24
RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 - Page 1 1 Chapter 8 – Framework for Infrastructure Contributions (Stormwater – Mainland) 3.8.1 Purpose (1) The purpose of this Policy is to implement an equitable developer contributions scheme for the trunk stormwater network servicing the mainland of Redland Shire. The contributions will be used to fund new and improved infrastructure needed to manage future growth on the Shire’s mainland. 3.8.1.1 Nature and Intention of Planning Scheme Policy (1) This planning scheme policy sets the basis for infrastructure contributions for trunk stormwater infrastructure for Redland Shire. The policy provides the basis for the contributions. (2) A new Priority Infrastructure Plan and related Infrastructure Charges Schedule will ultimately be adopted and form the basis for infrastructure provision. In the interim, this Chapter 8 of Planning Scheme Policy 3, Stormwater – Mainland, will be the basis for receiving contributions towards trunk stormwater infrastructure needed to service growth within the Shire. 3.8.1.2 Nature of Development to which Policy applies and triggers (1) This planning scheme policy applies to applications for material change of use and reconfiguration of a lot on the mainland in Redland Shire. 3.8.2 Background 3.8.2.1 The Need for Stormwater Infrastructure (1) Strong growth is expected to continue in Redland Shire creating an increasing demand on trunk stormwater and other infrastructure. To cater for this growth, and to ensure the mainland within the Shire have an effective trunk stormwater network with the capacity to cater for daily demands, continued upgrades to the network will be required. (2) Development required to accommodate ongoing population growth typically results in increased quantity of stormwater runoff and pollutants loadings to waterways. Stormwater infrastructure is required to manage runoff quantities and quality and help protect the natural waterways, including Moreton Bay. 3.8.2.2 Adoption Date and Superseded Policies (1) Applications received on or after the adoption date will be required to pay a contribution in accordance with the Planning Scheme Policy 3 –Contributions and Security Bonding, Chapter 8, Stormwater - Mainland). (2) The Infrastructure Contribution will not be applied to a. A properly made application received prior to the adoption date; or b. An application which has received a Development Permit or Preliminary Approval prior to the adoption date in respect of one or more of the following; Concurrent Material Change of Use and Reconfiguration; Material Change of Use; Reconfiguration.

Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 - Page 1

1

Chapter 8 – Framework for Infrastructure Contributions (Stormwater – Mainland) 3.8.1 Purpose (1) The purpose of this Policy is to implement an equitable developer contributions scheme for the

trunk stormwater network servicing the mainland of Redland Shire. The contributions will be used to fund new and improved infrastructure needed to manage future growth on the Shire’s mainland.

3.8.1.1 Nature and Intention of Planning Scheme Policy (1) This planning scheme policy sets the basis for infrastructure contributions for trunk stormwater

infrastructure for Redland Shire. The policy provides the basis for the contributions. (2) A new Priority Infrastructure Plan and related Infrastructure Charges Schedule will ultimately be

adopted and form the basis for infrastructure provision. In the interim, this Chapter 8 of Planning Scheme Policy 3, Stormwater – Mainland, will be the basis for receiving contributions towards trunk stormwater infrastructure needed to service growth within the Shire.

3.8.1.2 Nature of Development to which Policy applies and triggers (1) This planning scheme policy applies to applications for material change of use and

reconfiguration of a lot on the mainland in Redland Shire. 3.8.2 Background 3.8.2.1 The Need for Stormwater Infrastructure (1) Strong growth is expected to continue in Redland Shire creating an increasing demand on trunk

stormwater and other infrastructure. To cater for this growth, and to ensure the mainland within the Shire have an effective trunk stormwater network with the capacity to cater for daily demands, continued upgrades to the network will be required.

(2) Development required to accommodate ongoing population growth typically results in increased

quantity of stormwater runoff and pollutants loadings to waterways. Stormwater infrastructure is required to manage runoff quantities and quality and help protect the natural waterways, including Moreton Bay.

3.8.2.2 Adoption Date and Superseded Policies (1) Applications received on or after the adoption date will be required to pay a contribution in

accordance with the Planning Scheme Policy 3 –Contributions and Security Bonding, Chapter 8, Stormwater - Mainland).

(2) The Infrastructure Contribution will not be applied to

a. A properly made application received prior to the adoption date; or b. An application which has received a Development Permit or Preliminary Approval prior to the

adoption date in respect of one or more of the following;

Concurrent Material Change of Use and Reconfiguration; Material Change of Use; Reconfiguration.

Page 2: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

Page 2 - Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 RPS V4 – 2012

3.8.3 Network Planning Assumptions 3.8.3.1 Definition of Infrastructure Covered by Policy (1) The trunk stormwater infrastructure items covered by this policy include:

infrastructure required for stormwater quality management; infrastructure required for stormwater quantity management; and waterway enhancement works.

The trunk infrastructure items are listed in Table 1.

Table 1 Stormwater (Open Waterways) Infrastructure Items

Quality Wetlands Bioretention Systems

Quantity Land Acquisition Flood Mitigation / Levees Erosion Protection

Waterway Enhancement Rehabilitation

3.8.3.2 Stormwater – Desired Standards of Service 3.8.3.3 Objectives and Design Philosophy (1) The objectives and design philosophy of the trunk infrastructure within this policy is consistent

with ‘Objectives and Design Philosophy’ as detailed in Queensland Urban Drainage Manual (QUDM) Section 2.

3.8.3.4 Stormwater Quantity Management (1) Stormwater drainage systems shall be designed in accordance with Redland Planning Scheme

Policy 9 Chapter 6 – Stormwater Management, QUDM Section 5 and Australian Rainfall and Runoff (AR&R) 1997 unless otherwise specified.

(2) When calculating stormwater runoff flow rates the acceptable methods are described in Redland

Planning Scheme Policy 9 Chapter 6 – Stormwater Management, ARR 1997 and QUDM Section 5 unless otherwise specified.

(3) Intensity Frequency Duration (IFD) tables are to be created using methods outlined in AR&R

1997. (4) The design criteria for the major and minor drainage system must satisfy the criteria detailed in

QUDM Section 5.08. (5) The recommended Design Average Recurrence Interval for Major System Infrastructure is 100-

years. NOTE: where QUDM and the RSC requirements differ, the RSC requirements take precedence.

Page 3: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 - Page 3

3

3.8.3.5 Stormwater Quality Management (1) For the construction phase, the standard of service must comply with the Soil Erosion and

Sediment Control - Engineering Guidelines for Queensland Construction Sites (Queensland Division of the Institution of Engineers Australia, June 1996).

(2) For the operational phase, stormwater runoff treatment must be provided to achieve the water

quality objectives stated in “Redland Shire Council Water Quality Objectives”. These water quality objectives depend on the specific location of the proposed trunk infrastructure.

(3) The stormwater runoff treatment measures can be comprised of traditional engineering methods

or incorporate elements from Water Sensitive Urban Design (WSUD). The following references can be used in the design of the treatment measures:

Australia Runoff Quality, 2004, Institute of Engineers Australia, and Water Sensitive Urban Design Engineering Guidelines: Stormwater, 2004, Brisbane City

Council. 3.8.3.6 Waterway Enhancement (1) Enhancement such as rehabilitation, re-vegetation and stabilisation of the riparian zone is to be

undertaken in accordance with Redlands Planning Scheme Policy 14 – Waterways, Wetlands and Moreton Bay which identifies two main areas of the riparian zone as identified in Redlands Planning Scheme Part 5 - Overlays, Division 12 - Waterways, Wetlands and Moreton Bay Overlay (refer to Table 1);

The core riparian area (40m either side of waterway); The outer core riparian area.

(2) Re-vegetation is to be undertaken using native species complying with the standards outlined in

Redlands Planning Scheme Policy 4- Ecological Impacts, Section 4.11. (3) Works undertaken on bed and bank stabilisation including erosion protection are to provide

habitat enhancement, adopt soft engineering approaches and follow, as a minimum, the standards outlined in Redlands Planning Scheme Policy 14 – Waterways, Wetlands and Moreton Bay.

3.8.3.7 Growth Assumptions (1) Growth assumptions used for this planning scheme policy are those population and household

growth rates prepared for Redland Shire Council’s Priority Infrastructure Plan, Table 3.

Page 4: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

Page 4 - Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 RPS V4 – 2012

Hou

seh

old

s

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

20

21

Ale

xand

ra H

ills

5,95

1

5,95

9

5,96

7

5,97

5

5,98

4

5,99

2

6,00

0

6,00

8

6,02

1

6,03

4

6,04

6

6,05

9

6,07

2

6,07

6

6,08

0

6,08

5

6,08

9

6,09

3

Bir

kdal

e4,

888

4,95

0

5,01

2

5,07

4

5,13

7

5,20

0

5,26

3

5,32

6

5,42

0

5,51

4

5,60

9

5,70

4

5,80

0

5,86

9

5,93

8

6,00

8

6,07

8

6,14

9

Cap

alab

a6,

290

6,39

0

6,49

2

6,59

4

6,69

7

6,80

1

6,90

6

7,01

2

7,16

2

7,31

4

7,46

7

7,62

2

7,77

9

7,86

5

7,95

3

8,04

1

8,13

0

8,21

9

Cle

vela

nd5,

661

5,74

0

5,81

9

5,90

0

5,98

1

6,06

2

6,14

5

6,22

8

6,36

0

6,49

3

6,62

7

6,76

3

6,89

9

6,93

8

6,97

7

7,01

7

7,05

6

7,09

6

Orm

isto

n2,

106

2,13

0

2,15

4

2,17

9

2,20

3

2,22

7

2,25

2

2,27

6

2,33

8

2,40

0

2,46

2

2,52

4

2,58

6

2,64

4

2,70

3

2,76

3

2,82

4

2,88

6

Red

land

Bay

3,49

2

3,70

1

3,91

1

4,12

1

4,33

1

4,54

2

4,75

2

4,96

3

5,28

9

5,61

5

5,94

1

6,26

8

6,59

5

6,81

7

7,03

9

7,26

2

7,48

4

7,70

7

She

ldon

-Mt

Cot

ton

1,61

4

1,69

3

1,77

1

1,85

0

1,92

8

2,00

6

2,08

4

2,16

2

2,30

0

2,43

9

2,57

9

2,71

9

2,86

1

3,00

9

3,15

6

3,30

3

3,45

0

3,59

7

Thor

nesi

de1,

489

1,50

0

1,51

1

1,52

3

1,53

4

1,54

6

1,55

7

1,56

9

1,58

5

1,60

0

1,61

5

1,63

1

1,64

6

1,64

7

1,64

7

1,64

8

1,64

8

1,64

9

Thor

nlan

ds3,

341

3,52

2

3,70

5

3,89

0

4,07

8

4,26

7

4,45

9

4,65

3

4,93

5

5,21

8

5,50

2

5,78

7

6,07

2

6,31

6

6,57

0

6,83

5

7,11

1

7,40

0

Vic

tori

a Po

int

4,92

3

5,03

2

5,14

2

5,25

2

5,36

4

5,47

6

5,58

9

5,70

3

5,89

1

6,08

1

6,27

3

6,46

7

6,66

2

6,67

3

6,68

4

6,69

5

6,70

6

6,71

7

Wel

lingt

on P

oint

3,57

3

3,64

2

3,71

1

3,78

0

3,85

0

3,91

9

3,99

0

4,06

0

4,16

1

4,26

3

4,36

5

4,46

8

4,57

1

4,61

2

4,65

3

4,69

4

4,73

6

4,77

8

The

Bay

Isl

ands

3,15

3

3,21

2

3,27

1

3,33

0

3,38

8

3,44

5

3,50

2

3,55

9

3,61

6

3,67

2

3,72

8

3,78

4

3,83

9

3,89

5

3,95

2

4,00

7

4,06

3

4,11

8

46,4

81

47,4

72

48,4

67

49,4

68

50,4

73

51,4

83

52,4

98

53,5

19

55,0

77

56,6

43

58,2

15

59,7

95

61,3

82

62,3

62

63,3

54

64,3

58

65,3

77

66,4

09

Com

mu

nit

y O

f In

tere

st

Tab

le 2

H

ou

seh

old

Gro

wth

Rat

es –

Red

lan

d S

hir

e C

ou

nci

l

Po

pu

lati

on

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

20

21

Ale

xand

ra H

ills

17,6

92

17,7

15

17,7

38

17,7

61

17,7

83

17,8

06

17,8

29

17,8

52

17,8

84

17,9

16

17,9

49

17,9

81

18,0

13

18,0

20

18,0

26

18,0

33

18,0

39

18,0

46

Bir

kdal

e14

,440

14,5

95

14,7

49

14,9

04

15,0

58

15,2

13

15,3

67

15,5

22

15,7

62

16,0

02

16,2

41

16,4

81

16,7

21

16,8

66

17,0

11

17,1

55

17,3

00

17,4

45

Cap

alab

a17

,799

18,0

05

18,2

12

18,4

18

18,6

24

18,8

30

19,0

37

19,2

43

19,5

55

19,8

67

20,1

79

20,4

91

20,8

03

20,9

52

21,1

00

21,2

49

21,3

97

21,5

46

Cle

vela

nd13

,889

14,0

18

14,1

48

14,2

77

14,4

06

14,5

35

14,6

65

14,7

94

15,0

49

15,3

04

15,5

60

15,8

15

16,0

70

16,1

20

16,1

70

16,2

20

16,2

70

16,3

20

Orm

isto

n5,

669

5,72

7

5,78

6

5,84

4

5,90

3

5,96

1

6,02

0

6,07

8

6,23

9

6,39

9

6,56

0

6,72

0

6,88

1

6,98

7

7,09

3

7,20

0

7,30

6

7,41

2

Red

land

Bay

9,53

5

10,1

02

10,6

68

11,2

35

11,8

01

12,3

68

12,9

34

13,5

01

14,3

79

15,2

57

16,1

35

17,0

13

17,8

91

18,4

89

19,0

87

19,6

85

20,2

83

20,8

81

She

ldon

-Mt

Cot

ton

4,93

5

5,18

2

5,42

9

5,67

6

5,92

4

6,17

1

6,41

8

6,66

5

7,06

6

7,46

7

7,86

7

8,26

8

8,66

9

9,12

1

9,57

3

10,0

25

10,4

77

10,9

29

Thor

nesi

de3,

496

3,50

3

3,51

0

3,51

7

3,52

4

3,53

1

3,53

8

3,54

5

3,59

1

3,63

7

3,68

2

3,72

8

3,77

4

3,78

6

3,79

9

3,81

1

3,82

4

3,83

6

Thor

nlan

ds9,

695

10,1

62

10,6

28

11,0

95

11,5

62

12,0

29

12,4

95

12,9

62

13,7

31

14,5

00

15,2

69

16,0

38

16,8

07

17,1

35

17,4

64

17,7

92

18,1

21

18,4

49

Vic

tori

a Po

int

13,6

74

13,9

24

14,1

74

14,4

24

14,6

73

14,9

23

15,1

73

15,4

23

15,8

60

16,2

97

16,7

35

17,1

72

17,6

09

17,6

96

17,7

84

17,8

71

17,9

58

18,0

45

Wel

lingt

on P

oint

10,1

96

10,3

70

10,5

44

10,7

18

10,8

93

11,0

67

11,2

41

11,4

15

11,6

66

11,9

17

12,1

69

12,4

20

12,6

71

12,7

42

12,8

14

12,8

85

12,9

56

13,0

27

The

Bay

Isl

ands

6,75

7

6,91

3

7,07

0

7,22

6

7,38

2

7,53

8

7,69

5

7,85

1

8,00

1

8,15

1

8,30

1

8,45

1

8,60

1

8,75

3

8,90

5

9,05

7

9,20

9

9,36

1

Tota

l12

7,77

7

130,

216

13

2,65

5

135,

094

13

7,53

4

139,

973

14

2,41

2

144,

851

14

8,78

3

152,

715

15

6,64

7

160,

579

16

4,51

0

166,

668

16

8,82

5

170,

982

17

3,14

0

175,

297

Com

mu

nit

y O

f In

tere

st

Tab

le 2

P

op

ula

tio

n G

row

th R

ates

– R

edla

nd

Sh

ire

Co

un

cil

Page 5: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 - Page 5

3.8.4 Process for Determining Developer Contributions 3.8.4.1 Procedures Used to Calculate Stormwater Infrastructure Charges on the Mainland (1) The adopted stormwater infrastructure contributions scheme is based on charging new

developments on the mainland the shared cost of Council’s planned program of trunk stormwater infrastructure upgrading through to the year 2021. The trunk infrastructure elements are identified in the Plans for Trunk Infrastructure, included in Appendix A.

(2) The charges presented do not cover the cost of providing a new development with access to the

trunk stormwater infrastructure network. The cost of providing such access is a cost borne by the developer.

(3) The process used to calculate Trunk Stormwater Infrastructure Contributions for new

developments on the mainland of the Shire is detailed below. 3.8.4.2 Determination of Infrastructure Costs for each Catchment (1) The total costs of stormwater infrastructure, which meets the desired standards of service for both

quantity and quality management, has been calculated for each catchment on the mainland within the Priority Infrastructure Area, and is shown below in Table 4.

Table 4 Total Infrastructure Costs by Catchment

Catchment Total Cost ($)

Cleveland 30 022 000

Eprapah Creek 34 805 000

Hilliards Creek 21 045 980

Lower Tingalpa & Coolnwynpin Creek 50 445 000

Moogurrapum Creek 15 495 000

Native Dog Creek 10 744 000

Serpentine Creek 11 591 000

Southern Redland Bay 10 257 000

Tarradarrapin Creek 32 505 000

Thornlands 19 103 000

TOTALS 236 012 980

3.8.4.3 Apportionment of Costs Across Land Use Categories (1) The cost contribution for each land use was calculated by the most applicable procedure to fairly

allocate cost based on impact and infrastructure requirement. The characteristics of increased quantity of runoff are best associated with the increased impervious area occurring in the development. The proposed future land use zoning characteristics of the Shire, as outlined in Master Zoning Document Reference, have a typical fraction impervious value associated with them, as listed in Redland Planning Scheme Part 11 - Planning Scheme Policy 9 – Infrastructure Works – Chapter 6. These fraction impervious values were adopted for the assessment of quantity impacts, as listed in Table 5.

(2) Public open space land use categories (i.e. Open Space, Environmental Protection and

Conservation) were included for defining the Water Quality Objectives, but excluded for the distribution of infrastructure contribution charges. The cost of treatment for pollutant load

Page 6: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

Page 6 - Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 RPS V4 – 2012

reduction from these land use zones were shared evenly across all other land use categories within each catchment. It reflects Redland Shire Council’s water quality objectives of pollutant load reductions within waterways that does not discriminate by the source of the pollutants. This does not occur for quantity mitigation requirements, as the fraction impervious value of public open space is nil, hence no quantity impacts arise from its land use.

Table 5 Land use Characteristics

Land Use Category Fraction Impervious (Fi)

Commercial Industry 0.90

Community Purposes 0.90

Conservation 0

District Centre 1.0

Emerging Urban Community 0.45

Environmental Protection 0

General Industry 0.90

Investigation Zone 0.45

Local Centre 1.0

Low Density Residential 0.30

Major Centre 1.0

Marine Activity 0.90

Medium Density Residential 0.80

Neighbourhood Centre 0.90

Open Space 0

Park Residential 0.20

Rural Non-Urban 0.05

Urban Residential 0.45

3.8.4.4 Use of Fraction Impervious to Apportion Costs by Land Use (1) The basis of apportioning costs for works required to address trunk stormwater is the impervious

area for each land use. The total treatment cost for each catchment within the Priority Infrastructure Area was apportioned across the total impervious area within each catchment.

(2) The contribution for stormwater quantity and quality management infrastructure per impervious

hectare for Urban Residential Land is provided in Table 6. To calculate the contribution payable for various land use types, refer to Section 3.8.7 Calculating Infrastructure Contributions.

Page 7: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 - Page 7

Table 6 Stormwater Contribution per Impervious Hectare for Urban Residential Land

Catchment Contribution per Ha ($)

Cleveland 65,780

Eprapah Creek 45,049

Hilliards Creek 31,412

Lower Tingalpa and Coolnwynpin Creek 52,994

Moogurrapum Creek 49,347

Native Dog Creek 67,003

Southern Redland Bay 45,969

Serpentine Creek 53,885

Tarradarrapin Creek 62,462

Thornlands 63,550

3.8.4.5 Indexation (1) Developer contribution rates for stormwater infrastructure are in August 2006 dollars. Land

required for waterway corridors and infrastructure construction costs have been included in the Stormwater Infrastructure Contribution. Contributions payable shall be at the rate applicable at the time of payment. The Stormwater Infrastructure Contribution will be indexed on 1st July each year by the Australian Bureau of Statistics Road and Bridge Construction Index.

3.8.4.6 Subsidies and Grants (1) Any subsidies or grants that could be identified at the time of the planning for the Plans for Trunk

Infrastructure have been removed from the overall cost of facilities. 3.8.4.7 Creditable Contributions (1) Generally and at its discretion, Council will seek either a financial contribution based on the above

charge rates, works or land in lieu in accordance with the Infrastructure Contribution Schedule (refer Appendix A) and individual infrastructure agreements.

(2) Where a condition of development approval (imposed by Council) requires the applicant to

undertake works or dedicate land which are identified as part of the infrastructure charges schedule it is appropriate for the Council to offset the agreed costs of such works or land from the Stormwater Infrastructure Charge contribution. The value of such works will need to be agreed by Council prior to works commencing and will need to be documented in an Infrastructure Agreement.

(3) Credit may be sought for previous stormwater infrastructure charges attached to a parcel of land

where conclusive documentation is presented to Council that detail: How and the extent to which the previous charges or works complies with requirements of

the Infrastructure Charges Schedule; The date the previous charges works was dedicated to Council; The lawful development potential and actual development that accompanied the charges for

works; and A breakdown of credit per lot for each lot that resulted from a previous residential material

change in use or reconfiguring of a lot for which credit is sought.

Page 8: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

Page 8 - Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 RPS V4 – 2012

(4) An existing use has a credit value as stated in Tables 5, 6 and 7. 3.8.5 Charge Areas 3.8.5.1 Definition of Charge Areas, (1) The mainland stormwater contribution will apply to all development on the mainland within the

Priority Infrastructure Area that is serviced by the trunk stormwater network. 3.8.5.2 Master Planned Communities and Infrastructure Agreement Areas (1) Existing Infrastructure Agreements are not subject to this policy. (2) All Community Title Schemes or similar development will be charged in accordance with the rates

in Table 8. 3.8.6 Cost and Timing of Infrastructure (1) Details regarding cost and timing of infrastructure can be found in supporting documents - Refer

to Infrastructure Charges Schedule in Appendix A. 3.8.7 Calculating Infrastructure Contributions (1) The process for determining the stormwater infrastructure contribution for different development

types on the mainland and within the Priority Infrastructure Area is outlined below. (2) Step 1: From Table 5, determine the fraction impervious for each proposed land use in the

development. (3) Step 2: From Table 5, determine the fraction impervious for each existing land use in the

development. (4) Step 3: For each proposed land use, determine the net fraction impervious by subtracting the

existing impervious area determined in step 2 from the proposed impervious area determined in step 1.

(5) Step 4: Divide the net fraction impervious determined in step 3 by 0.45. (This converts the

fraction impervious to an equivalent urban residential land value) (6) Step 5: Determine the developable land area for each proposed land use type (in hectares). (7) Step 6: From Table 6, determine the contribution per ha for the appropriate catchment. (8) Step 7: Determine the contribution payable by multiplying the equivalent impervious value

determined in step 4 by the developable land area determined in step 5 by the charge per hectare determined in step 6.

Note: If there is a discrepancy between the nature of development proposed and the land use zone in which it is proposed, Council will determine the charge rate to be applied. 3.8.8 Terms and Definitions “DSS” Means the Desired Standard of Service “ICS” Means Infrastructure Charges Schedule “Dedication [of land]” Means the transfer of land to Council in fee simple.

Page 9: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 - Page 9

“Minor Drainage System” Means that part of the overall stormwater drainage system which controls flows from the minor design storm eg. kerb and channel, inlets, underground drainage etc. for the purposes of providing pedestrian safety, convenience and vehicle access. “Trunk Stormwater System” Means that part of the overall stormwater drainage system (including natural flow paths and creeks) which controls flow greater than those controlled by the minor drainage system. The trunk stormwater system excludes street flows not contained in the minor system. “Lot” A separate distinct parcel of land created on the registration on a plan of subdivision, under the land title act 1994. “Fraction Impervious” Proportion of site impervious to stormwater infiltration for different land use categories “Access” Means connection of individual developments to the trunk stormwater network. 3.8.9 Appendices Appendix A – Infrastructure Charges Schedule. Appendix B – Maps of existing and future infrastructure

Page 10: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

Page 10 - Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 RPS V4 – 2012

Appendix A – Stormwater Infrastructure

Page 11: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 - Page 11

Page 12: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

Page 12 - Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 RPS V4 – 2012

Page 13: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 - Page 13

Page 14: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

Page 14 - Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 RPS V4 – 2012

Page 15: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 - Page 15

Page 16: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

Page 16 - Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 RPS V4 – 2012

Page 17: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 - Page 17

Page 18: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

Page 18 - Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 RPS V4 – 2012

Appendix B – Stormwater Infrastructure

Page 19: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 - Page 19

Page 20: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

Page 20 - Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 RPS V4 – 2012

Page 21: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 - Page 21

Page 22: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

Page 22 - Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 RPS V4 – 2012

Page 23: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 - Page 23

Page 24: Chapter 8 – Framework for Infrastructure Contributions ... · Table 2 Population Growth Rates – Redland Shire Council RPS V4 - 2012 Part 11 – Planning Scheme Policy 3 Contributions

Page 24 - Part 11 – Planning Scheme Policy 3 Contributions and Security Bonding – Chapter 8 RPS V4 – 2012