Upload
arvee-villamor
View
226
Download
0
Embed Size (px)
DESCRIPTION
no copyright infringement intended
Citation preview
Sheet1BERDE for New Construction V1.0The Net Park Project14-8b Property Holdings, Inc.BGC, Taguig, Metro Manila, PhilippinesChecklist
PARAMETERPROGRESSATTACHMENTSACTION BY:DATENOTESSTARTEDCOMPLETEOF ACTIONMANAGEMENT`MN-RQ-1: COMMITMENTCOMMITMENT FORMREGISTRATION FORM 1PROJECT DESCRIPTIONBERDE PROPOSAL
MN-RQ-2: PROJECT TEAMOAD DESIGN ( INT'L ARCHITECTS)LA POCO ARCHITECTS (LAPAA)LEANDRO V. LOCSIN (ID CONSULTANTS)C|S DESIGNS (ID CONSULTANTS)ECOTEKTONIKAMPIDESCRIPTION ROLES
MN-RQ-3: TECHNICAL SITESITE TOPOGRAPHY SURVEY OR TOPOGRAPHY MAPASSESSMENTVICINITY MAPSITE COORDINATES(CIVIL WORKS) (FLOOD ASSESSMENT)
MN-RQ-4: ESTABLISH BASISOWNER'S SPECSOF DESIGNSUN STUDIESGENERAL SITE CRITERIASPECIFIC SITE CRITERIASUMMARY OF EXTERNAL ENVIRONMENT INFO BASED ON MN-RQ 3
MN-RQ-5: ESTABLISH A NET PARK DESIGN OR A CHARTDESIGN MANAGEMENT SYSTEMATTACHMENT FOR FOR MN-RQ 5 (DRAFT)DESIGN MANAGEMENT SYSTEM
MN-RQ-6: ESTABLISHED A CONSTRUCTION MANAGEMENT SYSTEMCONSTRUCTION MANAGEMENTCOMPONENTS OF CONSTRUCTION TEAMSYSTEMCOST AND SCHEDULE MANAGEMENT
MN-RQ-7 EST. COORDINATEDCOMMISIONING CHECKLISTBUILDING COMMISIONINGCOMMISIONING SCOPE (DRAFT) SYSTEMGENERAL BUILDING DESCRIPTION
MN-PT-1: BERDERCR CBP CERT. AND ID (SIGNED & SEALED)CONSULTANTS
MN-PT-2: STAKEHOLDERATTENDANCE SHEETCONSULTATIONPRESENTATION INCORPORATIONG ISSUES
MN-PT-3: DESIGN CHARRETTEGREEN FEATURESPRELIMINARY DESIGNRECOMMENDATION
MN-PT-4: SECURITYCCTV LAYOUT PLAN
MN-PT-5: SOCIAL DIMENSION COMMITMENTDOCUMENTATION
MN-PT-6: ENVIRONMENTAL DIMENSION COMMITMENTDOCUMENTATION
MN-PT-7: ECONOMIC DIMENSION COMMITMENTDOCUMENTATION
LAND USE AND ECOLOGY
LE-RQ-1: POLLUTION CONTROL SOIL PROTECTION PLANFROM CONSTRUCTIONAIR POLLUTION CONTROL PLANACTIVITIESEROSION CONTROLEXCATION PLAN
LE-PT-1: LAND REUSESITE PLAN REPORT OR SITE PHOTOGRAPHSLOCATION AND FOOTPRINTTEST REPORT OF CONTAMINATIONTECHNICAL REPORT OF REMEDIATION
LE-PT-2 PROTECTION OF ECOLOGICAL FEATURESDENR CERTIFICATEAND FURTHER IIMPROVEMENTTREE BALLINGLOCATION OF TRESS
LE-PT-3: PRO-BIODIVERSITY OPEN SPACECALCULATIONS
LE-PT-4: URBAN HEAT ISLAND EFFECT: NON ROOFCALCULATIONS
LE-PT-5: URBAN HEAT ISLAND EFFECT: BUILDING ROOFCALCULATIONS
LE-PT-6: FLOOD RISK MINIMIZATIONFLOOD MAP
WATERWT-RQ-1:EFFLUENT PLUMBING PLANMONITORING QUANTITY AND PLUMBING SPECSQUALITY MONITORINGCALCULATIONS & REPORTS
WT-PT-1: WATER METERINGWATER METER SPECSWATER METER & SUB-WATER METER/S PLAN
WT-PT-2: WATER CONSUMPTION WATER LAYOUTS (ISOMETRIC)REDUCTIONSANITARY LAYOUTS (ISOMETRIC)PLUMBING SYSTERM PLAN & SPECS
WT-PT-3: EFFICIENT LANDSCAPE WATER CONDESATE CALCULATIONSIRRIGATIONIRRIGATION TYPLE/SPECS & PLANS
ENERGYEN-PT-1: ENEGERY METERINGENERGY METERING (EPM 610)
EN-PT-2: ENERGY EFFICIENT LIGHTING & POWER LAYOUTLIGHTINGENERGY EFFICIENT LIGHTINGS
EN-PT-3: NATURAL VENTILATIONNATURAL VENTILATION CALCULATIONSZONING PLANS
EN-PT-4: ON-SITE ENERGY GENERATIONPLANS LOCATING RENEWABLE ENERGY TECHMANUAL ENERGY DESIGN ANALYSISELECTRICAL SINGLE LINE PLAN
EN-PT-5: ENERGY EFFICIENT IMPROVEMENTENERGY CONSERVATION PLANSELECTRICAL & MECHANICAL PLANS & SPECSREPORTS
EN-PT-6: ENERGY EFFICIENT BUILDING ENVELOPEARCHITECTURAL DRAWINGS SHOWING RADIATED EXPOSURE
SPECS / SCHEDULE OF WALLS, WINDOWS, ROOFING, SKYLIGHTS & SLABS
REPORT OF OTTV
EN-PT-7: ENERGY EFFICIENT EQUIPMENTSPECS OF ENERGY EFFICIENT EQUIP. (7.3.2.1 & 7.3.2.2 OF ASHRAE 189)
EN-PT-8:BUILDING AUTOMATION PLANS & SPECS OF MVAC SYSTEMSYSTEMSINNOVATION POINTS (LIFTS, LIGHTING, WASTE WATER SYSTEM, RENEWABLE ENERGY SYSTEM, EXTERNAL LOADS)
TRANSPORTATIONTR-PT-1: ALTERNATIVE TRANSPORTATION- BICYCLESVICINITY PLAN & PHOTOGRAPHS COMPUTATIONS SITE PLAN WITH SPECSDESIGN DRAWINGS
TR-PT-2: ALTERNATIVE TRANSPORTATION- LOW FEV & MPSPECS & CALCULATION
TR-PT-3:PARKINGPARKING LAYOUT / PLAN
TR-PT-4: PROXIMITY TO KEY VICINITY MAP & ADJACENT STRUCTURES (250M RADIUS)ESTABLISHMENTS
TR-PT-5: PUBLIC ACCESSPEDESTRIAN ROUTE PLANSECURITY MEASURES/PLAN
TR-PT-6: CONTRIBUTION TO PUBLIC TRANSPORT AMENITIESPUBLIC TRANSPORT AMENITES PLAN & SPECS
TR-PT-7: PUBLIC TRANSPORTATION ACCESSPUBLIC TRANSPORTATION ROUTES & STOPS ( BUS, JEEPNEY, SHUTTLE)
SPECS
TR-PT-8: TRANSPORTATION IMPACT ASSESSMENTPROPOSED DEVELOPMENT
INDOOR ENVIRONMENTAL QUALITYEQ-RQ-1: LIGHTING LEVELSCALCULATION PER AREA OF ILLUMINATIONS
EQ-RQ-2: THERMAL LEVELSMECHANICAL DESIGNSCOOLING LOAD CALCULATIONS
EQ-RQ-3: INDOOR ACOUSTICSACOUSTIC SPECS AND CONSIDERATIONS
EQ-PT-1: EXTERNAL VIEW AND ARCHITECTURAL DRAWINGSDAYLIGHTINGCOMPUTATION ADEQUATE DAYLIGHT LEVELS
EQ-PT-2: ILLUMINATION CONTROLLIGHTING LAYOUTLIGHTING PROTECTION LAYOUTSPECSDESIGN PLAN HIGHLIGHTING SPACE ARRANGEMENT AND ROOM TYPE
EQ-PT-3: GLARE CONTROLFUNCTION OF BUILDING SPACESTYPES & SPECS OF SHADING SYSTEM
EQ-PT-4: THERMAL CONTROLHEATING & COOLING SCOPESCOPE OF CONTROLS
EQ-PT-5: INDOOR AIR QUALITYAIR SUPPLY, DISTRIBUTION, VENT & EXH SYSTEM
UNITARY AC EQPTX
EQ-PT-6: MICROBIAL CONTAMINATION PREVENTIONAIR SUPPLY, DISTRIBUTION, VENT & EXH SYSTEM
WATER SYSTEM SPECS
EQ-PT-7: LOW VOC ENVIRONMENTTABLE OF MATERIALS (VOC LEVELS)LOW VOC REQ (ADHESIVE, SEALANTS, PAINT, CARPET SYSTEM, FURNITURE, WOOD PRODUCTS)
MATERIALSMT-PT-1: CIVIL WORKSBOMMATERIAL DATA SHEETSPLANS & SPECS
MT-PT-2 ELECTRICAL WORKSBOMMATERIAL DATA SHEETSREFLECTED CEILING PLANPLANS & SPECS
MT-PT-3: ARCHITECTURAL BOMWORKS AND FINISHESFSC CERTIFICATIONPLANS & SPECS
EMISSIONEM-PT-1: POLLUTANT AND GREENHOUSE GAS INVENTORYDESCRIPTION OF PROPOSED BUILDINGSCONSULTANTS BACKGROUNDIMPACT METHOD & CATEGORIESEMISSIONS REPORT
EM-PT-2: OZONE PROTECTIONM&E LETTERFUNCTIONAL DESCRIPTION OF THE SYSTEM
EM-PT-3 :EMISSION CONTROLPLANS & SPECS (EMISSION ALTERATION)FUNCTIONAL DESCRIPTION OF THE SYSTEM
WASTE
WS-RQ-1: WASTE MANAGEMENT PLANDOCUMENTATION/PLAN OF WASTE MANAGEMENT
WS-RQ-2: WASTE MANAGEMENT DURING CONSTRUCTIONWASTE MANAGEMENT
WS-PT-1: CONSTRUCTION WASTE DIVERSIONWASTE MANAGEMENT
WS-PT-2:MATERIALS RECOVERY FACILITYPLANS/SPECSFUNCTIONAL DESCRIPTION OF THE FACILITY
HERITAGE CONSERVATIONHC-RQ-1: CONSERVATION ASSESSMENTDETAILS, PHOTOGRAPS, CERTIFICATIONSCONSERVATION ASSESSMENT REPORT
HC-PT-1: HERITAGE FEATURE PROTECTIONCONSERVATION ASSESSMENT REPORTARCHITECTURAL PLANSUTILITY PLANS / LAYOUTSSPECS RETENTION, RESTORATION, PRESERVATION
HC-PT-2: HERITAGE FEATURES PROMOTIONCONSERVATION ASSESSMENT REPORTARCHITECTURAL PLANSUTILITY PLANS / LAYOUTSSPECS GREEN BUILDING
INNOVATIONIN-PT-1:INNOVATION IN DESIGN OR PROCESSPLAN DESIGN & SPECS (INNOVATION)CERTIFICATION (BERDE)
IN-PT-2: INNOVATION IN PERFORMANCEPLAN DESIGN & SPECS (INNOVATION)CERTIFICATION (BERDE)
Sheet2
Sheet3