    1. INTRODUCTION

    2. MWD SYSTEMS

    2.1 Power Sources

    3. MWD - DIRECTIONAL TOOLS

    3.1 Calculations for Inclination, Toolface and Azimuth

    3.2 Normal Surveying Routine

    3.3. Accuracy of MWD Surveys

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    3/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    4. MWD - GAMMA RAY TOOLS

    5. TRANSMISSION AND CONTROL SYSTEMS

    6. SURFACE SYSTEM

    7. CONFIGURATION OF MWD SYSTEMS

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    4/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    MWD systems allow the driller to gather and transmit information from the b

    hole back to the surface without interrupting normal drilling operations.

    This information can include

    Directional deviation data,

    Petrophysical properties

    drilling data, such as WOB and torque.

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    5/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    The information is gathered and transmitted to surface by the releva

    transmission equipment which is housed in a non-magnetic drill collar in

    assembly (Figure 1).

    This tool is known as a Measurement While Drilling Tool - MWD Tool.

    The data is transmitted through the mud column in the drill string, to surface

     At surface the signal is decoded and presented to the driller in an appropria

    The transmission system is known as mud pulse telemetry and does not

    line operations.

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    6/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Figure - 1

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    7/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Commercial MWD systems were first introduced in the North Sea in 1978 a

    effective method of taking directional surveys.

    To take a directional survey using conventional wireline methods may take 1

    Using an MWD system a survey takes less than 4 minutes.

     Although MWD operations are more expensive than wireline surveying

    But an operating company can save valuable rig time, which is usually more

    terms of cost.

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    8/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Recent MWD tool are more complicated tools which will

    provide not only directional information and drilling parameters (e.g. torq

    but also geological data (e.g. gamma ray, resistivity logs).

    The latter tools are generally referred to as Logging While Drilling - LWD To

     As more sensors are added the transmission system must be improved

    So MWD tools are becoming more sophisticated.

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    9/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    The main difference between the All MWD systems currently available

    The method by which the information is transmitted to surface.

     All three systems encode the data to be transmitted into a binary code

    Transmitting this data as a series of pressure pulses up the inside of the dri

    The process of coding and decoding the data will be described below.

    The only difference between the systems is the way in which the pressure p

    generated (Figure 2).

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    10/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    (1) Negative Mud Pulse Telemetry

    (2) Positive Mud Pulse

    (3) Frequency Modulation (Mud siren)

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    11/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Figure – 2.1

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    12/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Figure – 2.2

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    13/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Figure – 2.3

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    14/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    15/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    2.1 Power Sources

    No wireline connection to surface

     All the power required generated down hole.

    Either a battery pack or

    a turbine-alternator must be installed as part of the MWD tool.

    The turbine has been the standard method of power generation in the p

    and frequency modulation tools.

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    16/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    2.1 Power Sources

    Since less power is required in the negative pulse system batteries hav

    However, with more sensors being added and higher data rates require

    being replaced with turbines in negative pulse systems also.

    Turbines have several advantages over batteries (Table 2) but turbines

    to mechanical failure.

    Filter screens are used to prevent debris in the mud from damaging the

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    17/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    18/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

     All MWD systems use basically the same directional sensors for calculating

    Inclination,

     Azimuth

    Tool Face.

    The sensor package consists of

    3 orthogonal accelerometers and

    3 orthogonal magnetometers (Figure 3).

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    19/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Accelerometer 

     An accelerometer measure the component of the earth’s gravitational fie

    axis in which it is oriented.

    It works on the “force-balance” principle.

     A test mass is suspended from a quartz hinge which restricts any moveone axis only (Figure 4).

     As the mass tends to move due to gravity acting along that axis, its cen

    maintained by an opposing electromagnetic force.

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    20/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Accelerometer (cont.)

    The larger the gravitational force, the larger the pick-up current required

    The voltage drop over a resistor in the pick up circuit is measured

    This is directly related to the gravitational component

    Depending on the orientation of the BHA the reading on each accelerom

    different.

    From these 3 components the angle of inclination and tool face can be

    (Equations 1 and 2).

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    21/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Accelerometer (cont.)

    Figure - 3

    PCB – 

    4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    22/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Accelerometer (cont.)

    Figure -4

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    23/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Accelerometer (cont.)

    3.1 Calculations for Inclination, Tool face and Azimuth

    In the following equations a, b, c, x, y, z refer to the accelerometer and

    readings with axes as shown in Figure 3.

    - the angle between C accelerometer and vertical.

    verticalion cross-section

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    24/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Accelerometer (cont.)

    3.1 Calculations for Inclination, Tool face and Azimuth

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    25/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Accelerometer (cont.)

    3.1 Calculations for Inclination, Tool face and Azimuth

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    26/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Magnetometer 

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    27/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Magnetometer 

    Figure - 5

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    28/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    3.2 Normal Surveying Routine

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    29/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    3.2 Accuracy of MWD Survey

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    30/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    MWD Gamma Ray Tools

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

  • 8/18/2019 Chapter 5 Measurement While Drilling

    31/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    MWD Gamma Ray Tools

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

    UNIVERSITI TEKNOLOGI PETRONAS

  • 8/18/2019 Chapter 5 Measurement While Drilling

    32/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    MWD Gamma Ray Tools

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

    UNIVERSITI TEKNOLOGI PETRONAS

  • 8/18/2019 Chapter 5 Measurement While Drilling

    33/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

    UNIVERSITI TEKNOLOGI PETRONAS

  • 8/18/2019 Chapter 5 Measurement While Drilling

    34/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Figure - 6

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

    UNIVERSITI TEKNOLOGI PETRONAS

  • 8/18/2019 Chapter 5 Measurement While Drilling

    35/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

    UNIVERSITI TEKNOLOGI PETRONAS

  • 8/18/2019 Chapter 5 Measurement While Drilling

    36/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

    UNIVERSITI TEKNOLOGI PETRONAS

  • 8/18/2019 Chapter 5 Measurement While Drilling

    37/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

    UNIVERSITI TEKNOLOGI PETRONAS

  • 8/18/2019 Chapter 5 Measurement While Drilling

    38/43

    UNIVERSITI TEKNOLOGI PETRONAS

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

    UNIVERSITI TEKNOLOGI PETRONAS

  • 8/18/2019 Chapter 5 Measurement While Drilling

    39/43

    U S O OG O S

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

    UNIVERSITI TEKNOLOGI PETRONAS

  • 8/18/2019 Chapter 5 Measurement While Drilling

    40/43

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

    UNIVERSITI TEKNOLOGI PETRONAS

  • 8/18/2019 Chapter 5 Measurement While Drilling

    41/43

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

    UNIVERSITI TEKNOLOGI PETRONAS

  • 8/18/2019 Chapter 5 Measurement While Drilling

    42/43

    PETROLEUM ENGINEERING DEPARTMENT

    Internal

    Reference

    Harriot Watt Material

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR

    UNIVERSITI TEKNOLOGI PETRONAS

  • 8/18/2019 Chapter 5 Measurement While Drilling

    43/43

    Internal

    PETROLEUM ENGINEERING DEPARTMENT

    PCB  – 4213 ADVANCED DRILLING ENGINEERING

    BY . ASIF ZAMIR