Checklist Draft

Embed Size (px)

DESCRIPTION

no copyright infringement intended

Citation preview

Sheet1BERDE for New Construction V1.0The Net Park Project14-8b Property Holdings, Inc.BGC, Taguig, Metro Manila, PhilippinesChecklist

PARAMETERPROGRESSATTACHMENTSACTION BY:DATENOTESSTARTEDCOMPLETEOF ACTIONMANAGEMENT`MN-RQ-1: COMMITMENTCOMMITMENT FORMREGISTRATION FORM 1PROJECT DESCRIPTIONBERDE PROPOSAL

MN-RQ-2: PROJECT TEAMOAD DESIGN ( INT'L ARCHITECTS)LA POCO ARCHITECTS (LAPAA)LEANDRO V. LOCSIN (ID CONSULTANTS)C|S DESIGNS (ID CONSULTANTS)ECOTEKTONIKAMPIDESCRIPTION ROLES

MN-RQ-3: TECHNICAL SITESITE TOPOGRAPHY SURVEY OR TOPOGRAPHY MAPASSESSMENTVICINITY MAPSITE COORDINATES(CIVIL WORKS) (FLOOD ASSESSMENT)

MN-RQ-4: ESTABLISH BASISOWNER'S SPECSOF DESIGNSUN STUDIESGENERAL SITE CRITERIASPECIFIC SITE CRITERIASUMMARY OF EXTERNAL ENVIRONMENT INFO BASED ON MN-RQ 3

MN-RQ-5: ESTABLISH A NET PARK DESIGN OR A CHARTDESIGN MANAGEMENT SYSTEMATTACHMENT FOR FOR MN-RQ 5 (DRAFT)DESIGN MANAGEMENT SYSTEM

MN-RQ-6: ESTABLISHED A CONSTRUCTION MANAGEMENT SYSTEMCONSTRUCTION MANAGEMENTCOMPONENTS OF CONSTRUCTION TEAMSYSTEMCOST AND SCHEDULE MANAGEMENT

MN-RQ-7 EST. COORDINATEDCOMMISIONING CHECKLISTBUILDING COMMISIONINGCOMMISIONING SCOPE (DRAFT) SYSTEMGENERAL BUILDING DESCRIPTION

MN-PT-1: BERDERCR CBP CERT. AND ID (SIGNED & SEALED)CONSULTANTS

MN-PT-2: STAKEHOLDERATTENDANCE SHEETCONSULTATIONPRESENTATION INCORPORATIONG ISSUES

MN-PT-3: DESIGN CHARRETTEGREEN FEATURESPRELIMINARY DESIGNRECOMMENDATION

MN-PT-4: SECURITYCCTV LAYOUT PLAN

MN-PT-5: SOCIAL DIMENSION COMMITMENTDOCUMENTATION

MN-PT-6: ENVIRONMENTAL DIMENSION COMMITMENTDOCUMENTATION

MN-PT-7: ECONOMIC DIMENSION COMMITMENTDOCUMENTATION

LAND USE AND ECOLOGY

LE-RQ-1: POLLUTION CONTROL SOIL PROTECTION PLANFROM CONSTRUCTIONAIR POLLUTION CONTROL PLANACTIVITIESEROSION CONTROLEXCATION PLAN

LE-PT-1: LAND REUSESITE PLAN REPORT OR SITE PHOTOGRAPHSLOCATION AND FOOTPRINTTEST REPORT OF CONTAMINATIONTECHNICAL REPORT OF REMEDIATION

LE-PT-2 PROTECTION OF ECOLOGICAL FEATURESDENR CERTIFICATEAND FURTHER IIMPROVEMENTTREE BALLINGLOCATION OF TRESS

LE-PT-3: PRO-BIODIVERSITY OPEN SPACECALCULATIONS

LE-PT-4: URBAN HEAT ISLAND EFFECT: NON ROOFCALCULATIONS

LE-PT-5: URBAN HEAT ISLAND EFFECT: BUILDING ROOFCALCULATIONS

LE-PT-6: FLOOD RISK MINIMIZATIONFLOOD MAP

WATERWT-RQ-1:EFFLUENT PLUMBING PLANMONITORING QUANTITY AND PLUMBING SPECSQUALITY MONITORINGCALCULATIONS & REPORTS

WT-PT-1: WATER METERINGWATER METER SPECSWATER METER & SUB-WATER METER/S PLAN

WT-PT-2: WATER CONSUMPTION WATER LAYOUTS (ISOMETRIC)REDUCTIONSANITARY LAYOUTS (ISOMETRIC)PLUMBING SYSTERM PLAN & SPECS

WT-PT-3: EFFICIENT LANDSCAPE WATER CONDESATE CALCULATIONSIRRIGATIONIRRIGATION TYPLE/SPECS & PLANS

ENERGYEN-PT-1: ENEGERY METERINGENERGY METERING (EPM 610)

EN-PT-2: ENERGY EFFICIENT LIGHTING & POWER LAYOUTLIGHTINGENERGY EFFICIENT LIGHTINGS

EN-PT-3: NATURAL VENTILATIONNATURAL VENTILATION CALCULATIONSZONING PLANS

EN-PT-4: ON-SITE ENERGY GENERATIONPLANS LOCATING RENEWABLE ENERGY TECHMANUAL ENERGY DESIGN ANALYSISELECTRICAL SINGLE LINE PLAN

EN-PT-5: ENERGY EFFICIENT IMPROVEMENTENERGY CONSERVATION PLANSELECTRICAL & MECHANICAL PLANS & SPECSREPORTS

EN-PT-6: ENERGY EFFICIENT BUILDING ENVELOPEARCHITECTURAL DRAWINGS SHOWING RADIATED EXPOSURE

SPECS / SCHEDULE OF WALLS, WINDOWS, ROOFING, SKYLIGHTS & SLABS

REPORT OF OTTV

EN-PT-7: ENERGY EFFICIENT EQUIPMENTSPECS OF ENERGY EFFICIENT EQUIP. (7.3.2.1 & 7.3.2.2 OF ASHRAE 189)

EN-PT-8:BUILDING AUTOMATION PLANS & SPECS OF MVAC SYSTEMSYSTEMSINNOVATION POINTS (LIFTS, LIGHTING, WASTE WATER SYSTEM, RENEWABLE ENERGY SYSTEM, EXTERNAL LOADS)

TRANSPORTATIONTR-PT-1: ALTERNATIVE TRANSPORTATION- BICYCLESVICINITY PLAN & PHOTOGRAPHS COMPUTATIONS SITE PLAN WITH SPECSDESIGN DRAWINGS

TR-PT-2: ALTERNATIVE TRANSPORTATION- LOW FEV & MPSPECS & CALCULATION

TR-PT-3:PARKINGPARKING LAYOUT / PLAN

TR-PT-4: PROXIMITY TO KEY VICINITY MAP & ADJACENT STRUCTURES (250M RADIUS)ESTABLISHMENTS

TR-PT-5: PUBLIC ACCESSPEDESTRIAN ROUTE PLANSECURITY MEASURES/PLAN

TR-PT-6: CONTRIBUTION TO PUBLIC TRANSPORT AMENITIESPUBLIC TRANSPORT AMENITES PLAN & SPECS

TR-PT-7: PUBLIC TRANSPORTATION ACCESSPUBLIC TRANSPORTATION ROUTES & STOPS ( BUS, JEEPNEY, SHUTTLE)

SPECS

TR-PT-8: TRANSPORTATION IMPACT ASSESSMENTPROPOSED DEVELOPMENT

INDOOR ENVIRONMENTAL QUALITYEQ-RQ-1: LIGHTING LEVELSCALCULATION PER AREA OF ILLUMINATIONS

EQ-RQ-2: THERMAL LEVELSMECHANICAL DESIGNSCOOLING LOAD CALCULATIONS

EQ-RQ-3: INDOOR ACOUSTICSACOUSTIC SPECS AND CONSIDERATIONS

EQ-PT-1: EXTERNAL VIEW AND ARCHITECTURAL DRAWINGSDAYLIGHTINGCOMPUTATION ADEQUATE DAYLIGHT LEVELS

EQ-PT-2: ILLUMINATION CONTROLLIGHTING LAYOUTLIGHTING PROTECTION LAYOUTSPECSDESIGN PLAN HIGHLIGHTING SPACE ARRANGEMENT AND ROOM TYPE

EQ-PT-3: GLARE CONTROLFUNCTION OF BUILDING SPACESTYPES & SPECS OF SHADING SYSTEM

EQ-PT-4: THERMAL CONTROLHEATING & COOLING SCOPESCOPE OF CONTROLS

EQ-PT-5: INDOOR AIR QUALITYAIR SUPPLY, DISTRIBUTION, VENT & EXH SYSTEM

UNITARY AC EQPTX

EQ-PT-6: MICROBIAL CONTAMINATION PREVENTIONAIR SUPPLY, DISTRIBUTION, VENT & EXH SYSTEM

WATER SYSTEM SPECS

EQ-PT-7: LOW VOC ENVIRONMENTTABLE OF MATERIALS (VOC LEVELS)LOW VOC REQ (ADHESIVE, SEALANTS, PAINT, CARPET SYSTEM, FURNITURE, WOOD PRODUCTS)

MATERIALSMT-PT-1: CIVIL WORKSBOMMATERIAL DATA SHEETSPLANS & SPECS

MT-PT-2 ELECTRICAL WORKSBOMMATERIAL DATA SHEETSREFLECTED CEILING PLANPLANS & SPECS

MT-PT-3: ARCHITECTURAL BOMWORKS AND FINISHESFSC CERTIFICATIONPLANS & SPECS

EMISSIONEM-PT-1: POLLUTANT AND GREENHOUSE GAS INVENTORYDESCRIPTION OF PROPOSED BUILDINGSCONSULTANTS BACKGROUNDIMPACT METHOD & CATEGORIESEMISSIONS REPORT

EM-PT-2: OZONE PROTECTIONM&E LETTERFUNCTIONAL DESCRIPTION OF THE SYSTEM

EM-PT-3 :EMISSION CONTROLPLANS & SPECS (EMISSION ALTERATION)FUNCTIONAL DESCRIPTION OF THE SYSTEM

WASTE

WS-RQ-1: WASTE MANAGEMENT PLANDOCUMENTATION/PLAN OF WASTE MANAGEMENT

WS-RQ-2: WASTE MANAGEMENT DURING CONSTRUCTIONWASTE MANAGEMENT

WS-PT-1: CONSTRUCTION WASTE DIVERSIONWASTE MANAGEMENT

WS-PT-2:MATERIALS RECOVERY FACILITYPLANS/SPECSFUNCTIONAL DESCRIPTION OF THE FACILITY

HERITAGE CONSERVATIONHC-RQ-1: CONSERVATION ASSESSMENTDETAILS, PHOTOGRAPS, CERTIFICATIONSCONSERVATION ASSESSMENT REPORT

HC-PT-1: HERITAGE FEATURE PROTECTIONCONSERVATION ASSESSMENT REPORTARCHITECTURAL PLANSUTILITY PLANS / LAYOUTSSPECS RETENTION, RESTORATION, PRESERVATION

HC-PT-2: HERITAGE FEATURES PROMOTIONCONSERVATION ASSESSMENT REPORTARCHITECTURAL PLANSUTILITY PLANS / LAYOUTSSPECS GREEN BUILDING

INNOVATIONIN-PT-1:INNOVATION IN DESIGN OR PROCESSPLAN DESIGN & SPECS (INNOVATION)CERTIFICATION (BERDE)

IN-PT-2: INNOVATION IN PERFORMANCEPLAN DESIGN & SPECS (INNOVATION)CERTIFICATION (BERDE)

Sheet2

Sheet3