11
© ETSI 2020 Charmed 5G deployment Anand S, Deepika E Tata Elxsi - CTO Office

Charmed 5G deployment - ETSI

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Charmed 5G deployment - ETSI

© ETSI 2020

Charmed 5G deploymentAnand S, Deepika E

Tata Elxsi - CTO Office

Page 2: Charmed 5G deployment - ETSI

© ETSI 2020

Agenda

• Charmed 5G system overview

• 5G scenarios and configurations

• Components view

• Deployment View

• POD Services view

• Charms view

• KNF Package view

• Demo

2

Page 3: Charmed 5G deployment - ETSI

© ETSI 2020

Charmed 5G system overview

3

Charmed OSM Juju Controller

AMF SMF

NRF NSSF

UDM PCF

AUSF

5GC Core

5G RAN Emulator

UE App

RAN Emulator

UPF

K8S Cluster

OSM Orchestration Juju KNF Configuration

5G Control Plane

Data PlaneKamailio IMS

P-CSCF I-CSCF

S-CSCF HSS SIP CLIENT

Page 4: Charmed 5G deployment - ETSI

© ETSI 2020

5G Scenarios and Configurations

4

• RAN Emulator Configurations

o gNB configurationso UE configurationso SCTP connection trigger

• Core Configurations

o Data path configurationso Subscriber informationo Slice information

• IMS Configurations

o Subscriber informationo DNS configurationso Domain name

• Scenarios that are planned to be demonstrated as part of this event

o 5G components Deployment (KNFs deployment) –Charmed OSM, JUJU Controller, Microk8s• RAN Emulator• Core• IMS

o Components Configurations (KNF configurations – Day-1 & 2)o 5G scenarios (Control and Data)

• 5G User Registration • Internet Traffic flow• Voice traffic flow

Page 5: Charmed 5G deployment - ETSI

© ETSI 2020

Components view

Page 6: Charmed 5G deployment - ETSI

© ETSI 2020

Deployment view

Page 7: Charmed 5G deployment - ETSI

© ETSI 2020

POD services view

7

Page 8: Charmed 5G deployment - ETSI

© ETSI 2020

Charms view

8

Relationscharm.py• configure_pod• upf_relation_changed• upf_relation_departed• smf_relation_joined

podspec.py• make_pod_spec • make_pod_ports• make_pod_command• make_pod_services

Page 9: Charmed 5G deployment - ETSI

© ETSI 2020

KNF Package View

9

RAN Package CORE Package IMS Package

Page 10: Charmed 5G deployment - ETSI

© ETSI 2020

Demo

10

5G deployment and configuration through Charmed OSM

Page 11: Charmed 5G deployment - ETSI

© ETSI 2020

Charmed 5G deployment

11

Thank You