© ABB
| Slide 1
ABB Modular E-HouseMakes the Electrification Easy
Chenny Wang, ABB Xiamen Switchgear Co.Ltd. , November, 2016
November, 2016
© ABB
| Slide 2
Presentation Topics
Why packaging and integrated solutions
Modular Systems Introduction
Packaging Concept & Project Delivery
You need more than just a product package
E-House Concept
E-House Elements
Portfolio, Innovations & Applications
Global Footprint & Capabilities
November, 2016
© ABB
| Slide 3
Electrification Solutions
November, 2016
Plant Electrification Overview
65%
HV GISPower
Transformer MV SWGDistribution
Transformer
SCADA
System
LV SWG
DC Panel etcPower Incoming
© ABB
| Slide 4
Electrification Solutions
Customer request:
Access to the greater ABB portfolio through a single
entry point
Multiple products which will work together, without the
need for full fledged system
ABB Model :
Electrification Solutions by Modular Systems Team
November, 2016
Why Packaging and integrated Solution?
© ABB
| Slide 5
Electrification Solutions
ABB Provides the right solution for you depending on your needs:
November, 2016
ABB Offering
ABB Contact Point Scope of Supply
Product Sales:
Transformers
Low Voltage Products
Low Voltage Switchgear, Motors & Drives
Medium Voltage Products
Medium Voltage Switchgear, Motors & Drives
Basic Distribution Automation
Product PackagesProduct Bundles c/w Project Management (i.e. MV Switchgear, Transformers, LV
Switchgear or Drives, Motors)
Integrated solutionsE-House & PowerSkid c/w integrated products (i.e. MV, Switchgear, LV
Switchgear, Basic EMS, Drives, 3rd Party Product)
Full systems
High Risk Engineered Plant Systems, with Design & Performance Responsibility
for O&G, Power Generation etc
Full Turnkey packages c/w ICSS, EMCS, DCS, Fire & Gas Systems
MAC & MEC opportunities
Focus of this presentation
© ABB
| Slide 6
Electrification Solutions
▪ ABB offers a variety of electrical products to the market
▪ Product Packaging further enhances the offering with seamless
integration
▪ Single ABB contact to coordinate and deliver the packages
▪ Including basic interface engineering to optimize cable sizing,
reduce cable lengths, assure mechanical and electrical
connections
▪ And generally, make life easier for you and your customers!
November, 2016
Packaging Concept
© ABB
| Slide 7
Packaging Concept
November, 2016
Execution Model
ABB Project Manager
Commercial and Technical Project Management / Coordination
ABB Product A
Medium Voltage
Switchgear
ABB Product B
Low Voltage
Switchgear
ABB Product C
Distribution
Transformer
3rd party products
Client specified items
Basic Interface
Engineering
eSI Power
Management Systems
Covering products from all ABB Divisions
Installation and
commissioning
site services
ABB Service Teams
Customer
Single Commercial Agreement
© ABB
| Slide 8
Packaging Concept
Risk Mitigation
Transfer of risk from client to ABB for coordinating delivery and
design interface of all elements in the package
Simplified Commercial Agreement
Single contract for the entire package, reducing requirements
for multiple commercial agreements
Single Project Manager
Single point of contact to execute the project package
Reduced Client Resources
ABB being responsible for scope of works described above,
reduces client manpower to engineer and manage the project
November, 2016
Value Proposition
© ABB
| Slide 9
Conventional Site Built electrification
November, 2016
Challenge makes it difficult
Coordination & product integration issues caused by
multiple contractual parties
Skilled worker for remote area and harsh environment
are rare and more and more expensive
The progress of site work be affected by the bad
whether condition
The site work is not easy to conduct for revamping or
replacement project
Moving power demand requests the power supply to
be mobile
Compliance to local conventions, codes & standards
for export projects
Stringent project specification and requirement for
special application or from high end customer
© ABB
| Slide 10
Conventional Site Built electrification
November, 2016
Challenge makes it difficult – Case Study
© ABB
| Slide 11
Modular System
▪ An E-House is a pre-fabricated switchroom product,
containing electrical switch & control gear for control of
industrial plant equipment.
▪ E-Houses are also known as Power-House, LER (Local
Equipment Room), Electrical House or PDC (Power
Distribution Centre).
▪ Typically, the E-House fabrication & electrical equipment
installation occurs offsite and is delivered as fully tested
and operational solution.
November, 2016
E-House Concept
▪ The E-House solution is a
cost effective, risk reduced
alternative to conventional
concrete & brick switchroom
construction
© ABB
| Slide 12
The E-House construction is usually inclusive of the following equipment:
Building base frame & internal / external wall sheeting
HVAC, Fire & Gas equipment
Auxiliary Power & Internal / external lighting
Support posts and stairs / landings
Internal cable reticulation
Electrification SolutionsE-House Sub Elements
November, 2016
© ABB
| Slide 13
Electrification Solutions
▪ Typical electrical equipment contained within the E-House
would be :
▪ Medium Voltage Switchgear (IEC & ANSI)
▪ Low Voltage Switchgear (IEC & ANSI)
▪ UPS or battery backup
▪ VF Drives
▪ Fire & Gas Equipment (FIP, VESDA, Gas)
▪ Power Management System (eSI)
▪ Third party products as required by the customer
November, 2016
E-House Product Elements
© ABB
| Slide 14
E-House Solution
▪ Reduced Client Resources
▪ Simplified Commercial Agreement
▪ Single Project Manager
▪ Predictable Delivery & Cost Schedule: As majority of works
are performed off site, client is insulated from local labor
shortages, environmental & industrial relations factors
▪ Reduced Site Activities: Comprehensive FAT can be
performed before delivery reducing site commissioning
requirements as well as health & safety risks
▪ Increased Risk Mitigation : Total integration responsibility to
ABB to engineer/coordinate all aspects of the E-House
scope
November, 2016
E-House Value Proposition
© ABB
| Slide 15
▪ Compliant to IEC, NEMA, IEE, AS, BS, DEWA, Kahramaa, SABS
& GOST requirements and accepted, at least, in the following
market segments:
▪ Chemical, Oil & Gas
▪ Minerals & Mining
▪ Utilities
▪ Renewables
▪ Data Centers
▪ Railways
Electrification Solutions
November, 2016
E-House Applications
© ABB
| Slide 16
Electrification Solutions
November, 2016
E-House Portfolio
Skid Mounted
Modules
Mobile
SubstationsE-Houses
• Pre-assembled
on a skid (base
frame), shipped
and lifted as one
piece
• Easily
transported
• Heavy duty skid
design for
relocation on
site
• Indoor &
Outdoor designs
• Pre-assembled
trailer design
containing E-
House,
switchgear, and
transformer
• MV and HV
designs
available
• Standard and
custom
configured
designs
• Quick
Energization
• Mainly for
smaller
footprints
• Easy to
transport
• Very flexible
with respect to
design &
footprint
• Design for road
transport
• Large footprints
• No need for site
assembly
• Transport
restrictions
© ABB
| Slide 17
E-House Solution
Have you ever managed a project in a remote or high risk
location area and wished to minimize your time on site?
November, 2016
Portfolio Innovations & Applications
Pre-assembled, pre-cabled and pre-tested E-House solutions
for quick connection and energization
© ABB
| Slide 18
E-House Solution
▪ Have you ever face difficult to meet the project specification or other
special requirement from customer?
November, 2016
Portfolio Innovations & Applications
▪ ABB’s global footprint & extensive experience, enables to support
you from concept design, to formal pricing through to project
engineering & delivery.
© ABB
| Slide 19
E-House Solution
▪ Have you ever wanted a quick and easy method to install the
electrical package in your projects?
November, 2016
Portfolio Innovations & Applications
▪ Pre-assembled and pre-tested module, shipped
and lifted as one piece
▪ Easily transported
▪ Heavy duty design for relocation on site
▪ Indoor & Outdoor designs
© ABB
| Slide 21
E-House Solution
November, 2016
Case Study
Project Information
Project name Tamar Valley Power Station
Application Balance of Plant for 300MW Power Generation
Client / country Mitsubishi Japan / Installed in Australia
Number of
units
11 x E-Housed complexed together to form common
structure
Year of
delivery2012
Scope description
Product name Modularized E-Houses
Technical
details
Skeletal Frame / Clad Construction including HVAC
& Stairs and Landings
E-House contained Low Voltage & Medium Voltage
Switchgear, DC Battery System, Free Issue client
panels
HighlightsFully modularized design to accommodate
challenging site logistic in remote location
© ABB
| Slide 22
Modular System
▪ Modular System execution footprint exceeds 30 units globally, servicing
all major regions
▪ Global product platforms & feeder factories provides ABB the flexibility
to deliver products from many factories around the world, while
providing back up factories in case of any unexpected events.
November, 2016
Execution Footprint
Packaging center
E-House center
Global functions:
▪ Marketing & sales
▪ Product management
▪ SCM
▪ Controlling
▪ Opex & HSE
Global processes:
▪ SCM (supplier evaluation
& qualification)
▪ Project Management (PM
certification, unit
assessment &
development)
© ABB
| Slide 23
Electrification Solutions
▪ Team of experts to support businesses globally both bid preparation
& execution of E-House and Product Packaging projects
▪ High level of technical expertise as well as specialized design and
engineering tools to successfully design and optimize E-House
solutions
▪ Engineering support, in particular for structural design, HVAC
design, UPS design, electrical design, product selection and
building integration as well as support for project scheduling,
document control and supply chain management
November, 2016
Global Execution Team
© ABB
| Slide 24
Modular System
Innovative Portfolio for demanding project challenges ;
Packaging > customer resource, tight schedule, local
regulations
E-Houses > tailor made, High risk or remote locations
Skid Modules > Single shipment, easily transported
Mobile Subs > Mobile, pre configured, quick
energization
Extensive Global Footprint for execution & site support
Compliance to local customer specifications, local
conventions, global codes & standards
Risk Mitigation & Total Integration
Reduced client resources for engineering & project
management
Simplified commercial agreement
November, 2016
Summary
Modular E-House makes
the electrification easy!