2
continue on page 2 u ** Only fill in if different from the permanent customer address in our database. HF 86997 Status: 09/2020 - EN 1 Temperature ranges (please mark where applicable) 1.1 H-/V-track 1.2 H-/V-track 1.3 V-track (technical approval) 1.4 H-/V-track 2 Track application H V 3 Precooler area: Yes No 4 Is climatic condition known on the deep-freeze side? Yes Values °C / % No – Assumption: summer: 20 °C / 80%! Please fill in the HX diagramme on page 2! 5 On-site floor heating system (not required for > 0 °C / 0 °C): Yes No 6 Are fastening holes allowed in the floor? Yes No 7 Building structure material (the subsurface must be ready for fitting): Concrete Partition wall (thickness in mm) Special: 8 Hold-open phase: 9 Door cycle / timing: 10 Comments / extras: Page 1 of 2 Checkliste ISO Speed Cold 100 The fields with a grey border will be filled in at the factory. Customer no.: Customer: Invoice via: Delivery address:** Contact person: ( Fax: Order no. / com.: Construction project: Project no.: Quotation no. / dd.: Requested date: WK Fitting via: Sales office: Page: / Project postal code: Project location: Renovation New construction

Checkliste ISO Speed Cold 100 - Seuster

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Checkliste ISO Speed Cold 100 - Seuster

continue on page 2 u

** O

nly

fill i

n if

diff

ere

nt f

rom

the

pe

rma

nen

tcu

sto

me

r ad

dre

ss in

ou

r d

atab

ase

.H

F 8

69

97

Sta

tus:

09/

20

20

-E

N

1 Temperature ranges (please mark where applicable)

1.1H-/V-track

1.2H-/V-track

1.3V-track(technical approval)

1.4H-/V-track

2 Track application

H V

3 Precooler area: Yes No

4 Is climatic condition known on the deep-freeze side?

Yes Values °C / %

No – Assumption: summer: 20 °C / 80%!Please fill in the HX diagramme on page 2!

5 On-site floor heating system(not required for > 0 °C / 0 °C):

Yes No

6 Are fastening holes allowed in the floor?

Yes No

7 Building structure material (the subsurface must be ready for fitting):

Concrete Partition wall(thickness in mm)

Special:

8 Hold-open phase:

9 Door cycle / timing:

10 Comments / extras:

Page 1 of 2

Checkliste ISO Speed Cold 100

The fields with a grey border will be filled in at the factory.

Customer no.: Customer:

Invoice via:

Delivery address:**

Contact person: ( Fax:

Order no. / com.: Construction project:

Project no.: Quotation no. / dd.: Requested date: WK

Fitting via: Sales office: Page: /

Project postal code: Project location: Renovation New construction

Page 2: Checkliste ISO Speed Cold 100 - Seuster

Page 2 of 2

Customer no.: Customer: Sales office:

Order no. / com.: Construction project:

Project no.: Quotation no. / dd.:

u

Zwischensumme in €

weiter auf Seite u

HF

86

99

7S

tatu

s:0

9/2

02

0-

EN

** O

nly

fill i

n if

diff

ere

nt f

rom

the

pe

rma

nen

tcu

sto

me

r ad

dre

ss in

ou

r d

atab

ase

.

11 Mollier-h-x-diagramme

Please take information from the data label!

Order number Product number

Place, date Stamp and signature