Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
1
Chestnut Hill Subdivision Design Guidelines (updated on 8.26.2018)
Chapter 1: Architectural Review Committee Intent
A. INTENT OF THE ARCHITECTURAL REVIEW COMMITTEE
The function of the Architectural Review Committee (the ARC) is designed for the enforcement
of the Design Guidelines. The Design Guidelines have been established to provide property
owners, designers, and contractors with parameters for the preparation of architectural plans and
specifications. The performance of its duties with respect thereto shall be on a best effort basis -
to reasonably protect the aesthetics and property values within Chestnut Hill and the health,
safety and welfare of all the property owners therein as a community.
The design guidelines described herein shall not take precedent over any other design guidelines
or specifications that may not directly correlate with the Covenants, Conditions & Restrictions
filed with the Madison County Chancery Clerk.
Any person or party owning any lot in Chestnut Hill understands and agrees to the terms and
criteria set forth and agrees to be governed thereby.
B. GENERAL OVERVIEW OF THE ARCHITECTURAL REVIEW COMMITTEE
While the ARC will encourage creativity within the context of the requirements of the Covenants
and Design Guidelines, it is important to note that the authority to approve or deny any plan rests
solely with the ARC. The intent is not to dictate a specific architectural style, but rather
encourage a harmonious aesthetic in the community that will reflect high quality design and
craftsmanship as well as help maintain and improve property value. The aesthetic review and
approval of all design improvements is the initial critical step in obtaining all permits related to
construction. There are certain key elements of the application package that the committee will
always scrutinize:
1. The suitability of the house for the site on which it is being planned as well as the sensitivity
to the existing landscape of each site. 2. The harmony of the architectural style, exterior materials, and proposed footprint, with
adjacent houses and houses in the neighborhood.
3. Excellence of architectural design and properly executed and detailed construction documents.
4. The location of drives, walks, walls, fences, porches, decks, outside compressors, etc.
with respect to any possible impact on adjacent properties.
Chapter 2: General Overview of the Review Process
You are encouraged to contact the ARC (Architectural Review Committee) early in the planning
stage of your home. This meeting will provide you with an opportunity to ask questions, explain
any circumstances unique to your project, and should help expedite the permitting process. The
Committee will provide assistance and guidance in the preparation of the application.
Final design approval shall be effective for a period of six (6) months from the final
2
approval date upon the approved set of plans. Commencement of construction shall begin
within that 6 month approval window and be completed within 18 months or the design
shall require re-approval. The application for approval, fees and all other materials specified
herein for Committee consideration shall be sent to the following people in this order:
1. An Application Fee of $1,000 and a Damage Deposit of $2,000 should be mailed to
Stephanie Wilson at 106 Chestnut Hill Rd, Flora, MS 39071. Fees must be received
BEFORE any plans will be reviewed. In addition, HOA annual dues and any fees must be
current.
2. PDFs of plans should be emailed to [email protected] two weeks prior to the next
scheduled ARC meeting. This is to allow the committee time to review the plans before the
meeting.
3. Application and 3 sets of construction plans should be dropped at the office of Specialty
Management located at 700 Avignon Drive, Suite A-2, Ridgeland, MS 39157, between 9:00
am – 3:00 pm. (Phone: 601-605-8380) Plans must be received 2 weeks in advance of the
next scheduled ARC meeting in time to be reviewed by the consulting architect.
It is the sole responsibility of the Property Owner to acquaint his or her architects, advisors and
Contractors with the architectural review process and the Architectural Design Guidelines,
compliance with the design review process and the architectural design guidelines being the
joint and several obligations of the Property Owner and his agents and contractual participants.
Compliance with all local and state governmental regulations and obtaining all necessary
permits and fees shall be the obligation of the Property Owner. A fee of $1,000 payable to
Chestnut Hill HOA is required with the Application to offset the cost of architectural
consultants for the ARC. Additional charges above the $1,000 fee may be incurred if plan
changes are submitted during the review process and after the final approval is given.
The ARC shall not consider applications from parties who do not own a lot in Chestnut Hill.
Below is a list composed of the requirements for your application package. This list shall be
complete before the ARC members will review your application.
1. SITE ANALYSIS
(a) TOPOGRAPHICAL AND TREE SURVEY: One of the first steps in preparing a site
analysis is obtaining a Topographical/Tree Survey (Tree Survey as needed refer to CC&Rs) and
Boundary Survey for the property. The Tree Survey must be dated within twenty-four (24)
months of its submittal. This survey must be at 1” = 20’-0” scale and should include the
following:
1. Recorded property lines, easements and setbacks.
2. The topographical contours of the lot (2’ contour).
3. The location, genus and species of all trees in excess of 6” in diameter at 4’ height.
4. Any prominent natural features of the site.
5. Utility locations and other easements.
(b) PROPOSED SITE DEVELOPMENT: This analysis should be drawn on a copy of the
Topographical/Tree Survey and should include, but is not limited to the following:
3
1. Building footprint, pool, walks, driveways, decking locations, etc.
2. Existing drainage patterns
3. Site access from right-of-way
4. Dumpsters and portable toilets
5. All existing trees
6. Trees to be removed
7. Site lighting
8. Relationship to adjacent site features i.e.: lake edge, etc.
All variances must be brought to the attention of the ARC during the review process. Certain
variances may also require the approval of the County of Madison, Mississippi.
2. PLANNING THE PROJECT
The house plan and the lot should be mutually compatible. The two must work in harmony;
certain styles of houses are simply not suitable for certain lots. Below is a sample checklist of
some of the things you will want to consider:
• Basements
• Views from your house and your neighbors.
• Size of house.
• Orientation of house on lot.
• Size of nearby houses.
• Location of decks or patios.
• Location of neighbor’s decks or patios.
• Drainage.
• Driveway and parking facilities.
• Setbacks and easements.
• Architecture design
• Architecture of neighboring house
• Colors and Materials
• Trees and rocks
• Location of outside compressor (heat pump)
• Retaining walls
• Fences
• Sewer Grinder Pumps (Specific stats required by Bear Creek Water)
• Swimming pools
Since all exterior construction projects in the subdivision require a permit, it will save both time and
money if you can plan for and include on your initial application any fences, screens, retaining or privacy
walls, swimming pools, irrigation systems, etc.
4
3. PERMITTING PROCESS
The ARC meets on the 3rd Thursday of each month (please check to verify dates). Two weeks
PRIOR to the meeting week, the building permit application, three (3) sets of the house plans,
ARC specification sheet, all submittal fees, and all other required documents and material/color
samples must be submitted. A complete checklist of the requirements is in –Appendix 2
Reference ‘A’ of these Design Guidelines.
All HOA Fees must be current prior to submitting plans. PDF versions of plans are required
and should be submitted electronically to [email protected], two weeks PRIOR to the
meeting week.
The most important documents, as well as the ones which generally require the greatest amount
of planning and preparation include.
1. Architectural Plans with Initialed Checklist – Appendix 2 Reference “A”
2. Site Plan with Initialed Checklist (to include grading & drainage Plan) –
Appendix 2 Reference “A”
3. Landscape Plan with Initialed Checklist – Appendix 2 Reference “A”
4. Selection of contractor with Builders Application – Appendix 1 Form A
The importance of the remaining paperwork is not de-emphasized, but the above items are the
ones that most commonly create last-minute delays. Chapter 3: Rules and Regulations 1. PERMITS
Architectural Review Committee Permits shall be required for all permanent and temporary
construction, additions, revisions, blasting, removal, or demolition within the subdivision
including, but not limited to the following:
Changing exterior colors, lot clearance, residential homes and buildings, decks, porches, steps,
storage buildings, carports, garages, driveways, sidewalks, patios, retaining walls, pump
stations, irrigation systems, above ground propane tanks, solar
energy systems, geothermal energy systems, swimming pools, swimming pool buildings,
fences, commercial buildings, recreational buildings, public buildings, parking lots, access
streets and roads, tennis courts, racquetball courts, baseball, soccer, and football fields,
cemeteries, cutting and filling, flag poles, antennas, landscaping structures, temporary
construction, trailers within subdivisions, and all other forms of temporary or permanent
construction with the exception of landscaping and gardening.
All permits issued by the ARC shall be in compliance with the Declaration, the Protective
Covenants and any additional rules, regulations or standards adopted by the ARC. The ARC
office will process all applications and issue all permits approved by the ARC.
A Lot Clearing Permit is available only for clearing an undeveloped lot of undergrowth and
trees with a trunk diameter of three inches or less (measured not more than six inches from the
ground). A Lot Clearing Permit is not required in connection with a building permit.
5
Open burning is permitted only during construction phase and only by approval of ARC.
Burn ban laws of Madison County must be followed including any temporary burn bans
in effect before, during and after construction phase.
2. STANDARD CODES
The design and construction of all buildings and the issuance of permits for same shall be in
accordance with the International Residential Code approval, (hereinafter referred to as the
IRC), or other codes as adopted by the County of Madison.
(A) Structural: All structural design and construction of buildings shall be in accordance
with the IRC or by the American National Standards Institute, Inc., (hereinafter referred to as
the “A.N.S.I. Code”, whichever is stricter).
(B) Electrical: All electrical installations shall conform to the National Electrical Code, by
the National Fire Protection Association, (hereinafter referred to as the “National Electrical
Code”).
(C) Mechanical: All mechanical installations, including, but not limited to, heating,
ventilating, and air conditioning systems shall be in accordance with the appropriate local codes.
(D) Plumbing: All plumbing installations shall conform to the Standard Plumbing
Code, by the appropriate local codes.
(E) Fireplaces and wood heating systems: All airtight fireplace and wood heating systems
shall meet the following requirements:
1. Wood heaters, fireplace inserts, airtight free-standing wood heaters, and airtight fireplace
inserts shall meet the safety standards of one of the following listed organizations:
Underwriters Laboratories (UL)
International Conference of Building Officials (IBCO)
International Residential Code (IRC)
2. Pre-fabricated chimneys and flues, chimney pipes and accessories shall be UL- labeled.
3. All airtight fireplaces shall have an outside combustion air supply.
4. Installation of all heating units, ductwork, chimneys and flues shall be in accordance with
the manufacturer’s recommendations for installation and use.
5. Construction of all fireplaces, chimneys, and heating systems, as outlined above, must be in
accordance with the International Residential Code.
The ARC has adopted these standards for construction, but it does not inspect or assume
responsibility for compliance, this is done by the County of Madison. However, prior to a
final observation and permission for occupancy by the ARC, the Certificate of Compliance,
must be executed by the Contractor and Sub-Contractors involved, certifying that the work and
materials are in accordance with the applicable codes. Although not required by the ARC,
the property owner may obtain independent inspections and certifications for each step in
the construction process.
6
3. TIME FOR COMPLETION OF SINGLE FAMILY DWELLINGS
Construction activities must start within 6 months of the issuance of the permit. Failure to begin
work within this time frame may cause your permit to be revoked and all assessments and
deposits forfeited. Beginning with the date of issuance of the permit:
The interior and exterior shall be completely finished, final grading, drainage, foundation
landscaping, and ground cover completed, within eighteen (18) months.
No final inspection will be performed until the ARC Office has received the
Certificate of Occupancy.
4. FOUNDATIONS
Site-specific foundation investigations are encouraged, but not required for lightly loaded
residences. In the absence of site-specific foundation studies, great care should be taken in the
design of the foundation to insure the adequacy and structural integrity of the building.
Foundations of any structures constructed within the 100 Year flood line shall be designed to
withstand flood conditions and forces.
5. BUILDING SETBACK LIMITATIONS
Building setbacks are available from the ARC and should be verified by the owner prior to
advancing on the design process. Although these setback limitations are site specific, absent
such stipulations the following are typical setback dimensions as measure perpendicular from
the appropriate property line:
Sixty (60) feet front setback
Twenty (20) feet side setback, Forty (40) feet if on street side (corner lot)
Fifty (50) feet rear setback
Forty (40) feet lake setback
6. SITE PLAN REQUIREMENTS
All Site Plans must conform to the requirements as follows:
(a) Checklist, Existing Conditions: (Refer to Appendix 2)
Bearings and Distances shall be based on an actual field survey, not copied from the Record
Plot.
• All easement dimensions shall be shown and notated.
• All building setback dimensions, including recreational area setbacks, shall be shown and
notated.
• Lot corners must be noted as either found or set.
• All existing utilities shall be shown and plotted to scale based on an actual field survey.
• Locate and show outline of house on adjoining lot or make note that no house is present.
• Topo at 2 foot intervals based on actual field survey.
7
• Locate centerline of existing road and show width.
• Size: 24” x 36” or same size as other blueprints
• Scale: 1” = 10 feet (Unless an alternative scale has received prior approval from the ARC
Office). *Use a scale of 1”= 20’ for lots 1 acre or larger.
(b) Checklist, Proposed Improvements: (Refer to Appendix 2)
1. Stake house corners (4 to 6 points), and show all other proposed improvements—decks,
heat/air units, concrete pads, patios, driveways, porches, fences, swimming pools and aprons,
sewage tank, sewer stub-out, walks, soil erosion structure, retaining walls, etc.
2. Show proposed location of conduit under driveway for cable TV.
3. Show proposed basement, finish floor, and garage elevations.
4. Show distance from the closest point of the proposed house, including projections, roof
overhangs, porches, driveways, sidewalks, concrete pads and patios, on each side to the property
line. This measurement must be perpendicular to the property line. Then show the distance down
the property line to the property corner.
5. Projections and overhangs shall not encroach into easements.
6. Show any needed swales or other drainage control measures to properly control water runoff
during construction and after completion.
(c) Sign – Seal – Deliver:
Three (3) copies of the Site Plan with original seal and signature must be delivered to the ARC
drop off location.
7. GENERAL
(a) Licensed Professional:
The terms “registered architect”, “architect”, “registered professional engineer”, “engineer”,
“registered landscape architect”, or “landscape architect” as used herein shall mean that such
professional is licensed to practice or allowed to practice in the State of Mississippi by authority
of said state. An approved Energy Auditor shall mean that such professional is licensed and has
been preapproved by the ARC. When said professional’s design, inspection, certification, or
approval is required, that professional’s signed and dated seal shall be affixed to said documents.
Building plans, at a reasonable scale, and building specifications, which shall be prepared by or
certified by an architect and shall include the location, nature, shape, height, materials, type of
construction floor plans and elevations, gross square footage and other characteristics for
State law requires that contractors be licensed by the State of Mississippi Licensing Board. A copy
of the contractor’s license shall be on file with the ARC Administrator’s office.
The use of unlicensed contractors, overseers, consultants, superintendents, etc. will be cause for
denial or revocation of permit.
(b) Flood Plain Conditions:
The ARC requires a flood certificate from licensed engineer prior to construction of all lots
and/or parcels within a flood plain. Any permanent facilities or equipment subject to flood
damage must be located above, or flood-proofed to, the 100-year flood plain elevation, as
applicable at that site.
No building or structure shall be erected, and no existing building or structure shall be extended
8
or moved, unless the lowest habitable finished floor of said building or structure is placed at least
two (2) feet above the elevation of the 100-year flood plain elevation.
(c) Minimum Square Footage:
The minimum square footage of all heated floor areas per dwelling unit for residences is 3,500
square feet. For two story dwellings, the floor at street grade shall contain at least one-half (1/2)
of the minimum square footage, exclusive of open porches and garages.
8. RETAINING WALLS
All retaining walls with a maximum height of more than three (3) feet above grade must be
designed and inspected by a registered professional engineer or architect. The construction of all
retaining walls shall be in accordance with the plans as designed and permitted and shall be
inspected by the registered professional engineer or architect, or their representative, and
approved, with evidence thereof submitted to the ARC.
All walls shall be in accordance with all applicable building codes. The safety and structural
integrity of the retaining wall is the responsibility of the property owner and contractor.
Walls such as those used in landscaping, which are subject to low levels of horizontal pressure,
and which are over three (3) feet in height, require a permit from the County of Madison,
Mississippi.
Retaining walls shall be built of durable materials, including, but not limited to, reinforced
concrete, steel, pressure treated-wood, stone, brick, and other approved materials.
Finishes for retaining walls shall be in neutral tones. No bright or fluorescent colors are
permitted.
9. HEATING/COOLING AIR UNITS AND PADS
Units should be placed in an area having minimal negative impact on adjoining properties. No
unit or pad is to encroach into the utility easements.
10. RADIO AND TELEVISION ANTENNAS
A permit shall be required for each exterior antenna. Application for permits shall include:
Drawing showing location, type and size;
Description of permanent screening;
Complete specifications;
Compliance with FCC Regulations, particularly regarding electromagnetic interference.
Justification for need.
11. IRRIGATION SYSTEMS
If a lawn sprinkler system is planned or anticipated, the location of the piping should be shown
on the Site Plan. If the routing of the sprinkler system is not known at the time the permit
application is submitted, it should be noted and discussed with the ARC prior to install. Lawn
9
sprinkler systems require the installation of a reduced pressure back flow preventer when
connected to a potable water system (often, a larger water service is needed).
You may use the utility easement, building setback areas, or the street right of way (areas not
used for vehicular or pedestrian travel) to place sprinkler systems. However, property owners
are cautioned that any damage done to, or caused by the sprinkler system being placed in these
areas, as the result of utility work, mowing, or vehicles parked on the right-of-way, or for any
other reason or use, is strictly the responsibility of the property owner. Said property owner
agrees to indemnify and hold harmless the Developer and HOA from any liabilities or damages.
The sprinkler system should be installed and maintained in such a manner as to prevent water
being sprayed on the traveled portion of the street right-of- way. In the event HOA requires that
the sprinkler system be removed from the street right-of-way for any reason, the property owner
shall promptly comply and remove the system.
12. EROSION AND DRAINAGE CONTROL
Erosion and drainage control measures shall be maintained during and after construction.
Measures shall be taken to ensure that any excessive run-off, silt, and sediment is contained and
not allowed to contaminate adjoining properties and common areas. Except in extreme
circumstances, a properly installed silt fence is usually adequate. The silt fence shall be
properly installed and maintained in order to trap silt and shall not allow silt or debris to be
washed over, under or around the fence.
Water drainage shall also be controlled during and after construction, and provisions for this
should be planned at the time at which the house is being oriented. Water must not be allowed
to:
• Run onto the streets.
• Run across the street to other properties.
• Be unnecessarily and unreasonably diverted to adjacent properties.
In most instances, these objectives can be accomplished by properly utilizing the utility and
drainage easements, natural swales, and the ditch at the roadway. Some drives may require a
grate or swale to divert water into the ditch-way. The driveway tile must be cleaned out and
maintained by property owner.
When installing a drain tile the full width of the lot, approval must come from the ARC.
A “Temporary Limestone Gravel Construction Drive” is required during construction to
keep mud out of the street during construction and provides a hard base when the drive
is installed. Must be installed before any construction has begun.
Chapter 4: Design Guidelines
The proper integration of the site and form, color, materials, architectural language, etc. is a key
to the design objective of these guidelines.
1. AESTHETIC DESIGN OF BUILDINGS
10
All buildings and structures shall meet the minimum requirements for aesthetics as established
by the ARC, including, but not limited to, the following:
(a) Windows: Windows on homes built in Chestnut Hill are required to have muntin bars
unless the ARC deems them not necessary due to the design and style of the home. Window
and door muntin bars must be true or simulated divided lights which are appropriate to the
architectural style of the house. Snap-in or removable mullions/ grids are strictly prohibited.
(b) Window Shutters: When shutters are used they must be appropriate to the architectural
design and style of the home. Shutters must be sized to match the window opening and will be
mounted on hinges. “False” decorative shutters which mount directly to the wall and shutters
which do not match the height and the ½ the width of the window opening are not acceptable.
False shutters are acceptable but, must be recessed and appear to be operable with proper hinges.
Shutters for doubled or grouped windows are not acceptable unless they are actually sized to
match the total width of the opening.
(c) Colors: All exterior colors shall be neutral and/or soft tones and blend harmoniously
with the neighborhood. Exterior components such as front doors and shutters may be an accent
color if such color(s) complement the exterior colors. No colored metal roofs are permitted. No
colored clay tile roofs are permitted.
(d) Materials: The use of natural materials such as wood, stucco, stone and brick are encouraged.
Fiber cement siding, such as James Hardie, is acceptable. Chimney surfaces must be brick,
stone, or stucco - no siding. Windows and doors must be wood or wood clad, no vinyl. None
of the following exterior finish materials shall be allowed: concrete block, clay block, asphalt
siding, asphalt shingle siding, vinyl siding, or EIFS (synthetic stucco).
(e) Roofing: Roofing materials shall be architect grade shingle (30 yrs. Min.), wood shakes or
shingles, slate/slate select. Metal accents may be allowed on roof but must be approved by the
ARC. Any material other than those listed will be approved only at the discretion of the ARC.
Roof penetrations for venting should be located away from dominant views toward the structure,
where feasible and be painted to match or complement the roof color.
(f) Harmony with Surroundings: The ARC will review and compare the plans of the proposed
house exterior architecture and foundation footprint with the adjacent and other neighborhood
houses to determine if such plans are in harmony with the neighborhood and surroundings.
(g) Outbuildings: Storage space, garages and other uses for outbuildings should generally be
included in or attached to principle structure. However, consideration will be given to granting
a permit for an outbuilding if the shape or size of a lot requires such consideration for either new
home construction or additional space for an existing home. The following guidelines will be
considered in reviewing the application for a permit:
• The outbuilding shall coordinate with the architectural style and design of the home.
• The outbuilding exterior material composition shall be consistent with all items including but
not limited, to veneer and roofing.
• Site built outbuildings are preferred.
• Shielding views by an initial planting of suitable evergreens may be
required.
11
2. LANDSCAPE GUIDELINES: The following is a list of submittal requirements to ensure
proper review of the proposed site development:
a. A landscape plan (at 1”=10’ scale) must be prepared and submitted. b. Tree and topographical surveys are to be dated within twenty-four (24) months of their
submittal to the ARC.
c. The entire site must be documented. If areas are to remain natural, it should be indicated as
such on the plan.
d. Driveways, parking areas and elements such as service areas and utilities must be well
screened from the street and adjoining lots.
e. Garage doors must not face the street to which the front of the dwelling is oriented.
f. Water discharge areas and erosion control measures must be indicated in the National
Pollutant and Discharge Elimination System (NPDES) Plans, as well as the Mississippi
Department of Environmental
Quality (MDEQ).
3. EXISTING VEGETATION: The existing composition of tree canopy, understory and
water edge vegetation provides a backdrop for visual beauty and natural habitat. Alterations of
this environment should be minimized and considered only after extensive analysis and
evaluation.
The ARC or, in its discretion, Mississippi and/or the County of Madison, Mississippi, in the
same manner outlines the following guidelines in an effort to provide your design team ways to
minimize any adverse impacts of site development:
a. Any removal of trees or areas if understory requires the prior approval of the ARC or their
designee. If select trees are determined to be diseased or in immediate danger of falling, please
contact the ARC immediately for assistance in prompt review.
b. Proposed tree removal and understory clearing required for proper execution of the proposed
improvements should be clearly represented on preliminary drawings, as part of the design
review process. Clearing limits and tree protection during construction is critical to maintaining
the health and natural condition of the lot vegetation.
c. Pruning or selective clearing during construction or upon occupancy should be conducted
carefully to balance the need for improved views and maintenance of sensitive edge conditions.
Alteration to existing tree line and understory vegetation must be approved by ARC Staff prior
to the activity.
It is recommended that this activity be considered after a structure is sufficiently built to allow
the property owner and the ARC the opportunity to customize the pruning activity with as-is
conditions.
4. SOFTSCAPE GUIDELINES:
a. Trees
1. The ARC reserves the right to require additional trees to replace those removed during
construction and to provide a vegetative buffer. A minimum of two-thirds of the replacement
trees should be of native species for the purpose of reforestation.
2. Landscape plans shall show and label species and sizes of proposed trees.
12
b. Shrubs
1. All primary foundation shrubs shall be a minimum size of three gallons.
2. The ARC may require larger material (6’-8’ in height) to be planted to reduce the scale of
tall foundations.
3. Straight-line plantings (hedges) along the property lines are not allowed.
4. Planting beds near side property lines are encouraged to blend with adjacent properties in
both plant material and design. Native plants are also encouraged alongside the edges.
5. The use of native or drought tolerant plants is recommended to reduce irrigation needs.
6. Foundation plantings may be required to be at least one-third the height of the foundation at
time of installation, and should encompass the entire home.
c. Grass, ground cover and mulch
1. The ARC generally discourages the use of large expanses of sod.
2. Areas shown to be grassed should be sodded (as opposed to seeded or sprigged) to ensure
proper soil stabilization. Where surface drainage interfaces with grassed areas, sod is required.
3. Roadside rights-of-way disturbed during construction must be re- graded and re-grassed
where grass preexisted. Likewise, areas of nearby lots damaged during construction must be
returned to their previous condition.
4. Ground cover is encouraged in shaded areas where it is hard to grow grass.
5. Pine straw or hardwood mulch can be used as a ground cover in areas of medium or dense
shade.
6. The ARC encourages the use of rain sensor gauges on irrigation systems.
It should be noted that approval of a landscape plan is conditional, pending a field review of the
in-place installation. Additional landscaping may be required then.
5. HARDSCAPE GUIDELINES:
a. Each lot is permitted to have only one driveway access from the street, unless otherwise
approved by the ARC.
b. Driveways should be paved with concrete; however, the ARC may consider the use of soft
pervious material such as natural stone materials. The ARC prefers, and will likely require,
driveway colors that are subdued and natural in tone. The use of exposed aggregate is excluded.
c. No driveways or walkways may be sited closer than ten (10) feet from property lines, unless
otherwise approved by the ARC.
d. The Site Plan (at 1”=10’ scale; 1”= 20’-0” scale for lots larger than 1 acre) should indicate
the location of a properly sized culvert under the driveway unless deemed unnecessary by the
ARC. All driveways shall be designed and constructed so as to not interfere with and/or block
road drainage
e. Driveway aprons from entrance to property line are required to prevent main road damage.
Aprons should be of concrete and should extend to the property line. Refer to Appendix 3 ‘Detail
B’ for precise direction in constructing the driveway apron.
6. PARKING SPACE
The following standards shall apply to each dwelling unit:
Each dwelling shall have a minimum of (2) permanent garaged parking spaces and a minimum
of (2) off street guest parking spaces. Each parking area shall be served by adequate driveway
space for access to the street. Driveways shall be a minimum of ten (10) feet in width.
13
Materials shall be: hot-mix asphalt concrete, Portland cement concrete, brick, or other durable
material so as to provide a dust-free, all-weather surface. Loose surface materials are not
permitted, e.g.: gravel, sand (all exposed aggregate/washed gravel finish prohibited)
7. FENCES AND WALLS
All fences and walls shall meet the following requirements:
• Regarding fences to be built on recreational area lots or public streets, please refer to ARC.
• No fence or wall shall be built closer than one (1) foot to a property line unless the permit
application includes documented consent by the adjacent property owner, and, the survey
line is adequately staked to eliminate property line disputes.
• No fence or wall shall be built out of chain link, chains, galvanized metals, concrete blocks,
barbed wire, chicken wire, woven wire, unfinished metals, cord wood, gravel rubble, rip-rap,
brush, refuse, or other objectionable materials.
• Fences for non-estate lots must be the ARC approved design (Appendix 3, Detail C). For the
estate lots, any fence design or material other than the approved option must be submitted to
ARC for approval.
• Exposed block foundations must be properly stuccoed or bricked. Poured concrete
foundation walls shall be properly finished and painted or bricked.
• All finish colors shall be in neutral and/or soft tones. No bright or fluorescent colors are
permitted.
Periodic maintenance of fences is required, i.e., pressure washing, painting, replacement, etc.
8. SWIMMING POOLS
The following standards shall apply to all swimming pools:
No swimming pool or part thereof, including aprons and walks, shall protrude into any front
yard, construction setback line, or easement. Discharging of backwash water shall not be
permitted into the holding tank or any other part of the sewer system and shall be controlled so
that it will not wash across the adjoining lot or into any of the lakes.
Any private residential swimming pool and/or spa unit shall be constructed in the rear of the
dwelling and screened from public view. The actual pool or spa (not surrounding patio or deck)
may not be built closer than twenty (20) feet from either side yard lot line or twenty (20) feet
from the rear property line. A secure restrictive fence no less than five (5) feet high shall enclose
the pool or spa area or larger area in which the pool or spa is located.
9. LANDSCAPE ORNAMENTS AND STRUCTURES:
Landscaping ornaments installed on an owner’s lawn should be restricted to a limited number
of small to medium objects that are tasteful and are in harmony with the neighborhood and
surroundings. These types of ornaments require a permit from the ARC. Examples of acceptable
ornaments are arbors, lattice, flagpoles, lawn and/or home exterior lighting systems, water
fountains, and waterfalls with collection pools. Unacceptable examples include whole or parts
of automotive vehicles, agricultural equipment, aircraft, marine equipment, trailers, and motor
homes.
14
Landscaping structures are defined as objects that require purchasing of building materials and
either constructing, erecting, or assembling the materials on-site. These types of items require a
landscaping structure permit.
Chapter 5: Construction Regulations
1. SITE APPEARANCE
Site cleanliness shall be maintained at all times during construction. Extreme care should be
given to minimize debris spillage during driving to and from the site. It is imperative that all sites
be maintained in a clean and tidy manner. The following are rules that are enforced on all
construction sites:
a. Trash Containers:
During all construction activities, the lot shall be kept neat and free of excess trash and building
materials. A TRASH CONTAINER SHALL BE PROVIDED for cans and bottles, paper, and
any materials that might be blown from the site. Other building debris shall be kept condensed
and removed from the site on a timely basis. Workers shall be cautioned about any intentional
and unintentional littering while on the job or while traveling within the neighborhood. Litter
violators will be subject to a fine of up to $500.00.
b. Lot Line Markings:
After a permit for any work has been issued, the side lot lines shall be defined with string,
surveyors tape, or other means. Further, all building activities and materials shall be restricted to
the lot for which the permit was issued. Use of adjacent lots, or common property for access to
the building site is also prohibited. In rare instances in which it might be essential to use adjacent
properties for access, prior permission from the property owner is required AND written proof
of this submitted to the ARC Office.
c. Care of Streets:
The streets shall be kept clean and free from mud, rocks, and debris from the building site. In
order to help keep streets clean, the contractor must put rock in the driveway at the beginning of
construction. Any damage to the street or within the street right-of- way must be promptly
repaired. If necessary, the Public Works Director will take corrective action and will bill the
contractor and/or property owner for all expenses involved in the clean-up or repair. If there is
an unpaid balance at the time final inspection is requested, final inspection will be withheld until
the balance is paid. Extreme circumstances can result in the suspension of the permit.
d. Toilet Facilities:
Toilet facilities shall be made available to the personnel on the building site.
e. Parking at Construction Sites:
Limited to one side of road to prevent impeding the flow of traffic.
f. Site Clean Up:
Final clean-up is required, including the removal of all building materials, building debris,
stumps, portable toilets, etc. before the final observation will be completed.
g. Noise:
Noise on a construction site may be considered a nuisance. Loud music or broadcasts from
radios, televisions, or other similar devices AND loud, offensive or abusive language or behavior
is strictly prohibited.
h. Liquid Containment:
Construction liquids and all other construction materials shall be contained within the property.
No runoff is permitted. Excessive amounts shall be contained and disposed of in a manner
prescribed by local, State and Federal Laws.
15
2. ENFORCEMENT
These standards may be enforced by the Association in the same manner as any violation or
threatened violation of the Declaration, including, but not limited to, the lien rights of the
Association for any costs or charges incurred in connection therewith.
With the steadily increasing number of building permits issued, enforcement of the “Rules”
becomes of greater importance to property owners because of the impact on the aesthetics of the
neighborhood. The ARC recognizes the need for enhanced enforcement during the construction
period. Therefore, it has instituted a three (3) part program to minimize, and ultimately eliminate,
ongoing construction period violations.
a. Site Observations:
An ARC-authorized representative will make regular, but randomly, scheduled observations of
permitted construction sites. The representative will look for rule violations such as, but not
limited to: fires, mud on roads, trash collection, toilet facilities, silt fences, encroachment on
adjacent lots, common property, final clean-up, etc. These observations are not conducted to
check compliance with building codes and standards, but rather to see that the home reflects the
ARC approved plans and processes. Any alterations to the design will require a
re-submission to the ARC.
b. Notifications:
Notice of any violations will be posted at the job site by placement of an orange sticker on ARC
building permit. The ARC will then notify the property owner and general contractor by certified
mail of the violation(s) and allowing ten (10) calendar days to correct the violation to avoid
penalty.
c. Penalties:
Upon failure to correct the violation(s) within the 10 days, the ARC building permit will be
revoked and physically removed from the site. All construction at the site shall cease;
continuation of construction will bring other remedies at law available to the HOA.
Reinstatement of a revoked construction permit requires the following:
• Correction of the violation(s) cited.
• Re-inspection.
• Paying the reinstatement fee of $500.00 to the HOA.
In the event of subsequent violation(s) on a given site the same procedure as above applies,
however, a reinstatement payment of $1,000.00 for the second, and $1,500.00 for the third
violation and subsequent violations.
3. DAMAGE DEPOSIT POLICY AS OF July 01, 2017
(1) In addition to the $1,000 Initial Architectural Review Fee as described in Appendix 1
herein, the Property Owner or Contractor shall place a cash deposit with the Architectural
Review Committee at the time of submittal for final design approval. This deposit, (hereinafter
"Damage Deposit"), as established by the Committee is $2,000.00. This $2,000 deposit will
16
be refunded upon completion of all work, improvements and landscaping, and upon
acceptance by the Committee provided there is no damage by the Owner and/or his Contractors
or agents to public and private improvements, common areas, roads, or other lots within the
community* and all trash and debris have been disposed of in a timely basis
according to these Chestnut Hill Architectural Design Guidelines. In the event intervention is
necessary to resolve any job site issue, i.e. non-compliance with any approved submittal, trash
or mud removal, silt fence installation or maintenance, access drive conditions, or similar issues,
the damage deposit shall be forfeited to the extent these funds are used to resolve the issue. The
Chestnut Hill HOA Board is not obligated to intervene but can and will if it is necessary to
protect the interest of other lot owners, Declarant, or the Chestnut Hill Community. Payment
of the deposit and fee shall be made with two separate checks in the amount of $2,000.00 for
damage deposit fee and $1,000 for the ARC fee payable to the order of "Chestnut Hill
HOA” * In the event said Deposit is reduced because of some act of, action or failure to act or
noncompliance by Owner as stated herein, then upon demand of the ARC the Owner shall
within fifteen (15) days, restore the balance to the amount set forth in this paragraph. *Refer
to notes on erosion control.
(2) The Applicant acknowledges that the ARC has the right to deposit such damage deposit
in an interest-bearing account as designated by the HOA. The Applicant hereby agrees that
all such interest that accrues on the damage deposit shall be earned by the HOA and become
the property thereof. Applicant hereby waives any rights in and to the interest so accrued.
The Design Guidelines herein are not intended to amend, alter or supersede the Declaration of
Covenants, Conditions, and Restrictions for Chestnut Hill, as recorded in the office of the
Chancery Clerk of Madison County. In the event these Architectural Design Guidelines
conflict with said Declaration, the Declaration shall control. No approval of plans and
specification, nor these Architectural Design Guidelines shall ever be construed as representing
or implying that a structure is properly designed.
Such approvals and standards shall in no event be construed as representing or guaranteeing that
any structure will be built in a good workmanlike manner. It is the sole responsibility of the
Lot Owner to make sure that construction meets the criteria of Chestnut Hill Covenants and
Design Guidelines.
EFFECTIVE this 1st day of July, 2017.
17
APPENDIX 1
BUILDER APPLICATION
FORM A
I. GENERAL INFORMATION:
COMPANY NAME:
CONTRACTOR NAME:
MAILING ADDRESS:
CELL PHONE NUMBER:
OFFICE PHONE NUMBER:
FAX NUMBER:
E-MAIL ADDRESS: II. (If Builder Financed) LIST PRIMARY LENDER AND THREE CURRENT
CREDIT REFERENCES:
BUSINESS NAME ADDRESS PHONE # CONTACT PERSON
1.
2.
3.
4. III. LIST CUSTOMER REFERENCES: NAME ADDRESS PHONE#
1.
2. SHALL ATTACH ALL OF THE FOLLOWING TO BE CONSIDERED FOR
SUBMITTAL:
IV. ATTACH A COPY OF YOUR MISSISSIPPI BUILDERS LICENSE.
V. ATTACH A COPY OF YOUR LIABILITY INSURANCE
(MINIMUM OF $1,000,000 PER OCCURENCE.)
VI. ATTACH A COPY OF YOUR WORKERS COMPENSATION POLICY.
VII. PROVIDE FULL DISCLOSURE OF ANY LITIGATION PENDING, ACTIVE, or WITHIN
THE PAST 24 MONTHS.
THE INFORMATION PROVIDED IS TRUE AND ACCURATE. SIGN: DATE:
18
APPENDIX 1
BUILDER/ CONTRACTOR INSURANCE VERIFICATION
FORM B The undersigned builder/ contractor herein verifies there is in place workers compensation
coverage on all subcontractors, laborers, and all other individuals working on the following
described property.
The builder/ contractor agrees to hold harmless and indemnify the Chestnut Hill
Homeowners Association and its Architectural Review Committee for all occurrences that
take place on the work site.
LOT NUMBER: PHASE:
Further, said builder/ contractor acknowledges and agrees that the Architectural Design
Guidelines of the Chestnut Hill Homeowners Association and its Architectural Review
Committee (ARC) shall be followed. All approvals shall be obtained prior to any work
commencing upon any said lot. The builder/ contactor acknowledge that new homes cannot
be occupied until a final approval has been given and approved in writing by the Chestnut
Hill ARC.
Builder/ Contractor (print full name) DATE
Builder/ Contractor (signature) DATE
19
APPENDIX 1
SUB-CONTRACTOR LIST
FORM C
Lot Owner’s Name: Date:
Builder’s Name: __________________ Lot Number:
Contractor’s Name Job Description Contact Number
20
APPENDIX 1
DESIGN REVIEW APPLICATION
FORM D
APPLICANT INFORMATION
Date:____________ Lot #:_________ Applicant: ________________________
Contact Person: ______________
Mailing Address: _______________ Phone Number: ___________ Email Address: ____
BUILDER INFORMATION
Company: Contact Person: Mailing Address:____________________________________________________________________
Phone Number: Email Address: ___
ARCHITECT/DESIGNER INFORMATION
Company: Contact Person:
Mailing Address: ______________
Phone Number: ____________Email Address: ____
LANDSCAPE ARCHITECT/DESIGNER INFORMATION
Company: Contact Person: Mailing Address: ______________
Phone Number: ____________Email Address: ____
TYPES OF REVIEW (check all that apply)
Initial Construction Review
Post Construction Review _______Re-Submittal Review
IMPROVEMENTS/START/FINISH DATES
Estimated Cost of Improvements to Lot: ___________________________________________
Estimated Start to Finish Dates: _________________________________________________
21
APPENDIX 1
DESIGN REVIEW AND CONTROL ACKNOWLEDGEMENT
FORM E
PERMISSION TO ENTER PROPERTY Permission is hereby granted for members of the ARC to enter on the property to make
reasonable observations of the construction site.
Agreed: Date:
ARC ARCHITECTURAL DESIGN GUIDELINES
I have fully read, understand, and I agree to comply with the Chestnut Hill ARC
Architectural Design Guidelines.
Agreed: Date:
ARC ARCHITECTURAL CONTROL PROCEDURES I have fully read, understand, and I agree to contact the Chestnut Hill Architectural Review
Committee Chair at specified times deemed necessary for approval of observations
Agreed: Date:
PLAN APPROVAL
I fully understand that Plan Approval shall be valid for a period of six (6) months only from
the final approval date upon the approved set of plans in which I will receive, and
commencement of construction thereafter will require re-approval.
Agreed: Date:
DESIGN IS HEREBY APPROVED SUBJECT TO “REDLINE” REVISIONS ON PLANS:
Architectural Review Committee Chair, Chestnut Hill
Approved by: Date:
22
APPENDIX 1
HOME SPECIFICATIONS
COLOR PALETTE
FORM F
Lot owner may be asked to provide samples of any items.
Heated & Cooled Square Footage:
Total Under Roof Square Footage:
Exterior
Brick/Stone: (Provide photo of brick/stone on an existing home)
Name:
Size: Queen
Old New (check one)
Modular Other (check one)
Mortar Color: ________________________________Specify Notes if Any __________
Smear: Yes
No Color ___________
Style of Smear: Heavy Light
Painted Brick: Yes__________ No _____________ color _______________________________
Paint/Stain:________________________________________________________________ Include Sample, Brand Name, Number, and Color (Example: Sherwin Williams #5778 Super White)
Trim Color: Garage Door Color:
Siding Color: Shutter Color:
Door: Stain or Paint Color: Columns:
(Provide sample of stain or paint color and a color photo or rendering of what the door will look like.)
Window Brand: Color:(Windows must be wood or wood clad as approved by ARC. Also provide a window spec sheet.
No vinyl windows will be allowed.
Roof Brand/Type: Color: ________ (Provide a roof spec sheet.)
Column Materials: Old Timbers________ New Cypress Timbers ___________Permacast________ Other (List):_______________________________________________________________________
Courtyard: Yes No Material/Finish______________________________________
23
APPENDIX 1
REQUEST FOR APPROVAL
FORM G
Lot 911 Address Phase and Lot Number
REQUEST FOR SILT FENCE, AND GRAVEL DRIVE APPROVAL
The undersigned builder and or lot owner verifies there is in place a silt fence
(installed to County of Madison code) and temporary gravel drive per the site
meeting on the described property above.
Builder/ Contractor (signature) DATE
Chestnut Hill ARC Chair (signature) DATE
REQUEST FOR DRIVEWAY FORM APPROVAL
The undersigned builder and or lot owner verifies there is in place form boards and
reinforcement per the Approved Site plan on the described property above.
Builder/ Contractor (signature) DATE
Chestnut Hill ARC Chair (signature) DATE
REQUEST FOR GRADING APPROVAL
The undersigned builder and or lot owner verifies the above described property is ready for a grading observation to ensure all drainage swales are correct for proper water drainage per the Approved Site plan, and has sufficient slope away from the structure and does not directly shed water to any adjacent lot, common property, or public area.
Builder/ Contractor (signature) DATE
_________________________________ _________________________
Chestnut Hill ARC Chair (signature) DATE
24
APPENDIX 1
REQUEST FOR FINAL APPROVAL
FORM H
Lot 911 Address Phase and Lot Number
REQUEST FOR FINAL APPROVAL AND CERTIFICATE OF COMPLIANCE
The undersigned builder and or lot owner verifies that the above listed project is 100% per the
approved plans by the ARC. The undersigned also acknowledges that he or she has read and
fully adheres to Damage Deposit Policy and its process in which to release any or all of the
damage deposit.
Builder/ Contractor (signature) DATE
_________________________________ _________________________
Chestnut Hill ARC Chair (signature) DATE
25
APPENDIX 1
ARC SCHEDULE OF FEES
FORM I NOTICE: All submittal requirements shall be submitted to the Chestnut Hill ARC no later than
4:00 p.m. 2 weeks prior to the ARC meeting. The Chestnut Hill ARC meets on the 3rd Thursday of each month unless otherwise noted by the Architectural Committee Chair. All review
submittal(s) must be accompanied by a copy of filed deed to the lot under review for proof of
ownership. Applicant shall provide 3 sets of plans (Site Plan, Architectural Plan, Grading Plan & Landscape Plan) enclosed in Properly labeled shipping tube. All checks should be made payable to
the Chestnut Hill HOA. Fees will be due before plan submittal. Plans will not be reviewed until
all fees and required documentation has been submitted. 1. Initial Construction Fees
a. New Home Construction Fee $1,000 (initial fee may include all post fees below).
b. Damage Deposit $2,000.
c. Re-Submittal Fees - (For Architectural, Site, & Landscape Alterations) Additional fees may
be incurred by lot owner for changes to plans after initial submission and after initial
approval. Any changes must be submitted to the ARC and approved before they can be
made.
2. Post Construction Fees (If not included with New Home Construction Submittal) the following fees will apply:
a. Residential Addition
Examples may include - Landscape & fence plans (not for existing construction) must be included OR heated & cooled or non-heated & non-cooled areas.
$350 Fee, Damage Deposit of $1,000.
b. Outdoor Structures, Retainer Wall, Courtyard Wall & Play Equipment.
Examples may include – Pigeonnier, Open air structure, storage building, arbors, fireplaces,
fire pits, trampolines, play houses, etc. Must include landscape and fence plan.
$250 Fee, Damage Deposit of $1,000.
c. Pool & Spa. Shall Include landscape and fence plan.
$250 Fee, Damage Deposit of $1,000.
d. Fence, Material or Color Change Exterior of Home, Etc.
$150 Fee. e. Satellite Dish, Outdoor Play Equipment, Basketball Goals, etc.
$0 but ARC approval required. f. Waterfront. Sea walls, boat slips, piers, decks - $150 fee. Contact the Chestnut Hill ARC Chair, Amy Green @ 601-502-3954 to schedule a meeting
to review submittal requirements and plans to discuss any comments or changes.
APPENDIX 2
SUBMITTAL PLAN CHECKLIST
REFERENCE A.
26
Check to make sure each item under Appendix 2 is shown on plans, initialed, and checklist returned with application. Do not submit checklist unless all items are addressed. Incomplete
checklist may be rejected and not reviewed.
LANDSCAPE PLAN REQUIREMENTS
a. Contact information showing Owner & Landscape Architect/Designer
b. All plans are to be drawn at 1”=10’ (estate lots 1”=20’ only)
c. Complete foundation planting required
d. Minimum 3 gallon shrub plantings
e. North arrow, lot number, and scale noted
f. Adjacent streets to be noted
g. Boundary property lines (per site plan)
h. Lawn variety – (lawn to be sodded)
i. Proposed plant material location, species, quantities, and sizes
j. Sensitivity to the existing landscape
k. Existing trees that are to be removed and those to remain (must be flagged)
l. Services screened from public views with plant material
m. _ ___All hardscape elements shown on the site plan must be reflected on landscape
plan
n. Naturalized areas noted and sod limits, if areas are left naturalized GRADING PLAN REQUIREMENTS
a. __________All grading plans must be done by a licensed professional, meaning a
landscape architect, architect or engineer.
b. Contact information showing Owner & Landscape Architect
c. All plans are to be drawn at 1”=10’ (estate lots 1”=20’ only)
d. Topographic plan by registered land surveyor with existing contours
e. Proposed contour plan showing cut and fill requirements
f. Show and label all retaining wall location(s) and height(s)
g. Show and label all existing and proposed drainage features
h. Drainage pipe showing location, material, size and invert elevations
APPENDIX 2
SUBMITTAL PLAN CHECKLIST
REFERENCE A.
27
i. Show and label driveway location and grade
j. Show and label location of temporary gravel access for construction
k. Show and label locations for all silt fence installation
SITE PLAN REQUIREMENTS
a. All site plans are to be drawn at 1”=10’ (estate lots 1”=20’ only)
b. Property boundaries must be labeled properly
c. Building setbacks must be labeled properly
d. All easements must be shown and labeled properly
e. Critical dimensions to layout the house on the lot
f. Contact information & lot number
g. North arrow and scale
h. Adjacent streets to be shown and noted
i. Impact on the surrounding lots/homes
j. Finished floor elevation & garage finish floor elevation
k. Existing and proposed drainage features
l. Swales and arrows denoting all existing and proposed surface water flow
m. Proposed location of silt net fencing
n. Temporary Limestone Gravel drive to garage
o. Service yard screening: a/c, garbage, meters, firewood, etc.
p. Driveway and walkways – location, material, finish, and dimensions
q. Proper concrete drive apron (detail “B”)
r. Good proportions
s. Authenticity
t. Label all hardscape materials, finishes, and colors
u. Retaining walls - locations and materials
v. Fences – locations, materials, finishes and dimensions
w. Pools, spas, courts – locations, materials, finishes, and colors
x. Free standing structures – fireplaces, fire pits, arbors play equipment, trampolines,
etc. (submit pictures or detailed elevations of proposed structures)
y.____________Orientation of house on lot
z.____________ Stake house corners (4 -6 points)
APPENDIX 2
SUBMITTAL PLAN CHECKLIST
REFERENCE A.
28
ARCHITECTURAL PLAN REQUIREMENTS Floor Plan
a. Contact information showing Owner & Architect/Designer
b. Floor plans drawn at ¼”=1’-0”
c. Note heated and cooled square footage
d. Overall dimensions of the structure should be clearly noted
e. Must meet neighborhood minimum square footage requirements
Building Elevation
a. Color palette/ home specifications of brick, trim, and roof materials
b. Elevations drawn at ¼”=1’-0”
c. All exterior materials labeled
d. Vertical dimensions (ceiling heights)
e. Roof materials and pitches
f. Exterior millwork
g. Dormers: must be traditional or classical proportions
h.__________Chimneys: no exterior wood, clad, or metal chimneys (brick, stone, or stucco
allowed). Must have a cap on the chimney screen spark arrestor
i. __________Shutters: Must be sized for respective openings and hung on operable hinges.
Foundation Plan for aesthetic purpose (show integrated with lot and slopes able to maintain)
Three (3) sets of all plans stated above accompanied with a properly labeled shipping tube
Final Construction Specifications.
Property Owner’s Proposed Construction Schedule.
Copy of filed deed to lot under review (Proof of Ownership)
Appropriate ARC Fees and deposits on two separate checks
A complete application (All forms in Appendix 1 and Appendix 2)
29
APPENDIX 3
MAILBOX DETAIL
DETAIL A
Below is a picture of the approved mailbox for Chestnut Hill. Mailboxes are required to be placed
adjacent to the concrete apron of the homeowner or lot owner’s driveway.
The mail box itself is copper as is the sign that hangs above it with the street number.
Copper Sculptures in Flowood, MS designed the current mailbox and is where it can be purchased. This mailbox retails for $750 plus tax and $75 for installation plus tax.
5230 Highway 25
Flowood, MS 39232
601-992-9955 (phone)
800-235-6725 (toll-free)
601-992-9350 (fax)
APPENDIX 3
APRON DETAIL
DETAIL B
30
t::l t_!l!j
> t"""l
APPENDIX 3
FENCE DETAIL DETAIL C
31