    LEED-NC 3.0

    LEED-NC 3.0 Registered Project ChecklistInformation Technology Building, Brigham Young UniversityProvo, UTYes ? No

    17 0 9 Sustainable Sites

    Y Prereq 1 Construction Activity Pollution Prevention Required

    1 Credit 1 Site Selection 1

    5 > Credit 2 Development Density & Community Connectivity 5

    1 Credit 3 Brownfield Redevelopment 1

    6 Credit 4.1 6

    1 Credit 4.2 1

    3 > Credit 4.3 3

    2 > Credit 4.4 2

    1 Credit 5.1 1

    1 Credit 5.2 1

    1 Credit 6.1 1

    1 Credit 6.2 1

    1 > Credit 7.1 1

    1 > Credit 7.2 1

    1 > Credit 8 Light Pollution Reduction 1

    Yes ? No

    2 0 8 Water Efficiency

    N * Prereq 1 Required

    2 > Credit 1.1 2

    2 Credit 1.2 2

    2 Credit 2 Innovative Wastewater Technologies 2

    4 > Credit 3.1 2 to 4

    Yes ? No

    7 0 28 Energy & Atmosphere

    Y Prereq 1 Fundamental Commissioning of the Building Energy Systems Required

    N > Prereq 2 Required

    Y Prereq 3 Fundamental Refrigerant Management Required

    19 > Credit 1 1 to 19

    7 > Credit 2 1 to 7

    2 Credit 3 Enhanced Commissioning 2

    2 Credit 4 Enhanced Refrigerant Management 2

    3 > Credit 5 Measurement & Verification 3

    2 Credit 6 Green Power 2

    Key: e - errata > - changes from NC 2.2 * - new credit continued

    26 Points

    Alternative Transportation, Public Transportation Access

    Alternative Transportation, Bicycle Storage & Changing Rooms

    Alternative Transportation, Low-Emitting and Fuel-Efficient Vehicles

    Alternative Transportation, Parking Capacity

    Site Development, Protect of Restore Habitat

    Site Development, Maximize Open Space

    Stormwater Design, Quantity Control

    Stormwater Design, Quality Control

    Heat Island Effect, Non-Roof

    Heat Island Effect, Roof

    10 Points

    Water Use Reduction, 20% Reduction

    Water Efficient Landscaping, Reduce by 50%

    Water Efficient Landscaping, No Potable Use or No Irrigation

    Water Use Reduction, 30 - 40% Reduction (5% intervals)

    35 Points

    Minimum Energy Performance, 10% New Bldgs, 5% Existing Bldgs

    Optimize Energy Performance, 12 - 48% (2% intervals)

    On-Site Renewable Energy, 1 - 13% (1% intervals)

  • 8/9/2019 Certification Status ITB

    2/32

    Yes ? No

    3 0 0 Materials & Resources

    Y Prereq 1 Storage & Collection of Recyclables Required

    3 > Credit 1.1 1 to 3

    1 Credit 1.2 1

    1 Credit 2.1 1

    1 Credit 2.2 1

    1 Credit 3.1 1

    1 Credit 3.2 1

    1 Credit 4.1 1

    1 Credit 4.2 1

    1 Credit 5.1 1

    1 Credit 5.2 1

    1 Credit 6 Rapidly Renewable Materials 1

    1 Credit 7 Certified Wood 1

    Yes ? No

    5 0 10 > Indoor Environmental Quality

    Y Prereq 1 Minimum IAQ Performance Required

    Y Prereq 2 Required

    1 Credit 1 Outdoor Air Delivery Monitoring 1

    1 Credit 2 Increased Ventilation 1

    1 Credit 3.1 1

    1 > Credit 3.2 1

    1 Credit 4.1 1

    1 Credit 4.2 1

    1 > Credit 4.3 1

    1 Credit 4.4 1

    1 > Credit 5 Indoor Chemical & Pollutant Source Control 1

    1 Credit 6.1 1

    1 Credit 6.2 11 Credit 7.1 1

    1 > Credit 7.2 1

    1 > Credit 8.1 1

    1 Credit 8.2 1

    Yes ? No

    2 0 0 > Innovation & Design Process

    1 Credit 1.1 1

    Credit 1.2 1

    Credit 1.3 1

    Credit 1.4 1

    * Credit 1.5 1

    1 Credit 2 1

    Yes ? No

    2 0 2 Regional Priority Credits

    1 * Credit 1.1 1

    1 * Credit 1.2 1

    1 * Credit 1.3 1

    1 * Credit 1.4 1

    Yes ? No

    14 Points

    Building Reuse, Maintain 55 - 95% (20% intervals) Walls, Floors, & Roof

    Building Reuse, Maintain 50% of Interior Non-Structural Elements

    Construction Waste Management, Divert 50% from Disposal

    Construction Waste Management, Divert 75% from Disposal

    Materials Reuse, 5%Materials Reuse,10%

    Recycled Content, 10% (post-consumer + pre-consumer)

    Recycled Content, 20% (post-consumer + pre-consumer)

    Regional Materials, 10% Extracted, Processed & Manufactured Regiona

    Regional Materials, 20% Extracted, Processed & Manufactured Regiona

    15 Points

    Environmental Tobacco Smoke (ETS) Control

    Construction IAQ Management Plan, During Construction

    Construction IAQ Management Plan, Before Occupancy

    Low-Emitting Materials, Adhesives & Sealants

    Low-Emitting Materials, Paints & Coatings

    Low-Emitting Materials, Flooring Systems

    Low-Emitting Materials, Composite Wood & Agrifiber Products

    Controllability of Systems, Lighting

    Controllability of Systems, Thermal ComfortThermal Comfort, Design

    Thermal Comfort, Verification

    Daylight & Views, Daylight 75% of Spaces

    Daylight & Views, Views for 90% of Spaces

    6 Points

    Innovation in Design: Composted Soil

    Innovation in Design: Provide Specific Title

    Innovation in Design: Provide Specific Title

    Innovation in Design: Provide Specific Title

    Innovation in Design: Provide Specific TitleLEEDAccredited Professional

    4 Points

    Regional Priority Credt: SS 2 - Community Connectivity

    Regional Priority Credt: SS 4.1 - Public Transportation

    Regional Priority Credt: WE 1 - Efficient Landscaping, Option 2

    Regional Priority Credt: IEQ 8.1 - Daylight

  • 8/9/2019 Certification Status ITB

    3/32

    38 0 57

    None

    Project Totals (pre-certification estimates) 110 Points

    Certified 40-49 points Silver50-59 points Gold 60-79 points Platinum 80+ points

    Project Certification Level (pre-certification estimates)

  • 8/9/2019 Certification Status ITB

    4/32

    Date Company Contact Contact Info

  • 8/9/2019 Certification Status ITB

    5/32

    Description

  • 8/9/2019 Certification Status ITB

    6/32

    Contact Position Phone Email

    Wayn Martin apostry shop 25525

    Allen Ewell electgrical shop

    Rob Davey ? 25262

  • 8/9/2019 Certification Status ITB

    7/32

    Notes

    spoke to Lee and he gave me the msds

    in charge of lighting, call him for light timing

    he will give us utility cost of building for thelast 12 months

  • 8/9/2019 Certification Status ITB

    8/32

    office FTE estimate

    250 sf/person

    gross sf 79984

    320

    bikes 16

  • 8/9/2019 Certification Status ITB

    9/32

    Status Notes

    Action 0%

    Submittals 0%

    Credit 0%

    Requirement

    Plan of Action

    Notes

  • 8/9/2019 Certification Status ITB

    10/32

  • 8/9/2019 Certification Status ITB

    11/32

  • 8/9/2019 Certification Status ITB

    12/32

  • 8/9/2019 Certification Status ITB

    13/32

    Status Notes

    Action 0%

    Submittals 0%

    Credit 0%

    Requirement

    Plan of Action

    Notes

  • 8/9/2019 Certification Status ITB

    14/32

  • 8/9/2019 Certification Status ITB

    15/32

  • 8/9/2019 Certification Status ITB

    16/32

  • 8/9/2019 Certification Status ITB

    17/32

    Status Notes

    Action 0%

    Submittals 0%

    Credit 0%

    Requirement

    Plan of Action

    Notes

  • 8/9/2019 Certification Status ITB

    18/32

  • 8/9/2019 Certification Status ITB

    19/32

  • 8/9/2019 Certification Status ITB

    20/32

  • 8/9/2019 Certification Status ITB

    21/32

    Question Answer Source Responsibility

    Commissioning? Matt

    M&V Plan? Matt

    Do we have a digital copy? Clyne is on it. Matt

    Gene Matt

    Is ASHRAE 62.1, & 55.2 code? Or just BMP? Matt

    Parking requirements? City compliance? Pablo

    Pablo

    Call custodial and find out the system they use for recycling Pablo

    Pablo

    Check how many bike racks there are. 18

    Are there any changing rooms? 2

    FTE of the building. 250

    Divide up schedule of values and find up materials

    Talk to alan atwell about night t iming

    Who is in charge of building performance? How can we findout energy efficiency of the building?

    Landscape guidelines? Water saving? Is the grass normal?Etc.

    Find out who contractor was and if they sorted constructionwaste

  • 8/9/2019 Certification Status ITB

    22/32

    Rec

    Description Base Bid Material Cost % of Total Reuse Preconsumer

    Glass, Glazing, & Metal Panels 1,404,500 912,925 21%

    Structural Steel 1,375,498 894,074 20% 7.0%

    Gypsum Drywall 1,074,180 698,217 16%

    Concrete 657,873 427,617 10% 5.0%

    Masonry 326,255 212,066 5% 2.8%

    Asphalt Paving 321,043 208,678 5%Site Concrete 235,299 152,944 3% 5.0%

    Membrane Roofing 224,405 145,863 3%

    Metal Doors & Frames 167,341 108,772 2%

    Building Insulation 123,700 80,405 2%

    Millwork 113,450 73,743 2%

    Acoustical Treatment 112,687 73,247 2%

    Painting 109,100 70,915 2%

    Tile 100,800 65,520 1%

    SUBTOTAL 6,346,131 94%

    OTHER DIV 2-10 379,349 6%

    TOTAL HARD COST 2-10 6,725,480

    DIV 1,11-16 6,400,756TOTAL HARD COST 13,126,236

    Glass, Glazing, & Metal Panels

    Structural Steel

    Gypsum Drywall

    Concrete

    Earthwork

    Masonry

    Asphalt Paving

    Site Utilities

    Site Concrete

    Membrane RoofingMetal Doors & Frames

    Aggregate Pier Soil Reinforcement

    Building Insulation

    Millwork

    Acoustical Treatment

    Painting

    Tile

  • 8/9/2019 Certification Status ITB

    23/32

    ycled

    Postconsumer $ of recycled Regional $$ Regional RR FSC Adhesives/Sealants

    - -

    85.0% 791,255 -

    5.0% 34,911 95.0% 663,306

    10,690 100.0% 427,617

    20.2% 45,806 100.0% 212,066

    - 60.0% 125,2073,824 100.0% 152,944

    - 50.0% 72,932

    - -

    - 60.0% 48,243

    - 80.0% 58,994

    - -

    - -

    - 50.0% 32,760

    886,486 1,794,069

    13% 27%

    *As high as 16%, but probably *As high as 30%, but most likely 27%

    emailed viracon, kawneer (aluminum curtain wall)

    Contacted Bayou and Nucor, and both are all from scrap. I lowered the percentage a little to allow for oth

  • 8/9/2019 Certification Status ITB

    24/32

    IEQ

    Paints/Sealants Floor Coverings Wood Products Notes

    Georgia Pacific - These are estimates using joint c

    er metals.

  • 8/9/2019 Certification Status ITB

    25/32

  • 8/9/2019 Certification Status ITB

    26/32

    107201320 0.12

    8.12

    1320 0.56 0.5 10 36.96

  • 8/9/2019 Certification Status ITB

    27/32

    ITB UPC

    Mean Temp ITB (KWH) ITB (DTH) kwh/sf UPC (KWH) UPC (DTH kwh/sf

    Jan 28 74,400.0 0.056 503.9 0.9 119,575 2,038.1 2.458

    Feb 34 85,800.0 0.069 495.9 1.1 124,559 1,780.7 2.561

    Mar 41 85,000 507.0 1.043 132,213 1,419.7 2.718

    Apr 48 90,000 567.0 1.104 126,941 1,745.1 2.610

    May 58 105,000 180.0 1.288 138,127 829.5 2.840

    Jun 67 120,000 65.0 1.472 162,301 756.7 3.337Jul 75 132,000 65.0 1.619 178,778 645.9 3.675

    Aug 72 136,000 65.0 1.669 193,060 713.8 3.969

    Sep 64 118,200 0.461 138.7 1.450 159,600 716.8 3.281

    Oct 52 84,000 0.092 567.4 1.031 137,616 910.7 2.829

    Nov 40 79,800 0.079 507.1 0.979 132,462 1,454.9 2.723

    Dec 30 66,600 0.039 767.2 0.817 125,282 1,843.9 2.576

    0.741

    0.610

    0.6020.532

    0.4361

    30% 20%

    ITB (KWH)

    Jan 66,600 46,620.0 53,280.0

    Feb 66,600 46,620.0 53,280.0

    Mar 82,000 57,400.0 65,600.0

    Apr 85,000 59,500.0 68,000.0

    May 105,000 73,500.0 84,000.0

    Jun 120,000 84,000.0 96,000.0

    Jul 132,000 92,400.0 105,600.0

    Aug 136,000 95,200.0 108,800.0

    Sep 118,200 82,740.0 94,560.0

    Oct 84,000 58,800.0 67,200.0

    Jan Feb Mar Apr

    -

    0.5

    1.0

    1.5

    2.0

    2.5

    3.0

    3.5

    4.0

    4.5

  • 8/9/2019 Certification Status ITB

    28/32

    Nov 79,800 55,860.0 63,840.0

    Dec 66,600 46,620.0 53,280.0

  • 8/9/2019 Certification Status ITB

    29/32

    Jan Feb Mar Apr May Jun Jul-

    50,000.0

    100,000.0

    150,000.0

    200,000.0

    250,000.0

    Electricity Usage C

    Jan Feb Mar Apr May Jun Jul A

    -

    500.0

    1,000.0

    1,500.0

    2,000.0

    2,500.0

    May Jun Jul Aug Sep Oct Nov Dec

    Column F

    Column I

  • 8/9/2019 Certification Status ITB

    30/32

  • 8/9/2019 Certification Status ITB

    31/32

    ug Sep Oct Nov Dec

    Column C

    Column G

    mparison

    ug Sep Oct Nov Dec

    Column E

    Column H

  • 8/9/2019 Certification Status ITB

    32/32