20
CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon Dowon Shun, Dal-Hee Bae Korea Institute of Energy Research(KIER) [email protected]

CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

Embed Size (px)

Citation preview

Page 1: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

CFB TECHNOLOGY DEVELOPMENT IN KIER

October 28, 2013 Daejon

Dowon Shun, Dal-Hee Bae

Korea Institute of Energy Research(KIER)

[email protected]

Page 2: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

Clean Coal Center

Expanding demand of coal and coal power

• New coal power in Asia(2014)

– East Asia 69.7GW – West Asia 41.3GW – Africa 4.1GW

• New award (2013) – 1199units in 59

countries – China & India 76% – U.S.A. 36 New units

INTRODUCTION

New coal power in Asia;200% increase of capacity that of 2000

Source: J-POWER, Coal-fired Power Generation– Indispensable Japan’s Base Power Source, J-POWER Group SUSTAINABILITY REPORT 2012

Page 3: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

Deficiency of Steam coal

• By 2030 world coal power plants need 5400MT of coal (4000kcal/kg)

– 2012 world coal production 7,831MT – China and India expand coal power plants (China 900 India 700MW coal power of near future plan) – World market is heavily depend on Indonesian coal expoert

• Utilization of low rank coal is imposing issue – CFBC is an optimum solution – Applicable to the coal of China, India, Indonesia, Turkey

DEVELOPMENT

Thermal coal export market growth and Indonesia is the major supplier

Page 4: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

Clean Coal Center

World CFB market

• Chinese is leading the market

– China 46.5GW – India 8.5GW award

after year 2000 • Chinese model is

market standard in Asia

– 150MWe > 150 – 300MWe > 100 – 600MWe Super

Critical = 1 in China

CHALLENGE

600MWe Dong Fang Boiler

Page 5: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

Large scale CFBC

• SC-CFB market has a little delay – 2000-2010 150MWe – 2010-? 300MWe – Waiting for report from Lagiza(Poland), Baima(China),

Samchuk(Korea) until 2015? – Korean engineering develops CFBC from 150MWe

• Must show special advantages toward Low rank coal against lignite boiler.

– High ash & high moisture low heating value – Troubles with cyclone, loop seal and erosion

CONCLUSION

Samchuk 500MWe x 4 SC-CFBC

Page 6: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

CFBC distribution in Korea

• 1985~2000: about 17 boilers constructed • Industrial boiler to supply steam (200ton steam/h) • Original boilers were imported technology (Ahlstrom, Lurge,

ABB, ..)

• 2000~: about 10 new boilers are under construction ng

• 10 new boilers are contracted to build in next 5 years • Including 300MWe CFBC Power plant

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

19861988

19901992

19941996

19982000

20022004

20062008

20102012

Year

Stea

m rat

e(Ton

/h)

RDFCoal

Page 7: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

KIER CFBC Research history

1MWe CFBC for RDF

0.1MWth Test unit

1KWth Emission Test unit

10MWe commercial CFBC forRDF

Tech service for CFBC 1991 1997

2007

2011

2007-2010

• Commercial Boiler Design • Fuel Diversifications

• Diagnosis and monitoring

Business consulting for CFBC power plants

2008

Page 8: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

FBC boiler for Power and Steam

Combustor

S/H1

S/H2

A/H

Econ.

FD Fan

ID Fan

Stack

Cyclone

To Steam Generator

Air

Drum

RDF Hopper

SDR

Scru

bber

Combuston Heat

transfer Emission control

Ash removal

Dioxin control

• 1MWe equivalent • Industrial boiler for power and steam

Page 9: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

K (RDF: 4,400-4,500Kcal/kg)

RDF

Moist.(%) 5

Ash(%) 19

Elemental (%)

C 43.5

H 6.34

N 0.71

S -

O

Cl 1.0

150mm dia. x 500mm length

Page 10: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

Fabricated K RDF combustion

Temperature profile (K-RDF, 2007. 3. 28.)

Steam temperature

Page 11: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

Emission Characteristics

0

20

40

60

80

100

120

15:2516:1

517:0

517:5

518:4

519:3

520:2

521:1

522:0

522:5

523:4

50:3

51:2

52:1

53:0

53:5

54:4

55:3

56:2

57:1

58:0

58:5

59:4

510:3

511:2

5

T ime(min)

Conc

entr

atio

n(pp

m)

0

5

10

15

20

25

Conc

entr

atio

n(m

g/m

3)

SO2

NOx

TSP

2007.06.25.

O2 (%)

CO2 (%)

SO2 (ppm)

NOx (ppm)

CO (ppm)

HCl (ppm)

TSP (mg/Sm3)

7.3 10.1 2.5 78.2 155.9 298.3 22.4

Page 12: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

Design considerations

• 60 steam ton/h requires 250ton/day RDF or 300ton/day Biomass

• Corrosive combustion environment need stern metal protection

• Heavy measure for environment control is required

Page 13: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

10MWe CFBC boiler for RDF

• Combustor -Water wall – 4m x 4m x 24m - 30MWth

- Drum • Hot cyclone - ID 4m x 9m • Convection pass - Superheater 2 – 5MWth - Superheater 1 – 5MWth - Economizer – 8MWth - Air heater – 2MWth

Fuel Fuel

Page 14: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

CAD of 10MWe CFBC

Page 15: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)
Page 16: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

FBC for Waste Fuel and Biomass

• 10MWe FBC co-generation facility for RDF

– New concept for RDF • Commercial scale FBC

with fuel flexibility – Dispersed generation – Utilizing RDF, biomass, low

rank coal

10 MWe CFBC for RDF

Page 17: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

Prospect of FB Power Generation

FBC Co-generation

Commercial

SC-FBC Power

Generation (500MWe)

FBC Power(150-300MWe)

Steam Boiler for industry

Waste & Biomass RDF

Brown coal

Hard coal

Upgrading

FGD

Page 18: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

A Conceptual model of CCT Power Gen W/ CO2 capture

18

B O I L E R

CO2 H2O

Moist coal feed( mc)

Dry coal transfer

Briquetted product(mdc)

Cyclone

Briquetting

Bag filter

Dried coal

CC UPGRADING HELE

* Tehnology Roadmap, IEA 2012

Page 19: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

• Utilization of low rank coal is a major issue in thermal power sector

• To increase efficiency coal upgrading and large scale CFBC is necessary

– CFBC is a good solution for low rank coal – Market will be divided by 500MWe CFBC and 1000MWe

PC – Both CFBC and PC will go further to HSC

CONCLUSION

Page 20: CFB TECHNOLOGY DEVELOPMENT IN KIER - ProcessEng. D. Shun.pdf · CFB TECHNOLOGY DEVELOPMENT IN KIER October 28, 2013 Daejon . Dowon Shun, Dal-Hee Bae . Korea Institute of Energy Research(KIER)

Thank you for your attention!