe
re p
ract
icab
le, i
mpl
emen
t the
Str
uctu
ral M
itiga
tion
mea
sure
s for
ope
ratio
nal t
raffi
c no
ise, d
etai
led
in
Cond
ition
DC.
21, w
hich
are
iden
tifie
d in
the
Cons
truc
tion
Noi
se a
nd V
ibra
tion
Man
agem
ent P
lan
(SEM
P 00
3) a
s tra
ffic
noise
miti
gatio
n m
easu
res w
hich
will
also
miti
gate
con
stru
ctio
n no
ise, p
rior t
o co
mm
enci
ng c
onst
ruct
ion
wor
ks th
at w
ould
be
atte
nuat
ed b
y th
ese
miti
gatio
n m
easu
res.
22 O
ctob
er 2
013
13
DC.1
9
Cons
truc
tion
noise
shal
l be
mea
sure
d an
d as
sess
ed in
acc
orda
nce
with
NZS
680
3:19
99 ‘A
cous
tics –
Con
stru
ctio
n N
oise
’. Th
e co
nstr
uctio
n no
ise c
riter
ia fo
r the
pur
pose
s of t
he C
onst
ruct
ion
Noi
se a
nd V
ibra
tion
Man
agem
ent P
lan
(SEM
P 00
3) a
re:
Tim
e of
wee
k Ti
me
perio
d “L
ong-
term
” du
ratio
n co
nstr
uctio
n (d
BA)
L Aeq
L A
Fmax
Noi
se c
riter
ia a
t res
iden
tial b
uild
ings
Wee
kday
s 06
30-0
730
55
75
0730
-180
0 70
85
1800
-200
0 65
80
2000
-063
0 45
75
Satu
rday
s 06
30-0
730
45
75
0730
-180
0 70
85
1800
-200
0 45
75
2000
-063
0 45
75
Sund
ays a
nd p
ublic
ho
liday
s 06
30-0
730
45
75
0730
-180
0 55
85
1800
-200
0 45
75
2000
-063
0 45
75
Noi
se c
riter
ia a
t com
mer
cial
/ ind
ustr
ial b
uild
ings
Any
day
0730
-180
0 70
-
1800
-073
0 75
-
22 O
ctob
er 2
013
14
DC.2
0
Cons
truc
tion
vibr
atio
n sh
all b
e m
easu
red
in a
ccor
danc
e w
ith D
IN 4
150-
3:19
99 “
Stru
ctur
al V
ibra
tion
Part
3: E
ffect
s of v
ibra
tion
on
stru
ctur
es”.
The
con
stru
ctio
n vi
brat
ion
crite
ria fo
r the
pur
pose
s of t
he C
onst
ruct
ion
Noi
se a
nd V
ibra
tion
Man
agem
ent P
lan
(SEM
P 00
3)
are:
*
‘Oth
er o
ccup
ied
build
ings
’ is i
nten
ded
to in
clud
e da
ytim
e w
orkp
lace
s suc
h as
offi
ces,
com
mun
ity c
entr
es e
tc.,
and
not i
ndus
tria
l bu
ildin
gs. S
choo
ls, h
ospi
tals,
rest
hom
es e
tc. w
ould
fall
unde
r the
occ
upie
d dw
ellin
gs c
ateg
ory.
Rece
iver
De
tails
Ca
tego
ry A
Ca
tego
ry B
Occ
upie
d dw
ellin
gs
Nig
ht-t
ime
2000
h - 0
630h
0.
3 m
m/s
PPV
1
mm
/s P
PV
Da
ytim
e 06
30h
- 200
0h
1 m
m/s
PPV
5
mm
/s P
PV
Oth
er
occu
pied
bu
ildin
gs*
Dayt
ime
0630
h - 2
000h
2
mm
/s P
PV
5 m
m/s
PPV
All o
ther
bu
ildin
gs
Vibr
atio
n - t
rans
ient
5
mm
/s P
PV
BS 5
228-
2:20
09,
Tabl
e B.
2
Vibr
atio
n –
cont
inuo
us
BS 5
228-
2:20
09, 5
0%
of T
able
B.2
22 O
ctob
er 2
013
15
N
oise
and
Vib
ratio
n M
anag
emen
t - O
pera
tion
DC.2
1
Desig
n of
all
Stru
ctur
al M
itiga
tion
mea
sure
s (th
e “P
refe
rred
Miti
gatio
n O
ptio
ns”)
list
ed in
this
cond
ition
shal
l be
unde
rtak
en b
y a
suita
bly
qual
ified
aco
ustic
spec
ialis
t prio
r to
com
men
cem
ent o
f con
stru
ctio
n of
the
mea
sure
s, a
nd sh
all i
nclu
de, a
s a m
inim
um, t
he fo
llow
ing
traf
fic n
oise
miti
gatio
n m
easu
res:
(a
) N
oise
bar
riers
to b
e co
nstr
ucte
d us
ing
timbe
r pal
ings
con
siste
nt w
ith th
e m
ost c
omm
only
use
d fe
ncin
g m
ater
ials
with
in th
e Pr
ojec
t ar
ea w
ith a
mas
s rat
ing
of a
t lea
st 1
0kg/
m2 a
t: i.
Two
1.8
m h
igh
acou
stic
fenc
es a
t 152
8 M
ain
Sout
h Ro
ad;
ii.
One
1.8
m h
igh
acou
stic
fenc
e at
95
Berk
etts
Roa
d;
iii.
One
1.8
m h
igh
acou
stic
fenc
e at
121
3 M
ain
Sout
h Ro
ad;
iv.
One
1.8
m h
igh
acou
stic
fenc
e at
312
Spr
ings
Roa
d; a
nd
(b)
Ope
n G
rade
d Po
rous
Asp
halt
("O
GPA
") o
r equ
ival
ent l
ow-n
oise
gen
erat
ing
road
surf
ace
be u
sed
in th
e lo
catio
ns il
lust
rate
d on
Dr
awin
gs 6
2236
-A-C
251
to C
254
and
6223
6-B-
C250
to C
255.
DC
.22
W
here
the
desig
n of
the
Pref
erre
d M
itiga
tion
Opt
ions
iden
tifie
s tha
t it i
s not
pra
ctic
able
to im
plem
ent a
par
ticul
ar S
truc
tura
l Miti
gatio
n m
easu
re in
the
loca
tion
or o
f the
leng
th o
r hei
ght i
nclu
ded
in C
ondi
tion
DC.2
1, th
e de
sign
of th
e St
ruct
ural
Miti
gatio
n m
easu
re c
ould
be
chan
ged
if it
wou
ld st
ill a
chie
ve th
e sa
me
Noise
Crit
eria
Cat
egor
y or
Cat
egor
y B
at a
ll re
leva
nt P
PFs,
and
a su
itabl
y qu
alifi
ed p
lann
er
appr
oved
by
the
Coun
cil c
ertif
ies t
o th
e Co
unci
l tha
t the
cha
nged
Str
uctu
ral M
itiga
tion
wou
ld b
e co
nsist
ent w
ith a
dopt
ing
the
Best
Pr
actic
able
Opt
ion
in a
ccor
danc
e w
ith N
ZS 6
806:
2010
, the
Pre
ferr
ed M
itiga
tion
Opt
ions
may
incl
ude
the
chan
ged
miti
gatio
n m
easu
re.
The
Requ
iring
Aut
horit
y sh
all c
onsu
lt w
ith a
ffect
ed p
rope
rty
owne
rs p
rior t
o am
endi
ng th
e de
taile
d m
itiga
tion
mea
sure
s to
incl
ude
the
chan
ged
stru
ctur
e m
itiga
tion
mea
sure
. DC
.23
Th
e Pr
efer
red
Miti
gatio
n O
ptio
ns o
utlin
ed in
Con
ditio
n DC
.21
shal
l be
impl
emen
ted
prio
r to
com
plet
ion
of c
onst
ruct
ion
of th
e Pr
ojec
t, w
ith th
e ex
cept
ion
of a
ny lo
w-n
oise
gen
erat
ing
road
surf
aces
, whi
ch sh
all b
e im
plem
ente
d w
ithin
12
mon
ths o
f com
plet
ion
of
cons
truc
tion.
DC
.24
Th
e Re
quiri
ng A
utho
rity
shal
l man
age
and
mai
ntai
n th
e Pr
efer
red
Miti
gatio
n O
ptio
ns to
ens
ure
that
, to
the
exte
nt p
ract
icab
le, t
hose
m
itiga
tion
mea
sure
s ret
ain
thei
r noi
se re
duct
ion
perf
orm
ance
.
22 O
ctob
er 2
013
16
Tr
affic
Man
agem
ent -
Con
stru
ctio
n DC
.25
Th
e Re
quiri
ng A
utho
rity
shal
l fin
alise
the
Cons
truc
tion
Traf
fic M
anag
emen
t Pla
n (S
EMP
004)
subm
itted
with
the
appl
icat
ion.
The
Co
nstr
uctio
n Tr
affic
Man
agem
ent P
lan
shal
l be
upda
ted
in c
onsu
ltatio
n w
ith th
e Ro
ad C
ontr
ollin
g Au
thor
ity (o
r its
nom
inee
s). T
his
cons
ulta
tion
shal
l com
men
ce a
t lea
st 2
0 w
orki
ng d
ays p
rior t
o ce
rtifi
catio
n of
the
Cons
truc
tion
Traf
fic M
anag
emen
t Pla
n (a
s a
requ
irem
ent o
f Con
ditio
n DC
.8).
The
cert
ifica
tion
shal
l con
firm
that
the
Cons
truc
tion
Traf
fic M
anag
emen
t Pla
n:
(a)
is ge
nera
lly c
onsis
tent
with
the
draf
t Con
stru
ctio
n Tr
affic
Man
agem
ent P
lan
subm
itted
with
the
appl
icat
ion;
and
(b
) ad
dres
ses a
ll th
e m
atte
rs li
sted
in C
ondi
tion
DC.2
6 be
low
. DC
.26
Th
e pu
rpos
e of
the
Cons
truc
tion
Traf
fic M
anag
emen
t Pla
n (S
EMP
004)
is to
set o
ut th
e m
inim
um st
anda
rds t
o be
ado
pted
for t
he
impl
emen
tatio
n of
tem
pora
ry tr
affic
man
agem
ent.
Thes
e m
inim
um s
tand
ards
, and
any
pra
ctic
es a
nd p
roce
dure
s cre
ated
from
them
, aim
to
elim
inat
e, m
itiga
te o
r iso
late
any
risk
s to
the
envi
ronm
ent,
Proj
ect s
ite st
aff a
nd a
ll ro
ad u
sers
. Th
e Co
nstr
uctio
n Tr
affic
Man
agem
ent P
lan
(SEM
P 00
4) sh
all i
nclu
de, b
ut n
eed
not b
e lim
ited
to, t
he fo
llow
ing:
(a
) th
e st
agin
g of
the
wor
ks, i
nclu
ding
det
ails
of a
ny p
ropo
sals
to w
ork
on m
ultip
le se
ctio
ns o
f the
Pro
ject
rout
e co
ncur
rent
ly;
(b)
deta
ils o
f tra
ffic
man
agem
ent a
ctiv
ities
pro
pose
d w
ithin
eac
h se
ctio
n of
the
Proj
ect;
(c)
the
pote
ntia
l effe
cts o
f tra
ffic
man
agem
ent a
ctiv
ities
and
how
thes
e w
ill b
e m
anag
ed to
ens
ure
safe
ty fo
r all
road
use
rs;
(d)
a pr
oces
s for
the
deve
lopm
ent a
nd su
bmiss
ion
of si
te sp
ecifi
c tr
affic
man
agem
ent p
lans
; (e
) m
onito
ring,
aud
iting
and
repo
rtin
g re
quire
men
ts; a
nd
(f)
trai
ning
requ
irem
ents
for s
taff.
DC
.27
Si
te sp
ecifi
c tr
affic
man
agem
ent p
lans
shal
l be
prep
ared
in c
onsu
ltatio
n w
ith th
e Ro
ad C
ontr
ollin
g Au
thor
ity in
acc
orda
nce
with
the
Cons
truc
tion
Traf
fic M
anag
emen
t Pla
n (S
EMP
004)
. Site
spec
ific
traf
fic m
anag
emen
t pla
ns sh
all b
e ce
rtifi
ed b
y an
inde
pend
ent
Appr
ovin
g En
gine
er a
nd p
rovi
ded
to th
e Ro
ad C
ontr
ollin
g Au
thor
ity T
raffi
c M
anag
emen
t Coo
rdin
ator
for a
ppro
val a
t lea
st 5
wor
king
day
s pr
ior t
o th
e co
mm
ence
men
t of w
ork
in th
at a
rea,
and
shal
l des
crib
e th
e m
easu
res t
hat w
ill b
e ta
ken
to m
anag
e th
e tr
affic
effe
cts
asso
ciat
ed w
ith th
e co
nstr
uctio
n of
spec
ific
part
s of t
he P
roje
ct p
rior t
o co
mm
ence
men
t of w
ork
in th
e re
leva
nt p
art(
s) o
f the
Pro
ject
. W
orks
shal
l not
pro
ceed
unt
il ap
prov
al fr
om th
e Ro
ad C
ontr
ollin
g Au
thor
ity T
raffi
c M
anag
emen
t Coo
rdin
ator
is o
btai
ned.
DC
.28
Th
e Co
nstr
uctio
n Tr
affic
Man
agem
ent P
lan
(SEM
P 00
4) a
nd th
e sit
e sp
ecifi
c tr
affic
man
agem
ent p
lans
shal
l gen
eral
ly b
e co
nsist
ent w
ith
the
vers
ion
of th
e N
Z Tr
ansp
ort A
genc
y Co
de o
f Pra
ctic
e fo
r Tem
pora
ry T
raffi
c M
anag
emen
t (“C
OPT
TM”)
whi
ch a
pplie
s at t
he ti
me
the
CTM
P or
the
rele
vant
Site
Spe
cific
Tra
ffic
Man
agem
ent P
lans
are
pre
pare
d. W
here
it is
not
pra
ctic
able
to a
dher
e to
this
Code
, the
CO
PTTM
’s pr
escr
ibed
Eng
inee
ring
Exce
ptio
n De
cisio
n (“
EED”
) pro
cess
will
be
follo
wed
, whi
ch w
ill in
clud
e ap
prop
riate
man
agem
ent
mea
sure
s agr
eed
with
the
Road
Con
trol
ling
Auth
ority
.
22 O
ctob
er 2
013
17
La
ndsc
ape
and
Urb
an D
esig
n DC
.29
Th
e Re
quiri
ng A
utho
rity
shal
l fin
alise
the
Land
scap
e M
anag
emen
t Pla
n (S
EMP
005)
subm
itted
with
the
appl
icat
ion.
Th
e La
ndsc
ape
Man
agem
ent P
lan
shal
l be
cert
ified
(as a
requ
irem
ent o
f Con
ditio
n DC
.8),
to c
onfir
m th
at th
e La
ndsc
ape
Man
agem
ent
Plan
: (a
) is
gene
rally
con
siste
nt w
ith th
e dr
aft L
ands
cape
Man
agem
ent P
lan
subm
itted
with
the
appl
icat
ion;
and
(b
) ad
dres
ses a
ll th
e m
atte
rs li
sted
in C
ondi
tion
DC.3
0 be
low
. DC
.30
Th
e pu
rpos
e of
the
Land
scap
e M
anag
emen
t Pla
n (S
EMP
005)
is to
out
line
the
met
hods
and
mea
sure
s to
be a
dopt
ed to
avo
id, r
emed
y an
d m
itiga
te a
dver
se e
ffect
s on
land
scap
e am
enity
dur
ing
the
cons
truc
tion
phas
e of
the
Proj
ect.
It sh
all a
lso p
rovi
de fo
r com
plet
ion
of
the
Proj
ect’s
per
man
ent l
ands
cape
wor
ks a
nd o
utlin
e th
e ne
cess
ary
mai
nten
ance
and
mon
itorin
g of
thes
e.
The
Land
scap
e M
anag
emen
t Pla
n (S
EMP
005)
shal
l inc
lude
, but
nee
d no
t be
limite
d to
, the
follo
win
g:
(a)
The
Proj
ect L
ands
cape
Pla
ns;
(b)
Dem
onst
ratio
n of
how
the
Land
scap
e Ke
y De
sign
Prin
cipl
es (i
n Ch
apte
r 5.0
of t
he U
rban
and
Lan
dsca
pe D
esig
n Fr
amew
ork)
hav
e be
en ta
ken
into
acc
ount
thro
ugho
ut th
e Pr
ojec
t alig
nmen
t; (c
) O
utlin
e of
the
land
scap
e tr
eatm
ent p
ropo
sed
as m
itiga
tion
thro
ugho
ut th
e Pr
ojec
t alig
nmen
t;
(d)
Land
scap
e im
plem
enta
tion
deta
ils in
clud
ing:
i.
Trai
ning
of s
taff;
ii.
M
eetin
gs w
ith th
e Pr
ojec
t Lan
dsca
pe A
rchi
tect
; iii
. Th
e id
entif
icat
ion
of v
eget
atio
n to
be
reta
ined
or r
eloc
ated
(inc
ludi
ng th
e de
finiti
on o
f the
ext
ent o
f veg
etat
ion
clea
ranc
e bo
unda
ries w
hich
shal
l inc
lude
, but
nee
d no
t lim
ited
to, t
he e
xist
ing
oak
tree
s on
the
sout
h sid
e of
Mai
n So
uth
Road
whe
re
prac
tical
); iv
. So
urci
ng n
ativ
e pl
ants
from
the
Cant
erbu
ry E
colo
gica
l Dist
rict;
v.
A pl
antin
g pr
ogra
mm
e (t
he st
agin
g of
pla
ntin
g in
rela
tion
to th
e co
nstr
uctio
n pr
ogra
mm
e);
vi.
A pl
antin
g re
stor
atio
n sc
hedu
le (t
o so
far a
s pra
ctic
able
repl
icat
e ex
istin
g pl
antin
g pa
tter
ns);
vii.
Land
scap
e tr
eatm
ent f
or n
oise
bar
riers
; vi
ii.
Land
scap
e in
tegr
atio
n of
ped
estr
ian
and
cycl
eway
faci
litie
s;
ix.
Land
scap
e tr
eatm
ent f
or st
orm
wat
er p
onds
; x.
Pr
e-pr
epar
ing
boul
derf
ield
s (if
requ
ired)
; xi
. Ri
paria
n pl
antin
g ad
jace
nt to
stoc
kwat
er ra
ces t
hat t
akes
into
acc
ount
the
SDC
Plan
ting
Guid
e fo
r Wat
er R
ace
Mar
gins
; xi
i. Pl
antin
g in
acc
orda
nce
with
the
New
Zea
land
Ele
ctric
ity (H
azar
d fr
om T
rees
) Reg
ulat
ions
200
3, in
clud
ing
the
prov
ision
s of t
he
22 O
ctob
er 2
013
18
Sche
dule
(Gro
wth
Lim
it Zo
nes)
to th
ose
regu
latio
ns;
(e)
Mai
nten
ance
and
mon
itorin
g in
clud
ing:
i.
Mon
itorin
g an
d re
port
ing
of b
asel
ine
cond
ition
s and
mon
thly
thro
ugho
ut c
onst
ruct
ion;
ii.
M
aint
enan
ce re
gim
e w
hich
shou
ld a
pply
for t
he tw
o ye
ars f
ollo
win
g pl
antin
g be
ing
unde
rtak
en (i
nclu
ding
wee
d co
ntro
l and
cl
eara
nce
and
pest
con
trol
and
repl
acem
ent o
f unh
ealth
y pl
ants
). DC
.31
Th
e de
sign
prin
cipl
es se
t out
in C
hapt
er 5
.0 o
f the
CSM
2 an
d M
SRFL
Urb
an a
nd L
ands
cape
Des
ign
Fram
ewor
k sh
all b
e ta
ken
into
acc
ount
in
the
deve
lopm
ent o
f the
des
ign
conc
epts
for t
he P
roje
ct's
perm
anen
t wor
ks, i
nclu
ding
(but
not
lim
ited
to) p
rinci
ples
for a
cous
tic
fenc
es, b
ound
ary
wal
ls an
d st
ruct
ures
(inc
ludi
ng b
ridge
s, u
nder
pass
es a
nd a
ssoc
iate
d re
tain
ing
wal
ls).
Cu
ltura
l, Ar
chae
olog
y an
d He
ritag
e M
anag
emen
t - C
onst
ruct
ion
Ad
vice
Not
e:
An A
rcha
eolo
gica
l Aut
horit
y sh
all b
e so
ught
from
the
New
Zea
land
Hist
oric
Pla
ces T
rust
whe
re re
quire
d un
der t
he H
istor
ic P
lace
s Act
19
93.
DC.3
2
The
Requ
iring
Aut
horit
y sh
all i
mpl
emen
t the
Acc
iden
tal D
iscov
ery
Prot
ocol
cov
erin
g N
ZTA
New
Zea
land
Reg
ions
11
(Can
terb
ury)
and
12
(Wes
t Coa
st) i
n th
e ev
ent o
f acc
iden
tal d
iscov
ery
of c
ultu
ral o
r arc
haeo
logi
cal a
rtef
acts
or f
eatu
res d
urin
g th
e co
nstr
uctio
n of
the
Proj
ect.
DC
.33
Th
e Re
quiri
ng A
utho
rity
shal
l im
plem
ent t
he N
gai T
ahu
Koiw
i Tan
gata
Pol
icy
1993
“Th
e Po
licy
of N
gai T
ahu
Conc
erni
ng th
e Hu
man
Re
mai
ns o
f our
Anc
esto
rs”
in th
e ev
ent t
hat K
oiw
i are
disc
over
ed.
El
ectr
icity
Tra
nsm
issio
n M
anag
emen
t
DC.3
4
All w
orks
or a
ctiv
ities
ass
ocia
ted
with
the
Proj
ect s
hall
be d
esig
ned
and
unde
rtak
en to
com
ply
with
the
New
Zea
land
Ele
ctric
al C
ode
of
Prac
tice
for E
lect
rical
Saf
e Di
stan
ces (
NZE
CP 3
4:20
01) w
here
the
alig
nmen
t pas
ses b
enea
th th
e Is
lingt
on -
Sprin
gsto
n A
(ISL-
SPN
A) a
nd
Brom
ley-
Islin
gton
A (B
RY-IS
L A)
tran
smiss
ion
lines
.
Ope
ratio
nal L
ight
ing
DC
.35
Li
ghtin
g sh
all b
e de
signe
d to
com
ply
with
AS/
NZS
1158
“Li
ghtin
g fo
r Roa
ds a
nd P
ublic
Spa
ces”
. Th
is sh
all i
nclu
de li
miti
ng th
e am
ount
of
light
spill
, gla
re a
nd u
pwar
d w
aste
ligh
t int
o th
e ne
ighb
ourin
g en
viro
nmen
t via
the
sele
ctio
n of
app
ropr
iate
lum
inai
res.
The
se e
ffect
s sh
all n
ot e
xcee
d th
e te
chni
cal p
aram
eter
s ind
icat
ed w
ithin
the
Stan
dard
.
Ecol
ogy
Advi
ce N
ote:
A
Wild
life
Perm
it sh
all b
e so
ught
from
the
Depa
rtm
ent o
f Con
serv
atio
n w
here
requ
ired
unde
r the
Wild
life
Act 1
953.
DC
.36
Th
e Re
quiri
ng A
utho
rity
shal
l dev
elop
and
impl
emen
t a L
izard
Man
agem
ent P
lan
(SEM
P 00
7) w
hich
out
lines
the
actio
ns re
quire
d to
m
inim
ise a
dver
se e
ffect
s on
lizar
ds.
(a)
The
Liza
rd M
anag
emen
t Pla
n sh
all b
e de
velo
ped
by a
n su
itabl
y qu
alifi
ed a
nd e
xper
ienc
ed e
colo
gist
;
22 O
ctob
er 2
013
19
(b)
The
Liza
rd M
anag
emen
t Pla
n sh
all i
nclu
de, b
ut n
eed
not b
e lim
ited
to, t
he fo
llow
ing
actio
ns:
i. O
btai
ning
a W
ildlif
e Pe
rmit
from
the
Depa
rtm
ent o
f Con
serv
atio
n un
der t
he W
ildlif
e Ac
t 195
3;
ii.
Crea
tion
of sp
ecifi
c liz
ard
habi
tat o
f an
area
com
men
sura
te to
the
num
ber o
f liza
rds l
ikel
y to
occ
ur in
the
foot
prin
t. P
oten
tial
loca
tions
are
show
n on
the
Proj
ect L
ands
cape
Pla
ns;
iii.
Capt
ure
and
relo
catio
n of
liza
rds;
iv
. Pr
otec
tion
of li
zard
s in
rela
tion
to c
onst
ruct
ion
activ
ities
and
pre
dato
rs;
v.
Mon
itorin
g to
det
erm
ine
surv
ival
and
pop
ulat
ion
esta
blish
men
t and
gro
wth
, if m
ore
than
30
lizar
ds a
re a
ble
to b
e re
loca
ted.
DC
.37
Al
l mac
hine
ry sh
all b
e w
ater
bla
sted
at a
suita
ble
faci
lity
prio
r to
entr
y on
site
to a
void
spre
ad o
f wee
d sp
ecie
s.
Fe
edba
ck a
nd In
cide
nts -
Con
stru
ctio
n DC
.38
(a
) At
all
times
dur
ing
cons
truc
tion
wor
k, th
e Re
quiri
ng A
utho
rity
shal
l mai
ntai
n a
perm
anen
t reg
ister
(s) o
f any
pub
lic o
r sta
keho
lder
fe
edba
ck re
ceiv
ed a
nd a
ny in
cide
nts o
r non
-com
plia
nce
note
d by
the
Requ
iring
Aut
horit
y’s c
ontr
acto
r, in
rela
tion
to th
e co
nstr
uctio
n of
the
Proj
ect.
The
regi
ster
(s) s
hall
incl
ude:
i.
the
nam
e an
d co
ntac
t det
ails
(as f
ar a
s pra
ctic
able
) of t
he p
erso
n pr
ovid
ing
feed
back
or c
ontr
acto
r obs
ervi
ng th
e in
cide
nt/
non-
com
plia
nce;
ii.
id
entif
icat
ion
of th
e na
ture
and
det
ails
of th
e fe
edba
ck/ i
ncid
ent;
and
iii.
loca
tion,
dat
e an
d tim
e of
the
feed
back
/ inc
iden
t. (b
) Th
e Re
quiri
ng A
utho
rity
shal
l pro
mpt
ly in
vest
igat
e an
y ad
vers
e fe
edba
ck, i
ncid
ent o
r non
-com
plia
nce.
Thi
s sha
ll in
clud
e, b
ut n
eed
not b
e lim
ited
to:
i. re
cord
ing
wea
ther
con
ditio
ns a
t the
tim
e of
the
even
t (as
far a
s pra
ctic
able
), an
d in
clud
ing
win
d di
rect
ion
and
appr
oxim
ate
win
d sp
eed
if th
e ad
vers
e fe
edba
ck o
r inc
iden
t rel
ates
to d
ust;
ii.
reco
rdin
g an
y ot
her a
ctiv
ities
in th
e ar
ea, u
nrel
ated
to th
e Pr
ojec
t tha
t may
hav
e co
ntrib
uted
to th
e ad
vers
e fe
edba
ck/
inci
dent
/ non
-com
plia
nce,
such
as n
on-P
roje
ct c
onst
ruct
ion,
fire
s, tr
affic
acc
iden
ts o
r unu
sual
ly d
usty
con
ditio
ns g
ener
ally
(if
appl
icab
le);
iii.
inve
stig
atin
g ot
her c
ircum
stan
ces s
urro
undi
ng th
e in
cide
nt.
(c)
In re
latio
n to
Con
ditio
n DC
.38(
b), t
he R
equi
ring
Auth
ority
shal
l: i.
reco
rd th
e ou
tcom
e of
the
inve
stig
atio
n on
the
regi
ster
(s);
ii.
reco
rd a
ny re
med
ial a
ctio
ns o
r mea
sure
s und
erta
ken
to a
ddre
ss o
r res
pond
to th
e m
atte
r on
the
regi
ster
(s);
iii.
resp
ond
to th
e in
itiat
or, i
n cl
osin
g th
e fe
edba
ck lo
op, i
f pra
ctic
able
; and
iv
. w
here
the
adve
rse
feed
back
or i
ncid
ent w
as in
rela
tion
to a
non
-com
plia
nce,
the
Man
ager
shal
l be
notif
ied
in w
ritin
g of
the
mat
ter w
ithin
5 w
orki
ng d
ays o
f the
non
-com
plia
nce,
and
info
rm o
f the
rem
edia
l act
ions
und
erta
ken.
22 O
ctob
er 2
013
20
(d)
The
regi
ster
(s) s
hall
be m
aint
aine
d on
site
and
shal
l be
mad
e av
aila
ble
to th
e M
anag
er u
pon
requ
est.
DC.3
9
The
Requ
iring
Aut
horit
y sh
all l
iaise
with
the
Coun
cil w
here
ther
e ar
e ex
istin
g ne
twor
k ut
ilitie
s tha
t are
dire
ctly
affe
cted
by
the
Proj
ect.
All
wor
ks to
exi
stin
g Co
unci
l util
ities
ass
ocia
ted
with
the
Proj
ect s
hall
be d
esig
ned
and
cons
truc
tion
com
plet
ed in
gen
eral
acc
orda
nce
with
th
e Co
unci
l’s e
ngin
eerin
g sp
ecifi
catio
n.
The
Requ
iring
Aut
horit
y sh
all e
nsur
e th
at th
e op
erat
ion
and
mai
nten
ance
of t
he P
roje
ct d
oes n
ot u
ndul
y co
nstr
ain
acce
ss to
exi
stin
g an
d/or
relo
cate
d ne
twor
k ut
ilitie
s for
mai
nten
ance
pur
pose
s on
an o
ngoi
ng b
asis.
Th
e Re
quiri
ng A
utho
rity
shal
l giv
e re
ason
able
not
ice
and
mak
e re
ason
able
end
eavo
urs t
o:
a)
Liai
se w
ith th
e Co
unci
l in
rela
tion
to a
ny p
art o
f the
wor
ks w
ithin
the
desig
natio
n w
here
thei
r inf
rast
ruct
ure
may
be
affe
cted
; and
b)
M
ake
reas
onab
le a
nd re
leva
nt c
hang
es re
ques
ted
by th
e Co
unci
l to
the
rele
vant
des
ign
plan
s and
met
hodo
logi
es, t
o en
sure
that
ac
cess
to, m
aint
enan
ce a
nd th
e op
erat
ion
of a
ll ne
twor
k ut
ility
infr
astr
uctu
re w
ithin
the
desig
nate
d ar
ea is
not
adv
erse
ly a
ffect
ed.
22 O
ctob
er 2
013
21
3.
Reso
urc
e C
on
sen
t C
on
dit
ion
s - G
uid
e t
o r
ead
ing
th
e c
on
dit
ion
s
The
suite
of c
ondi
tions
to m
anag
e ef
fect
s of t
he P
roje
ct h
ave
been
num
bere
d in
ord
er to
elim
inat
e co
nfus
ion,
spec
ifica
lly to
avo
id m
ultip
le
‘Con
ditio
n 1’
and
so fo
rth.
The
num
berin
g fo
rmat
is a
s fol
low
s:
The
NZT
A re
gion
al re
sour
ce c
onse
nt c
ondi
tions
G
Gen
eral
con
ditio
ns a
pply
ing
to a
ll re
sour
ce c
onse
nts.
E Co
nditi
ons a
pply
ing
to c
onse
nts f
or th
e ex
cava
tion
and
depo
sitio
n of
fill
over
unc
onfin
ed o
r sem
i-con
fined
aqu
ifers
and
the
Coas
tal
Conf
ined
Gra
vel A
quife
r Sys
tem
.
BC
Cond
ition
s app
lyin
g to
con
sent
s for
the
cons
truc
tion
of b
oreh
oles
/ inf
iltra
tion
galle
ries a
nd w
ells.
GT
Cond
ition
s app
lyin
g to
the
cons
ent f
or th
e ta
king
of g
roun
dwat
er.
D Co
nditi
ons a
pply
ing
to th
e co
nsen
t for
the
tem
pora
ry a
nd p
erm
anen
t div
ersio
n an
d ta
ke o
f wat
er in
stoc
kwat
er ra
ces.
DP
Cond
ition
s app
lyin
g to
the
cons
ents
for t
he d
ischa
rges
to w
ater
and
land
ass
ocia
ted
with
con
stru
ctio
n an
d op
erat
ion
of th
e Pr
ojec
t.
DA
Cond
ition
s app
lyin
g to
the
cons
ent f
or th
e di
scha
rge
of d
ust t
o ai
r ass
ocia
ted
with
con
stru
ctio
n of
the
Proj
ect.
HS
Cond
ition
s app
lyin
g to
the
cons
ent f
or th
e st
orag
e an
d us
e of
haz
ardo
us su
bsta
nces
dur
ing
cons
truc
tion
BR
Cond
ition
s app
lyin
g to
the
cons
ent f
or a
ctiv
ities
with
in th
e be
d of
a ri
ver a
ssoc
iate
d w
ith th
e co
nstr
uctio
n of
the
Proj
ect.
The
NZT
A di
stric
t res
ourc
e co
nsen
t con
ditio
ns
CL
Cond
ition
s app
lyin
g to
the
cons
ents
in re
latio
n to
pot
entia
lly c
onta
min
ated
land
und
er th
e N
atio
nal E
nviro
nmen
tal S
tand
ards
for
Asse
ssin
g an
d M
anag
ing
Cont
amin
ants
in S
oil t
o Pr
otec
t Hum
an H
ealth
.
22 O
ctob
er 2
013
22
4.
Reso
urc
e C
on
sen
t C
on
dit
ion
s - A
cro
nym
s an
d T
erm
s U
sed
in
Co
nd
itio
ns
The
tabl
e be
low
pro
vide
s exp
lana
tion
to a
num
ber o
f the
acr
onym
s and
term
s use
d in
the
cond
ition
s:
Def
initi
ons
AEE
Mea
ns th
e CS
M2
and
MSR
FL (“
Proj
ect”
) Ass
essm
ent o
f Effe
cts o
n th
e En
viro
nmen
t (V
olum
e 2)
dat
ed N
ovem
ber 2
012
AEP
Mea
ns th
e An
nual
Exc
eede
nce
Prob
abili
ty
BPO
M
eans
the
Best
Pra
ctic
able
Opt
ion
CCC
Mea
ns th
e Ch
ristc
hurc
h Ci
ty C
ounc
il
CEM
P M
eans
the
Cons
truc
tion
Envi
ronm
enta
l Man
agem
ent P
lan
Cons
ent H
olde
r M
eans
the
New
Zea
land
Tra
nspo
rt A
genc
y
CRC
Mea
ns th
e Ca
nter
bury
Reg
iona
l Cou
ncil
Com
men
cem
ent
of W
orks
M
eans
the
time
whe
n th
e w
orks
that
are
aut
horis
ed b
y th
e re
sour
ce c
onse
nts c
omm
ence
Man
ager
M
eans
the
Regu
lato
ry M
anag
er o
f Can
terb
ury
Regi
onal
Cou
ncil
Proj
ect
Mea
ns th
e co
nstr
uctio
n, o
pera
tion
and
mai
nten
ance
of t
he C
hrist
chur
ch S
outh
ern
Mot
orw
ay S
tage
2 (C
SM2)
, and
the
wid
enin
g an
d up
grad
ing
of S
H1 M
ain
Sout
h Ro
ad b
etw
een
Robi
nson
s Roa
d an
d Ro
llest
on to
pro
vide
a fo
ur-la
ne m
edia
n se
para
ted
expr
essw
ay (M
ain
Sout
h Ro
ad F
our L
anin
g kn
own
as M
SRFL
), an
d in
clud
es a
ssoc
iate
d lo
cal r
oad
wor
ks, i
nclu
ding
new
rear
ac
cess
road
s
Road
Con
trol
ling
Auth
ority
M
eans
the
rele
vant
Roa
d Co
ntro
lling
Aut
horit
y (S
elw
yn D
istric
t Cou
ncil
or C
hrist
chur
ch C
ity C
ounc
il)
RMA
Mea
ns th
e Re
sour
ce M
anag
emen
t Act
199
1
22 O
ctob
er 2
013
23
Def
initi
ons
SDC
Mea
ns th
e Se
lwyn
Dist
rict C
ounc
il
SEM
P M
eans
Spe
cial
ised
Envi
ronm
enta
l Man
agem
ent P
lan
Wor
k M
eans
any
act
ivity
or a
ctiv
ities
und
erta
ken
in re
latio
n to
the
cons
truc
tion
and
oper
atio
n of
the
Proj
ect
22 O
ctob
er 2
013
24
5.
Reg
ion
al R
eso
urc
e C
on
sen
t C
on
dit
ion
s - G
en
era
l co
nd
itio
ns
Exce
pt a
s spe
cifie
d ot
herw
ise, t
he g
ener
al c
ondi
tions
shal
l app
ly to
the
regi
onal
reso
urce
con
sent
s as s
peci
fied
in th
e ta
ble
belo
w. I
n ad
ditio
n, a
nu
mbe
r of r
esou
rce
cons
ents
hav
e sp
ecifi
c co
nditi
ons t
hat a
pply
as o
utlin
ed in
the
sect
ions
bel
ow th
e ge
nera
l con
ditio
ns.
Ref
Regi
onal
con
sent
con
ditio
ns
Appl
icab
le re
sour
ce
cons
ent
Gen
eral
and
Adm
inist
ratio
n
G.1
Ex
cept
as m
odifi
ed b
y th
e co
nditi
ons b
elow
, and
subj
ect t
o fin
al d
esig
n, th
e Pr
ojec
t sha
ll be
und
erta
ken
in g
ener
al
acco
rdan
ce w
ith th
e in
form
atio
n pr
ovid
ed b
y th
e Co
nsen
t Hol
der i
n th
e re
sour
ce c
onse
nt a
pplic
atio
ns d
ated
N
ovem
ber 2
012
and
supp
ortin
g do
cum
ents
bei
ng:
(a)
Asse
ssm
ent o
f Env
ironm
enta
l Effe
cts r
epor
t, da
ted
Nov
embe
r 201
2 (b
) Pl
an se
ts:
i. La
yout
Pla
ns: 6
2236
-A-C
020-
C029
& 6
2236
-B-C
020-
C025
, C02
6-C0
27 re
v 1,
C02
8-C0
35, C
036
rev
1, C
037-
C038
ii.
Pl
an a
nd L
ongi
tudi
nal S
ectio
ns: 6
2236
-A-C
100-
C107
, C11
0-C1
13, C
120,
C13
1-C1
33 &
622
36-B
-C10
1-C1
12,
C115
, C12
0-C1
21, C
125-
C126
, C13
0 re
v 1,
C13
5-C1
36, C
140-
C145
, C16
0-C1
63
iii.
Typi
cal C
ross
Sec
tions
: 622
36-A
-C17
1-C1
73 &
622
36-B
-C17
1-C1
73
iv.
Pave
men
t Sur
face
s: 6
2236
-A-C
250-
C252
, C25
3 re
v 1
& 6
2236
-B-C
250-
C251
, C25
2-C2
53 re
v 1,
C25
4-C2
55
v.
Cycl
e Pa
th P
lans
: 622
36-B
-C31
5-C3
16
vi.
Drai
nage
Lay
out P
lans
: 622
36-A
-C40
1, C
402-
C403
rev
1, C
404-
C406
, C40
8 re
v 1,
C41
1 re
v 1,
C41
2 re
v 2
&
6223
6-B-
C401
-C40
2 re
v 1,
C40
3-C4
04, C
405-
rev
1, C
406-
407
rev
2, C
408,
C40
9-C4
12 re
v 1,
C41
3, C
414
rev
1, C
415,
C41
6-C4
17 re
v 1,
C42
5-C4
26 re
v 1
vii.
Drai
nage
Det
ails:
622
36-A
-C45
1, C
453-
C454
, C46
1-C4
63 re
v 1
& 6
2236
-B-C
451-
C455
, C46
1-C4
66 re
v 1
viii.
Sig
nage
Pla
ns: 6
2236
-A-C
501-
C508
& 6
2236
-B-C
501-
C505
, C50
6-C5
07 re
v 1,
C50
8-C5
15, C
516
rev
1, C
517
ix.
Land
Req
uire
men
t Pla
ns: 6
2236
-A-C
1101
-C11
09, C
1110
rev
1 &
622
36-B
-C11
01-C
1105
, C11
06-C
1107
rev
1,
C110
8-C1
115,
C11
16 re
v 1,
C11
17-C
1118
x.
St
ruct
ural
Pla
ns: 6
2236
-A-S
000,
S01
1-S0
12 &
622
36-B
-S00
0, S
011-
S013
, S02
1-S0
23, S
031-
S032
, S04
1-S0
43,
S051
-S05
3, S
061-
S063
, S07
1-S0
72, S
081-
S083
xi
. La
ndsc
ape
Plan
ting
Plan
s: 6
2236
-A-L
011-
L019
rev
1 &
622
36-B
-L01
1-L0
15 re
v 1,
L01
6-L0
17 re
v 2,
L01
8-L0
24
rev
1, L
025
rev
2, L
026-
L028
rev
1
All
22 O
ctob
er 2
013
25
Ref
Regi
onal
con
sent
con
ditio
ns
Appl
icab
le re
sour
ce
cons
ent
xii.
Ligh
ting
Plan
s: 1
6.00
1630
, she
ets 1
-20
Whe
re th
ere
is co
nflic
t bet
wee
n th
e do
cum
ents
lodg
ed a
nd th
e co
nditi
ons,
the
cond
ition
s sha
ll pr
evai
l.
G.2
Th
e Ca
nter
bury
Reg
iona
l Cou
ncil
shal
l be
notif
ied
in w
ritin
g of
the
inte
ntio
n to
com
men
ce c
onst
ruct
ion
wor
k at
leas
t th
ree
mon
ths p
rior t
o th
e st
art o
f con
stru
ctio
n ac
tiviti
es.
All
G.3
Al
l ope
ratio
nal p
erso
nnel
invo
lved
with
the
cons
truc
tion
of th
e Pr
ojec
t sha
ll be
mad
e aw
are
of, a
nd h
ave
acce
ss to
, al
l con
sent
doc
umen
ts, c
ondi
tions
and
man
agem
ent p
lans
app
licab
le to
the
cons
truc
tion,
mai
nten
ance
and
op
erat
ion
of th
e Pr
ojec
t. A
copy
shal
l be
kept
on
site
at a
ll tim
es.
All
G.4
Pu
rsua
nt to
sect
ion
125(
1) o
f the
RM
A, th
is co
nsen
t sha
ll la
pse
15 y
ears
from
the
date
of i
ts c
omm
ence
men
t (p
ursu
ant t
o Se
ctio
n 11
6(5)
of t
he R
MA)
unl
ess i
t has
bee
n gi
ven
effe
ct, s
urre
nder
ed o
r bee
n ca
ncel
led
at a
n ea
rlier
da
te.
All
G.5
Pu
rsua
nt to
sect
ion
123(
d) o
f the
RM
A, th
is co
nsen
t sha
ll ex
pire
35
year
s fro
m th
e da
te o
f its
com
men
cem
ent
(pur
suan
t to
Sect
ion
116(
5) o
f the
RM
A).
All
Man
agem
ent P
lans
- G
ener
al
G
.6
At le
ast t
hree
mon
ths p
rior t
o th
e co
mm
ence
men
t of w
orks
, the
Con
sent
Hol
der s
hall
subm
it in
form
atio
n to
the
Man
ager
to d
emon
stra
te th
at th
e pr
opos
ed c
ertif
ier (
requ
ired
by C
ondi
tion
G.7)
is in
depe
nden
t, su
itabl
y qu
alifi
ed
and
expe
rienc
ed. W
orks
shal
l not
pro
ceed
unt
il ap
prov
al fr
om th
e M
anag
er is
obt
aine
d.
If th
e M
anag
er d
oes n
ot a
ppro
ve th
e pe
rson
(s) p
ropo
sed
by th
e Co
nsen
t Hol
der,
reas
ons s
houl
d be
pro
vide
d to
in
dica
te w
hy th
e pe
rson
(s) i
s not
con
sider
ed to
be
suita
ble.
W
ith th
e pr
ior a
gree
men
t of t
he M
anag
er, t
he in
depe
nden
t cer
tifie
r may
be
chan
ged
at a
ny st
age
in th
e Pr
ojec
t.
All
22 O
ctob
er 2
013
26
Ref
Regi
onal
con
sent
con
ditio
ns
Appl
icab
le re
sour
ce
cons
ent
G.7
(a
) Al
l wor
ks sh
all b
e ca
rrie
d ou
t in
gene
ral a
ccor
danc
e w
ith C
onst
ruct
ion
Envi
ronm
enta
l Man
agem
ent P
lan
and
rele
vant
Spe
cial
ised
Envi
ronm
enta
l Man
agem
ent P
lans
(“SE
MPs
”) re
quire
d by
thes
e co
nditi
ons.
The
dra
ft
man
agem
ent p
lans
lodg
ed w
ith th
e Co
nsen
t App
licat
ions
that
are
list
ed b
elow
in th
is co
nditi
on sh
all b
e up
date
d an
d fin
alise
d by
the
Cons
ent H
olde
r:
i. Co
nstr
uctio
n En
viro
nmen
tal M
anag
emen
t Pla
n (“
CEM
P”)
ii.
SEM
P 00
1 Ai
r Qua
lity
Man
agem
ent P
lan
iii
. SE
MP
002
Eros
ion
and
Sedi
men
t Con
trol
Pla
n
iv.
SEM
P 00
6 Ac
cide
ntal
Aqu
ifer I
nter
cept
ion
Man
agem
ent P
lan
(b)
The
man
agem
ent p
lans
shal
l be
cert
ified
by
an in
depe
nden
t, su
itabl
y qu
alifi
ed a
nd e
xper
ienc
ed p
erso
n(s)
(a
ppro
ved
by th
e M
anag
er a
s bei
ng c
ompe
tent
and
suita
ble
to p
rovi
de su
ch c
ertif
icat
ion
as p
er C
ondi
tion
G.6
), at
leas
t 40
wor
king
day
s prio
r to
the
com
men
cem
ent o
f con
stru
ctio
n of
the
rele
vant
stag
e or
stag
es. I
f cha
nges
ar
e re
ques
ted
by th
e ce
rtifi
er th
ese
chan
ges s
hall
be m
ade
befo
re th
e ce
rtifi
catio
n is
conf
irmed
. (c
) Th
is ce
rtifi
catio
n sh
all b
e pr
ovid
ed to
the
Cons
ent H
olde
r and
the
Man
ager
at l
east
10
wor
king
day
s prio
r to
the
com
men
cem
ent o
f con
stru
ctio
n of
the
rele
vant
stag
e or
stag
es.
(d)
Whe
re a
man
agem
ent p
lan(
s) is
to b
e su
bmitt
ed in
a st
aged
man
ner a
s a re
sult
of th
e st
agin
g of
con
stru
ctio
n w
orks
, inf
orm
atio
n ab
out t
he p
ropo
sed
stag
ing
shal
l be
subm
itted
as p
art o
f the
CEM
P.
Advi
ce N
ote:
A
20 w
orki
ng d
ay tu
rnar
ound
tim
e is
inte
nded
for t
he m
anag
emen
t pla
n ce
rtifi
catio
n pr
oces
s.
All
G.8
W
orks
shal
l not
pro
ceed
unt
il th
e re
leva
nt m
anag
emen
t pla
ns a
nd c
ertif
icat
ion
desc
ribed
in C
ondi
tion
G.7
hav
e be
en re
ceiv
ed a
nd a
ckno
wle
dged
in w
ritin
g by
the
Man
ager
. If w
ritte
n ac
know
ledg
emen
t is n
ot p
rovi
ded
by th
e Ca
nter
bury
Reg
iona
l Cou
ncil
with
in 1
0 w
orki
ng d
ays o
f the
Con
sent
Hol
der s
endi
ng th
e ce
rtifi
catio
n, th
e ce
rtifi
catio
n sh
all b
e de
emed
to b
e co
nfirm
ed.
All
G.9
Th
e Co
nsen
t Hol
der m
ay m
ake
reas
onab
le a
men
dmen
ts to
the
man
agem
ent p
lans
at a
ny ti
me.
Any
cha
nges
to th
e m
anag
emen
t pla
ns sh
all r
emai
n co
nsist
ent w
ith th
e ov
eral
l int
ent o
f the
rele
vant
man
agem
ent p
lan
and
shal
l be
cert
ified
by
the
agre
ed in
depe
nden
t cer
tifie
r, as
per
the
requ
irem
ents
out
lined
in C
ondi
tion
G.7
. The
Con
sent
Hol
der
shal
l pro
vide
a c
opy
of a
ny su
ch a
men
dmen
t to
the
man
agem
ent p
lans
and
cer
tific
atio
n to
Can
terb
ury
Regi
onal
Co
unci
l for
info
rmat
ion,
prio
r to
givi
ng e
ffect
to th
e am
endm
ent,
or w
ithin
15
wor
king
day
s.
All
22 O
ctob
er 2
013
27
Cons
truc
tion
Envi
ronm
enta
l Man
agem
ent P
lan
G
.10
The
Cons
ent H
olde
r sha
ll fin
alise
the
CEM
P su
bmitt
ed w
ith th
e ap
plic
atio
n an
d th
is sh
all b
e ce
rtifi
ed in
acc
orda
nce
with
Con
ditio
n G
.7. T
he c
ertif
icat
ion
shal
l con
firm
that
the
CEM
P:
(a)
is ge
nera
lly c
onsis
tent
with
the
draf
t CEM
P su
bmitt
ed w
ith th
e ap
plic
atio
n; a
nd
(b)
addr
esse
s the
mat
ters
set o
ut in
Con
ditio
n G
.11
belo
w.
All
G.1
1 Th
e pu
rpos
e of
the
CEM
P is
to p
rovi
de a
n ov
erar
chin
g fr
amew
ork
to e
nsur
e th
at th
e Pr
ojec
t rem
ains
with
in th
e lim
its a
nd st
anda
rds a
ppro
ved
unde
r thi
s con
sent
and
that
the
cons
truc
tion
activ
ities
avo
id, r
emed
y or
miti
gate
ad
vers
e ef
fect
s on
the
envi
ronm
ent.
Th
e CE
MP
shal
l inc
lude
, but
nee
d no
t be
limite
d to
, the
follo
win
g:
(a)
Gene
ral:
i.
CEM
P pu
rpos
e;
ii.
Proj
ect d
etai
ls in
clud
ing
antic
ipat
ed c
onst
ruct
ion
activ
ities
; iii
. CE
MP
Obj
ectiv
es a
nd P
olic
ies;
(b
) En
viro
nmen
tal M
anag
emen
t:
i. Ex
istin
g en
viro
nmen
t cha
ract
erist
ics;
ii.
En
viro
nmen
tal i
ssue
s ant
icip
ated
dur
ing
cons
truc
tion;
iii
. En
viro
nmen
tal m
anag
emen
t app
roac
h an
d m
etho
ds;
iv.
Miti
gatio
n/co
ntin
genc
y m
easu
res;
(c
) CE
MP
Requ
irem
ents
: i.
Role
s and
resp
onsib
ilitie
s;
ii.
Trai
ning
and
edu
catio
n;
iii.
Mon
itorin
g, m
aint
enan
ce, a
udit
and
repo
rtin
g;
iv.
Corr
ectiv
e ac
tion
and
emer
genc
y co
ntac
ts a
nd re
spon
se;
v.
Feed
back
man
agem
ent;
vi.
CEM
P re
visio
n an
d co
mpl
ianc
e iss
ue re
solu
tion
proc
esse
s;
(d)
Activ
ity S
peci
fic R
equi
rem
ents
: i.
Haza
rdou
s Sub
stan
ces
The
CEM
P sh
all d
evel
op a
nd im
plem
ent m
etho
dolo
gies
and
pro
cess
es fo
r min
imisi
ng p
oten
tial e
nviro
nmen
tal
All
22 O
ctob
er 2
013
28
risks
aris
ing
from
the
use
and
stor
age
of h
azar
dous
subs
tanc
es a
nd th
e tr
ansp
orta
tion,
disp
osal
and
trac
king
of
mat
eria
ls ta
ken
away
dur
ing
the
cons
truc
tion
of th
e Pr
ojec
t, in
acc
orda
nce
with
bes
t pra
ctic
e an
d na
tiona
l st
anda
rds a
nd re
gula
tions
. Thi
s sha
ll in
clud
e:
a) t
he ty
pes a
nd v
olum
es o
f haz
ardo
us su
bsta
nces
stor
ed d
urin
g th
e co
nstr
uctio
n ph
ase;
b)
the
equ
ipm
ent,
syst
ems a
nd p
roce
dure
s to
be u
sed
to m
inim
ise th
e ris
k of
spill
s or l
eaks
of h
azar
dous
su
bsta
nces
; c)
the
spill
man
agem
ent a
nd c
onta
inm
ent e
quip
men
t to
be m
aint
aine
d at
all
times
on
site,
and
its l
ocat
ion;
d)
pro
cedu
res f
or c
onta
inin
g, m
anag
ing,
cle
anin
g an
d di
spos
ing
of a
ny sp
ill o
r lea
k of
con
tam
inat
ed m
ater
ial
from
the
site
(spi
ll ki
ts);
e) p
roce
dure
s to
notif
y an
d re
port
to th
e Ca
nter
bury
Reg
iona
l Cou
ncil
with
in 2
4 ho
urs o
f a sp
ill o
r lea
k in
volv
ing
10 li
tres
or m
ore
occu
rrin
g, in
clud
ing
a m
aint
aine
d sc
hedu
le o
f em
erge
ncy
cont
act n
ames
and
nu
mbe
rs; a
nd
f) pr
oced
ures
to b
e fo
llow
ed to
iden
tify
caus
es o
f spi
lls o
r lea
ks a
nd to
avo
id th
eir r
ecur
renc
e.
ii.
Cultu
ral/
Arch
aeol
ogy
and
Herit
age
Man
agem
ent
a) T
he C
EMP
shal
l inc
orpo
rate
the
Acci
dent
al D
iscov
ery
Prot
ocol
cov
erin
g N
ZTA
New
Zea
land
Reg
ions
11
(Can
terb
ury)
and
12
(Wes
t Coa
st) a
nd th
e N
gai T
ahu
Koiw
i Tan
gata
Pol
icy
1993
.
Air Q
ualit
y M
anag
emen
t Pla
n - C
onst
ruct
ion
G
.12
The
Cons
ent H
olde
r sha
ll fin
alise
the
Air Q
ualit
y M
anag
emen
t Pla
n (S
EMP
001)
subm
itted
with
the
appl
icat
ion.
Th
e Ai
r Qua
lity
Man
agem
ent P
lan
shal
l be
cert
ified
(as a
requ
irem
ent o
f Con
ditio
n G
.7) t
o co
nfirm
that
the
Air
Qua
lity
Man
agem
ent P
lan:
(a
) is
gene
rally
con
siste
nt w
ith th
e dr
aft A
ir Q
ualit
y M
anag
emen
t Pla
n su
bmitt
ed w
ith th
e ap
plic
atio
n; a
nd
(b)
addr
esse
s all
the
mat
ters
list
ed in
Con
ditio
n G.
13 b
elow
.
E, B
C, D
, DA
& B
R
22 O
ctob
er 2
013
29
G.1
3 Th
e Ai
r Qua
lity
Man
agem
ent P
lan
(SEM
P 00
1) sh
all d
escr
ibe
the
mea
sure
s tha
t will
be
adop
ted
that
, so
far a
s pr
actic
able
, red
uce
the
dust
or f
umes
aris
ing
as a
resu
lt of
the
cons
truc
tion
of th
e Pr
ojec
t at a
ny p
oint
bey
ond
the
desig
natio
n bo
unda
ry th
at b
orde
rs a
hig
hly
sens
itive
air
pollu
tion
land
use
. Th
e Ai
r Qua
lity
Man
agem
ent P
lan
shal
l in
clud
e, b
ut n
eed
not b
e lim
ited
to, t
he fo
llow
ing:
i.
Desc
riptio
n of
the
wor
ks, a
nd so
urce
s of d
ust a
nd fu
mes
; ii.
Per
iods
of t
ime
whe
n em
issio
ns o
f dus
t or f
umes
mig
ht a
rise
from
con
stru
ctio
n ac
tiviti
es;
iii.
Iden
tific
atio
n of
hig
hly
sens
itive
air
pollu
tion
land
use
s lik
ely
to b
e ad
vers
ely
affe
cted
by
emiss
ions
of d
ust o
r fu
mes
from
con
stru
ctio
n ac
tiviti
es;
iv.
Met
hods
for m
anag
ing
dust
em
itted
from
con
stru
ctio
n ya
rds,
hau
l roa
ds, s
tock
-pile
s and
con
stru
ctio
n sit
e ex
its
used
by
truc
ks;
v. M
etho
ds fo
r mai
ntai
ning
and
ope
ratin
g co
nstr
uctio
n eq
uipm
ent a
nd v
ehic
les i
n or
der t
o m
inim
ise v
ehic
le
emiss
ions
from
exh
aust
tailp
ipes
; vi
. M
etho
ds fo
r mon
itorin
g du
st a
nd fu
mes
dur
ing
cons
truc
tion,
incl
udin
g vi
sual
insp
ectio
ns o
f dus
t sou
rces
and
du
st g
ener
atin
g ac
tiviti
es, v
isual
insp
ectio
ns o
f man
agem
ent m
easu
res,
che
ckin
g w
eath
er fo
reca
sts a
nd
obse
rvin
g w
eath
er c
ondi
tions
; vi
i. M
etho
ds fo
r und
erta
king
and
repo
rtin
g on
the
resu
lts o
f dai
ly in
spec
tions
of c
onst
ruct
ion
activ
ities
that
mig
ht
give
rise
to d
ust o
r fum
es; a
nd
viii.
Pro
cedu
res f
or m
aint
aini
ng c
onta
ct w
ith st
akeh
olde
rs, n
otify
ing
of p
ropo
sed
cons
truc
tion
activ
ities
and
ha
ndlin
g fe
edba
ck a
bout
dus
t or f
umes
.
E, B
C, D
, DA
& B
R
Er
osio
n an
d Se
dim
ent C
ontr
ol P
lan
G
.14
The
Cons
ent H
olde
r sha
ll fin
alise
the
Eros
ion
and
Sedi
men
t Con
trol
Pla
n (S
EMP
002)
subm
itted
with
the
appl
icat
ion.
Th
e Er
osio
n an
d Se
dim
ent C
ontr
ol P
lan
shal
l be
cert
ified
(in
acco
rdan
ce w
ith C
ondi
tion
G.7
), to
con
firm
that
the
Eros
ion
and
Sedi
men
t Con
trol
Pla
n:
(a)
is ge
nera
lly c
onsis
tent
with
the
draf
t Ero
sion
and
Sedi
men
t Con
trol
Pla
n su
bmitt
ed w
ith th
e ap
plic
atio
n; a
nd
(b)
addr
esse
s all
the
mat
ters
list
ed in
Con
ditio
n G.
15 b
elow
.
All
G.1
5 Th
e Er
osio
n an
d Se
dim
ent C
ontr
ol P
lan
(SEM
P 00
2) sh
all b
e pr
epar
ed in
acc
orda
nce
with
Env
ironm
ent C
ante
rbur
y’s
Eros
ion
and
Sedi
men
t Con
trol
Gui
delin
e 20
07. T
he p
urpo
se o
f the
Ero
sion
and
Sedi
men
t Con
trol
Pla
n is
to d
escr
ibe
the
met
hods
and
pra
ctic
es to
be
impl
emen
ted
durin
g co
nstr
uctio
n to
min
imise
the
effe
cts o
f soi
l ero
sion
and
sedi
men
t gen
erat
ion
and
yiel
d on
the
aqua
tic re
ceiv
ing
envi
ronm
ents
ass
ocia
ted
with
the
Proj
ect.
Th
e Er
osio
n an
d Se
dim
ent C
ontr
ol P
lan
shal
l inc
lude
, but
nee
d no
t be
limite
d to
, the
follo
win
g:
(a)
outli
ne o
f the
prin
cipl
es o
f the
Ero
sion
and
Sedi
men
t Con
trol
Pla
n w
here
by th
e pl
an sh
all b
e co
nsist
ent w
ith
All
22 O
ctob
er 2
013
30
the
NZT
A’s E
rosio
n an
d Se
dim
ent C
ontr
ol S
tand
ard
for S
tate
Hig
hway
Infr
astr
uctu
re a
nd th
e ob
ject
ives
ou
tline
d in
the
NZT
A’s E
nviro
nmen
tal P
lan;
(b
) a
site
desc
riptio
n, in
clud
ing
land
type
, clim
ate,
topo
grap
hy, v
eget
atio
n, so
ils, a
nd w
ater
bod
ies;
(c
) lo
calit
y m
ap(s
) det
ailin
g as
a m
inim
um th
e lo
catio
n of
road
s, p
rope
rty
boun
darie
s, su
rfac
e w
ater
way
s/ w
ater
ra
ces a
nd c
ross
ings
, sto
rmw
ater
retic
ulat
ion
surf
aces
(exi
stin
g an
d pr
opos
ed),
the
dire
ctio
n of
stor
mw
ater
flo
ws,
and
the
eros
ion
and
sedi
men
t con
trol
dev
ices
. Con
tour
info
rmat
ion
shal
l be
iden
tifie
d at
suita
ble
inte
rval
s to
show
the
cont
our o
f the
land
with
in a
nd a
roun
d th
e Pr
ojec
t alig
nmen
t; (d
) a
deta
iled
prog
ram
me
of w
orks
iden
tifyi
ng:
i. ea
ch st
age
of c
onst
ruct
ion;
ii.
an
est
imat
e of
the
max
imum
are
a of
bar
e gr
ound
(cum
ulat
ive
tota
l) ex
pose
d at
eac
h st
age
of
cons
truc
tion,
incl
udin
g pr
ogre
ssiv
e st
abili
satio
n an
d m
inim
ising
are
as o
f exp
osed
soil
cons
ider
atio
ns;
iii.
an e
stim
ate
of th
e to
tal l
engt
h of
exp
osed
road
s, tr
ench
es a
nd tr
acks
; iv
. th
e vo
lum
e of
ear
thw
orks
pro
pose
d;
v.
a fie
ld te
stin
g pr
ogra
mm
e to
con
firm
soak
age
rate
s of t
he re
ceiv
ing
grou
nd a
t the
loca
tion
of a
ll so
akag
e st
ruct
ures
pro
pose
d al
ong
the
rout
e to
disc
harg
e co
nstr
uctio
n re
late
d st
orm
wat
er ru
noff
to g
roun
d.
(e)
a de
scrip
tion
of th
e se
dim
ent c
ontr
ol m
easu
res p
ropo
sed.
Mea
sure
s con
sider
ed m
ay in
clud
e, b
ut n
eed
not b
e lim
ited
to, t
he fo
llow
ing:
i.
clea
n w
ater
div
ersio
ns;
ii.
dive
rsio
n dr
ains
and
infil
trat
ion
ditc
hes f
or se
dim
ent-
lade
n ru
noff;
iii
. co
llect
ion
and
trea
tmen
t of s
edim
ent l
aden
runo
ff w
ater
, tre
atm
ent t
here
of a
nd d
ischa
rge
to g
roun
d (s
edim
ent r
eten
tion
pond
s);
iv.
use
of p
erm
anen
t sw
ales
and
the
abili
ty to
reha
bilit
ate
the
swal
es to
thei
r fin
al p
urpo
se d
urin
g th
e co
nstr
uctio
n pr
oces
s, in
clud
ing
use
of d
ecan
ting
eart
h bu
nds;
v.
us
e of
silt
fenc
es to
pro
tect
surf
ace
wat
erw
ays a
nd a
djac
ent l
and;
vi
. sp
ecifi
c di
spos
al to
land
soak
pits
whi
ch a
re n
ot to
form
par
t of t
he fi
nal s
oak
pit s
yste
m;
vii.
cove
ring
expo
sed
area
s of e
arth
and
stoc
kpile
s with
app
ropr
iate
ero
sion
resis
tant
mat
eria
l; vi
ii.
dive
rsio
n of
stor
mw
ater
runo
ff aw
ay fr
om a
ny c
onta
min
ated
land
from
the
Proj
ect a
rea;
and
ix
. st
abili
sed
site
exit(
s) a
nd m
easu
res t
o en
sure
trac
king
of s
edim
ent o
nto
the
exist
ing
road
net
wor
k is
redu
ced;
(f)
a
desc
riptio
n of
the
eros
ion
cont
rol m
easu
res p
ropo
sed.
Mea
sure
s con
sider
ed sh
all i
nclu
de, b
ut n
eed
not b
e lim
ited
to, t
he fo
llow
ing:
i.
vege
tatin
g th
e st
orm
wat
er sy
stem
, inc
ludi
ng sw
ales
, det
entio
n ba
sins a
nd in
filtr
atio
n ba
sins
and
emba
nkm
ents
as s
oon
as is
pra
ctic
able
, ii.
sur
face
roug
heni
ng o
n em
bank
men
t slo
pes p
rior t
o re
-veg
etat
ing;
and
iii
. mul
chin
g, se
edin
g or
seal
ing
area
s of e
xpos
ed so
il as
soon
as i
s pra
ctic
able
;
22 O
ctob
er 2
013
31
(g)
prio
r to
each
stag
e of
wor
ks, d
etai
led
draw
ings
and
des
ign
spec
ifica
tions
of e
rosio
n an
d se
dim
ent c
ontr
ol
mea
sure
s sha
ll be
pro
vide
d to
the
Man
ager
; (h
) a
sche
dule
of t
he fr
eque
ncy
and
met
hods
of i
nspe
ctio
n, m
onito
ring
and
mai
nten
ance
of a
ll er
osio
n an
d se
dim
ent c
ontr
ol m
easu
res,
incl
udin
g an
y ch
ecks
pro
pose
d to
be
unde
rtak
en a
fter m
ore
than
15m
m o
f rai
n fa
lls in
a 2
4 ho
ur p
erio
d; a
nd
(i)
emer
genc
y pr
oced
ures
that
set o
ut m
easu
res t
hat w
ill b
e im
plem
ente
d if
ther
e is
an a
ccid
enta
l unt
reat
ed
sedi
men
t disc
harg
e to
surf
ace
wat
er.
Ac
cide
ntal
Aqu
ifer I
nter
cept
ion
Man
agem
ent P
lan
G
.16
The
Cons
ent H
olde
r sha
ll fin
alise
the
Acci
dent
al A
quife
r Int
erce
ptio
n M
anag
emen
t Pla
n (S
EMP
006)
subm
itted
with
th
e ap
plic
atio
n.
The
Acci
dent
al A
quife
r Int
erce
ptio
n M
anag
emen
t Pla
n sh
all b
e ce
rtifi
ed (i
n ac
cord
ance
with
Con
ditio
n G
.7),
to
conf
irm th
at th
e Ac
cide
ntal
Aqu
ifer I
nter
cept
ion
Man
agem
ent P
lan:
(a
) is
gene
rally
con
siste
nt w
ith t
he d
raft
Acci
dent
al A
quife
r In
terc
eptio
n M
anag
emen
t Pl
an s
ubm
itted
with
the
ap
plic
atio
n; a
nd
(b)
addr
esse
s all
the
mat
ters
list
ed in
Con
ditio
n G.
17 b
elow
.
E &
BC
22 O
ctob
er 2
013
32
G.1
7 Th
e pu
rpos
e of
the
Acci
dent
al A
quife
r Int
erce
ptio
n M
anag
emen
t Pla
n (S
EMP
006)
is to
pro
vide
an
over
all
fram
ewor
k fo
r the
con
trol
of a
ccid
enta
lly in
terc
epte
d gr
ound
wat
er a
nd o
utlin
e th
e m
easu
res t
o be
ado
pted
to
avoi
d, re
med
y an
d m
itiga
te th
e ef
fect
s of a
ccid
enta
l aqu
ifer i
nter
cept
ion.
Th
e Ac
cide
ntal
Aqu
ifer I
nter
cept
ion
Man
agem
ent P
lan
(SEM
P 00
6) sh
all i
nclu
de, b
ut n
eed
not b
e lim
ited
to, t
he
follo
win
g:
i. Te
chni
ques
to a
void
inte
rcep
tion
of a
quife
rs d
urin
g co
nstr
uctio
n w
orks
; ii.
M
onito
ring
of g
roun
dwat
er le
vels
prio
r to
com
men
cem
ent o
f con
stru
ctio
n in
wel
ls lo
cate
d w
ithin
100
m o
f the
Pr
ojec
t w
here
con
stru
ctio
n or
con
stru
ctio
n re
late
d ac
tiviti
es a
re l
ikel
y to
pen
etra
te t
he w
ater
tab
le a
nd
inte
rsec
t gro
undw
ater
; iii
. Pr
oced
ures
for i
mm
edia
te a
ctio
n sh
ould
an
aqui
fer a
ccid
enta
lly b
e br
each
ed;
iv.
Mea
sure
s to
ens
ure
suffi
cien
t qua
ntiti
es o
f im
perv
ious
mat
eria
l enc
ount
ered
dur
ing
exca
vatio
n ar
e st
ockp
iled
with
in th
e Pr
ojec
t are
a so
it is
read
y fo
r im
med
iate
dep
loym
ent i
f a sp
ring
is en
coun
tere
d;
v.
Mea
sure
s to
rem
ove
exce
ss w
ater
to
the
sedi
men
t co
ntro
l tre
atm
ent
devi
ces
and
the
rem
oval
of
all w
ater
af
fect
ed a
nd w
eak
soil
mat
eria
l with
out e
xace
rbat
ing
the
sprin
g;
vi.
Repl
acem
ent o
f the
mat
eria
l in
the
brea
ched
are
a w
ith c
ompa
cted
impe
rvio
us m
ater
ial;
vi
i. M
easu
res t
o en
sure
that
no
cont
amin
atio
n of
the
aqui
fer o
ccur
s and
that
hyd
raul
ic p
ress
ure
is re
stor
ed;
viii.
Pro
cedu
res f
or th
e no
tific
atio
n of
the
Cant
erbu
ry R
egio
nal C
ounc
il;
ix.
Mon
itorin
g of
the
mat
eria
l to
ensu
re n
o le
akag
e an
d th
at th
e aq
uife
r is f
ully
sea
led;
and
x.
M
onito
ring
of g
roun
dwat
er le
vels
follo
win
g th
e br
each
to c
onfir
m th
at g
roun
dwat
er c
ondi
tions
hav
e st
abili
sed.
E &
BC
22 O
ctob
er 2
013
33
St
orm
wat
er O
pera
tion
and
Mai
nten
ance
Pla
n
G.1
8 At
leas
t 20
wor
king
day
s prio
r to
the
com
men
cem
ent o
f wor
ks re
leva
nt to
syst
ems i
dent
ified
in (a
) to
(f) li
sted
bel
ow
in th
is co
nditi
on, t
he C
onse
nt H
olde
r sha
ll su
bmit
a St
orm
wat
er O
pera
tion
and
Mai
nten
ance
Pla
n to
the
Man
ager
. Th
e St
orm
wat
er O
pera
tion
and
Mai
nten
ance
Pla
n sh
all b
e pr
epar
ed in
con
sulta
tion
with
the
Stoc
kwat
er R
ace
Cont
rolli
ng A
utho
rity.
The
Man
ager
shal
l con
firm
the
Stor
mw
ater
Ope
ratio
n an
d M
aint
enan
ce P
lan
addr
esse
s eac
h of
the
follo
win
g as
pect
s of t
he P
roje
ct:
(a)
Mai
nten
ance
and
ope
ratio
n of
the
stor
mw
ater
syst
em in
clud
ing
trea
tmen
t pon
ds, s
oakp
it w
ater
qua
lity
dry
pond
s, sw
ales
, soa
k pi
ts a
nd e
mer
genc
y sp
illw
ay, i
nclu
ding
the
rem
oval
of d
ebris
; (b
) Pu
mpi
ng a
nd d
ispos
al sy
stem
at R
obin
sons
Roa
d ov
erpa
ss, w
hich
shal
l acc
omm
odat
e th
e 10
0 ye
ar 1
hou
r st
orm
eve
nt (s
ubje
ct to
pow
er a
vaila
bilit
y) a
nd sh
all i
ncor
pora
te a
n em
erge
ncy
war
ning
syst
em (w
ith a
n in
depe
nden
t pow
er so
urce
); (c
) Dr
aina
ge sy
stem
at M
aize
Maz
e an
d Ra
mp
pond
s;
(d)
Ope
ratio
n an
d m
aint
enan
ce o
f the
inve
rted
siph
ons w
hich
pas
s flo
ws f
rom
ups
trea
m o
f the
Pro
ject
, inc
ludi
ng
prev
entio
n of
blo
ckag
e of
the
sipho
ns;
(e)
Ope
ratio
n an
d m
aint
enan
ce o
f the
stoc
kwat
er ra
ce si
phon
s, in
clud
ing
prev
entio
n of
blo
ckag
e of
the
sipho
ns;
and
(f)
Mai
nten
ance
of t
he in
tegr
ity o
f the
CCC
pon
ds (O
wak
a Ba
sin/ W
ilmer
s Qua
rry)
to th
e ex
tent
they
are
im
pact
ed.
The
Cons
ent H
olde
r sha
ll pr
ogre
ssiv
ely
impl
emen
t the
Sto
rmw
ater
Ope
ratio
n an
d M
aint
enan
ce P
lan
as c
onst
ruct
ion
is co
mpl
eted
and
on
an o
n-go
ing
basis
as p
art o
f rou
tine
mai
nten
ance
. U
pon
com
plet
ion
of c
onst
ruct
ion
of th
e Pr
ojec
t, th
e St
orm
wat
er O
pera
tion
and
Mai
nten
ance
Pla
n sh
all b
e up
date
d to
refle
ct a
ny c
hang
es m
ade
durin
g th
e co
nstr
uctio
n pr
oces
s.
GT, D
, & D
P
Cultu
ral a
nd A
rcha
eolo
gica
l Dist
urba
nce
G.1
9 Th
e Co
nsen
t Hol
der s
hall
impl
emen
t the
Acc
iden
tal D
iscov
ery
Prot
ocol
cov
erin
g N
ZTA
New
Zea
land
Reg
ions
11
(Can
terb
ury)
and
12
(Wes
t Coa
st) i
n th
e ev
ent o
f acc
iden
tal d
iscov
ery
of c
ultu
ral o
r arc
haeo
logi
cal a
rtef
acts
or
feat
ures
dur
ing
the
cons
truc
tion
of th
e Pr
ojec
t.
E, B
C, D
& B
R
G.2
0 Th
e Co
nsen
t Hol
der s
hall
impl
emen
t the
Nga
i Tah
u Ko
iwi T
anga
ta P
olic
y 19
93 “
The
Polic
y of
Nga
i Tah
u Co
ncer
ning
th
e Hu
man
Rem
ains
of o
ur A
nces
tors
” in
the
even
t tha
t Koi
wi a
re d
iscov
ered
. E,
BC,
D &
BR
22 O
ctob
er 2
013
34
Feed
back
and
Inci
dent
s
G.2
1 (a
) At
all
times
dur
ing
cons
truc
tion
wor
k, th
e Co
nsen
t Hol
der s
hall
mai
ntai
n pe
rman
ent r
egist
er(s
) of a
ny p
ublic
or
stak
ehol
der f
eedb
ack
rece
ived
and
any
inci
dent
s or n
on-c
ompl
ianc
e no
ted
by th
e Co
nsen
t Hol
der’s
con
trac
tor,
in re
latio
n to
the
cons
truc
tion
of th
e Pr
ojec
t. Th
e re
gist
er(s
) sha
ll in
clud
e:
i. th
e na
me
and
cont
act d
etai
ls (a
s far
as p
ract
icab
le) o
f the
per
son
prov
idin
g fe
edba
ck o
r con
trac
tor
obse
rvin
g th
e in
cide
nt/ n
on-c
ompl
ianc
e;
ii.
iden
tific
atio
n of
the
natu
re a
nd d
etai
ls of
the
feed
back
/ inc
iden
t; an
d iii
. lo
catio
n, d
ate
and
time
of th
e fe
edba
ck/ i
ncid
ent.
(b)
The
Cons
ent H
olde
r sha
ll pr
ompt
ly in
vest
igat
e an
y ad
vers
e fe
edba
ck, i
ncid
ent o
r non
-com
plia
nce.
Thi
s sha
ll in
clud
e, b
ut n
eed
not b
e lim
ited
to:
i. re
cord
ing
wea
ther
con
ditio
ns a
t the
tim
e of
the
even
t (as
far a
s pra
ctic
able
), an
d in
clud
ing
win
d di
rect
ion
and
appr
oxim
ate
win
d sp
eed
if th
e ad
vers
e fe
edba
ck o
r inc
iden
t rel
ates
to d
ust;
ii.
reco
rdin
g an
y ot
her a
ctiv
ities
in th
e ar
ea, u
nrel
ated
to th
e Pr
ojec
t tha
t may
hav
e co
ntrib
uted
to th
e ad
vers
e fe
edba
ck/ i
ncid
ent/
non
-com
plia
nce,
such
as n
on-P
roje
ct c
onst
ruct
ion,
fire
s, tr
affic
acc
iden
ts o
r un
usua
lly d
usty
con
ditio
ns g
ener
ally
(if a
pplic
able
); iii
. in
vest
igat
ing
the
circ
umst
ance
s sur
roun
ding
the
inci
dent
. (c
) In
rela
tion
to C
ondi
tion
G.2
1(b)
, the
Con
sent
Hol
der s
hall:
i.
reco
rd th
e ou
tcom
e of
the
inve
stig
atio
n on
the
regi
ster
(s);
ii.
reco
rd a
ny re
med
ial a
ctio
ns o
r mea
sure
s und
erta
ken
to a
ddre
ss o
r res
pond
to th
e m
atte
r on
the
regi
ster
(s);
iii
. re
spon
d to
the
initi
ator
, in
clos
ing
the
feed
back
loop
, if p
ract
icab
le; a
nd
iv.
whe
re th
e ad
vers
e fe
edba
ck o
r inc
iden
t was
in re
latio
n to
a n
on-c
ompl
ianc
e, th
e M
anag
er sh
all b
e no
tifie
d in
writ
ing
of th
e m
atte
r with
in 5
wor
king
day
s of t
he n
on-c
ompl
ianc
e, a
nd in
form
of t
he
rem
edia
l act
ions
und
erta
ken.
(d
) Th
e re
gist
er(s
) sha
ll be
mai
ntai
ned
on si
te a
nd sh
all b
e m
ade
avai
labl
e to
the
Man
ager
upo
n re
ques
t.
All
22 O
ctob
er 2
013
35
6.
Reg
ion
al R
eso
urc
e C
on
sen
t C
on
dit
ion
s - C
on
sen
t co
nd
itio
ns
for
the e
xca
vati
on
of
lan
d a
nd
dep
osi
tio
n o
f fi
ll o
ver
an
un
con
fin
ed
or
sem
i-co
nfi
ned
aq
uif
er
La
nd u
se c
onse
nt fo
r the
exc
avat
ion
of g
reat
er th
an 1
00 c
ubic
met
res o
f lan
d w
here
the
dept
h of
exc
avat
ion
will
be
deep
er th
an th
e hi
ghes
t gr
ound
wat
er le
vel w
hich
is re
ason
ably
exp
ecte
d to
occ
ur in
isol
ated
pla
ces.
This
may
occ
ur d
urin
g co
nstr
uctio
n of
the
Robi
nson
s Ro
ad
unde
rpas
s and
stor
mw
ater
det
entio
n po
nds a
t Hal
swel
l Jun
ctio
n Ro
ad, b
ut it
will
be
appl
icab
le to
are
as w
here
any
exc
avat
ion
inte
rcep
ts a
n aq
uife
r, or
ther
e is
less
than
one
met
re b
etw
een
the
base
of t
he e
xcav
atio
n an
d th
e sh
allo
wes
t aqu
ifer.
La
nd u
se c
onse
nt fo
r the
dep
ositi
on o
f mor
e th
an 5
0 m
3 of f
ill w
here
the
land
has
bee
n ex
cava
ted
to a
dep
th o
f 5 m
or d
eepe
r tha
n th
e hi
ghes
t gr
ound
wat
er le
vel w
hich
is re
ason
ably
exp
ecte
d to
occ
ur (i
n th
e iso
late
d pl
aces
iden
tifie
d ab
ove)
.
Ref
Regi
onal
con
sent
con
ditio
ns
E.1
In
the
even
t any
exc
avat
ion
inte
rcep
ts a
n aq
uife
r the
Con
sent
Hol
der s
hall:
(a
) N
otify
the
Cant
erbu
ry R
egio
nal C
ounc
il w
ithin
24
hour
s of t
he in
terc
eptio
n oc
curr
ing;
and
(b
) Fo
llow
the
proc
edur
es in
the
cert
ified
Acc
iden
tal A
quife
r Int
erce
ptio
n M
anag
emen
t Pla
n (S
EMP
006)
subm
itted
in
com
plia
nce
with
Gen
eral
Con
ditio
n G
.16.
E.2
Fo
llow
ing
the
com
plet
ion
of th
e ex
cava
tion
no se
epag
e of
gro
undw
ater
from
the
aqui
fer b
enea
th th
e ex
cava
ted
and
back
fille
d ar
eas s
hall
occu
r. If
seep
age
does
occ
ur, t
he C
onse
nt H
olde
r sha
ll no
tify
the
Cant
erbu
ry R
egio
nal C
ounc
il an
d un
dert
ake
reas
onab
le re
med
ial a
ctio
n to
ens
ure
that
ther
e is
no fu
rthe
r see
page
of g
roun
dwat
er fr
om th
e aq
uife
r.
E.3
Th
e Co
nsen
t Hol
der s
hall:
(a
) Ad
opt
the
best
pra
ctic
able
opt
ions
to
prev
ent
the
disc
harg
e of
sed
imen
t an
d co
ntam
inan
ts i
nto
the
exca
vate
d la
nd.
Mea
sure
s sh
all i
nclu
de, b
ut s
hall
not b
e lim
ited
to, t
he in
stal
latio
n of
ero
sion
and
sedi
men
t con
trol
mea
sure
s in
acc
orda
nce
with
the
cert
ified
Ero
sion
and
Sedi
men
t Con
trol
Pla
n (S
EMP
002)
as r
equi
red
by G
ener
al C
ondi
tion
G.1
4.
(b)
Ensu
re th
at a
ll di
stur
bed
area
s sh
all b
e st
abili
sed
and
regr
asse
d or
sea
led
as s
oon
as p
ract
icab
le fo
llow
ing
com
plet
ion
of th
e w
orks
. (c
) Re
mov
e fr
om si
te a
ll sp
oil a
nd o
ther
was
te m
ater
ial f
rom
the
wor
ks o
n co
mpl
etio
n of
the
wor
ks.
(d)
Avoi
d pl
acin
g cu
t or c
lear
ed v
eget
atio
n, d
ebris
, or e
xcav
ated
mat
eria
l in
a po
sitio
n su
ch th
at it
may
ent
er e
xcav
ated
land
.
E.4
Al
l pra
ctic
able
mea
sure
s sha
ll be
und
erta
ken
to p
reve
nt o
il an
d fu
el le
aks f
rom
veh
icle
s and
mac
hine
ry. M
easu
res
shal
l inc
lude
, bu
t not
be
limite
d to
: (a
) N
o st
orag
e of
fuel
or r
efue
lling
of v
ehic
les a
nd m
achi
nery
with
in 5
0 m
etre
s of e
xcav
atio
n(s)
. (b
) Se
cure
stor
age
of fu
el o
r ove
rnig
ht re
mov
al fr
om th
e sit
e.
22 O
ctob
er 2
013
36
Ref
Regi
onal
con
sent
con
ditio
ns
E.5
Sp
ill k
its c
apab
le o
f abs
orbi
ng th
e qu
antit
y of
oil
and
petr
oleu
m p
rodu
cts t
hat m
ay b
e sp
illed
on
site
at a
ny o
ne ti
me,
shal
l be
kept
on
-site
in a
n ac
cess
ible
loca
tion
and:
(a
) Th
e Co
nsen
t Ho
lder
sha
ll ta
ke a
ll pr
actic
able
mea
sure
s to
avo
id s
pills
of f
uel o
r an
y ot
her
haza
rdou
s su
bsta
nces
with
in t
he
site,
incl
udin
g bu
t no
t lim
ited
to s
torin
g fu
el a
nd c
arry
ing
out
refu
ellin
g at
leas
t 50
met
res
from
any
wat
erw
ay a
nd t
he
exca
vate
d ar
ea.
(b)
In t
he e
vent
of
a sp
ill o
f fu
el o
r an
y ot
her
haza
rdou
s su
bsta
nce,
the
Con
sent
Hol
der
shal
l cle
an u
p th
e sp
ill a
s so
on a
s pr
actic
able
and
take
pra
ctic
able
mea
sure
s to
prev
ent r
ecur
renc
e.
(c)
The
Cons
ent
Hold
er s
hall
info
rm t
he C
ante
rbur
y Re
gion
al C
ounc
il w
ithin
24
hour
s of
a s
pill
even
t an
d sh
all p
rovi
de t
he
follo
win
g in
form
atio
n:
i. Th
e da
te, t
ime,
loca
tion
and
estim
ated
vol
ume
of th
e sp
ill;
ii.
The
caus
e of
the
spill
; iii
. Th
e ty
pe o
f haz
ardo
us su
bsta
nce(
s) sp
illed
; iv
. Cl
ean
up p
roce
dure
s und
erta
ken;
v.
De
tails
of t
he st
eps t
aken
to c
ontr
ol a
nd re
med
iate
the
effe
cts o
f the
spill
on
the
rece
ivin
g en
viro
nmen
t; vi
. An
ass
essm
ent o
f any
pot
entia
l effe
cts o
f the
spill
; and
vi
i. M
easu
res t
o be
und
erta
ken
to p
reve
nt re
curr
ence
.
E.6
O
pen
exca
vatio
ns th
at e
xpos
e gr
ound
wat
er sh
all b
e in
fille
d w
ith c
lean
fill m
ater
ial w
ithin
24
hour
s fol
low
ing
the
com
plet
ion
of th
e co
nstr
uctio
n re
quiri
ng th
e op
en e
xcav
atio
n.
Clea
nfill
mat
eria
l is d
efin
ed a
s mat
eria
l tha
t whe
n bu
ried
will
hav
e no
adv
erse
effe
ct o
n pe
ople
or t
he e
nviro
nmen
t; an
d in
clud
es
virg
in n
atur
al m
ater
ials
such
as c
lay,
soil
and
rock
, and
oth
er in
ert m
ater
ials
such
as c
oncr
ete
or b
rick
that
are
free
of:
• co
mbu
stib
le, p
utre
scib
le, d
egra
dabl
e or
leac
habl
e co
mpo
nent
s,
• ha
zard
ous s
ubst
ance
s,
• pr
oduc
ts o
r mat
eria
ls de
rived
from
haz
ardo
us w
aste
trea
tmen
t, ha
zard
ous w
aste
stab
ilisa
tion
or h
azar
dous
was
te d
ispos
al
prac
tices
, •
mat
eria
ls th
at m
ay p
rese
nt a
risk
to h
uman
hea
lth, o
r
liqui
d w
aste
.
22 O
ctob
er 2
013
37
7.
Reg
ion
al R
eso
urc
e C
on
sen
t C
on
dit
ion
s - C
on
sen
t co
nd
itio
ns
for
the c
on
stru
ctio
n o
f b
ore
s
La
nd u
se c
onse
nt fo
r the
con
stru
ctio
n of
inve
stig
atio
n an
d m
onito
ring
bore
s acr
oss t
he P
roje
ct;
La
nd u
se c
onse
nt fo
r the
con
stru
ctio
n of
a b
ore/
infil
trat
ion
faci
lity
(gro
undw
ater
col
lect
ion
field
) ass
ocia
ted
with
the
Robi
nson
s Roa
d U
nder
pass
are
a an
d ex
trac
tion
wel
ls at
Mai
ze M
aze
and
Ram
p po
nds;
and
La
nd u
se c
onse
nt fo
r the
con
stru
ctio
n of
bor
es fo
r dom
estic
and
stoc
kwat
er a
s a re
sult
of b
ore
relo
catio
n ac
ross
the
Proj
ect.
Expl
anat
ory
Not
e: T
he u
se o
f the
new
bor
es a
nd d
ecom
miss
ioni
ng o
f the
exi
stin
g bo
res h
ave
been
ass
esse
d as
per
mitt
ed a
ctiv
ities
.
Ref
Regi
onal
con
sent
con
ditio
ns
BC.1
Th
e bo
re(s
) sha
ll be
con
stru
cted
in a
ccor
danc
e w
ith th
e N
ew Z
eala
nd E
nviro
nmen
tal S
tand
ard
for D
rillin
g of
Soi
l and
Roc
k (N
ZS
4411
:201
1).
BC.2
Th
e ex
terio
r of e
ach
bore
shal
l be
seal
ed w
ith b
ento
nite
or c
oncr
ete
grou
t or s
imila
r mat
eria
l to
abov
e th
e sc
reen
pac
k or
one
met
re
belo
w g
roun
d le
vel,
whi
chev
er is
the
less
er, t
o pr
even
t flu
id m
ovem
ent d
own
the
sides
of t
he c
asin
gs in
to th
e sc
reen
ed c
olle
ctio
n la
yers
.
BC.3
W
hen
not i
n us
e, th
e to
p of
eac
h bo
re o
r the
abo
ve g
roun
d po
rtio
n of
the
galle
ry p
ipe
shal
l be
cove
red
or c
appe
d to
pre
vent
co
ntam
inan
ts e
nter
ing
the
bore
s and
und
erly
ing
grou
ndw
ater
.
BC.4
A
conc
rete
pad
of a
t lea
st 0
.3 m
etre
s rad
ius a
nd 0
.1 m
etre
s thi
ckne
ss sh
all b
e co
nstr
ucte
d ar
ound
the
bore
hea
d at
gro
und
or
pum
phou
se fl
oor l
evel
to p
reve
nt le
akag
e of
gro
undw
ater
, any
mov
emen
t of t
he c
asin
g, a
nd a
ny m
ater
ial o
r sur
face
wat
er e
nter
ing
the
bore
or a
nnul
us. T
he c
oncr
ete
pad
shal
l slo
pe a
way
from
the
bore
(s).
BC.5
Th
e bo
re(s
) sha
ll be
loca
ted
at le
ast 5
0 m
etre
s fro
m a
ny b
ore
that
a n
eigh
bour
ing
prop
erty
ow
ner i
s aut
horis
ed to
use
via
a w
ater
pe
rmit
or a
s a p
erm
itted
act
ivity
.
BC.6
Th
e in
form
atio
n re
quire
men
ts o
f the
CRC
BO
RE C
OM
PLIA
NCE
REP
ORT
and
CRC
CO
MPL
IAN
CE P
LAN
S sh
all b
e co
mpl
eted
and
retu
rned
to
Can
terb
ury
Regi
onal
Cou
ncil
with
in 2
0 w
orki
ng d
ays o
f the
com
plet
ion
of th
e co
nstr
uctio
n of
the
bore
(s).
BC.7
Th
e in
form
atio
n re
quire
men
ts o
f the
CRC
BO
RE IN
STAL
LATI
ON
REPO
RT, i
nclu
ding
the
inst
alle
r’s o
r dril
lers
GPS
eig
ht d
igit
map
re
fere
nce,
shal
l be
com
plet
ed a
nd re
turn
ed to
Can
terb
ury
Regi
onal
Cou
ncil
with
in 2
0 w
orki
ng d
ays o
f the
com
plet
ion
of c
onst
ruct
ion
of th
e bo
re(s
).
22 O
ctob
er 2
013
38
8.
Reg
ion
al R
eso
urc
e C
on
sen
t C
on
dit
ion
s - C
on
sen
t co
nd
itio
ns
for
the g
rou
nd
wate
r ta
kes
W
ater
per
mit
for t
he g
roun
dwat
er ta
kes f
rom
the
grou
ndw
ater
col
lect
ion
field
from
the
Robi
nson
s Roa
d ov
erpa
ss a
rea
(pum
ping
) and
at
Mai
ze M
aze
and
Ram
p po
nds (
by g
ravi
ty d
rain
age)
on
an in
term
itten
t bas
is du
ring
oper
atio
n.
Ref
Regi
onal
con
sent
con
ditio
ns
GT.
1 Th
e lo
catio
n, d
esig
n, im
plem
enta
tion
and
oper
atio
n of
the
grou
ndw
ater
take
s sha
ll be
in g
ener
al a
ccor
danc
e w
ith th
e co
nsen
t ap
plic
atio
n an
d its
ass
ocia
ted
plan
s and
doc
umen
ts, a
s out
lined
in G
ener
al C
ondi
tion
G.1
.
GT.
2 Gr
ound
wat
er le
vels
shal
l be
mon
itore
d at
the
Robi
nson
s Roa
d ov
erpa
ss to
det
erm
ine
the
appr
opria
te ti
min
g fo
r tem
pora
ry c
losu
re o
f th
e lo
cal r
oad
or in
stal
latio
n of
the
equi
pmen
t for
gro
undw
ater
low
erin
g an
d th
e pr
edic
ted
freq
uenc
y, le
vel a
nd d
urat
ion
of
grou
ndw
ater
low
erin
g at
this
loca
tion.
Thi
s sha
ll oc
cur i
n co
nsul
tatio
n w
ith th
e Ro
ad C
ontr
ollin
g Au
thor
ity.
GT.
3 Gr
ound
wat
er le
vels
shal
l be
mon
itore
d at
the
Halsw
ell J
unct
ion
Road
pon
ds (M
aize
Maz
e an
d Ra
mp
pond
s) to
det
erm
ine
the
appr
opria
te ti
min
g fo
r ins
talla
tion
of th
e gr
ound
wat
er lo
wer
ing
inte
rven
tion
prop
osed
at t
his l
ocat
ion.
GT.
4 An
ann
ual G
roun
dwat
er M
onito
ring
Repo
rt sh
all b
e su
bmitt
ed to
the
Man
ager
out
linin
g th
e re
cord
ed g
roun
dwat
er le
vels
at
Robi
nson
s Roa
d an
d Ha
lswel
l Jun
ctio
n Ro
ad o
ver t
he p
revi
ous y
ear.
A co
py o
f the
repo
rt sh
all a
lso
be p
rovi
ded
to th
e Se
lwyn
Dist
rict
Coun
cil A
sset
Man
ager
. Thi
s rep
ort s
hall
incl
ude
an u
pdat
ed p
redi
ctio
n fo
r the
tim
ing
of in
stal
latio
n of
the
grou
ndw
ater
low
erin
g in
terv
entio
n at
the
Robi
nson
s and
Hal
swel
l Jun
ctio
n Ro
ad a
reas
(if r
equi
red)
. Th
e re
port
shal
l rec
omm
end
any
nece
ssar
y ch
ange
s to
the
trig
ger l
evel
set o
ut in
cond
ition
GT.
5 be
low
and
incl
ude
the
info
rmat
ion
requ
ired
by C
ondi
tion
GT.
6 an
d G
T.7
(if a
pplic
able
). Th
e re
quire
men
t for
an
annu
al G
roun
dwat
er M
onito
ring
Repo
rt m
ay c
ease
follo
win
g co
nsul
tatio
n w
ith th
e Se
lwyn
Dist
rict C
ounc
il As
set M
anag
er, w
ith th
e ag
reem
ent o
f the
Man
ager
.
GT.
5 Th
e in
terim
trig
ger l
evel
for t
he g
roun
dwat
er lo
wer
ing
inte
rven
tion
at H
alsw
ell J
unct
ion
Road
shal
l be
1.0m
bel
ow b
ase
of M
aize
M
aze
pond
. Th
e tr
igge
r lev
el sh
all b
e up
date
d an
nual
ly in
acc
orda
nce
with
con
ditio
n GT
.4 a
bove
.
GT.
6 Th
e gr
ound
wat
er lo
wer
ing
equi
pmen
t (pu
mp)
at R
obin
sons
Roa
d w
ill b
e in
stal
led
in c
onsu
ltatio
n w
ith th
e Ro
ad C
ontr
ollin
g Au
thor
ity,
if gr
ound
wat
er c
omes
with
in 1
.5 m
etre
s of t
he to
p of
the
Robi
nson
s Roa
d ke
rb, a
t the
low
poi
nt w
here
it p
asse
s ben
eath
the
stat
e hi
ghw
ay.
At th
is tim
e, a
reco
rdin
g de
vice
shal
l be
inst
alle
d to
reco
rd th
e ra
te o
f gro
undw
ater
take
, the
vol
ume
of ta
ke a
nd th
e pe
riod
of g
roun
dwat
er d
iver
sion.
The
ann
ual G
roun
dwat
er M
onito
ring
Repo
rt, p
repa
red
in a
ccor
danc
e w
ith C
ondi
tion
GT.4
, sha
ll in
clud
e a
sum
mar
y of
the
reco
rded
gro
undw
ater
div
ersio
n da
ta o
nce
oper
atio
nal.
Ad
vice
not
e:
The
disc
harg
e as
soci
ated
with
this
grou
ndw
ater
take
is m
anag
ed in
acc
orda
nce
with
Con
ditio
n DP
.28.
22 O
ctob
er 2
013
39
Ref
Regi
onal
con
sent
con
ditio
ns
GT.
7 (a
) O
nce
the
grou
ndw
ater
has
exc
eede
d th
e tr
igge
r le
vel
at H
alsw
ell
Junc
tion
Road
(Co
nditi
on G
T.5)
, th
en t
he i
nter
vent
ion
mea
sure
s fo
r lo
wer
ing
grou
ndw
ater
bel
ow th
e M
aize
Maz
e an
d Ra
mp
pond
s sh
all b
e in
stal
led.
The
infr
astr
uctu
re to
com
plet
e th
e gr
ound
wat
er d
rain
age
regi
me
to U
pper
Kni
ghts
Str
eam
shal
l be
com
plet
ed a
nd c
omm
issio
ned.
(b
) A
data
logg
er s
hall
be in
stal
led
to r
ecor
d th
e flo
w r
ate,
vol
ume
of d
iver
ted
grou
ndw
ater
and
per
iod
of g
roun
dwat
er d
iver
sion.
W
here
und
er C
ondi
tion
GT.4
the
requ
irem
ent f
or a
Gro
undw
ater
Mon
itorin
g Re
port
has
cea
sed,
mon
itorin
g of
the
data
logg
er
may
also
cea
se.
(c
) An
ann
ual
Grou
ndw
ater
Mon
itorin
g Re
port
, pr
epar
ed i
n ac
cord
ance
with
Con
ditio
n GT
.4,
shal
l in
clud
e a
sum
mar
y of
the
re
cord
ed g
roun
dwat
er d
iver
sion
data
onc
e op
erat
iona
l.
GT.
8 Th
e pu
mpi
ng a
nd d
ispos
al sy
stem
s sha
ll be
ope
rate
d an
d m
aint
aine
d in
acc
orda
nce
with
the
cert
ified
Sto
rmw
ater
Ope
ratio
n an
d M
aint
enan
ce P
lan
subm
itted
in c
ompl
ianc
e w
ith G
ener
al C
ondi
tion
G.1
8.
22 O
ctob
er 2
013
40
9.
Reg
ion
al R
eso
urc
e C
on
sen
t C
on
dit
ion
s - C
on
sen
t co
nd
itio
ns
for
the t
emp
ora
ry a
nd
perm
an
en
t d
ivers
ion
of
stock
wat
er
race
s
W
ater
per
mit
for t
he te
mpo
rary
and
per
man
ent d
iver
sion
of st
ockw
ater
race
s.
Ref
Regi
onal
con
sent
con
ditio
ns
Ad
vice
Not
e:
Appr
oval
to m
odify
stoc
kwat
er ra
ces w
ill b
e so
ught
whe
re re
quire
d un
der t
he S
elw
yn D
istric
t Cou
ncil
Wat
er R
ace
Byla
w 2
008.
D.1
The
loca
tion,
des
ign
and
cons
truc
tion
of th
e te
mpo
rary
and
per
man
ent d
iver
sions
shal
l be
in g
ener
al a
ccor
danc
e w
ith th
e co
nsen
t ap
plic
atio
n an
d its
ass
ocia
ted
plan
s and
doc
umen
ts, a
s out
lined
in G
ener
al C
ondi
tion
G.1
.
D.2
The
Cons
ent H
olde
r sha
ll de
sign
and
cons
truc
t all
tem
pora
ry a
nd p
erm
anen
t div
ersio
ns in
a m
anne
r tha
t will
mai
ntai
n th
e fu
nctio
n of
th
e st
ockw
ater
race
, in
part
icul
ar w
here
this
is cu
lver
ted
or p
iped
ben
eath
or a
djac
ent t
o th
e Pr
ojec
t, w
hich
shal
l inc
lude
:
(a)
dive
rsio
ns t
o be
con
stru
cted
in a
ccor
danc
e w
ith t
he S
elw
yn D
istric
t Co
unci
l Eng
inee
ring
Code
of
Prac
tice,
Par
t 13
, Sto
ck
Wat
er R
aces
(201
2) a
nd S
elw
yn D
istric
t Cou
ncil
Engi
neer
ing
Stan
dard
dra
win
g W
R8.0
; (b
) pr
ovid
ing
for t
he la
nd d
rain
age
func
tion
of th
e ra
ce n
etw
ork
for t
he p
assa
ge o
f flo
od fl
ows;
(c
) pr
ovid
ing
for f
ish p
assa
ge w
here
by th
e ra
ces s
hall
not i
nclu
de a
ny st
eep
drop
s or p
erch
ed se
ctio
ns. T
his m
ay a
lso in
clud
e th
e us
e of
ligh
t wel
ls an
d re
stin
g ar
eas f
or fi
sh a
long
the
long
, fla
t, pi
ped
sect
ions
(app
roxi
mat
ely
ever
y 40
- 60
m w
here
pos
sible
) an
d th
e us
e of
baf
fles;
(d
) av
oidi
ng u
nnec
essa
ry m
odifi
catio
n of
the
wat
er r
ace
bed
and
chan
nel (
such
as
the
avoi
danc
e of
larg
e ar
eas
of c
oncr
ete
chan
nelli
ng).
D.3
All w
orks
nec
essa
ry to
car
ry o
ut th
e te
mpo
rary
div
ersio
ns sh
all b
e co
mpl
eted
prio
r to
flow
s bei
ng p
rogr
essiv
ely
dive
rted
to th
e ne
w
tem
pora
ry c
hann
el lo
catio
n. F
low
s sha
ll be
retu
rned
to th
e or
igin
al c
hann
el a
s soo
n as
pra
ctic
able
follo
win
g th
e co
mpl
etio
n of
te
mpo
rary
wor
ks, t
o en
sure
that
wat
er q
ualit
y an
d ra
ce st
abili
ty a
re n
ot a
dver
sely
affe
cted
. Ad
vice
not
e:
For t
he p
urpo
ses o
f thi
s con
ditio
n, a
s soo
n as
pra
ctic
able
mea
ns n
o lo
nger
than
24
hour
s unl
ess a
long
er p
erio
d ha
s bee
n ag
reed
fo
llow
ing
the
proc
ess s
et o
ut in
the
SDC
Polic
y M
anua
l for
Pla
nned
Wor
ks O
utag
e M
anag
emen
t W11
7, w
hich
requ
ires S
DC to
pro
vide
14
cal
enda
r day
s not
ice
to w
ater
use
rs b
efor
e co
mm
ence
men
t of p
lann
ed m
aint
enan
ce w
orks
whi
ch w
ill re
sult
in te
mpo
rary
stop
page
or
disr
uptio
n to
supp
ly o
f gre
ater
than
36
hour
s.
D.4
Dive
rsio
n w
orks
shal
l not
per
man
ently
dec
reas
e th
e flo
od c
arry
ing
capa
city
of t
he st
ockw
ater
race
s or e
xace
rbat
e flo
od p
oten
tial o
n su
rrou
ndin
g la
nd.
22 O
ctob
er 2
013
41
Ref
Regi
onal
con
sent
con
ditio
ns
D.5
Dive
rsio
n w
orks
shal
l be
unde
rtak
en in
a m
anne
r whi
ch a
void
s the
stra
ndin
g of
fish
in p
ools
or c
hann
els.
D.6
Inst
ream
wor
ks w
ill b
e ca
rrie
d ou
t off
line
from
the
activ
e ra
ce fl
ow.
Onc
e th
e w
ater
race
net
wor
k is
shut
off,
wor
ks c
an b
e un
dert
aken
to c
ompl
ete
the
cros
s ove
r in
the
dry
bed.
D.7
With
in tw
o m
onth
s of t
he c
ompl
etio
n of
the
dive
rsio
ns, a
cer
tific
ate
signe
d by
a su
itabl
y ex
perie
nced
cha
rter
ed p
rofe
ssio
nal e
ngin
eer
(CPE
ng) c
onfir
min
g th
at th
e di
vers
ions
hav
e be
en c
onst
ruct
ed in
acc
orda
nce
with
the
requ
irem
ents
of C
ondi
tion
D.2,
shal
l be
subm
itted
to th
e M
anag
er.
D.8
All a
reas
dist
urbe
d by
div
ertin
g th
e st
ockw
ater
race
s and
dist
urbe
d ar
eas a
djac
ent t
o w
ater
race
s sha
ll be
stab
ilise
d an
d pl
ante
d w
ith
suita
ble
ripar
ian
vege
tatio
n as
soon
as p
ract
icab
le fo
llow
ing
com
plet
ion
of th
e di
vers
ion
wor
ks.
Stab
ilisa
tion,
in th
is co
nditi
on, m
eans
pr
ovid
ing
appr
opria
te m
easu
res,
veg
etat
ive
or st
ruct
ural
, to
prot
ect e
xpos
ed so
il fr
om e
rosio
n.
22 O
ctob
er 2
013
42
10
. R
eg
ion
al R
eso
urc
e C
on
sen
t C
on
dit
ion
s - C
on
sen
t co
nd
itio
ns
for
the d
isch
arg
e o
f st
orm
wat
er a
nd
wate
r d
uri
ng
co
nst
ruct
ion
an
d o
pera
tio
n o
f th
e P
roje
ct
Di
scha
rge
perm
it fo
r the
disc
harg
e of
stor
mw
ater
to la
nd d
urin
g co
nstr
uctio
n an
d op
erat
ion
of th
e Pr
ojec
t.
Di
scha
rge
perm
it fo
r the
disc
harg
e of
ove
rflo
w w
ater
from
the
stor
mw
ater
det
entio
n ba
sin to
an
artif
icia
l wat
erco
urse
(Mon
tgom
ery’
s Dra
in /
Upp
er K
nigh
ts S
trea
m) i
n an
ext
rem
e ra
infa
ll ev
ent o
r ext
rem
e gr
ound
wat
er e
vent
s dur
ing
and
post
con
stru
ctio
n of
the
Proj
ect.
Di
scha
rge
perm
it fo
r the
disc
harg
e of
wat
er to
wat
er (a
rtifi
cial
wat
erco
urse
) fro
m si
te d
ewat
erin
g ac
tiviti
es d
urin
g co
nstr
uctio
n an
d op
erat
ion
of th
e Pr
ojec
t.
Di
scha
rge
perm
it fo
r the
disc
harg
e of
de-
wat
erin
g w
ater
to la
nd a
t Rob
inso
ns R
oad
durin
g op
erat
ion
of th
e Pr
ojec
t.
Ref
Regi
onal
con
sent
con
ditio
ns
Er
osio
n an
d Se
dim
ent C
ontr
ol -
Cons
truc
tion
DP.1
All e
rosio
n an
d se
dim
ent c
ontr
ol m
easu
res s
hall
be d
esig
ned,
con
stru
cted
, im
plem
ente
d an
d m
aint
aine
d in
acc
orda
nce
with
th
e ce
rtifi
ed E
rosio
n an
d Se
dim
ent C
ontr
ol P
lan,
subm
itted
in c
ompl
ianc
e w
ith G
ener
al C
ondi
tion
G.1
4.
DP.2
The
Cons
ent H
olde
r sha
ll en
sure
that
ear
thw
orks
are
stag
ed, a
s out
lined
in th
e ce
rtifi
ed E
rosio
n an
d Se
dim
ent C
ontr
ol P
lan,
an
d th
at d
istur
banc
e is
kept
to th
e m
inim
um p
ract
icab
le.
DP.3
All e
rosio
n an
d se
dim
ent c
ontr
ol m
easu
res,
and
any
nec
essa
ry p
erim
eter
con
trol
s, sh
all b
e in
stal
led
prio
r to
the
com
men
cem
ent o
f ear
thw
orks
, for
eac
h st
age
of th
e Pr
ojec
t.
DP.4
The
Cons
ent H
olde
r sha
ll ca
rry
out m
onito
ring
of e
rosio
n an
d se
dim
ent c
ontr
ol m
easu
res
in a
ccor
danc
e w
ith th
e ce
rtifi
ed
Eros
ion
and
Sedi
men
t Con
trol
Pla
n, su
bmitt
ed in
com
plia
nce
with
Gen
eral
Con
ditio
n G
.14,
and
shal
l sat
isfy
the
follo
win
g:
(a)
The
eros
ion
and
sedi
men
t con
trol
mea
sure
s sha
ll be
insp
ecte
d at
leas
t onc
e ev
ery
wee
k, a
nd a
fter
eac
h ra
infa
ll ev
ent
whe
re g
reat
er th
an 1
5 m
m o
f rai
n fa
lls w
ithin
a 2
4 ho
ur p
erio
d.
(b)
Any
repa
ir an
d m
aint
enan
ce o
f the
ero
sion
and
sedi
men
t con
trol
mea
sure
s sha
ll be
und
erta
ken
in a
ccor
danc
e w
ith th
e ce
rtifi
ed E
rosio
n an
d Se
dim
ent C
ontr
ol P
lan
and
any
amen
dmen
ts to
the
cert
ified
Ero
sion
and
Sedi
men
t Con
trol
Pla
n.
(c)
Accu
mul
ated
sedi
men
t sha
ll be
rem
oved
from
any
sedi
men
t ret
entio
n de
vice
whe
n it
occu
pies
mor
e th
an 2
0 pe
rcen
t of
that
dev
ice.
(d
) Re
cord
s of e
ach
insp
ectio
n, a
nd a
ll re
pairs
and
mai
nten
ance
shal
l be
kept
and
pro
vide
d to
the
Cant
erbu
ry R
egio
nal
Coun
cil u
pon
requ
est.
22 O
ctob
er 2
013
43
Ref
Regi
onal
con
sent
con
ditio
ns
DP.5
All d
ischa
rges
to w
ater
of:
a)
Co
nstr
uctio
n ph
ase
stor
mw
ater
up
to a
nd in
clud
ing
110
mm
of r
ain
in 2
4 ho
urs s
hall
not;
i. Ex
ceed
a tu
rbid
ity o
f 55
NTU
; ii.
Ex
ceed
a to
tal s
uspe
nded
solid
s (TS
S) c
once
ntra
tion
of 1
00 m
illig
ram
per
litr
e; o
r iii
. Ca
use
flood
ing
of p
rope
rtie
s out
side
of th
e de
signa
tion.
b)
Co
nstr
uctio
n de
wat
erin
g w
ater
shal
l not
; i.
Exce
ed a
turb
idity
of 3
0 N
TU;
ii.
Exce
ed a
tota
l sus
pend
ed so
lids c
once
ntra
tion
of 5
0 m
illig
ram
per
litr
e; o
r iii
. Ca
use
flood
ing
of p
rope
rtie
s out
side
of th
e de
signa
tion.
c)
If
flocc
ulat
ion
is us
ed d
urin
g co
nstr
uctio
n, o
ther
than
Chi
tin fl
occu
lant
s, w
ater
shal
l not
exc
eed
a pH
of b
etw
een
5.5
and
8.5.
In
the
even
t tha
t the
turb
idity
or T
SS c
once
ntra
tions
, or p
H, e
xcee
d th
e lim
its in
cla
uses
(a),
(b) o
r (c)
of t
his c
ondi
tion,
the
cons
ent h
olde
r sha
ll;
1)
Not
ify th
e M
anag
er w
ithin
24
hour
s of t
he e
xcee
danc
e; a
nd
2)
Revi
ew a
nd a
men
d (a
s nec
essa
ry) t
he E
rosio
n an
d Se
dim
ent C
ontr
ol P
lan
(SEM
P002
) and
/or t
he A
ccid
enta
l Aqu
ifer
Inte
rcep
tion
Man
agem
ent P
lan
(SEM
P006
) to
prev
ent f
urth
er e
xcee
denc
e of
the
limits
set o
ut in
this
cond
ition
.
DP.6
All e
xpos
ed e
arth
wor
ks sh
all b
e st
abili
sed
once
ear
thw
orks
are
com
plet
ed o
r if t
he e
xpos
ed a
rea
is no
t to
be e
arth
wor
ked
for
a pe
riod
of 1
4 da
ys.
For t
hose
are
as th
at a
re to
be
vege
tate
d, a
n ex
pose
d ar
ea is
con
sider
ed to
be
fully
stab
ilise
d on
ce:
(a)
80 p
erce
nt v
eget
atio
n co
ver h
as b
een
esta
blish
ed v
ia co
nven
tiona
l gra
ssin
g or
hyd
ro-s
eedi
ng; o
r (b
) 10
0 pe
rcen
t cov
er e
stab
lishe
d vi
a m
ulch
ing.
Ope
ratio
nal S
torm
wat
er T
reat
men
t and
Disp
osal
DP.7
At le
ast 2
0 w
orki
ng d
ays p
rior t
o co
mm
enci
ng c
onst
ruct
ion
of th
e re
leva
nt st
orm
wat
er sy
stem
(s),
the
Cons
ent H
olde
r sha
ll su
bmit
desig
n pl
ans a
nd d
etai
ls of
the
stor
mw
ater
man
agem
ent s
yste
m(s
) to
be u
sed
to tr
eat a
nd d
ispos
e of
stor
mw
ater
fr
om th
e sit
e (in
acc
orda
nce
with
Con
ditio
ns D
P.9
- DP.
14 b
elow
) to
the
Man
ager
. Th
e pl
ans s
hall
be a
ccom
pani
ed b
y a
cert
ifica
te si
gned
by
a ch
arte
red
prof
essio
nal e
ngin
eer (
CPEn
g) c
ertif
ying
that
the
stor
mw
ater
trea
tmen
t sys
tem
s com
ply
with
, or e
nabl
e co
mpl
ianc
e w
ith, C
ondi
tions
DP.
9 - D
P.14
and
that
the
desig
n, c
onst
ruct
ion
and
inst
alla
tion
spec
ifica
tions
are
in
acc
orda
nce
with
all
rele
vant
New
Zea
land
Sta
ndar
ds.
The
cert
ifica
te sh
all b
e ac
com
pani
ed w
ith su
ffici
ent t
echn
ical
in
form
atio
n to
dem
onst
rate
the
basis
for t
he c
ertif
icat
ion.
22 O
ctob
er 2
013
44
Ref
Regi
onal
con
sent
con
ditio
ns
DP.8
(a)
For t
he se
ctio
n of
the
Proj
ect w
est o
f Sha
nds R
oad,
the
stor
mw
ater
runo
ff fr
om th
e ca
rria
gew
ay sh
all b
e di
scha
rged
ei
ther
, dire
ctly
to la
nd v
ia sh
eet f
low
ove
r the
gra
ssed
ver
ge a
nd tr
eatm
ent s
wal
es, o
r to
land
or w
ater
via
stor
mw
ater
tr
eatm
ent a
nd in
filtr
atio
n sy
stem
s tha
t sha
ll be
des
igne
d to
col
lect
and
disp
ose
of st
orm
wat
er fr
om a
ll st
orm
eve
nts u
p to
and
incl
udin
g th
e 1%
AEP
. (b
) Fo
r the
bal
ance
of t
he P
roje
ct e
ast o
f Sha
nds R
oad
incl
udin
g ra
mps
and
at o
verp
asse
s and
und
erpa
sses
, the
BPO
ap
proa
ch sh
all b
e us
ed to
trea
t sto
rmw
ater
runo
ff, p
rior t
o di
scha
rge
into
or o
nto
land
. (N
ote
this
may
incl
ude
kerb
and
ch
anne
l whi
ch d
irect
s the
disc
harg
e to
stor
mw
ater
trea
tmen
ts sy
stem
s).
Thes
e sy
stem
s sha
ll be
des
igne
d to
col
lect
and
di
spos
e of
stor
mw
ater
from
all
stor
m e
vent
s up
to a
nd in
clud
ing
the
1% A
EP.
DP.9
Whe
re p
ract
icab
le, t
he d
esig
n of
swal
es sh
all b
e in
gen
eral
acc
orda
nce
with
the
NZT
A St
orm
wat
er T
reat
men
t Sta
ndar
d fo
r St
ate
High
way
Infr
astr
uctu
re (M
ay 2
010)
. The
exc
eptio
ns m
ay in
clud
e:
i. lo
ngitu
dina
l slo
pe m
ay b
e fla
tter
than
the
Stan
dard
. ii.
m
inim
um le
ngth
may
be
less
than
the
Stan
dard
. iii
. re
ar sl
opes
may
be
stee
per t
han
the
Stan
dard
on
Mai
n So
uth
Road
. Al
l sw
ales
shal
l: (a
) Be
veg
etat
ed u
nifo
rmly
with
gra
ss o
r sim
ilar v
eget
atio
n; a
nd
(b)
Be li
ned
with
a la
yer o
f san
dy lo
am to
psoi
l at l
east
120
mill
imet
res t
hick
. (c
) Be
des
igne
d to
ens
ure
stor
mw
ater
will
not
pon
d fo
r lon
ger t
han
48 h
ours
aft
er th
e ce
ssat
ion
of a
ny st
orm
eve
nt.
DP.1
0
The
follo
win
g sp
ecifi
c re
quire
men
ts fo
r the
des
ign
and
cons
truc
tion
of th
e so
ak p
its sh
all a
pply
: (a
) So
ak p
its a
nd so
akag
e tr
ench
es s
hall
be in
stal
led
at th
e en
ds o
f sw
ales
whe
re th
e m
appe
d de
pth
to g
roun
dwat
er le
vel i
s gr
eate
r tha
n 6
m.
(b)
A fie
ld te
stin
g pr
ogra
mm
e sh
all b
e de
velo
ped
to c
onfir
m s
oaka
ge r
ates
of t
he r
ecei
ving
gro
und,
in p
artic
ular
at
criti
cal
loca
tions
incl
udin
g sa
g po
ints
.
22 O
ctob
er 2
013
45
Ref
Regi
onal
con
sent
con
ditio
ns
DP.1
1
The
follo
win
g sp
ecifi
c re
quire
men
ts fo
r the
des
ign
and
cons
truc
tion
of th
e so
akpi
t wat
er q
ualit
y dr
y po
nds s
hall
appl
y:
i. Fi
rst f
lush
trea
tmen
t dep
th o
f 25
mm
of r
ainf
all.
ii.
Firs
t flu
sh tr
eatm
ent s
hall
be in
stal
led
at th
e en
ds o
f sto
rage
or i
nfilt
ratio
n de
vice
s loc
ated
eas
t of S
hand
s Roa
d in
terc
hang
e.
iii.
Soak
pit w
ater
qua
lity
dry
pond
s sha
ll be
veg
etat
ed u
nifo
rmly
with
gra
ss o
r sim
ilar v
eget
atio
n.
iv.
Soak
pit w
ater
qua
lity
dry
pond
s sha
ll be
line
d w
ith a
laye
r of i
nfilt
ratio
n m
edia
of a
t lea
st 3
50 m
illim
etre
s in
thic
knes
s.
v.
All s
oakp
it w
ater
qua
lity
dry
pond
s sha
ll be
line
d w
ith a
laye
r of i
nfilt
ratio
n m
edia
con
sistin
g of
wel
l gra
ded
sand
, with
su
ffici
ent o
rgan
ic m
ater
ial a
dded
to su
ppor
t gra
ss g
row
th. T
he in
filtr
atio
n m
ater
ial s
hall
mee
t the
follo
win
g re
quire
men
ts:
i. D1
00 <
10m
m
ii.
<3%
w/w
cla
y an
d sil
t (<0
.06m
m)
iii.
With
a 5
to 1
0% o
rgan
ic m
ater
ial (
e.g.
com
post
, mul
ch) a
dded
to th
e to
p 10
0 m
m.
DP.1
2
The
follo
win
g sp
ecifi
c re
quire
men
ts fo
r the
des
ign
and
cons
truc
tion
of st
orm
wat
er tr
eatm
ent p
onds
(Mai
ze M
aze
and
Ram
p po
nds)
shal
l app
ly:
i. M
aint
enan
ce o
f flo
ws i
n an
d ou
t of M
ushr
oom
Pon
d an
d O
wak
a Ba
sin d
urin
g co
nstr
uctio
n an
d op
erat
ion
of th
e Pr
ojec
t. ii.
An
abi
lity
to re
ceiv
e an
d st
ore
the
entir
e 60
hou
r 100
yea
r sto
rm ru
noff
from
the
Proj
ect.
iii.
The
runo
ff fr
om th
e fir
st 2
5 m
m o
f rai
nfal
l sha
ll be
dire
cted
to th
e fir
st fl
ush
trea
tmen
t bas
in.
iv.
Prov
ision
for s
torm
wat
er tr
eatm
ent w
ithin
the
pond
s thr
ough
an
orga
nic
filte
r med
ium
whi
ch sh
all m
eet t
he
follo
win
g re
quire
men
ts:
i. D1
00 <
10m
m
ii.
<3%
w/w
cla
y an
d sil
t (<0
.06m
m)
iii.
With
a 5
to 1
0% o
rgan
ic m
ater
ial (
e.g.
com
post
, mul
ch) a
dded
to th
e to
p 10
0 m
m.
v.
A pr
imar
y ou
tlet f
rom
pon
ds th
at d
ischa
rges
to g
roun
d vi
a an
infil
trat
ion
basin
. vi
. An
abi
lity
to d
raw
dow
n th
e le
vel o
f the
pon
d fo
llow
ing
a la
rge
rain
or g
roun
dwat
er e
vent
.
vii.
A pr
oces
s for
the
cont
rolle
d re
leas
e of
wat
er fr
om th
e M
aize
Maz
e an
d Ra
mp
pond
s.
viii.
Se
para
te a
reas
to b
e di
vide
d by
per
viou
s bun
ds to
ens
ure
wat
er c
anno
t sho
rt c
ircui
t the
pon
d.
ix.
Infil
trat
ion
basin
s sha
ll be
des
igne
d to
min
imise
pon
ding
for l
onge
r tha
n 72
hou
rs a
fter
the
cess
atio
n of
any
stor
m
even
t and
shal
l be
gras
sed
and/
or v
eget
ated
to ta
ke a
ccou
nt o
f the
ext
ende
d de
tent
ion
times
. Po
nd b
ases
shal
l pr
ovid
e fo
r var
ied
dept
h zo
nes.
x.
Pr
ovisi
on fo
r inc
reas
ed g
roun
dwat
er le
vels
as a
resu
lt of
the
Cent
ral P
lain
s Wat
er E
nhan
cem
ent S
chem
e.
22 O
ctob
er 2
013
46
Ref
Regi
onal
con
sent
con
ditio
ns
DP.1
3
The
pum
ping
and
disp
osal
syst
em a
t the
Rob
inso
ns R
oad
over
pass
shal
l acc
omm
odat
e th
e 10
0 ye
ar 1
hou
r sto
rm e
vent
(s
ubje
ct to
pow
er a
vaila
bilit
y) a
nd sh
all i
ncor
pora
te a
n em
erge
ncy
war
ning
syst
em, w
ith a
n in
depe
nden
t pow
er so
urce
.
DP.1
4
The
follo
win
g sp
ecifi
c re
quire
men
t for
the
desig
n an
d co
nstr
uctio
n of
ove
rland
flow
s sha
ll ap
ply:
Th
e ex
tent
of a
fflux
as a
resu
lt of
the
Proj
ect (
i.e. i
ncre
ase
in fl
ood
leve
l) up
stre
am o
f the
Pro
ject
, and
out
side
the
desig
natio
n,
post
con
stru
ctio
n sh
all n
ot e
xcee
d 25
0 m
m fo
r a 1
% A
EP e
vent
, inc
ludi
ng th
e ef
fect
s of c
limat
e ch
ange
to 2
080,
and
whe
re n
o ex
istin
g ha
bita
ble
floor
leve
ls ar
e af
fect
ed.
Whe
re e
xist
ing
habi
tabl
e flo
or le
vels
outs
ide
the
desig
natio
n ar
e po
tent
ially
af
fect
ed th
e in
crea
se in
affl
ux sh
all b
e 0
mm
.
DP.1
5
An a
sses
smen
t pro
cess
shal
l be
unde
rtak
en to
fiel
d-id
entif
y w
here
an
exist
ing
wel
l has
the
pote
ntia
l to
be a
dver
sely
affe
cted
by
the
stor
mw
ater
disc
harg
es (i
.e. t
hose
wel
ls w
ithin
30
m p
lan
dist
ance
of t
he P
roje
ct d
ispos
al p
oint
s).
Prio
r to
any
disc
harg
es o
ccur
ring
in th
e vi
cini
ty o
f a w
ell w
hich
is id
entif
ied
as b
eing
pot
entia
lly a
dver
sely
affe
cted
, the
Con
sent
Hol
der
shal
l eith
er a
djus
t the
disc
harg
e lo
catio
n to
avo
id p
oten
tial c
onta
min
atio
n, o
r, ar
rang
e fo
r the
wel
l to
be d
ecom
miss
ione
d an
d (if
requ
ired)
a n
ew w
ell s
hall
be lo
cate
d, d
rille
d, te
sted
and
dev
elop
ed in
acc
orda
nce
with
the
Bore
Con
stru
ctio
n Co
nditi
ons
BC.1
to B
C.7.
DP.1
6
Stor
mw
ater
that
exc
eeds
the
desig
n ca
paci
ty o
f the
stor
mw
ater
syst
ems,
bein
g ov
erflo
w fr
om th
e M
aize
Maz
e po
nd, s
hall
disc
harg
e in
to a
n ar
tific
ial w
ater
cour
se v
ia a
n em
erge
ncy
spill
way
des
igne
d to
car
ry fl
ood
even
ts.
DP.1
7
With
in tw
o m
onth
s of c
ompl
etio
n of
con
stru
ctio
n of
the
stor
mw
ater
syst
ems,
a ce
rtifi
cate
sign
ed b
y a
suita
bly
expe
rienc
ed
char
tere
d pr
ofes
siona
l eng
inee
r (CP
Eng)
cer
tifyi
ng th
at th
e st
orm
wat
er sy
stem
s hav
e be
en c
onst
ruct
ed in
full
acco
rdan
ce
with
the
desig
n, lo
catio
n an
d in
stal
latio
n sp
ecifi
catio
ns su
bmitt
ed in
Con
ditio
ns D
P.8-
DP.1
4 of
this
cons
ent,
shal
l be
subm
itted
to
the
Man
ager
.
Insp
ectio
ns, M
aint
enan
ce a
nd M
onito
ring
DP.1
8
The
Cons
ent H
olde
r sha
ll m
aint
ain
and
oper
ate
the
stor
mw
ater
trea
tmen
t dev
ices
in a
ccor
danc
e w
ith th
e ce
rtifi
ed
Stor
mw
ater
Ope
ratio
n an
d M
aint
enan
ce P
lan
subm
itted
in c
ompl
ianc
e w
ith G
ener
al C
ondi
tion
G.1
8.
DP.1
9
The
Cons
ent H
olde
r sha
ll in
spec
t the
stor
mw
ater
trea
tmen
t sys
tem
s, in
clud
ing
swal
es, i
nfilt
ratio
n ba
sins,
and
soak
age
pits
: (a
) At
leas
t onc
e ev
ery
six m
onth
s; a
nd
(b)
Afte
r eac
h ra
infa
ll ev
ent r
esul
ting
in m
ore
than
25
mill
imet
res o
f rai
nfal
l with
in th
e pr
evio
us 2
4 ho
urs.
22 O
ctob
er 2
013
47
Ref
Regi
onal
con
sent
con
ditio
ns
DP.2
0
Follo
win
g th
e in
spec
tion
carr
ied
out i
n Co
nditi
on D
P.19
, the
Con
sent
Hol
der s
hall
mai
ntai
n th
e st
orm
wat
er tr
eatm
ent
syst
ems,
incl
udin
g sw
ales
, inf
iltra
tion
basin
s, an
d so
akag
e pi
ts a
s fol
low
s:
(a)
Any
visib
le h
ydro
carb
ons,
litt
er o
r deb
ris in
the
stor
mw
ater
sys
tem
shal
l be
rem
oved
with
in fi
ve w
orki
ng d
ays o
f the
in
spec
tion.
(b
) An
y ac
cum
ulat
ed se
dim
ent i
n th
e st
orm
wat
er sy
stem
that
is li
kely
to d
ecre
ase
the
perf
orm
ance
of t
he st
orm
wat
er
trea
tmen
t and
or d
ispos
al sy
stem
shal
l be
rem
oved
with
in fi
ve w
orki
ng d
ays o
f the
insp
ectio
n.
(c)
Any
dam
age
that
has
the
pote
ntia
l to
lead
to a
dec
reas
e in
the
stor
mw
ater
trea
tmen
t, or
incr
ease
in e
rosio
n or
scou
r sh
all b
e re
paire
d w
ithin
five
wor
king
day
s of t
he in
spec
tion.
(d
) An
y m
inor
dam
age
or m
oder
ate
dam
age
that
is u
nlik
ely
to c
ause
a d
ecre
ase
in p
erfo
rman
ce o
f the
stor
mw
ater
syst
em
shal
l be
sche
dule
d fo
r rou
tine
mai
nten
ance
with
in th
e fo
llow
ing
thre
e m
onth
s of t
he in
spec
tion.
DP.2
1
The
Cons
ent H
olde
r sha
ll en
sure
that
the
swal
es a
nd in
filtr
atio
n ba
sins a
re:
(a)
Mai
ntai
ned
so th
at g
rass
/ veg
etat
ion
is in
a h
ealth
y an
d un
iform
stat
e;
(b)
Repl
ante
d w
here
ero
sion
or d
ie-o
ff ha
s res
ulte
d in
bar
e or
pat
chy
soil
cove
r; an
d (c
) M
owed
so g
rass
/ veg
etat
ion
is m
aint
aine
d to
a h
eigh
t bet
wee
n 50
mm
and
200
mm
.
DP.2
2
The
Cons
ent H
olde
r sha
ll ke
ep re
cord
s of a
ll in
spec
tions
, mai
nten
ance
and
mon
itorin
g. T
hese
reco
rds s
hall
incl
ude,
but
not
be
limite
d to
: (a
) Da
te a
nd d
etai
ls of
insp
ectio
ns o
f the
stor
mw
ater
syst
em;
(b)
Date
and
det
ails
of a
ny m
onito
ring
unde
rtak
en in
rela
tion
to th
is co
nsen
t; an
d (c
) Da
te a
nd d
etai
ls of
any
mai
nten
ance
wor
k, r
epai
rs a
nd u
pgra
des
to t
he s
torm
wat
er s
yste
m,
incl
udin
g re
mov
al o
f m
ater
ial a
nd it
s disp
osal
. Th
ese
reco
rds s
hall
be m
ade
avai
labl
e to
the
Cant
erbu
ry R
egio
nal C
ounc
il on
requ
est.
St
orm
wat
er T
reat
men
t Per
form
ance
Mon
itorin
g
DP.2
3
Follo
win
g 25
mm
of r
ain
in th
e pr
eced
ing
24 h
ours
and
at l
east
onc
e pe
r yea
r, in
spec
tions
shal
l be
mad
e to
obs
erve
the
exte
nt
of p
ondi
ng o
f wat
er a
t soa
kage
loca
tions
. W
here
pon
ding
long
er th
an 4
8 ho
urs i
s occ
urrin
g in
the
soil
med
ia in
firs
t flu
sh b
asin
s and
pon
ds, a
nd in
the
swal
e in
vert
of
the
bala
nce
of th
e Pr
ojec
t are
a, th
e Co
nsen
t Hol
der s
hall
initi
ate
a pr
ogra
mm
e to
rein
vigo
rate
the
soak
rate
thro
ugh
the
med
ia a
nd th
ough
the
swal
e in
vert
.
22 O
ctob
er 2
013
48
Ref
Regi
onal
con
sent
con
ditio
ns
DP.2
4
(a)
At le
ast o
nce
ever
y fiv
e ye
ars,
a re
pres
enta
tive
com
posit
e sa
mpl
e of
soil
shal
l be
take
n fr
om a
dep
th o
f 50
mill
imet
res a
t th
e lo
wes
t poi
nt o
f ele
vatio
n, fr
om th
e fo
llow
ing
loca
tions
:
Two
repr
esen
tativ
e sa
mpl
es o
f sw
ales
on
the
MSR
FL se
ctio
n
Two
repr
esen
tativ
e sa
mpl
es o
f sw
ales
from
the
CSM
2 se
ctio
n
One
sam
ple
each
from
the
Mai
ze M
aze
Pond
and
Ram
p Po
nds f
oreb
ay
O
ne sa
mpl
e ea
ch fr
om th
e M
aize
Maz
e Po
nd a
nd R
amp
Pond
s inf
iltra
tion
basin
(b
) Th
e so
il sa
mpl
es sh
all b
e an
alys
ed u
sing
the
Uni
ted
Stat
es E
nviro
nmen
tal P
rote
ctio
n Ag
ency
met
hod
1312
, Syn
thet
ic
Prec
ipita
tion
Leac
hing
Pro
cedu
re (S
PLP)
, usin
g re
agen
t wat
er, b
y a
labo
rato
ry a
ccre
dite
d by
Tel
arc
for t
his m
etho
d.
(c)
The
soil
sam
ples
shal
l be
anal
ysed
, usin
g th
e m
etho
d ou
tline
d ab
ove,
for t
he fo
llow
ing
cont
amin
ants
and
com
pare
d ag
ains
t the
Lea
chat
e Tr
igge
r Con
cent
ratio
ns a
s list
ed in
Con
ditio
n DP
.25:
Tota
l cop
per
To
tal z
inc
To
tal l
ead
Be
nzo(
a)py
rene
Tota
l pet
role
um h
ydro
carb
ons C
7-C9
To
tal p
etro
leum
hyd
roca
rbon
s C10
-C14
(d
) Th
e so
il sa
mpl
es sh
all b
e m
easu
red
in m
illig
ram
s per
litr
e (m
g/L)
. (e
) Th
e an
alys
es u
nder
take
n sh
all b
e ca
rrie
d ou
t with
det
ectio
n lim
its o
f a m
axim
um o
f 10
perc
ent o
f the
trig
ger l
evel
s for
to
tal c
oppe
r, zin
c, le
ad a
nd b
enzo
(a)p
yren
e an
d 0.
2 pe
rcen
t for
tota
l pet
role
um h
ydro
carb
ons.
(f)
Th
e re
sults
of t
he a
naly
ses s
hall
be p
rovi
ded
to th
e M
anag
er, w
ithin
two
mon
ths o
f sam
plin
g.
22 O
ctob
er 2
013
49
Ref
Regi
onal
con
sent
con
ditio
ns
DP.2
5
(a)
The
Cons
ent H
olde
r sha
ll co
mpa
re th
e re
sults
of a
naly
ses u
nder
take
n in
acc
orda
nce
with
Con
ditio
n DP
.24
with
the
follo
win
g tr
igge
r con
cent
ratio
ns:
Cont
amin
ant
Leac
hate
Trig
ger V
alue
s (m
g/L)
To
tal c
oppe
r
40
Tota
l zin
c
0.30
To
tal l
ead
0.
2 Be
nzo(
a)py
rene
0.01
4 To
tal p
etro
leum
hyd
roca
rbon
s C7-C
9 36
0 To
tal p
etro
leum
hyd
roca
rbon
s C10
-C14
7 (b
) Sh
ould
the
conc
entr
atio
n of
any
of t
he c
onta
min
ants
in th
e so
il sa
mpl
es e
xcee
d th
e tr
igge
r con
cent
ratio
ns, a
n in
vest
igat
ion
of th
e ex
tent
of t
he so
il co
ntam
inat
ion,
with
refe
renc
e to
the
abov
e tr
igge
r val
ues,
shal
l be
unde
rtak
en
unde
r the
supe
rvisi
on o
f a su
itabl
y qu
alifi
ed a
nd e
xper
ienc
ed p
erso
n an
d a
repo
rt o
n th
e co
ntam
inat
ion
prep
ared
with
in
thre
e m
onth
s of t
he fi
rst s
oil s
ampl
ing.
A c
opy
of th
at re
port
shal
l be
prov
ided
to th
e M
anag
er w
ithin
10
wor
king
day
s of
its re
ceip
t by
the
Cons
ent H
olde
r. (c
) Th
e vo
lum
e of
soil
iden
tifie
d as
con
tam
inat
ed in
the
abov
e re
port
shal
l be
rem
oved
and
repl
aced
with
unc
onta
min
ated
so
il w
ithin
six
mon
ths o
f pro
visio
n of
the
abov
e re
port
.
DP.2
6
Any
mat
eria
l rem
oved
dur
ing
mai
nten
ance
of t
he st
orm
wat
er sy
stem
s or i
n ac
cord
ance
with
Con
ditio
n DP
.24
shal
l be
disp
osed
of a
t a fa
cilit
y au
thor
ised
to re
ceiv
e su
ch m
ater
ial.
Li
aiso
n w
ith R
iver
Eng
inee
rs
DP.2
7
Prio
r to
oper
atin
g th
e di
scha
rge
valv
e at
the
Mai
ze M
aze
Pond
and
Ram
p Po
nds,
the
Cons
ent H
olde
r sha
ll lia
ise w
ith th
e Ca
nter
bury
Reg
iona
l Cou
ncil
‘Reg
iona
l Eng
inee
r’ an
d w
ith th
e CC
C ‘S
urfa
ce W
ater
Ope
ratio
ns M
anag
er’ t
o en
sure
the
disc
harg
e ra
te (u
p to
60
l/s) f
rom
the
Mai
ze M
aze
and
Ram
p po
nds e
mpt
ying
will
not
exa
cerb
ate
flood
ing
of th
e Ha
lswel
l Ri
ver d
rain
age
syst
em.
DP.2
8
Prio
r to
oper
atin
g th
e pu
mp
at R
obin
sons
Roa
d (in
acc
orda
nce
with
Con
ditio
n G
T.6)
, the
Con
sent
Hol
der s
hall
liaise
with
the
Selw
yn D
istric
t Cou
ncil
Asse
t Man
ager
to e
nsur
e th
e di
scha
rge
rate
from
the
Robi
nson
Roa
d pu
mp
stat
ion
will
not
exa
cerb
ate
flood
ing
of th
e Se
lwyn
Dist
rict C
ounc
il st
ock
wat
er ra
ce sy
stem
.
22 O
ctob
er 2
013
50
Ref
Regi
onal
con
sent
con
ditio
ns
DP.2
9
The
CRC
may
, onc
e pe
r yea
r, on
the
last
five
wor
king
day
s of N
ovem
ber o
r Apr
il, se
rve
notic
e of
its i
nten
tion
to re
view
the
cond
ition
s of t
his c
onse
nt fo
r the
pur
pose
of d
ealin
g w
ith a
ny a
dver
se e
ffect
on
the
envi
ronm
ent w
hich
may
aris
e fr
om th
e di
scha
rge
of g
roun
dwat
er to
the
Robi
nson
s Roa
d st
ockw
ater
race
and
whi
ch it
is a
ppro
pria
te to
dea
l with
at a
late
r sta
ge. T
he
scop
e of
the
revi
ew m
ay in
clud
e:
(i)
the
effe
cts o
f gro
undw
ater
disc
harg
e on
the
stoc
kwat
er ra
ce in
fras
truc
ture
;
(ii)
the
miti
gatio
n of
any
floo
ding
effe
cts a
ttrib
utab
le to
gro
undw
ater
disc
harg
e;
(iii)
the
timin
g fo
r disc
harg
e in
rela
tion
to ra
infa
ll ev
ents
; and
/or
(iv)
the
need
for t
he in
stal
latio
n of
det
entio
n fa
cilit
ies o
r mod
ifica
tion
to th
e ra
ce sy
stem
to in
crea
se c
apac
ity.
Advi
ce n
ote:
Th
is re
view
con
ditio
n do
es n
ot p
recl
ude
this
perm
it, o
r any
oth
er p
erm
it, b
eing
revi
ewed
as a
llow
ed fo
r by
sect
ion
128
of th
e Re
sour
ce M
anag
emen
t Act
. It h
as b
een
spec
ifica
lly in
clud
ed to
add
ress
the
pote
ntia
l of t
he d
ewat
erin
g of
the
Robi
nson
s Roa
d ov
erpa
ss c
ausin
g do
wns
trea
m fl
oodi
ng in
the
Robi
nson
s Roa
d w
ater
race
. Whe
re a
revi
ew is
und
erta
ken,
con
sulta
tion
shal
l be
unde
rtak
en w
ith th
e Se
lwyn
Dist
rict C
ounc
il As
set M
anag
er.
22 O
ctob
er 2
013
51
11
. R
eg
ion
al R
eso
urc
e C
on
sen
t C
on
dit
ion
s - C
on
sen
t co
nd
itio
ns
for
the d
isch
arg
e o
f d
ust
to a
ir d
uri
ng
co
nst
ruct
ion
of
the P
roje
ct
Di
scha
rge
perm
it to
disc
harg
e du
st to
air
beyo
nd th
e bo
unda
ry o
f the
Pro
ject
are
a.
The
cond
ition
s for
this
cons
ent a
re th
ose
gene
ral c
ondi
tions
set o
ut in
sect
ion
5.
12
. R
eg
ion
al R
eso
urc
e C
on
sen
t C
on
dit
ion
s - C
on
sen
t co
nd
itio
ns
for
the s
tora
ge a
nd
use
of
hazard
ou
s su
bst
an
ces
La
nd u
se c
onse
nt to
stor
e an
d us
e ha
zard
ous s
ubst
ance
s dur
ing
cons
truc
tion.
The
cond
ition
s for
this
cons
ent a
re th
ose
gene
ral c
ondi
tions
set o
ut in
sect
ion
5.
13
. R
eg
ion
al R
eso
urc
e C
on
sen
t C
on
dit
ion
s - C
on
sen
t co
nd
itio
ns
for
eart
hw
ork
s w
ith
in r
ipari
an
marg
ins
an
d a
ctiv
itie
s in
th
e b
ed
of
a s
tream
La
nd u
se c
onse
nt fo
r ear
thw
orks
with
in th
e rip
aria
n m
argi
n ad
jace
nt to
Upp
er K
nigh
ts S
trea
m.
La
nd u
se c
onse
nt fo
r rec
lam
atio
n/ d
istur
banc
e of
form
er st
ream
bed
.
The
cond
ition
s for
this
cons
ent a
re th
ose
gene
ral c
ondi
tions
set o
ut in
sect
ion
5.
22 O
ctob
er 2
013
52
14
. D
istr
ict
Reso
urc
e C
on
sen
t C
on
dit
ion
s –
Acr
on
ym
s an
d T
erm
s U
sed
in
Co
nd
itio
ns
The
tabl
e be
low
pro
vide
s exp
lana
tion
to a
num
ber o
f the
acr
onym
s and
term
s use
d in
the
cond
ition
s:
Def
initi
ons
AEE
Mea
ns th
e CS
M2
and
MSR
FL (“
Proj
ect”
) Ass
essm
ent o
f Effe
cts o
n th
e En
viro
nmen
t (V
olum
e 2)
dat
ed N
ovem
ber 2
012
CEM
P M
eans
the
Cons
truc
tion
Envi
ronm
enta
l Man
agem
ent P
lan
Coun
cil
Mea
ns th
e re
leva
nt te
rrito
rial a
utho
rity
(Sel
wyn
Dist
rict C
ounc
il or
Chr
istch
urch
City
Cou
ncil)
Cons
ent H
olde
r M
eans
the
New
Zea
land
Tra
nspo
rt A
genc
y
Com
men
cem
ent
of W
orks
M
eans
the
time
whe
n th
e w
orks
that
are
aut
horis
ed b
y th
e re
sour
ce c
onse
nts c
omm
ence
Man
ager
M
eans
the
Regu
lato
ry M
anag
er o
f the
rele
vant
terr
itoria
l aut
horit
y (S
elw
yn D
istric
t Cou
ncil
or C
hrist
chur
ch C
ity C
ounc
il)
Proj
ect
Mea
ns th
e co
nstr
uctio
n, o
pera
tion
and
mai
nten
ance
of t
he C
hrist
chur
ch S
outh
ern
Mot
orw
ay S
tage
2 (C
SM2)
, and
the
wid
enin
g an
d up
grad
ing
of S
H1 M
ain
Sout
h Ro
ad b
etw
een
Robi
nson
s Roa
d an
d Ro
llest
on to
pro
vide
a fo
ur-la
ne m
edia
n se
para
ted
expr
essw
ay (M
ain
Sout
h Ro
ad F
our L
anin
g kn
own
as M
SRFL
), an
d in
clud
es a
ssoc
iate
d lo
cal r
oad
wor
ks, i
nclu
ding
ne
w re
ar a
cces
s roa
ds
RMA
Mea
ns th
e Re
sour
ce M
anag
emen
t Act
199
1
Wor
k M
eans
any
act
ivity
or a
ctiv
ities
und
erta
ken
in re
latio
n to
the
cons
truc
tion
and
oper
atio
n of
the
Proj
ect
22 O
ctob
er 2
013
53
15
. D
istr
ict
Reso
urc
e C
on
sen
t C
on
dit
ion
s fo
r th
e N
ati
on
al En
vir
on
men
tal St
an
dard
for
Ass
ess
ing
an
d M
an
ag
ing
C
onta
min
ants
in
Soil
to P
rote
ct H
um
an
Healt
h l
an
d u
se c
on
sen
ts
La
nd u
se c
onse
nt fo
r the
sam
plin
g an
d di
stur
banc
e of
soil
and
chan
ge in
land
use
with
in la
nd id
entif
ied
as H
azar
dous
Act
iviti
es In
dust
ries L
ist
(HAI
L) si
tes i
n th
e Se
lwyn
Dist
rict a
nd C
hrist
chur
ch C
ity
Ref
Dis
tric
t con
sent
con
ditio
ns
CL.1
Ex
cept
as m
odifi
ed b
y th
e co
nditi
ons b
elow
, and
subj
ect t
o fin
al d
esig
n, th
e Pr
ojec
t sha
ll be
und
erta
ken
in g
ener
al a
ccor
danc
e w
ith
the
info
rmat
ion
prov
ided
by
the
Cons
ent H
olde
r in
the
Reso
urce
Con
sent
App
licat
ion
date
d N
ovem
ber 2
012
and
supp
ortin
g do
cum
ents
bei
ng:
(a)
Asse
ssm
ent o
f Env
ironm
enta
l Effe
cts r
epor
t, da
ted
Nov
embe
r 201
2 (b
) Pl
an se
ts:
i. La
yout
Pla
ns: 6
2236
-A-C
020-
C029
& 6
2236
-B-C
020-
C025
, C02
6-C0
27 re
v 1,
C02
8-C0
35, C
036
rev
1, C
037-
C038
ii.
Pl
an a
nd L
ongi
tudi
nal S
ectio
ns: 6
2236
-A-C
100-
C107
, C11
0-C1
13, C
120,
C13
1-C1
33 &
622
36-B
-C10
1-C1
12, C
115,
C12
0-C1
21,
C125
-C12
6, C
130
rev
1, C
135-
C136
, C14
0-C1
45, C
160-
C163
iii
. Ty
pica
l Cro
ss S
ectio
ns: 6
2236
-A-C
171-
C173
& 6
2236
-B-C
171-
C173
iv
. Pa
vem
ent S
urfa
ces:
622
36-A
-C25
0-C2
52, C
253
rev
1 &
622
36-B
-C25
0-C2
51, C
252-
C253
rev
1, C
254-
C255
v.
Cy
cle
Path
Pla
ns: 6
2236
-B-C
315-
C316
vi
. Dr
aina
ge L
ayou
t Pla
ns: 6
2236
-A-C
401,
C40
2-C4
03 re
v 1,
C40
4-C4
06, C
408
rev
1, C
411
rev
1, C
412
rev
2 &
622
36-B
-C40
1-C4
02
rev
1, C
403-
C404
, C40
5- re
v 1,
C40
6-40
7 re
v 2,
C40
8, C
409-
C412
rev
1, C
413,
C41
4 re
v 1,
C41
5, C
416-
C417
rev
1, C
425-
C426
re
v 1
vii.
Drai
nage
Det
ails:
622
36-A
-C45
1, C
453-
C454
, C46
1-C4
63 re
v 1
& 6
2236
-B-C
451-
C455
, C46
1-C4
66 re
v 1
viii.
Sig
nage
Pla
ns: 6
2236
-A-C
501-
C508
& 6
2236
-B-C
501-
C505
, C50
6-C5
07 re
v 1,
C50
8-C5
15, C
516
rev
1, C
517
ix.
Land
Req
uire
men
t Pla
ns: 6
2236
-A-C
1101
-C11
09, C
1110
rev
1 &
622
36-B
-C11
01-C
1105
, C11
06-C
1107
rev
1, C
1108
-C11
15,
C111
6 re
v 1,
C11
17-C
1118
x.
St
ruct
ural
Pla
ns: 6
2236
-A-S
000,
S01
1-S0
12 &
622
36-B
-S00
0, S
011-
S013
, S02
1-S0
23, S
031-
S032
, S04
1-S0
43, S
051-
S053
, S06
1-S0
63, S
071-
S072
, S08
1-S0
83
xi.
Land
scap
e Pl
antin
g Pl
ans:
622
36-A
-L01
1-L0
19 re
v 1
& 6
2236
-B-L
011-
L015
rev
1, L
016-
L017
rev
2, L
018-
L024
rev
1, L
025
rev
2,
L026
-L02
8 re
v 1
xii.
Ligh
ting
Plan
s: 1
6.00
1630
, she
ets 1
-20
22 O
ctob
er 2
013
54
Ref
Dis
tric
t con
sent
con
ditio
ns
Whe
re th
ere
is co
nflic
t bet
wee
n th
e do
cum
ents
lodg
ed a
nd th
e co
nditi
ons,
the
cond
ition
s sha
ll pr
evai
l.
CL.2
Pu
rsua
nt to
sect
ion
125(
1) o
f the
RM
A, th
is co
nsen
t sha
ll la
pse
15 y
ears
from
the
date
of i
ts c
omm
ence
men
t (pu
rsua
nt to
Sec
tion
116(
5) o
f the
RM
A) u
nles
s it h
as b
een
give
n ef
fect
, sur
rend
ered
or b
een
canc
elle
d at
an
earli
er d
ate.
CL.3
At
leas
t thr
ee m
onth
s prio
r to
the
com
men
cem
ent o
f the
rele
vant
stag
e or
stag
es o
f wor
k, th
e Co
nsen
t Hol
der s
hall
subm
it in
form
atio
n to
the
Man
ager
to d
emon
stra
te th
at th
e pr
opos
ed c
ertif
ier (
requ
ired
by C
ondi
tion
CL.4
) is i
ndep
ende
nt, s
uita
bly
qual
ified
an
d ex
perie
nced
. Wor
ks sh
all n
ot p
roce
ed u
ntil
appr
oval
from
the
Man
ager
is o
btai
ned.
If
the
Man
ager
doe
s not
app
rove
the
pers
on(s
) pro
pose
d by
the
Cons
ent H
olde
r, re
ason
s sho
uld
be p
rovi
ded
to in
dica
te w
hy th
e pe
rson
(s) i
s not
con
sider
ed to
be
suita
ble.
W
ith th
e pr
ior a
gree
men
t of t
he M
anag
er, t
he in
depe
nden
t cer
tifie
r may
be
chan
ged
at a
ny st
age
in th
e Pr
ojec
t.
CL.4
(a
) Al
l wor
ks sh
all b
e ca
rrie
d ou
t in
gene
ral a
ccor
danc
e w
ith th
e re
leva
nt S
peci
alise
d En
viro
nmen
tal M
anag
emen
t Pla
n (“
SEM
P”)
requ
ired
by th
ese
cond
ition
s.
(b)
The
SEM
P lis
ted
bel
ow w
ill b
e pr
epar
ed a
nd fi
nalis
ed b
y th
e Co
nsen
t Hol
der:
i. SE
MP
008
Soil
Cont
amin
atio
n Di
scov
ery,
Inve
stig
atio
n an
d Ex
cava
tion
Man
agem
ent P
lan
(c)
The
SEM
P sh
all b
e ce
rtifi
ed b
y an
inde
pend
ent,
suita
bly
qual
ified
and
exp
erie
nced
per
son(
s) (a
ppro
ved
by th
e M
anag
er a
s bei
ng
com
pete
nt a
nd su
itabl
e to
pro
vide
such
cer
tific
atio
n as
per
Con
ditio
n CL
.3),
at le
ast 4
0 w
orki
ng d
ays p
rior t
o th
e co
mm
ence
men
t of c
onst
ruct
ion
of th
e re
leva
nt st
age
or st
ages
. If c
hang
es a
re re
ques
ted
by th
e ce
rtifi
er th
ese
chan
ges s
hall
be
mad
e be
fore
the
cert
ifica
tion
is co
nfirm
ed.
(d)
The
cert
ifica
tion
shal
l con
firm
the
Soil
Cont
amin
atio
n Di
scov
ery,
Inve
stig
atio
n an
d Ex
cava
tion
Man
agem
ent P
lan
addr
esse
s the
m
atte
rs li
sted
in C
ondi
tion
CL.7
bel
ow.
(e)
This
cert
ifica
tion
shal
l be
prov
ided
to th
e Co
nsen
t Hol
der a
nd th
e M
anag
er a
t lea
st 1
0 w
orki
ng d
ays p
rior t
o th
e co
mm
ence
men
t of c
onst
ruct
ion
of th
e re
leva
nt st
age
or st
ages
. (f)
W
here
a m
anag
emen
t pla
n(s)
is to
be
subm
itted
in a
stag
ed m
anne
r as a
resu
lt of
the
stag
ing
of c
onst
ruct
ion
wor
ks,
info
rmat
ion
abou
t the
pro
pose
d st
agin
g sh
all b
e su
bmitt
ed.
Advi
ce N
ote:
A
20 w
orki
ng d
ay tu
rnar
ound
tim
e is
inte
nded
for t
he m
anag
emen
t pla
n ce
rtifi
catio
n pr
oces
s.
CL.5
W
orks
shal
l not
pro
ceed
unt
il th
e re
leva
nt m
anag
emen
t pla
n an
d ce
rtifi
catio
n de
scrib
ed in
Con
ditio
n CL
.4 h
ave
been
rece
ived
and
ac
know
ledg
ed in
writ
ing
by th
e M
anag
er. I
f writ
ten
ackn
owle
dgem
ent i
s not
pro
vide
d by
the
Coun
cil w
ithin
10
wor
king
day
s of t
he
Cons
ent H
olde
r sen
ding
the
cert
ifica
tion,
the
cert
ifica
tion
shal
l be
deem
ed to
be
conf
irmed
.
22 O
ctob
er 2
013
55
Ref
Dis
tric
t con
sent
con
ditio
ns
CL.6
Th
e Co
nsen
t Hol
der m
ay m
ake
amen
dmen
ts to
the
man
agem
ent p
lan
at a
ny ti
me.
Any
cha
nges
to th
e m
anag
emen
t pla
n sh
all r
emai
n co
nsist
ent w
ith th
e ov
eral
l int
ent o
f the
man
agem
ent p
lan
and
shal
l be
cert
ified
by
the
agre
ed in
depe
nden
t cer
tifie
r, as
per
the
requ
irem
ents
out
lined
in C
ondi
tion
CL.4
. The
Con
sent
Hol
der s
hall
prov
ide
a co
py o
f any
such
am
endm
ent t
o th
e m
anag
emen
t pla
n an
d ce
rtifi
catio
n to
Cou
ncil
for i
nfor
mat
ion,
prio
r to
givi
ng e
ffect
to th
e am
endm
ent,
or w
ithin
15
wor
king
day
s.
CL.7
Th
e So
il Co
ntam
inat
ion
Disc
over
y, In
vest
igat
ion
and
Exca
vatio
n M
anag
emen
t Pla
n (S
EMP
008)
shal
l out
line
mea
sure
s to
iden
tify
actio
ns re
quire
d fo
r any
con
tam
inat
ion
disc
over
ed w
hich
shal
l inc
lude
, but
nee
d no
t be
limite
d to
, the
follo
win
g:
(a)
Met
hods
for m
anag
ing
exca
vatio
n an
d st
orag
e of
soil
(incl
udin
g er
osio
n an
d se
dim
ent c
ontr
ols a
nd d
ust c
ontr
ols
(b
) M
etho
ds fo
r man
agin
g tr
ansp
ort,
disp
osal
(at a
n ap
prop
riate
faci
lity)
and
trac
king
of s
oil a
nd o
ther
mat
eria
l tak
en a
way
from
sit
e;
(c)
Safe
ty m
easu
res d
urin
g th
e w
ork
(app
ropr
iate
PPE
); (d
) Ho
w sp
ills a
nd e
miss
ions
from
any
such
are
as sh
all b
e m
anag
ed;
and
(e
) Pr
oced
ures
for c
onsu
ltatio
n w
ith th
e re
leva
nt te
rrito
rial a
utho
rity.