Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt.Ltd.
Chapter 1: Executive Summary
Microbrew Bistro Pvt. Ltd is proposing a 30 KLD malt based distillery plant in the State of
Uttarakhand. The project is coming up at Village Mahuakheraganj, tehsil Kashipur, and district
Udham Singh Nagar, state Uttarakhand. The total investment for the project is estimated as Rs
195 Crores.
The project falls under category A of schedule 5 (g) for Distilleries (All Cane juice/non-
molasses based distilleries <60 KLD).
The project is listed under Item 5(g) categorized as Category “B” as per the Schedule of
EIA Notification but the project is categorized as “A” due to the presence of interstate
boundary and considered at MoEF & CC for the grant of Environmental Clearance.
There is no wild life sanctuary, eco sensitive area present within 10 km area from the project
site.
The project details are summarized as under:
S. No. Particulars Details
1. Plot area (sq. m.) 60,702.80 sq. m. (15 acres)
2. Address/ Location/ land details (Khasra no.) Khasra Nos. 926, 933, 934, 937, 938, 940,
village Mahuakheraganj, tehsil Kashipur,
and district Udham Singh Nagar, state
Uttarakhand
3. Production capacity 30 KLD*
4. Water requirement(KLD) & Source One time water demand : 611 KLD
Fresh water : 456KLD
(Domestic : 6KLD + Industrial : 450 KLD)
Recycled water : 155 KLD
( Domestic : 5 KLD + Industrial 150KLD)
Source : Borewell
5. Power requirement Connected load : 3500 KW
Operating load : 2600 KW
6. Back up source 1000 kVA each (2 nos.)
7. Employment generation 230 persons
*30 KLD malt Spirit
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt.Ltd.
Water Requirement (Ground water):
Particulars Water requirement
Fresh water demand 456 KLD
Industrial : 450 KLD
Domestic : 6 KLD
Recycled water demand 155 KLD
Industrial : 150 KLD
Domestic : 5 KLD
Total 611 KLD
The fresh water requirement will be met through from borewells. Domestic effluent will be
treated in the STP. Industrial effluent will be treated in the ETP. Further STP/ETP Treated
water will be used in process and in green belt development.
The project site is well connected with adequate infrastructure like National Highway,
Railway, Airport, telephone, internet, fax, post, etc.
**********
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
For Microbrew Bistro Pvt. Ltd.
Chapter 2: Introduction to the Project/Background information
2.1 Identification of Project and Project Proponent:
Microbrew Bistro Pvt. Ltd is proposing a 30 KLD malt based distillery plant in the
State of Uttarakhand. The project is coming up at Village Mahuakheraganj, tehsil
Kashipur, and district Udham Singh Nagar, state Uttarakhand. The total investment for
the project is estimated as Rs 195 Crores.
PROJECT PROPONENT
Microbrew Bistro Private Limited is a private company. Mr. Anil Kejriwal, Director of
the company brings onboard over 35 years of entrepreneurial experience that has spanned a
range of industries and countries and was recently honoured by his alma mater, IIT Kanpur, as
one of the 50 most outstanding alumnus in its history.
Information:
Company name : Microbrew Bistro Pvt. Ltd
Registered Address : F-14, Competent House, 308(3rd Floor) Middle Circle,
Connaught Place New Delhi
Directors : Anil Kejriwal
: Ritwik Kejriwal
Email : [email protected]
Phone No. : 9871275059
2.2 Nature of the Project
The project in consideration is a proposed distillery unit. The proposal involves
production of 30 KLD malt spirit. The proposed activity is listed at Item 5 (g) of
schedule of Gazette Notification dated Sep 14th, 2006 and subsequent amendments
{Distilleries (All Cane juice/non-molasses based distilleries <60 KLD)}.
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
2.3 Need for the Project
Due to abundant availability of raw materials used in the malt based distilleries there has
been a huge demand for malt spirit for the fast growing IMFL Industries and for
blending in Foreign Liquor outside India which has been a multifold surge in demand.
Due to substantial deficiency in supply of FMS and potentiality of the national &
international market M/s. Microbrew Bistro Pvt. Ltd proposes a distillery unit for the
production of malt spirit.
In India, the emerging middle class population in India is expected to grow from 120
million to 600 million (45% of total) by 2025. Both the affluent and the middle class
income groups are expected to account for more than 80% of national consumption by
2025. The expected growth in spirits is growing to more than 3 times their current
value.
2.4 Demand and Supply Gap
As per the increase in population demand in the market for alcohol always prevail.
There is a huge gap in our country in demand and supply as far as the malt based raw
material in the production of alcohol is concerned. There are three main uses of ethanol
in India. Of the total available ethanol, the maximum- about 45% is used to produce
potable liquor, about 40% is used in the alcohol based chemical industry (as a solvent in
synthesis of other organic chemicals) and the rest is used for blending with petrol and
other purposes. The demand for ethanol has been continually increasing on account of
the growth of user industries and use of ethanol as a fuel in the country. However, the
production and availability of ethanol has largely lagged behind. India is the fourth
largest producer of ethanol in the world after Brazil, the United States of America
(USA) and China.
2.5 Imports versus Indigenous Production
Indian producers are not able to meet present alcohol demand. Approx 5-7% of total
demand of alcohol is being imported from other countries. As far as malt spirit
production is concerned, Indian market play a vital role at both domestic &
international level. In this context, there is major requirement of indigenous grain
based alcohol production to reduce the import load and save the revenue.
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
2.6 Export Possibility
None
2.7 Domestic/Export Market
Marketing will be done at the local level as well as the finished goods will be supplied
to the regulated and non-regulated domestic market.
2.8 Employment Generation
Due to the proposed project employment will be increased. The unit will hire local
people to the extent possible. Approx 230 persons will be employed. The project will
also increase indirect employment opportunities to several ancillary service providers.
*********
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
Chapter 3: Project Description
3.1 Type of Project
M/s Microbrew Bistro Private Limited is majorly in Manufacturing (Food stuffs)
business and now proposing distillery unit at Uttrakhand with the capacity of 30 KLD
malt spirit.
The Proposed project is covered under the Schedule of EIA Notification at S. No. 5(g)
Distilleries (All Cane juice/non-molasses based distilleries <60 KLD) of Gazette
Notification dated Sep 14th
, 2006 and subsequent amendments and thus requires prior
Environmental Clearance. The project is categorized as “B” category but due to the
presence of interstate boundary the project is categorized as “A” category.
3.2 Location
The proposed project is coming up at Khasra no. 926, 933, 934, 937, 938, 940, village
Mahuakheraganj, tehsil Kashipur, and district Udham Singh Nagar, state Uttarakhand.
The latitude and longitude of the project site are between 26°8'27.58 "N to 29°8'22.13
"N and 78°57'39042"E to 78°57'23.70 "E respectively.
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
Figure 3.2: Google Map
3.3 Details of Alternate Sites
No alternative site has been examined as the selected site full fills all the criteria of
the site selection in terms of land & raw material availability, manpower requirement
etc.
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
3.4 Size / Magnitude of Operation
The proposed project will be executed in the total plot area of (15 acres) 60702.8 sq. m
sq. m. The same is tabulated as under:
Table 3.1: Details of proposed land use
Particulars Area (sq.m) %
Work shed 29,137.35 sq. m. 48
Green Belt 20,031.92 sq. m. 33
Open Surface& paved areas 11,533.53 sq. m. 19
Total 60702.8 sq. m. (15 acres) 100
3.5 Project Description with Process Details
The proposed project will involves the production of malt spirit to the tune of 30 KLD.
Details of raw materials, product specifications and manufacturing process are tabulated
as under:
Table3. 2: Details of Raw Material, Product Sizes & Manufacturing Process
Raw Material details
S.No. Particulars Quantity (Per day)
1. Barley Malt 60MT/ day
2. Enzyme 15 kg per day
3. Steam Requirement 300 MT/ day
4. Yeast 65 kg per day
Product details
5. Malt Spirit 30 KLD
Manufacturing Process
Malting: Malt is made primarily from barley. The grain is cleaned, then moisture is added
in steeping tanks. This is followed by germination of the grain in a controlled environment.
When germination reaches accurate levels the grain is called green malt. Green malt is dried
in Kilning vessels, the end product is known as malt.
Milling: The objective of milling is to crush malt to produce grist. Very small particles
would be ideal for filtration, to pack together to provide a semi permeable bed so that wort
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
runs off slowly and incompletely. The fineness of grinding therefore depends on the type of
wort recovery equipment being used. For this task we intend to use a simple roller mill
comprising two pairs of contra-rotating rolls.
Mashing: The traditional mashing equipment for this process is called Mash-tun. Grist is
mixed with hot water. This mixture falls into the mash-tun. Enzymes released in the mash-
tun lead to progressive solubilisation of the contents of the grist particles, converting all
starches to sugars. The mash water around the particles dissolves the extractable material
and drains through the bed and is filtered by the husks. The spent grains are removed at the
end of the process. This intern can be utilized as cattle feed.
Fermentation: The course of fermentation results in the formation of ethanol, carbon - di
-oxide and energy (including heat). Fermentation process results in formation of about
6% v/v alcohol. Parameters like pH, temperature etc. are controlled to yield more alcohol
during fermentation.
Distillation: The fermented wash from fermentation section is directly taken to Beer heater
followed by fermented wash pre-heater and then fed to top of analyzer column. The
vapours generated at the top of the column are concentrated to 62.5% v/v in rectifier
installed at the top of the analyzer column. Multiple feed points and draw points are
provided in the column to meet quality of malt spirit.
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
Barley Malt
Grinding/ Milling
Mashing
(Saccrification)
Fermentation
Distillation
Malt Spirit
Maturation
Hot Water +Arrow
Sac Malt
Spent Drain
Dry Yeast
Steam
Spent Wash
Spent Leese
Removal of stones
and dust particles
Extraction of Starch
and conversion of
sugar
Conversion of
fermentable sugars to
alcohol
Separation and
Purification of alcohol
Figure 3.3: Manufacturing process for malt Spirit
3.6 Raw material with required quantity, source, marketing area of final
products, mode of transport of raw material and finished product
The major raw materials used for the manufacturing of malt spirit are:-
S. No. Raw Material Quantity Mode of Transport
1 Barley Malt 60MT/ day Road
2 Enzyme 15 kg per day Road
3 Steam Requirement 300 TPD Road
4 Yeast 65 Kg/day Road
5 Coal 540 Kg/day Road
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
3.7 Resource Optimization / Recycling and Reuse
Spent wash generated during the process of fermentation, will be treated in multiple
effective evaporators to concentrate the solids and concentrated syrup along with wet
cake will be dried in dryer. This is known as distilleries dry grain with soluble
(DDGS). This will be sold as cattle feed/poultry feed/ Fish/ prawn farms. The
condensate generated during the process of multiple effective evaporators and drying
will be reused in the process thus decreasing the net water requirement.
3.8 Availability of Water, Its Source, Energy / Power Requirement and
Source
3.8.1 Water Availability & Its Source
Source of Water : Bore wells
Water demand : As under:
WATER CONSUMPTION
Particulars Water requirement
Fresh water demand 456 KLD
Industrial : 450 KLD
Domestic : 6 KLD
Recycled water demand 155 KLD
Industrial : 150 KLD
Domestic : 5 KLD
Total 611 KLD
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
Boiler 85 KLD
Blow down: 25 KLD
ETP= 205 KLD
250 KLD
Landscaping 20 KLD
1st stage R.O 60 % recovery
2 stage R.O 50 %recovery
112 KLD
38 KLD
MEE 38 KLD
Fresh water : 450 KLD
One time demand : 611 KLD
Domestic 11 KLD
Cooling Tower 265 KLD
Water treatment tank 600 KLD
Spent grain 40
KLD
Distillation 250 KLD
5 KLD 20KLD
Water in spirit
30 KLD
Spent wash 180
KLD
Flushing 5 KLD
Recycled water 150
KLD
600 KLD
STP 9 KLD
Evaporation losses : 1 KLD
3 KLD
17 KLD
11 KLD
Fig: Water Balance
3.8.2 Energy / Power Requirement & Its Source
The electric requirement for the project is as under:-
Particulars
Source of supply Nearest GSS
Electric demand Connected load : 3500 KW
Operating load : 2600 KW
DG Sets
Number 2 nos.
Capacity 1000 kVA each
Fuel HSD
Boilers Number 1 No.
Capacity 8 TPH
Fuel Coal /Biomass
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
3.9 Quantity of wastes to be generated (Liquid and Solid) and scheme for
their management / disposal
(A) Quantity of Liquid Waste to be Generated & Its Management / Disposal:
The quantity of domestic wastewater generated will be around 9 KLD. The domestic
wastewater will be treated through STP. Approximately 155 KLD for process water and
20 KLD for green belt development shall be catered to by the treated wastewater.
(B) Quantity of Solid Waste to be Generated & Its Management / Disposal:
The name, quantification and disposal of the same are tabulated as under:-
1. Process solid Waste :
Both hazardous and non-hazardous solid waste will be generated from the unit.
Hazardous waste will be managed as per HOWR, 2016
Table 10: Solid Waste (Non-hazardous)
S. No. Name Requirement (per Annum)
1. Paper Waste Carton 2 MT
2. PPE Bags 20 M Ton
3. Plastic waste 0.5 M Ton
4. Spent Grain 20,000 M Ton
5. ETP Sludge 80 M Ton
6. Boiler Ash 130 ton
Table 11: Solid Waste (Hazardous)
S.No. Type of hazardous waste Category Quantity/unit Disposal
1. Empty barrels/ Containers/
liners contaminated with
hazardous chemicals/wastes
33.1 750 nos./annum
Recycled, broken ones to be
disposed via approved agencies
2. Oil soaked filter 35.1 50kg/mth Hazardous waste disposal
3. Used or spent oil 5.1 500 litres/ yr Sale/ disposal to registered/
approve agencies
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
4. Oil soaked cotton 5.2 50/mth Disposal to registered/ approve
agencies
2. Municipal Solid waste : 30 kg/day
The same will be disposed of as per SWMR, 2016
3.10 Schematic representations of the feasibility drawing which give
information of EIA purpose:
The project layout showing various features is given as under:
Figure 3.7: Plant Layout
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
Chapter 4: Site Analysis
4.1 Connectivity:
The project site is well connected with all infrastructures like National Highway,
Railway, Airport, telephone, internet, fax, post, etc.
National Highway No. 74 is at a distance of about 5.6 km towards ENE and NH-11
C is at a distance of -3.0 km towards west.
Nearest railway station is Kashipur Railway station at a distance of 7 km towards
North from the project site.
Nearest airport is Pantnagar Airport located at a distance of about 51.0 km towards
ESE direction from the project site.
4.2 Land Form, Land Use and Land Ownership:
The Unit is located in Industrial Area.
Land use: The entire area is designated for Industrial area.
The total land area will be 60,702.80 sq. m. (15 acres). The ownership of the land is
with Microbrew Bistro Pvt. Ltd.
4.3 Topography:
The topography of the land is flat terrain. No change in topography is envisaged due
to proposed project.
4.4 Existing Land Use Pattern, Shortest Distance from the Periphery of
the Project to Periphery of the Forest, National Park, Wild Life
Sanctuary, Eco Sensitive Area, Water Bodies (Distance from the HFL
of the River), CRZ:
The project is coming up in an area designed for industrial use. The existing land use
is industrial and no change in land use in envisaged.
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
There is no Wild life Sanctuary, National Park, Notified eco sensitive areas within 10
km from the project site.
The details of water bodies and P.F/RF within 15 kms area are mentioned below:
Water bodies
Bahalla Nadi : 1.7 km towards ESE
Kosi River : 5.7 km towards ESE
Dhela Nadi : 6.0 km towards WNW
Pachhana nala : 6.2 km towards NW
Dhandhi Nadi : 6.7 km towards NW
Khuliya Nala : 7.1 km towards ENE
Drona Sagar : 7.3 km towards
Pathri Nala : 8.0 km towards ENE
Kurka Nala : 9.0 km towards NNE
Gangii Nala : 9.4 km towards NNE
Nakti Nala :10.2 km towards NNE
Bahalla Nadi :10.5 km towards NNE
Lebra Nala :10.6 km towards NE
Karesi Nala :11.5 km towards NE
Nachna Nala :12.9 km towards SSW
Lapkana nadi :13.0 km towards WNW
Kachhina Nala :13.06 km towards SW
Khokhra Nala :13.1 km towards NW
Khalia Nadi :13.6 km towards WSW
P.F/RF
Lalipur R.F : 9.3 km towards NNW
Lalpur R.F : 10.2 km towards NNW
Manrur Firozpur R.F : 10.7 km towards N
Tumaria ranvines R.F : 12.4 km towards NW
Gulzarpur R.F :14.8 km towards NE
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
4.5 Existing Infrastructure:
The project is proposed distillery unit coming up at Village Mahuakheraganj, tehsil
Kashipur, and district Udham Singh Nagar, state Uttarakhand. The project is a vacant
land.
4.6 Soil Classification:
Soils in the region is shallow with sandy to loamy texture, poorly sorted, comprising
mainly of gravel, sand, silt, clay with pebbles etc
4.7 Climatic Data From Secondary Sources:
The climate varies from Sub-tropical and sub-humid with three distinct seasons i.e.
summer, monsoon (rainy season) and winter. The rainy season starts from the month
of middle June to September end, and followed by the winter season, which starts
from the end of October and goes up to February. The winter rains are generally
experienced in late December or early January, which brings down the temperature
and that’s how December and January are the coldest months in the district. The
summer season starts from March and it goes up to June. The hottest months of the
year are May and June. The maximum temperature in the district goes up to 42ºC
during the summers and the minimum temperature is between 1 and 4ºC, further
north of the district, the temperature comes down to 0.4ºC in winter season.
Rainfall, spatially, is highly variable depending upon the altitude. The intensity of the
rainfall increases from south to north and the amount of rainfall decreases in
generally from west to east. About 90% of the rainfall received during the monsoon
period, and the remaining 10% of the rainfall in non-monsoon period. The average
annual rainfall is 1296.85 mm .
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
4.8 Social Infrastructure Available:
The project surroundings has well developed social infrastructure within 5 kms radius,
though the 1 kms radius is predominantly industrial.
*********
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd
Microbrew Bistro Pvt. Ltd
Chapter 5: Planning Brief
5.1 Planning Concept:
The proposed project is coming up at Mahuakheraganj, tehsil Kashipur, and district
Udham Singh Nagar, state Uttarakhand. The project will involve the production of 30
KLD malt spirit. The plan showing the proposed project is detailed at Chapter 3 (Fig.
3.7)
5.2 Population Projection
Due to the upcoming project employment will be increased. The unit will hire local
people from the nearby villages. Approx 230 people will be employed. The proposed
project will also generate indirect employment opportunities.
5.3 Land Use Planning:
The land use break up (internal) is summarized as under:
Table 5.1: Land use break up
Particulars Area (sq.m) %
Work shed 29,137.35 sq. m. 48
Green Belt 20,031.92 sq. m. 33
Open Surface& paved areas 11,533.53 sq. m. 19
Total 60702.8 sq. m. (15 acres) 100
5.4 Assessment of Infrastructure Demand (Physical & Social)
The project site is well connected with all the infrastructure facilities. New roads will
be constructed. Local people will be hired for the proposed project and they will be
trained within unit.
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd
Microbrew Bistro Pvt. Ltd
5.5 Amenities / Facilities
All the basic facilities like sanitation & drinking water, dining areas will be provided
within premises.
First aid box, free medicines & professional medical assistance/ service (on call basis)
will be provided.
Adequate PPE’s will be provided to all workers.
********
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
Chapter 6: Proposed Infrastructure
1. Industrial Area 60,702.80 sq. m. (15 acres)
2. Residential Area
(Non Processing Area)
Not envisaged
3. Green Belt (33 %) 20,031.92 sq. m.
4. Social Infrastructure Social infrastructure available within 10-15 km from
project site.
5. Connectivity The project is well connected with Railway, Airport;
Highways etc. New roads will be constructed near the
project site.
6. Drinking Water
Management
Adequate drinking water facilities will be provided.
Source of water will be ground water
7. Sewerage System Domestic effluent will be disposed in STP and treated
effluent recycled, reused.
8. Industrial Waste
Management
All the industrial waste will be managed as per the
applicable rules.
9. Solid Waste Management All the solid waste will be managed as per the solid
waste management rules, 2016.
10. Power Requirement &
Supply / Source
Energy details:
Source: Nearest GSS
Connected load : 3500 KW
Operating load : 2600 KW
For power back up:
Two DG sets of capacity 1000 kVA (each)
**********
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
Chapter 7: Rehabilitation and Resettlement (R & R) Plan
There are no R&R implications of proposed project.
***********
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
Chapter 8: Project Schedule & Cost Estimates
8.1 Likely Date of Start of Construction and Likely Date of Completion
Production will be started within one or two year of getting Environment Clearance
from MoEF&CC and consents from UKSPCB.
8.2 Project Cost Estimation
The total investment for the project is estimated as Rs. 195 Crores.
***********
Project : Proposed distillery unit “Microbrew Bistro Pvt. Ltd.” PFR
Promoter : Microbrew Bistro Pvt. Ltd.
Microbrew Bistro Pvt. Ltd.
Chapter 9: Analysis of Proposal
9.1 Financial and Social Benefits with Special Emphasis on theBenefit to
the Local People Including Tribal Population, if any, in the Area
Due to proposed project, it is expected that employment will increase for people who
reside nearby project area. Approx. 230 persons will get employment directly.
Due to increase in raw material and product transportation activity, indirect
employment will be generated.
As local people will get job, their living status will increase.
Due to green belt development, aesthetic value of local environment will improve.
***********