Upload
miyoko
View
25
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Chapter 2. The Construction Business Environment. Key Terms. Addenda Agency CM Agreement American Institute of Architects (AIA). Key Terms. Approved Set As-builts (record set) Associated General Contractors (AGC) Best value. Key Terms. Bid set Building codes CM at Risk - PowerPoint PPT Presentation
Citation preview
Chapter 2
The ConstructionBusiness Environment
Key Terms
• Addenda
• Agency CM
• Agreement
• American Institute of Architects (AIA)
Key Terms
• Approved Set
• As-builts (record set)
• Associated General Contractors (AGC)
• Best value
Key Terms
• Bid set
• Building codes
• CM at Risk
• Commercial building construction
Key Terms
• Construction Specifications Institute (CSI)
• Contract set
• Delivery system
• Design-bid build
Key Terms
• Design-build
• Design development
• Engineering construction
• Engineers’ Joint Contract Documents Committee (EJCDC)
Key Terms
• General conditions
• Industrial construction
• Integrated services delivery
• MasterFormat
Key Terms
• Owner-builder
• Planning codes
• Preconstruction services agreement
• Project delivery system
Objectives
• Extent construction industry affects national economy
• How construction projects originate and evolve
• Fundamental project delivery systems and explain
Objectives
• Principal components of a contract for construction/role each plays
• Challenges a builder faces when using construction drawing
I. Types of Construction
A. Residential
B. Commercial Building
C. Engineering
D. Industrial
II. Government Influences
A. ICBOB. BOCAC. SBCCID. IBCE. AccessibilityF. Energy Use
III. Delivery Systems – Best Value
A. Qualifications-Based SelectionB. Design-bid-buildC. CM at RiskD. Design-buildE. Owner-BuilderF. Agency CMG. Program Management
V. The Construction Contract
A. AgreementB. General and Supplementary
ConditionsC. DrawingsD. SpecificationsE. Miscellaneous Documents
VI. Causes of Errors and Omissions in Drawings and Specifications
A. Project complexityB. The design professional’s
project workloadC. Inadequate staffD. Inadequate coordination of
designerE. Severe time constraints
F. Designers lack of experienceG. Inadequate compensation of
designerH. Owner changesI. Understanding how changes
affect entire projectJ. Poor quality control systems
VII. Current Concerns in Design Field
A. Lack of construction knowledgeB. Lack of knowledge of past
standardsC. EducationD. Poorly produced documentsE. Lack of will to correct problems
VIII. Drawing Issues
A. Duplications
B. Omissions
C. Discrepancies
IX. Contractors Responsibilities
A. Estimating
B. Operations and Administration
C. Interpreting Drawings and Specifications