20
Chapter 2 The Construction Business Environment

Chapter 2

  • Upload
    miyoko

  • View
    25

  • Download
    0

Embed Size (px)

DESCRIPTION

Chapter 2. The Construction Business Environment. Key Terms. Addenda Agency CM Agreement American Institute of Architects (AIA). Key Terms. Approved Set As-builts (record set) Associated General Contractors (AGC) Best value. Key Terms. Bid set Building codes CM at Risk - PowerPoint PPT Presentation

Citation preview

Page 1: Chapter 2

Chapter 2

The ConstructionBusiness Environment

Page 2: Chapter 2

Key Terms

• Addenda

• Agency CM

• Agreement

• American Institute of Architects (AIA)

Page 3: Chapter 2

Key Terms

• Approved Set

• As-builts (record set)

• Associated General Contractors (AGC)

• Best value

Page 4: Chapter 2

Key Terms

• Bid set

• Building codes

• CM at Risk

• Commercial building construction

Page 5: Chapter 2

Key Terms

• Construction Specifications Institute (CSI)

• Contract set

• Delivery system

• Design-bid build

Page 6: Chapter 2

Key Terms

• Design-build

• Design development

• Engineering construction

• Engineers’ Joint Contract Documents Committee (EJCDC)

Page 7: Chapter 2

Key Terms

• General conditions

• Industrial construction

• Integrated services delivery

• MasterFormat

Page 8: Chapter 2

Key Terms

• Owner-builder

• Planning codes

• Preconstruction services agreement

• Project delivery system

Page 9: Chapter 2

Objectives

• Extent construction industry affects national economy

• How construction projects originate and evolve

• Fundamental project delivery systems and explain

Page 10: Chapter 2

Objectives

• Principal components of a contract for construction/role each plays

• Challenges a builder faces when using construction drawing

Page 11: Chapter 2

I. Types of Construction

A. Residential

B. Commercial Building

C. Engineering

D. Industrial

Page 12: Chapter 2

II. Government Influences

A. ICBOB. BOCAC. SBCCID. IBCE. AccessibilityF. Energy Use

Page 13: Chapter 2

III. Delivery Systems – Best Value

A. Qualifications-Based SelectionB. Design-bid-buildC. CM at RiskD. Design-buildE. Owner-BuilderF. Agency CMG. Program Management

Page 14: Chapter 2
Page 15: Chapter 2

V. The Construction Contract

A. AgreementB. General and Supplementary

ConditionsC. DrawingsD. SpecificationsE. Miscellaneous Documents

Page 16: Chapter 2

VI. Causes of Errors and Omissions in Drawings and Specifications

A. Project complexityB. The design professional’s

project workloadC. Inadequate staffD. Inadequate coordination of

designerE. Severe time constraints

Page 17: Chapter 2

F. Designers lack of experienceG. Inadequate compensation of

designerH. Owner changesI. Understanding how changes

affect entire projectJ. Poor quality control systems

Page 18: Chapter 2

VII. Current Concerns in Design Field

A. Lack of construction knowledgeB. Lack of knowledge of past

standardsC. EducationD. Poorly produced documentsE. Lack of will to correct problems

Page 19: Chapter 2

VIII. Drawing Issues

A. Duplications

B. Omissions

C. Discrepancies

Page 20: Chapter 2

IX. Contractors Responsibilities

A. Estimating

B. Operations and Administration

C. Interpreting Drawings and Specifications