LEED-NC 3.0
LEED-NC 3.0 Registered Project ChecklistInformation Technology Building, Brigham Young UniversityProvo, UTYes ? No
17 0 9 Sustainable Sites
Y Prereq 1 Construction Activity Pollution Prevention Required
1 Credit 1 Site Selection 1
5 > Credit 2 Development Density & Community Connectivity 5
1 Credit 3 Brownfield Redevelopment 1
6 Credit 4.1 6
1 Credit 4.2 1
3 > Credit 4.3 3
2 > Credit 4.4 2
1 Credit 5.1 1
1 Credit 5.2 1
1 Credit 6.1 1
1 Credit 6.2 1
1 > Credit 7.1 1
1 > Credit 7.2 1
1 > Credit 8 Light Pollution Reduction 1
Yes ? No
2 0 8 Water Efficiency
N * Prereq 1 Required
2 > Credit 1.1 2
2 Credit 1.2 2
2 Credit 2 Innovative Wastewater Technologies 2
4 > Credit 3.1 2 to 4
Yes ? No
7 0 28 Energy & Atmosphere
Y Prereq 1 Fundamental Commissioning of the Building Energy Systems Required
N > Prereq 2 Required
Y Prereq 3 Fundamental Refrigerant Management Required
19 > Credit 1 1 to 19
7 > Credit 2 1 to 7
2 Credit 3 Enhanced Commissioning 2
2 Credit 4 Enhanced Refrigerant Management 2
3 > Credit 5 Measurement & Verification 3
2 Credit 6 Green Power 2
Key: e - errata > - changes from NC 2.2 * - new credit continued
26 Points
Alternative Transportation, Public Transportation Access
Alternative Transportation, Bicycle Storage & Changing Rooms
Alternative Transportation, Low-Emitting and Fuel-Efficient Vehicles
Alternative Transportation, Parking Capacity
Site Development, Protect of Restore Habitat
Site Development, Maximize Open Space
Stormwater Design, Quantity Control
Stormwater Design, Quality Control
Heat Island Effect, Non-Roof
Heat Island Effect, Roof
10 Points
Water Use Reduction, 20% Reduction
Water Efficient Landscaping, Reduce by 50%
Water Efficient Landscaping, No Potable Use or No Irrigation
Water Use Reduction, 30 - 40% Reduction (5% intervals)
35 Points
Minimum Energy Performance, 10% New Bldgs, 5% Existing Bldgs
Optimize Energy Performance, 12 - 48% (2% intervals)
On-Site Renewable Energy, 1 - 13% (1% intervals)
8/9/2019 Certification Status ITB
2/32
Yes ? No
3 0 0 Materials & Resources
Y Prereq 1 Storage & Collection of Recyclables Required
3 > Credit 1.1 1 to 3
1 Credit 1.2 1
1 Credit 2.1 1
1 Credit 2.2 1
1 Credit 3.1 1
1 Credit 3.2 1
1 Credit 4.1 1
1 Credit 4.2 1
1 Credit 5.1 1
1 Credit 5.2 1
1 Credit 6 Rapidly Renewable Materials 1
1 Credit 7 Certified Wood 1
Yes ? No
5 0 10 > Indoor Environmental Quality
Y Prereq 1 Minimum IAQ Performance Required
Y Prereq 2 Required
1 Credit 1 Outdoor Air Delivery Monitoring 1
1 Credit 2 Increased Ventilation 1
1 Credit 3.1 1
1 > Credit 3.2 1
1 Credit 4.1 1
1 Credit 4.2 1
1 > Credit 4.3 1
1 Credit 4.4 1
1 > Credit 5 Indoor Chemical & Pollutant Source Control 1
1 Credit 6.1 1
1 Credit 6.2 11 Credit 7.1 1
1 > Credit 7.2 1
1 > Credit 8.1 1
1 Credit 8.2 1
Yes ? No
2 0 0 > Innovation & Design Process
1 Credit 1.1 1
Credit 1.2 1
Credit 1.3 1
Credit 1.4 1
* Credit 1.5 1
1 Credit 2 1
Yes ? No
2 0 2 Regional Priority Credits
1 * Credit 1.1 1
1 * Credit 1.2 1
1 * Credit 1.3 1
1 * Credit 1.4 1
Yes ? No
14 Points
Building Reuse, Maintain 55 - 95% (20% intervals) Walls, Floors, & Roof
Building Reuse, Maintain 50% of Interior Non-Structural Elements
Construction Waste Management, Divert 50% from Disposal
Construction Waste Management, Divert 75% from Disposal
Materials Reuse, 5%Materials Reuse,10%
Recycled Content, 10% (post-consumer + pre-consumer)
Recycled Content, 20% (post-consumer + pre-consumer)
Regional Materials, 10% Extracted, Processed & Manufactured Regiona
Regional Materials, 20% Extracted, Processed & Manufactured Regiona
15 Points
Environmental Tobacco Smoke (ETS) Control
Construction IAQ Management Plan, During Construction
Construction IAQ Management Plan, Before Occupancy
Low-Emitting Materials, Adhesives & Sealants
Low-Emitting Materials, Paints & Coatings
Low-Emitting Materials, Flooring Systems
Low-Emitting Materials, Composite Wood & Agrifiber Products
Controllability of Systems, Lighting
Controllability of Systems, Thermal ComfortThermal Comfort, Design
Thermal Comfort, Verification
Daylight & Views, Daylight 75% of Spaces
Daylight & Views, Views for 90% of Spaces
6 Points
Innovation in Design: Composted Soil
Innovation in Design: Provide Specific Title
Innovation in Design: Provide Specific Title
Innovation in Design: Provide Specific Title
Innovation in Design: Provide Specific TitleLEEDAccredited Professional
4 Points
Regional Priority Credt: SS 2 - Community Connectivity
Regional Priority Credt: SS 4.1 - Public Transportation
Regional Priority Credt: WE 1 - Efficient Landscaping, Option 2
Regional Priority Credt: IEQ 8.1 - Daylight
8/9/2019 Certification Status ITB
3/32
38 0 57
None
Project Totals (pre-certification estimates) 110 Points
Certified 40-49 points Silver50-59 points Gold 60-79 points Platinum 80+ points
Project Certification Level (pre-certification estimates)
8/9/2019 Certification Status ITB
4/32
Date Company Contact Contact Info
8/9/2019 Certification Status ITB
5/32
Description
8/9/2019 Certification Status ITB
6/32
Contact Position Phone Email
Wayn Martin apostry shop 25525
Allen Ewell electgrical shop
Rob Davey ? 25262
8/9/2019 Certification Status ITB
7/32
Notes
spoke to Lee and he gave me the msds
in charge of lighting, call him for light timing
he will give us utility cost of building for thelast 12 months
8/9/2019 Certification Status ITB
8/32
office FTE estimate
250 sf/person
gross sf 79984
320
bikes 16
8/9/2019 Certification Status ITB
9/32
Status Notes
Action 0%
Submittals 0%
Credit 0%
Requirement
Plan of Action
Notes
8/9/2019 Certification Status ITB
10/32
8/9/2019 Certification Status ITB
11/32
8/9/2019 Certification Status ITB
12/32
8/9/2019 Certification Status ITB
13/32
Status Notes
Action 0%
Submittals 0%
Credit 0%
Requirement
Plan of Action
Notes
8/9/2019 Certification Status ITB
14/32
8/9/2019 Certification Status ITB
15/32
8/9/2019 Certification Status ITB
16/32
8/9/2019 Certification Status ITB
17/32
Status Notes
Action 0%
Submittals 0%
Credit 0%
Requirement
Plan of Action
Notes
8/9/2019 Certification Status ITB
18/32
8/9/2019 Certification Status ITB
19/32
8/9/2019 Certification Status ITB
20/32
8/9/2019 Certification Status ITB
21/32
Question Answer Source Responsibility
Commissioning? Matt
M&V Plan? Matt
Do we have a digital copy? Clyne is on it. Matt
Gene Matt
Is ASHRAE 62.1, & 55.2 code? Or just BMP? Matt
Parking requirements? City compliance? Pablo
Pablo
Call custodial and find out the system they use for recycling Pablo
Pablo
Check how many bike racks there are. 18
Are there any changing rooms? 2
FTE of the building. 250
Divide up schedule of values and find up materials
Talk to alan atwell about night t iming
Who is in charge of building performance? How can we findout energy efficiency of the building?
Landscape guidelines? Water saving? Is the grass normal?Etc.
Find out who contractor was and if they sorted constructionwaste
8/9/2019 Certification Status ITB
22/32
Rec
Description Base Bid Material Cost % of Total Reuse Preconsumer
Glass, Glazing, & Metal Panels 1,404,500 912,925 21%
Structural Steel 1,375,498 894,074 20% 7.0%
Gypsum Drywall 1,074,180 698,217 16%
Concrete 657,873 427,617 10% 5.0%
Masonry 326,255 212,066 5% 2.8%
Asphalt Paving 321,043 208,678 5%Site Concrete 235,299 152,944 3% 5.0%
Membrane Roofing 224,405 145,863 3%
Metal Doors & Frames 167,341 108,772 2%
Building Insulation 123,700 80,405 2%
Millwork 113,450 73,743 2%
Acoustical Treatment 112,687 73,247 2%
Painting 109,100 70,915 2%
Tile 100,800 65,520 1%
SUBTOTAL 6,346,131 94%
OTHER DIV 2-10 379,349 6%
TOTAL HARD COST 2-10 6,725,480
DIV 1,11-16 6,400,756TOTAL HARD COST 13,126,236
Glass, Glazing, & Metal Panels
Structural Steel
Gypsum Drywall
Concrete
Earthwork
Masonry
Asphalt Paving
Site Utilities
Site Concrete
Membrane RoofingMetal Doors & Frames
Aggregate Pier Soil Reinforcement
Building Insulation
Millwork
Acoustical Treatment
Painting
Tile
8/9/2019 Certification Status ITB
23/32
ycled
Postconsumer $ of recycled Regional $$ Regional RR FSC Adhesives/Sealants
- -
85.0% 791,255 -
5.0% 34,911 95.0% 663,306
10,690 100.0% 427,617
20.2% 45,806 100.0% 212,066
- 60.0% 125,2073,824 100.0% 152,944
- 50.0% 72,932
- -
- 60.0% 48,243
- 80.0% 58,994
- -
- -
- 50.0% 32,760
886,486 1,794,069
13% 27%
*As high as 16%, but probably *As high as 30%, but most likely 27%
emailed viracon, kawneer (aluminum curtain wall)
Contacted Bayou and Nucor, and both are all from scrap. I lowered the percentage a little to allow for oth
8/9/2019 Certification Status ITB
24/32
IEQ
Paints/Sealants Floor Coverings Wood Products Notes
Georgia Pacific - These are estimates using joint c
er metals.
8/9/2019 Certification Status ITB
25/32
8/9/2019 Certification Status ITB
26/32
107201320 0.12
8.12
1320 0.56 0.5 10 36.96
8/9/2019 Certification Status ITB
27/32
ITB UPC
Mean Temp ITB (KWH) ITB (DTH) kwh/sf UPC (KWH) UPC (DTH kwh/sf
Jan 28 74,400.0 0.056 503.9 0.9 119,575 2,038.1 2.458
Feb 34 85,800.0 0.069 495.9 1.1 124,559 1,780.7 2.561
Mar 41 85,000 507.0 1.043 132,213 1,419.7 2.718
Apr 48 90,000 567.0 1.104 126,941 1,745.1 2.610
May 58 105,000 180.0 1.288 138,127 829.5 2.840
Jun 67 120,000 65.0 1.472 162,301 756.7 3.337Jul 75 132,000 65.0 1.619 178,778 645.9 3.675
Aug 72 136,000 65.0 1.669 193,060 713.8 3.969
Sep 64 118,200 0.461 138.7 1.450 159,600 716.8 3.281
Oct 52 84,000 0.092 567.4 1.031 137,616 910.7 2.829
Nov 40 79,800 0.079 507.1 0.979 132,462 1,454.9 2.723
Dec 30 66,600 0.039 767.2 0.817 125,282 1,843.9 2.576
0.741
0.610
0.6020.532
0.4361
30% 20%
ITB (KWH)
Jan 66,600 46,620.0 53,280.0
Feb 66,600 46,620.0 53,280.0
Mar 82,000 57,400.0 65,600.0
Apr 85,000 59,500.0 68,000.0
May 105,000 73,500.0 84,000.0
Jun 120,000 84,000.0 96,000.0
Jul 132,000 92,400.0 105,600.0
Aug 136,000 95,200.0 108,800.0
Sep 118,200 82,740.0 94,560.0
Oct 84,000 58,800.0 67,200.0
Jan Feb Mar Apr
-
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
8/9/2019 Certification Status ITB
28/32
Nov 79,800 55,860.0 63,840.0
Dec 66,600 46,620.0 53,280.0
8/9/2019 Certification Status ITB
29/32
Jan Feb Mar Apr May Jun Jul-
50,000.0
100,000.0
150,000.0
200,000.0
250,000.0
Electricity Usage C
Jan Feb Mar Apr May Jun Jul A
-
500.0
1,000.0
1,500.0
2,000.0
2,500.0
May Jun Jul Aug Sep Oct Nov Dec
Column F
Column I
8/9/2019 Certification Status ITB
30/32
8/9/2019 Certification Status ITB
31/32
ug Sep Oct Nov Dec
Column C
Column G
mparison
ug Sep Oct Nov Dec
Column E
Column H
8/9/2019 Certification Status ITB
32/32