5
THE CHAMPLAIN HUDSON POWER EXPRESS PROJECT

Champlain hudson power express projeCT...New York City Rochester Albany 1 2 4 5 3 6 tHE routE the project extends 333 miles, traveling from the u.s.-Canadian border to New York City

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Champlain hudson power express projeCT...New York City Rochester Albany 1 2 4 5 3 6 tHE routE the project extends 333 miles, traveling from the u.s.-Canadian border to New York City

TO U.S. BORDERUnderground DC Cable

50 km (31 miles)

LAKE CHAMPLAINSubmarine DC Cable 101.5 miles (163 km)

ALONG ROAD & RAILROAD ROWUnderground DC Cable 126.8 miles (204 km)

STONY POINTTO CLARKSTOWNUnderground DC Cable

7.9 miles (12.7 km)ConEdSystem

ASTORIA ANNEXGIS SUBSTATION

ASTORIA CONVERTER STATION1,000 MW CAPACITY

CANADA USA/NEW YORK STATECANADA USA/NEW YORK STATE

CHAMPLAIN HUDSON POWER EXPRESS

HERTELCONVERTERSTATION

BRONX TO ASTORIAUnderground DC Cable

2.3 miles (3.7 km)

HUDSON RIVERSubmarine DC Cable67.2 miles (108 km)

HUDSON &HARLEM RIVER

Submarine DC Cable27.3 miles (44 km)

CHAMPLAIN HUDSON POWER EXPRESS

AC POWERTO NYC

Underground GIS 345 kv AC0.2 miles (0.3 km)

The

Champlain hudson power express projeCT

Transmission Developers Inc.600 BroadwayAlbany, N.Y. 12207(518) 465-0710info@transmissiondevelopers.comwww.transmissiondevelopers.comwww.CHPExpress.com

ABout trANsmissioN DEvEloPErs iNC.tDi was founded in 2008 with the goal of developing unique energy transmission projects in an environmentally responsible manner. the company has its headquarters in Albany, N.Y., and uses HvDC cable to link trapped generation resources with markets that are experiencing acute power shortages.

the company was acquired by the Blackstone Group lP, which has its headquarters in New York City, in January 2010. more information is available at www.chpexpress.com.

Page 2: Champlain hudson power express projeCT...New York City Rochester Albany 1 2 4 5 3 6 tHE routE the project extends 333 miles, traveling from the u.s.-Canadian border to New York City

1 | Transmission Developers inc. www.cHpexpress.com | 2

tHE CHAmPlAiN HuDsoN PowEr ExPrEss (CHPE) ProJECtthe Champlain Hudson Power Express Project is a 333-mile, buried transmission line that will bring up to 1,000 megawatts (mw) of clean, renewable energy to the New York City metropolitan area. 1,000 mw is enough power to serve approximately one million residential customers.

the $2.2 billion project, financed completely by the private sector, will deliver renewable power to meet New York’s growing demands, increase the security of the state’s electric grid, reduce greenhouse gas and other air emissions and lower energy costs for consumers.

the project will also diversify the state’s energy portfolio and increase the electric grid’s safety and security by creating new, hardened infrastructure that is less susceptible to damage from natural disasters. in fact, New York City supports this project as part of its overall effort to prepare the city for climate change.

sAfE, BuriED trANsmissioNthe CHPE Project will consist of two buried High voltage Direct Current (HvDC) cables, each five inches in diameter. this technology is extremely controllable, which allows the system to integrate more intermittent renewable resources onto the grid. it will also provide additional benefits including black-start capability for quick restoration of the statewide electric system in the event of a blackout and voltage control for management of daily load swings. All of these benefits put the project at the forefront of America’s emerging “smart grid” revolution. the cables are solid state, nonflammable, and well insulated.

the cables will be buried mostly in public and railroad rights of way and avoid the visual impacts of overhead transmission projects. the cables are virtually maintenance free once installed and have been in use all over the world for more than 60 years.

iNstAllAtioNwhen in water, the cables will be buried an average of six feet deep, using low-impact water-jet technology over much of the route.

when on land, the cables will be buried up to five feet deep. the trenches needed to safely bury the cables will be minimally invasive, averaging only four feet wide during installation.

Five-inch diameter HVDC cable cross-section used in this project.

Scan the QR code above with your smartphone and watch the installation video.

Page 3: Champlain hudson power express projeCT...New York City Rochester Albany 1 2 4 5 3 6 tHE routE the project extends 333 miles, traveling from the u.s.-Canadian border to New York City

Raquette R.

Mohawk R.

HUDS

ON

RIVE

R

L. Champlain

F i n g e r L a k e s

Oneida L.

L. George

Great Sacandaga L.

Syracuse

Binghamton

CheektowagaNiagara Falls

Schenectady

Plattsburgh

TonawandaUtica

West SenecaBuffalo

New York City

Rochester

Albany

1

2

4

5

3

6

tHE routEthe project extends 333 miles, traveling from the u.s.-Canadian border to New York City. the cables will be buried mostly on public and railroad rights of way.

the route begins at the U.S.-Canadian border 1 and travels most of the distance of lake Champlain, emerging from the water at the south end of the lake 2 . from there the CHPE Project continues along state highway and railroad rights of way, then enters the Hudson River in Catskill 3 .

the route then stays in the Hudson until it reaches Rockland County 4 , where it travels on land for nine miles before re-entering the Hudson river. once back in the Hudson, the route continues down to the junction of the Hudson and Harlem rivers, follows the Harlem down to the vicinity of the new Willis Avenue Bridge 5 , and finishes its journey with short stretches buried on land in the Bronx and Queens. finally, it reaches its destination along the East river—a new converter station that will be built in Astoria Queens 6 .

NEw York stAtE’s PowEr NEEDsthe New York energy market is comprised of approximately 42,000 mw of energy supply resources which need to be continuously expanded and modernized to meet the steady growth of the New York market’s electricity demand. with an aging energy infrastructure, New York state will

need many solutions to address its energy future. An analysis done as part of New York’s Energy Highway initiative found that most of the state’s transmission lines are more than 50 years old and many need to be replaced in the next 10 years.

NEw York CitY’s PowEr NEEDswhile residents and businesses inside and outside of New York City will see lower power prices and new jobs as a result of the CHPE Project, this new source of clean, renewable power will play a major role in helping New York City meet its aggressive clean energy goals. mayor Bloomberg has announced plans to

reduce New York City carbon emissions by 30 percent by 2030, and the CHPE Project will play a role in accomplishing that.

the clean power being delivered by the CHPE Project is a major reason why citizen groups fighting for cleaner air in the New York City borough of Queens are supporting the project.

3 | Transmission Developers inc. www.cHpexpress.com | 4

Page 4: Champlain hudson power express projeCT...New York City Rochester Albany 1 2 4 5 3 6 tHE routE the project extends 333 miles, traveling from the u.s.-Canadian border to New York City

mErCHANt trANsmissioN: lowEriNG PriCEs AND ProtECtiNG rAtEPAYErsunlike most transmission lines, the CHPE Project is what is known as a merchant project. that means the developer, in this case transmission Developers inc. (tDi), has to find its own customers and financing for the line. As a result, ratepayers, who normally have to pay the costs associated with new transmission projects through their bills, pay nothing.

in fact, studies have shown the CHPE, once in service, will lower energy bills

for New Yorkers by $650 million a year. this is a true example of how an open, independent market can deliver a project that benefits the public sector.

The benefits of such a development are: • Financed by the private sector• Lower power prices for consumers

and businesses• Economic risk is the responsibility

of the developer

CAlENDAr AND PuBliC iNPutthe development of the CHPE Project began in 2008. since that time the project has been thoroughly vetted by regulators and the public alike. Nearly 30 public meetings have been held at locations along the route, and more will occur in 2013 and throughout the construction period.

state and federal regulators have thoroughly vetted the project and continually seek public input.

several major milestones have already been achieved, and permitting is expected to conclude in 2014.

tDi plans on commencing construction in 2015 with a projected in-service date of December 2017.

5 | Transmission Developers inc.

July 2010—The Federal Energy Regulatory Commission authorizes TDI to establish negotiated rates for users of the CHPE Project.

march 2011—New York Independent System Operator approves the project’s System Reliability Impact Study.

february 2012—Joint Proposal of Settlement filed.

June 2011—New York Department of State determines that project conforms to state’s Coastal Zone Management Program.

January 2013—New York State Public Service Commission issues the Project

a Water Quality Certificate.

april 2013—New York State Public Service

Commission issues the project a Certificate

of Environmental Compatibility and Public Need (Article VII permit).

$2.2 Bnew private sector investment in ny

1,000mwof new low-carbon power

$117man unprecedented

environmental trust

838per year reduced so2

toN

s

2.2mper year reduced co2

toN

s

1,432per year reduced noX

toN

s

$600mincrease in the state’s Gdp

$650mconsumer savinGs

300construction jobs

for 3.5 years (with a peak of 600)

2,400new jobs created

as a result of those savinGs

1,200indirect jobs created in the

construction phase

www.cHpexpress.com | 6

emissions clean enerGy

futu

re

employment

production

Grow

th

savi

nG

s

lowEr PowErPriCEs AND A

ClEANEr ENviroNmENtYou don’t have to choose between clean energy

and lower prices. the CHPE Project is proof positive that new energy solutions can deliver

cleaner air and economic benefits to consumers and the economy.

By adding 1,000 mw of renewable energy to one of the nation’s most congested markets,

the CHPE Project will bring lower prices and a better environment to New

Yorkers.

Page 5: Champlain hudson power express projeCT...New York City Rochester Albany 1 2 4 5 3 6 tHE routE the project extends 333 miles, traveling from the u.s.-Canadian border to New York City

TO U.S. BORDERUnderground DC Cable

50 km (31 miles)

LAKE CHAMPLAINSubmarine DC Cable 101.5 miles (163 km)

ALONG ROAD & RAILROAD ROWUnderground DC Cable 126.8 miles (204 km)

STONY POINTTO CLARKSTOWNUnderground DC Cable

7.9 miles (12.7 km)ConEdSystem

ASTORIA ANNEXGIS SUBSTATION

ASTORIA CONVERTER STATION1,000 MW CAPACITY

CANADA USA/NEW YORK STATECANADA USA/NEW YORK STATE

CHAMPLAIN HUDSON POWER EXPRESS

HERTELCONVERTERSTATION

BRONX TO ASTORIAUnderground DC Cable

2.3 miles (3.7 km)

HUDSON RIVERSubmarine DC Cable67.2 miles (108 km)

HUDSON &HARLEM RIVER

Submarine DC Cable27.3 miles (44 km)

CHAMPLAIN HUDSON POWER EXPRESS

AC POWERTO NYC

Underground GIS 345 kv AC0.2 miles (0.3 km)

The

Champlain hudson power express projeCT

Transmission Developers Inc.600 BroadwayAlbany, N.Y. 12207(518) 465-0710info@transmissiondevelopers.comwww.transmissiondevelopers.comwww.CHPExpress.com

ABout trANsmissioN DEvEloPErs iNC.tDi was founded in 2008 with the goal of developing unique energy transmission projects in an environmentally responsible manner. the company has its headquarters in Albany, N.Y., and uses HvDC cable to link trapped generation resources with markets that are experiencing acute power shortages.

the company was acquired by the Blackstone Group lP, which has its headquarters in New York City, in January 2010. more information is available at www.chpexpress.com.