ELECTRICAL COMPLETION REPORT (EC)

Junction Box

Project No: GK002

Date: Drawings No:

Location:

Check List Number:

Equipment Description: Sub-System Number:

Test Package Number: No.DescriptionYESNON.A

1.Check correctness of equipment tag

2.Check and record nameplate data in Test Memo

3.Check correctness of cable tag

4.Check tightness of mounting bolts

5.Check correctness and tightness of cable gland

6.Check correctness and tightness of cable lug / ferrule

7.Check tightness of terminals

8.Check earthing of junction box

9.Check cleanliness of junction box

10.Check continuity and insulation resistance (line to line and line to earth) of cable. Record the lowest value.

No.Cable TagContinuityInsulation Resistance Line to Line (Mohm)Insulation Resistance Line to Earth (Mohm)

1.

Remarks:

PVMS QC/ Subcontractor QCPVMS QAClientSurveyor

Name

Signature

Date

Page 2 of 2