CHAPTER 15
ENVIRONMENTAL AND SOCIAL MANAGEMENT
SYSTEM
Quantum Power Ghana Gas Limited 15-i Knight Piésold Consulting
Environmental and Social Impact Assessment
TABLE OF CONTENTS
15 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM ................................................ 15-1
15.1 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM OVERVIEW ............................. 15-1
15.2 QUANTUM POWER GHANA GAS LIMITED VISION, POLICY AND STRATEGIES ................ 15-3
15.2.1 Quantum’s Vision ...................................................................................................................... 15-3
15.2.2 Quantum’s Integrated Sustainability Policy (Environment, Health and Safety) ........................ 15-3
15.2.3 Objective ................................................................................................................................... 15-5
15.2.4 Implementation ......................................................................................................................... 15-5
15.2.5 Quantum Power Strategies....................................................................................................... 15-5
15.3 FRAMEWORK FOR IMPLEMENTATION OF THE ENVIRONMENTAL AND SOCIAL
MANAGEMENT PLANS ........................................................................................................... 15-7
15.3.1 Purpose of the Provisional Environmental and Social Management Plans ............................. 15-7
15.3.2 Contents of the Provisional Environmental and Social Management Plans ............................ 15-7
15.3.3 Roles and Responsibilities ........................................................................................................ 15-7
15.3.4 Stakeholder Engagement ......................................................................................................... 15-9
15.4 KEY COMPONENTS FOR THE IMPLEMENTATION OF THE ENVIRONMENTAL AND SOCIAL
MANAGEMENT SYSTEM ...................................................................................................... 15-10
15.4.1 Training ................................................................................................................................... 15-10
15.4.2 Responses to Incidents .......................................................................................................... 15-11
15.4.3 Audit and Inspection ............................................................................................................... 15-12
15.4.4 Reporting ................................................................................................................................ 15-13
15.4.5 Managing Changes ................................................................................................................. 15-13
15.4.6 Communication to Stakeholders ............................................................................................. 15-14
LIST OF TABLES
Table 15-1: Quantum Project HSE Organisation...................................................................... 15-7
Table 15-2: EPC Contractor HSE Organisation ....................................................................... 15-8
Table 15-3: Environmental Incident Categories ..................................................................... 15-11
LIST OF FIGURES
Figure 15-1: Environmental and Social Management System Implementation Process ......... 15-2
Quantum Power Ghana Gas Limited 15-1 Knight Piésold Consulting
Environmental and Social Impact Assessment
15 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM
This chapter presents the framework for implementation of the Project Environmental and
Social Management System (ES-MS). This includes environmental and social monitoring,
documenting compliance (e.g. record-keeping), as required to measure the effectiveness of the
mitigation measures, reporting on environmental and social performance, and the process for
defining and implementing procedures for corrective action when necessary.
In the course of the ESIA, impacts (both positive and negative) to the physical, natural and
socio-economic environments have been identified. In order to avoid, minimise and reduce
negative impacts, and to ensure opportunities for the enhancement of positive impacts are
realised, provisional Environmental and Social Management Plans (ESMPs) have been
prepared.
The ES-MS framework enables implementation of the ESMP, which details the actions that will
be taken to mitigate and manage environmental and social impacts based on the activities
described in the Chapter 2: Project description; Chapters 8-10: Environmental and Socio-
economic Baseline chapters; and Chapters 11-13: Impact Assessment chapters of this ESIA.
Implementation of the ESMP provides tools for auditing the Project’s mitigation and monitoring
activities, and communicating monitoring outcomes to stakeholders1.
The provisional ESMPs are contained in Volume Three of this ESIA. These include:
Annexure A: Provisional Environmental and Social Management Plans
Annexure B: Provisional Emergency Response Plan
To provide a vehicle for the integrated management of all the ESMPs, an Environmental and
Social Management System (ES-MS) will be implemented by Quantum Power. In this regard,
the ES-MS is a key component of this ESIA.
15.1 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM OVERVIEW
IFC Performance Standard 1 requires that an ES-MS be developed to support an organisation’s
overall management systems to address environmental and social impact management
effectively. The overarching management system is the Project’s Management System that:
enables the Project to manage activities in a healthy, safe and environmentally and socially
responsible manner;
establishes a common set of objectives and expectations;
provides a structure to organise processes, programmes and procedures that enable the
Project to carry out these objectives and expectations;
is designed to identify, evaluate and control Project risks in a way that prevents or
mitigates incidents that could impact people, the environment or assets; and
applies to the entire asset life cycle: starting with design or acquisition, continuing through
construction, installation, start-up and operations, and on through abandonment or
divestiture.
1 A Stakeholder Engagement Strategy has been developed to describe its engagement strategies with identified project stakeholders.
Quantum Power Ghana Gas Limited 15-2 Knight Piésold Consulting
Environmental and Social Impact Assessment
The key steps or processes of the ES-MS are illustrated in Figure 15-1, and each of the steps is
further detailed below.
Figure 15-1: Environmental and Social Management System Implementation Process
The main elements of an ES-MS comprise the following four phases.
Planning: Establishing the objectives and processes necessary to deliver results in
accordance with the Quantum Powers’ Environmental and Social Policy.
Doing: Implementing the processes through defining mitigation measures and assigning
responsibilities for undertaking or implementing such mitigation measures.
Checking: Monitoring and measuring these processes against the policy, objectives and
targets, legal and other requirements (such as those of Ghana and the IFC), and reporting
of the results.
Acting: Taking actions to continually improve performance of the ES-MS through the
training of personnel and auditing of results.
An ES-MS is therefore implemented to:
Assist management in establishing priorities for environmental and social impacts;
Provide a mechanism for ensuring that measures identified in the ESIA and listed in each
management plan, are implemented;
Ensure that changes in Ghanaian legislation are tracked and adhered to at all times;
Provide a framework for compliance auditing and inspection programmes;
Ensure environmental and social issues continue to be integrated into business decisions;
Provide a framework for mitigating impacts that may be unforeseen or unidentified until
construction or operation is underway;
Quantum Power Ghana Gas Limited 15-3 Knight Piésold Consulting
Environmental and Social Impact Assessment
Encourage and achieve appropriate environmental and social performance and awareness
from all employees and contractors;
Provide assurance to regulators, stakeholders and lenders that their requirements with
respect to environmental, social and health performance are being managed; and
Provides the opportunity to certify the system to international standards, such as ISO
14001, if so desired.
The ESIA has essentially undertaken most of the initial planning aspects required by an ES-MS
by identifying environmental and social impacts and formulating management plans. Further
elements of an ES-MS related to planning and those related to doing, checking and acting, are
described in this chapter.
15.2 QUANTUM POWER GHANA GAS LIMITED VISION, POLICY AND STRATEGIES
The development of the ES-MS has been guided by the vision statement and environmental
policy of Quantum Power. These Policies are high-level corporate statements of intent and
establishes the principles to be followed in the management of environmental and social issues.
The policies therefore constitute the documents against which all related activities should be
judged.
15.2.1 Quantum’s Vision
The vision of Quantum Power is as follows:
Quantum Power’s primary focus is on the development of a Liquefied Natural Gas
Facility and associated infrastructure to import, re-gasify and distribute gas to
independent power producers in the Tema/ Kpone area. Their vision is to be a leading
supplier of natural gas in Ghana that creates value for its shareholders, employees and
their business in a manner that is sustainable and that does not harm the environment or
people.
15.2.2 Quantum’s Integrated Sustainability Policy (Environment, Health and Safety)
Quantum Power Ghana Gas Limited’s Integrated Sustainability Policy is defined in Box 15-1
and is designed to reflect the environmental needs and responsibilities of the company’s
activities. Additionally, the company will continue to address hazard control, accident
prevention, training and employee participation in all aspects of its operations.
In particular the Integrated Sustainability Policies indicate Quantum’s commitment to continual
environmental improvement, health and safety responsibilities, the prevention of pollution,
conformance to legislation and other requirements in relation to its environmental aspects.
Quantum Power Ghana Gas Limited 15-4 Knight Piésold Consulting
Environmental and Social Impact Assessment
INTEGRATED SUSTAINABILITY POLICY (ENVIRONMENT, HEALTH AND SAFETY)
Quantum Power Ghana Gas Limited (QPRGG) is a developer, owner and operator of
electricity generation assets and power-related infrastructure throughout Africa. QPRGG is
committed to the implementation of a management system which will minimise negative
and advance positive impacts on the environment. The company recognises that the work it
undertakes could have an impact on the safety and health of its employees. To this end,
QPRGG is firmly committed to and will:
Establish procedures to promote continuing improvement of compliance with all
applicable Environmental, Health and Safety (EHS) laws and regulations.
Establish procedures to continue efforts to strengthen and improve knowledge of
environmental issues within the company.
Monitor and report on health and safety objectives by including health and safety
targets in the Key Performance Indicators.
Seek optimal operation of the Company’s Facilities to minimise generation of
hazardous waste at the point of generation, and to reduce or eliminate pollution
sources with continual improvement.
Promote cooperation and understanding with the public, clients, and governmental
agencies in developing economically feasible and environmentally sound
operational objectives.
Establish procedures for reporting all noncompliance’s in accordance with
applicable governmental reporting requirements, evaluate causes of
noncompliance, and implement corrective actions.
Establish procedures for periodic review of environmental compliance with all laws
and regulations, as well as with the ISO 14001 Environmental Management
System.
Establish procedures to ensure that all employees, contractors and sub-contractors
are knowledgeable of, and understand and comply with the policy.
Promptly correct any practice or condition not in compliance with this policy.
Review policy annually in line with QPRGG’s business operations.
Management at all levels of QPRGG is responsible for ensuring that this policy is adhered
to by all employees and subcontractors.
Don Ackah
Chief Executive Officer
Effective date: 1st January 2015
Box 15-1: Integrated Sustainability Policy
Quantum Power Ghana Gas Limited 15-5 Knight Piésold Consulting
Environmental and Social Impact Assessment
15.2.3 Objective
Quantum Power recognises that maintenance of environmental quality is vital to the Company’s
existence, progress, and continued development. The Company will maintain high
environmental standards and will adhere as far as practicably possible to international best
practise limited only by technical and economic feasibility. The Company will take positive
action to protect the safety of its workers, conserve natural resources, and minimize the impact
of its activities on the environment through diligent application of appropriate technology and
responsible conduct at all stages of the LNG Project.
The purpose of Quantum’s Integrated Sustainability Policy is to provide a measurable
framework for the performance of the Company’s activities in an environmentally responsible
manner, ensuring compliance by the Company and its employees with all applicable
environmental regulations and commitments.
15.2.4 Implementation
Quantum Power will:
Evaluate, plan, construct, and operate all projects and facilities to reduce adverse
environmental impacts and to meet or exceed applicable environmental laws, regulations,
and standards. In the absence of applicable regulations, the Company will apply cost
effective best management practices to protect the environment.
Require managers of all projects and operations to adhere to the Company Environmental
Policy and to identify, evaluate, and minimize risks to the environment.
Continuously review environmental achievements and technology to seek and implement
methods for further improvement.
Require all operations to have site-specific emergency response plans as well as adequate
management plans to mitigate impacts which meet or exceed all applicable regulations.
Conduct regular audits of environmental performance and emergency response plans to
verify compliance with the Company’s policy and applicable regulations. Identify revisions
or improvements to current practices in order to minimize environmental impacts. Report
findings quarterly to the Board of Directors.
Educate employees in environmental matters and responsibilities relating to performance of
their assigned tasks. Entrust all employees to maintain necessary environmental
performance for their activities.
Foster communication with shareholders, the public, employees, and government to
enhance understanding of environmental issues affecting the Company’s activities.
Work pro-actively with government and the public to define environmental priorities.
Participate in the development of responsible laws for the protection of the environment.
Allocate sufficient resources to meet the Company’s environmental goals. Annually assess
the projected costs of decommissioning and reclamation while funding off balance sheet an
appropriate amount to ensure that there is sufficient cash reserves to pay for these costs
upon closure.
15.2.5 Quantum Power Strategies
The Environmental and Social and Health Policies provide a set of strategies. These include:
Quantum Power Ghana Gas Limited 15-6 Knight Piésold Consulting
Environmental and Social Impact Assessment
Legal Compliance
Evaluate, plan, construct, and operate the Project and associated facilities to reduce
adverse environmental impacts and to meet or exceed applicable environmental laws,
regulations, and standards. In the absence of applicable regulations, the Company will
apply cost effective best management practices to protect the environment.
Employee Awareness
Require managers of all operations to adhere to the Company Environmental Policy and to
identify, evaluate, and minimize risks to the environment.
Educate employees in environmental matters and responsibilities relating to performance of
their assigned tasks. Entrust all employees to maintain necessary environmental
performance for their activities.
Emergency Responses
Require all operations to have site-specific emergency response plans as well as adequate
management plans to mitigate impacts which meet or exceed all applicable regulations.
Interaction with Stakeholders
Foster communication with shareholders, the public, employees, and government to
enhance understanding of environmental issues affecting the Company’s activities.
Work pro-actively with government and the public to define environmental priorities.
Participate in the development of responsible laws for the protection of the environment.
Occupational Health and Safety
Safe and healthy working conditions.
Arrangements for the operation, design and maintenance of safe systems of work.
Properly maintained and guarded machinery.
Information, instruction, training, and supervision appropriate to the company’s activities.
Arrangements for consultation with employees and their representation health and safety
matters.
Continuous Assessment
Continuously review environmental achievements and technology to seek and implement
methods for further improvement.
Conduct regular audits of environmental performance and emergency response plans to
verify compliance with the Company’s policy and applicable regulations. Identify revisions
or improvements to current practices in order to minimize environmental impacts. Report
findings quarterly to the Board of Directors.
Allocate sufficient resources to meet the Company’s environmental goals. Annually assess
the projected costs of decommissioning and reclamation while funding off balance sheet an
appropriate amount to ensure that there is sufficient cash reserves to pay for these costs
upon closure.
The management plans should support the commitments made in Quantum Power’s Vision,
Environmental Policy statements and associated strategies.
Quantum Power Ghana Gas Limited 15-7 Knight Piésold Consulting
Environmental and Social Impact Assessment
15.3 FRAMEWORK FOR IMPLEMENTATION OF THE ENVIRONMENTAL AND SOCIAL
MANAGEMENT PLANS
15.3.1 Purpose of the Provisional Environmental and Social Management Plans
To ensure that identified and unforeseen or unidentified impacts are detected and resolved a
set of management plans have been developed. The management plans will be supplemented
with additional requirements as detailed design proceeds and as contractors are selected.
Contractors will be required to develop their working methods and procedures in accordance
with the management plans.
The management plans are an integral part of the ES-MS and act as the main vehicle for
converting the Vision, Policy and Strategies into action.
15.3.2 Contents of the Provisional Environmental and Social Management Plans
Each of the management plans included in Volume Three provides:
A description of the impacts, actions and direct responsibility for managing the impact;
Monitoring requirements, including targets and performance indicators; and
Reporting requirements.
The formulation of each plan covers the planning process of the ES-MS while the
implementation of each plan will cover the implementation and operations processes.
15.3.3 Roles and Responsibilities
To implement the Management Plans, roles and responsibilities for implementation need to be
defined. These roles and responsibilities are discussed below.
The successful implementation of the ES-MS requires a commitment from Quantum Power as
well as their employees and contractors. Within these structures roles and responsibilities for
the implementation of the Management Plans need to be defined as presented in Table 15-1.
Table 15-1: Quantum Project HSE Organisation
Role Responsibility
Project Director Oversee and coordinate all activities pertaining to the Project;
ultimately responsible for HSE.
HSE Manager Ensure that the Project and all its contractors operate in accordance
with applicable regulatory environmental requirements and the
Tema LNG Project ESMP (and associated plans); liaise with
regulators on the Project’s behalf; oversee programs associated with
environmental initiatives.
Site Manager Manage, monitor, report, and ensure the efficient working conditions
of all site activities by the Project staff and by EPC contractors;
assist the HSE Manager with matters related to HSE compliance
and enforcement including implementation of ESMP.
Quantum Power Ghana Gas Limited 15-8 Knight Piésold Consulting
Environmental and Social Impact Assessment
Community Relations
Manager
Liaise with the communities on the Project’s behalf, including in
relation to works being carried out by contractor and subcontractor;
oversee programs associated with social and community
development initiatives; maintain the Project’s grievance procedure.
Environmental and
Social Inspector
Monitor and report on the compliance and performance of the
Project with respect to environmental and social commitments; carry
out regular on-site inspection; monitor compliance and performance
of EPC contractors and any subcontractors.
Similarly specific roles and responsibilities need to be defined for contractors and
subcontractors as shown in Table 15-2.
Table 15-2: EPC Contractor HSE Organisation
Role Responsibility
EPCM Project Director Oversee and coordinate all activities; ultimately responsible for HSE
compliance of the EPC contractor.
EPCM Site Manager Ensure that all work by the EPC contractor and by all subcontractors
is done in compliance with applicable regulatory environmental
requirements and the Tema LNG Project HSE plans. Responsible
for coordination with project Community Relations Manager for all
community relations issues including upcoming works.
EPCM Contractor HSE
Manager
Ensure that the EPC contractor organisation operates in accordance
with applicable regulatory environmental requirements and the
Tema LNG Project HSE plans.
During construction, and to a lesser extent operations, contractors will be the key implementers
of mitigation measures as defined in management plans and will also be responsible for
ensuring compliance with the Project policies and commitments.
Under their contracts, contractors will be responsible for managing the potential environmental,
socio-economic, safety and health impacts of all their contract activities including those of their
subcontractors.
Contractors must as part of their obligations:
Demonstrate compliance with the Environmental Policy through the development and
approval of detailed environmental, social and health plans, procedures and standards;
Demonstrate commitment to the ESIA and its management plans in their management
structure;
Identify individuals responsible for overall environment, social, safety and health
management; and
Undertake regular environmental, social, health and safety inspections and provide reports
to allow for the monitoring and evaluation of performance.
Quantum Power Ghana Gas Limited 15-9 Knight Piésold Consulting
Environmental and Social Impact Assessment
Although the contractors will have the primary roles in delivering on the measures set out in the
ESIA and management plans, Quantum Power will have the ultimate accountability for ensuring
the measures are delivered. This accountability may be delegated to the other where
applicable.
15.3.4 Stakeholder Engagement
Quantum Power will continue to engage with stakeholders throughout the life of the Project.
During construction, communication with local communities and other local stakeholders will be
undertaken by the community liaison function who will work closely with the relevant
contractors.
The objectives of the Stakeholder Engagement Strategy outlined in Annexure C of Volume Two,
are as follows:
To ensure understanding by facilitating an open, culturally appropriate and inclusive
approach to engagement that provides timely and accurate information in an accessible
and transparent way to all stakeholders, regardless of their status.
To manage expectations and concerns by providing a mechanism which not only provides
stakeholders an opportunity to freely provide comment and feedback but also allows
Quantum Power to respond to this feedback, thereby addressing concerns.
To manage risks through building sustainable relationships. Engagement will allow
Quantum Power to understand stakeholder interests and issues and work with
stakeholders to find mutually acceptable ways to achieve or address these.
To create value where engagement allows for partnerships to be developed for the mutual
benefit of both Quantum and the stakeholders. This includes but is not restricted to
corporate social investment activities. This relates also to seeking mutual benefit through
design and operations by considering stakeholders and seeking their benefit in all Project
activities.
15.3.4.1 Grievance Procedure
It is intended that the stakeholder engagement measures outlined above, and the mitigation
and management measures outlined in all other management plans, will work proactively
towards identifying and addressing issues before they become grievances. However, when
grievances are reported they need to be addressed in a consistent and verifiable manner. This
will be done through the implementation of a grievance procedure.
This procedure focuses on the recording and processing of complaints and grievances and not
of incidents, which should be dealt with through the ES-MS. The definitions of both a grievance
and an incident are presented in below. Although their definitions may differ, there are clear
links that need to be established between this grievance procedure and the incident reporting
system. The definitions are as follows:
A grievance is when a complaint linked to the operation is raised with the expectation that
the complaint will be addressed.
An incident is any occurrence that has caused, or has the potential to cause, a negative
impact on people, the environment or property (or a combination thereof). It also includes
any significant departure from standard operating procedures.
Quantum Power Ghana Gas Limited 15-10 Knight Piésold Consulting
Environmental and Social Impact Assessment
In some cases, grievances may be linked to actual incidents, in which case the incident also
needs to be reported.The grievance procedure for the QuantumPower should be followed for all
grievances relating to the Project as a whole. The grievance procedure is divided into six key
steps:
Step 1: Receive and log grievance.
Step 2: Acknowledge grievance.
Step 3: Assess and prioritise grievance and forward to relevant function.
Step 4: Investigate and resolve grievance.
Step 5: Sign off on grievance.
Step 6: Monitor.
15.4 KEY COMPONENTS FOR THE IMPLEMENTATION OF THE ENVIRONMENTAL AND
SOCIAL MANAGEMENT SYSTEM
Mitigation, monitoring and management measures are contained throughout this ESIA and in all
management plans. These measures all represent the doing and checking processes of the ES-
MS framework.
In addition to these commitments, other key components of the ES-MS include training, audits
and inspections and reporting. These measures all represent the doing (training), checking
(audits and inspections) and acting (reporting) processes of the ES-MS framework.
15.4.1 Training
The key components of training requirements are to ensure that all site personnel, including
contractors understand the:
Environmental and social requirements of the proposed Project and how these will be
implemented and monitored on site;
Contents and relevant requirements of Project actions contained within the applicable
management plans;
Environmental and social sensitivities of the Study Area;
Procedures to be followed in the event of non- compliance with the environmental, social
and health requirements; and
Procedures for responding to the media, unauthorised visitors to the site, and enquiries
from the public.
They must also:
Know how to deal with unforeseen environmental and social incidents; and
Be aware of their roles with respect to environmental, social and health issues.
15.4.1.1 Project Training Programme
One of the most important mechanisms for the enhancement of the Project’s environmental and
social performance will be the continued implementation of a training programme for all Project
personnel including the personnel of contractors and subcontractors.
Quantum Power Ghana Gas Limited 15-11 Knight Piésold Consulting
Environmental and Social Impact Assessment
Training will include:
Induction training for all staff including modules on: health and safety, environmental
awareness, accommodation rules, worker code of conduct, stakeholder engagement,
grievance mechanisms and cultural heritage awareness;
Toolbox training for specific tasks; and
Training for individuals involved in tasks with specific responsibilities.
Refresher training programmes will also be implemented to ensure continual improvement
in environmental awareness for all Project personnel.
Training will be provided at each stage of the Project, from initial establishment of logistical
facilities through to construction and operation. The training function will assist managers in
developing and co-ordinating training programmes as required.
Training records will be maintained by the training function and an assessment of the
effectiveness of the training programmes will be included as part of the internal audit
procedures.
15.4.1.2 Contractor Training Programme
Contractors will be responsible for ensuring that all their personnel are aware of their
environmental, social and health responsibilities. They will develop and implement training
programmes to the satisfaction and approval of the Project Sponsors.
Training will include:
Induction training for all staff prior to carrying out any work on site. This will include
modules on: health and safety, environmental awareness, accommodation rules, worker
code of conduct, stakeholder engagement, grievance mechanisms and cultural awareness;
Toolbox training for specific tasks;
Training for individuals involved in tasks with specific responsibilities; and
Training programmes organised by the Project Sponsor as required.
The contractor will keep auditable records of training given. Assessment of the effectiveness of
the training programme will be included as part of the ESH-MS audit procedures.
15.4.2 Responses to Incidents
The reporting and investigation of all potential and actual incidents that could have a
detrimental impact on human health, the natural environment or property is required so that
remedial and preventive steps can be taken to reduce the potential or actual impacts as a result
of all such incidents.
For Quantum Power, environmental incidents can be classified in three categories, with each
category having specific reporting and follow-up requirements, as defined in Table 15.1, below.
Table 15-3: Environmental Incident Categories
Classification Category 1 Category 2 Category 3
Quantum Power Ghana Gas Limited 15-12 Knight Piésold Consulting
Environmental and Social Impact Assessment
Identification
An incident resulting
in a breach of RoD
conditions,
environmental
regulations and/or
Quantum standards;
an incident that is
reportable to the
government by law
or other statute, or
has caused
significant
environmental harm
or injury to people,
animals, or property.
This category
incident also includes
incidents whose
impacts have
extended onto
publicly accessible
land and which have
the potential to
adversely impact on
surrounding
communities,
livestock or wildlife.
An incident with
potential to breach
RoD conditions or
environmental
regulations or
standards, but which is
not reportable to the
government (though
voluntary disclosure
may be undertaken at
the discretion of site
management).
Has the potential to
cause significant
environmental harm or
injury to people or
animals and/or has
impacted on publicly
accessible land in
some measure. This
includes incidents that
have interfered with
the public domain
outside the
QuantumPower
Project area, but which
are not reportable by
law to Government.
An incident with little
potential to breach RoD
conditions or
environmental regulations
or standards and which is
not reportable to the
government and/or the
management committee.
Reporting Immediately
reportable to the
QuantumPower
board of directors.
Reportable to all
management
associated with site
operations of the
project.
Reportable only to the
environmental site officer.
Follow up Formal investigation
will be required.
Formal investigation
required.
Informal investigation
actions required.
The actions resulting from any formal or informal investigations will be used to update the
applicable management plans. The Audit programme should be revised to audit areas or
aspects where incidents occur more regularly to ensure that the potential for such incidents
recurring are minimised.
15.4.3 Audit and Inspection
An audit programme detailing the aspects to be audited, the area, and the frequency of audits
will be established. The audits will be based on appropriate protocols prepared by the
environmental and social functions.
Regular environmental and social audits and random spot checks will be undertaken by
selected audit team members throughout all phases of the Project. The audit and inspection
frequencies will be defined, and may be increased or decreased according to the findings and
Quantum Power Ghana Gas Limited 15-13 Knight Piésold Consulting
Environmental and Social Impact Assessment
degree of confidence in the audit programme. Audits will also assess compliance with agreed
objectives and targets as well as the effectiveness of the management plans and their
implementation.
Audit findings will be reviewed by the applicable management functions and where corrective
actions are deemed necessary; the relevant management plans will be updated.
15.4.4 Reporting
The proposed Project will develop a system of internal reporting that allows for appropriate
reporting on the effectiveness of the ES-MS. Public reports will also be prepared on a range of
issues of interest or concern to local communities.
During the construction phase, contractors are required to take all appropriate measures in its
ES-MS and related plans and procedures to identify and document incidents of environmental,
social and health non-conformance. These records should be produced at no less than weekly
frequency, identifying the category of non-conformance, its potential severity and its frequency
to be demonstrated. The resultant records will be addressed in the appropriate management
meetings to initiate corrective actions required.
Quarterly Reporting
Project Environmental and Social Quarterly Report will be prepared and submitted to the
Environmental Protection Agency (EPA). The structure, content and format will be agreed with
the authority prior to the commencement of work. This quarterly report will document key
information on the Project’s performance against the ESMP requirements.
Incident Notification and Reporting
Contractors will notify the Project immediately following any environmental or social incident.
Project will ensure that all environmental and social incidents are appropriately documented,
that the relevant parties are notified, and that reporting requirements around the incident are
met.
These records are intended to facilitate the purposeful reduction of incidents of non-
conformance, leading to a consequential reduction of the root causes of such incidents.
All management plans include a monitoring plan detailing parameters that will be monitored.
The results from this data will be reviewed and published annually. The report will review
performance over the previous year and will set targets for subsequent years.
15.4.5 Managing Changes
Changes in the Project may occur due to unanticipated Project developments. Wherever
possible, the environmental and social mitigation measures that have the potential to impact
design have been passed to the relevant design contractors during the ESIA process. As the
ESIA progressed, certainty regarding the nature and magnitude of impact sources became
clearer and the relevant changes were made to the ESIA Report. Adaptive changes may also
occur during Project commissioning and operations.
The Project will implement a formal procedure to manage changes that will apply to all Project
activities. The process for dealing with Project changes and uncertainty recognises three levels
of change/uncertainty:
Quantum Power Ghana Gas Limited 15-14 Knight Piésold Consulting
Environmental and Social Impact Assessment
Level One: Minor Significance, where the change or uncertainty is largely deemed to be
immaterial to the ESIA findings, and does not affect the Project’s ability to meet
environmental and social performance requirements outlined in the ESMP. This change
may require additional but limited environmental or social study or survey activities.
Level Two: Moderate Significance, where the change or uncertainty is deemed to be
material to the ESIA findings, but is within the boundaries of the defined Project base-case
covered by the ESIA. This may require minor changes to the ESMP and additional surveys
or environmental and social assessments.
Level Three: Higher Significance, where a future significant change or uncertainty leads
to a departure from the base-case, or a key aspect of it. An addendum to the ESIA, or a
new ESIA and formal submission and approval process, is then required.
The above mentioned process will ensure that the Project is able to adapt to changes whilst
meeting the relevant environmental and social performance requirements.
15.4.6 Communication to Stakeholders
As noted during the various phases of the stakeholder consultation programs, the Project is
committed to engaging with and reporting to all stakeholders. As part of the project financing, an
independent environmental and social consultant is anticipated to be hired by the project
lenders. Their auditing reports will be shared with stakeholders in a transparent manner, as they
become available.